Breakdown Details of Machine: Sl. No. Equiptment Model Breakdown From Breakdown Upto

The document lists equipment breakdowns between November 2016 and February 2017 for 5 pieces of construction equipment. It provides details of the equipment, dates of breakdown and repair, types of issues, requests for funds, and amounts pending. The largest funding delay was for a dumper truck that required around Rs. 15,000 for repairs and had a dumper and grader that together had a Rs. 9,000 bill pending for assessment in March 2017.

Uploaded by

kwangdid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views3 pages

Breakdown Details of Machine: Sl. No. Equiptment Model Breakdown From Breakdown Upto

The document lists equipment breakdowns between November 2016 and February 2017 for 5 pieces of construction equipment. It provides details of the equipment, dates of breakdown and repair, types of issues, requests for funds, and amounts pending. The largest funding delay was for a dumper truck that required around Rs. 15,000 for repairs and had a dumper and grader that together had a Rs. 9,000 bill pending for assessment in March 2017.

Uploaded by

kwangdid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Breakdown

Sl. No. Equiptment Model Breakdown from Breakdown Upto

1 Xenon TATA 11/26/2016 12/22/2016

2 Dumper AMW 10 AXL 12/20/2016 Till date

3 Dumper TATA 6 AXL 2/5/2017 2/19/2017


3 Gradder Escort 2/6/2017 2/12/2017
4 Dumper TATA 10 AXL 2/11/2017 Till date

5 Excavator Hyundai 210 2/27/2017 Till date


Breakdown details of Machine

Type of Breakdown Request put on Fund Received

Stearing, Brake, Spring Patti and


11/27/2016 12/20/2016
others
Gear box, Brake, Spring Patti,
12/21/2016
others
Crown, brake and others 2/6/2017 2/8/2017
First servicing 2/6/2017 2/8/2017
Crown 2/12/2017

Gear oil leakage inside chain,


2/28/2017
servicing pending
If B/D reason for delay Remarks

NA

Fund not received Rs 15000 approx required

NA
NA
Fund not received
Rs. 9000/- bill pending for
Fund not received Assesment done on 4th
march