0% found this document useful (0 votes)
70 views1 page

Letter of Recommendation GreyLogix

This letter provides a recommendation for System Automation Service Ltd. from Bilfinger GreyLogix GmbH. It summarizes that SAS was a subcontractor for Bilfinger on a biogas plant construction project in Ukraine from 2014-2015, where they performed electrical installation work including creating drawings, installing cables, supporting with local standards, performing loop checks, and installing a lightning protection system. Bilfinger recommends SAS as a skilled and trustworthy local Ukrainian contractor for industrial automation projects.

Uploaded by

rajavinugmailcom
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views1 page

Letter of Recommendation GreyLogix

This letter provides a recommendation for System Automation Service Ltd. from Bilfinger GreyLogix GmbH. It summarizes that SAS was a subcontractor for Bilfinger on a biogas plant construction project in Ukraine from 2014-2015, where they performed electrical installation work including creating drawings, installing cables, supporting with local standards, performing loop checks, and installing a lightning protection system. Bilfinger recommends SAS as a skilled and trustworthy local Ukrainian contractor for industrial automation projects.

Uploaded by

rajavinugmailcom
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Bilfinger GreyLogix GmbH

Conrad-Rntgen-Str. 1, 24941 Flensburg, Germany

System Automation Service Ltd.


79, Pushkinskaya str.
Kharkov, Ukraine, 61024

Contact person Department Phone Fax e-mail

Per Wegner BT Biogas -155 -100 [email protected]


Thomas Haack BT Biogas -207 -100 [email protected]

Letter of recommendation for the Avangard Bio- 9 June 2015 Bilfinger GreyLogix GmbH
Conrad-Rntgen-Str. 1
gasplant 24941 Flensburg
Germany

Phone +49 461 505487-0


During 2014-2015 System Automation Service Ltd. was a subcontractor Fax +49 461 505487-100
of Bilfinger GreyLogix GmbH in the biogas plant construction project in [email protected]
www.greylogix.bilfinger.com
Ukraine.
The works included: Corporate Headquarters and
Registered Office
- Creation of drawings for the customer and engineering office Flensburg
Amtsgericht Flensburg
concerning the electrical Installation HRB 4002

- Build cable ways and installation of cables for drives, VSDs and Executive Management
Lars Malter, Chairman
instrumentation, and Fibre optical Gerd Witzel
- Support with local standards and regulations
Bank Account
- Support with the Loopcheck on site and independent Loopcheck Commerzbank AG
BLZ 21540060
after BGx left the site Account No. 210966800
- Installation of a lightning protection system IBAN DE43 2154 0060 0210 9668 00
BIC COBADEFF215
- Site management for the electrical part of the project
VAT No. DE 207573082
Tax office Flensburg

SAS Ltd has proven itself as a skilled professional with a strong


knowledge of industrial automation equipment. We hereby recommend
SAS as a trustworthy partner for any company looking for local Ukrainian
contractors.

Sincerely,

You might also like