M40105 - Air Conditioning, Air Curtain Unit Ver 2.0

This document outlines the planned preventive maintenance procedures for air conditioning and air curtain units at hospitals in Malaysia on a semi-annual basis. The maintenance includes [1] notifying user departments before shutting down units, [2] performing safety precautions like lock out/tag out procedures and using personal protective equipment, and [3] checking for loose connections, burnt signs, cleaning filters and louvers, and cleaning dirt accumulation. Upon completion, maintenance workers must [1] remove lock out/tag out, [2] note any necessary corrective maintenance, and [3] sign off that preventive maintenance was performed satisfactorily.

Uploaded by

Samawi Muhammad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
161 views2 pages

M40105 - Air Conditioning, Air Curtain Unit Ver 2.0

This document outlines the planned preventive maintenance procedures for air conditioning and air curtain units at hospitals in Malaysia on a semi-annual basis. The maintenance includes [1] notifying user departments before shutting down units, [2] performing safety precautions like lock out/tag out procedures and using personal protective equipment, and [3] checking for loose connections, burnt signs, cleaning filters and louvers, and cleaning dirt accumulation. Upon completion, maintenance workers must [1] remove lock out/tag out, [2] note any necessary corrective maintenance, and [3] sign off that preventive maintenance was performed satisfactorily.

Uploaded by

Samawi Muhammad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

KEMENTERIAN KESIHATAN MALAYSIA Task No.

: M40105
HOSPITAL ENGINEERING PLANNED PREVENTIVE MAINTENANCE
(HEPPM)
Page : 1 of 2

Asset Category Air Conditioning, Air Curtain Unit Workgroup Mechanical

Work Request No. Frequency Semi-Annually

CAUTION:
Ensure the stipulated safety procedures are followed while carrying Estimated
out the PM activities PM hours:

Comply
A. General Checks Remark
Yes No
a) Notify user dept that unit will be out of service for preventive maintenance
b) Observe and listen to the unit in normal operation before shut down

Comply
B.
Safety Precautions
Remark
Yes No
a) Carry out lock out/ tag out procedures
b) Use appropriate PPE.

C Performance (Qualitative) Checklist Comply Remark


Yes No
General Checks
a) Check for loose connections. Tighten wherever necessary.
b) Check for burnt signs on the terminals.
c) Clean filters and louvers.
d) Clean/service dirt accumulation at blower.

D. Checklist for Safety Inspection on Completion of PM: Comply Remark


Yes No
a) Remove lock out and tag out
b) Raise Schedule Corrective Maintenance work order as necessary

E. Consumables used during maintenance: F. Part Replaced:

G. Tools/Equipment used:
1. Tool Box

KKM/FEMS/M0001 Effective Date : 01/01/2009 Version : 2.0


KEMENTERIAN KESIHATAN MALAYSIA Task No. : M40105
HOSPITAL ENGINEERING PLANNED PREVENTIVE MAINTENANCE
(HEPPM)
Page : 2 of 2

Asset Category Air Conditioning, Air Curtain Unit Workgroup Mechanical

Work Request No. Frequency Semi-Annually

PPM has been performed in compliance to the checklist and the plant/equipment functions satisfactory to the
intended purpose.

Remarks: ___________________________________________________________________________________

___________________________________________________________________________________

Performed By :

Signature : _____________________________

Name :

Designation :

Company :

Date :

KKM/FEMS/M0001 Effective Date : 01/01/2009 Version : 2.0