Design Slab With Beams
Design Slab With Beams
UNITS: SI
SI 1 E = 200000 Mpa 5 m 5 m
English f'c = 20.7 Mpa
fy = 275 Mpa
B
Section A-A:
A A
hf
(Panel 1) (Panel 2) 3.5 m
350 mm
350 mm
Ecb = 35 Mpa
clear L = 3.25 m 250 mm Ecs = 35 Mpa
bar = 16 mm
Estimate I factor: (factor x Ig) Optional Values: concrete cover = 20 mm
Interior Beams: 2 Assume hf = 150 mm wDL = 3 kpa
Exterior Beams: 1.5 wu = kpa wLL = 2 kpa
Long clear span = 4.750 m
Short clear span = 3.250 m
Assume slab thickness, hf:
Use: Ln = 4.750 m
Long clear span
=
Short clear span
= 1.462
Ln(800+0.73fy) Ln(800+0.73fy)
Min. h = Max. h =
36,000+9,000 36,000
Min. h = 96.708 mm 100 Max. h = 132.043 mm
Use hf = 150.000 mm
Effective flange projection:
(a) 5-m span (b) 3.5-m span
h - hf = 200.000 mm h - hf = 200.000 mm
4hf = 600.000 mm 4hf = 600.000 mm
Use: 200.000 mm Use: 200.000 mm
Estimate moment of inertia of T-beams and slabs:
(a) 5-m span (b) 3.5-m span
Interior Ib = 2 x Ig Interior Ib = 2 x Ig
= 1786458333 mm^4 = 1786458333 mm^4
Interior Is = bh/12, slab width: b = 3500 mm 3500 Interior Is = bh/12, slab width: b = 5000 mm 5000
= 984375000 mm^4 = 1406250000 mm^4
Exterior Ib = 1.5 x Ig Exterior Ib = 1.5 x Ig
= 1339843750 mm^4 = 1339843750 mm^4
Exterior Is = bh/12, slab width: b = 1875 mm 1875 Exterior Is = bh/12, slab width: b = 2625 mm 2625
= 527343750 mm^4 = 738281250 mm^4
Calculate average , m:
Ecb x Ib Length of continuous edges Ln(800+0.73fy)
= s = h=
Ecs x Is Total Perimeter 36,000+9,000
(a) 5-m span (b) 3.5-m span
35(1786458333.333) 35(1786458333.333)
Interior = Interior =
35(984375000) 35(1406250000)
= 1.815 = 1.270
35(1339843750) 35(1339843750)
Exterior = Exterior =
35(527343750) 35(738281250)
= 2.541 = 1.815
Total perimeter = 2(5+3.5)
= 17 m
Panel 1, m = (1.815+1.815+1.27+1.815)/4 Panel 2, m = (1.815+2.541+1.27+1.815)/4
= 1.679 = 1.860
s = [5+2(3.5)]/17 s = [5+3.5]/17
= 0.706 = 0.500
h= 102.320 mm h= 102.189 mm
Panel 3, m = (1.815+1.815+1.27+1.27)/4 Panel 4, m = (1.815+2.541+1.27+1.27)/4
= 1.543 = 1.724
s = [2(5)+2(3.5)]/17 s = [2(5)+3.5]/17
= 1 = 0.794
h = 100.557 mm h = 100.431 mm
350 mm
wu = 1.4wDL + 1.7wLL
wu = 7.600 kpa Ln = 4.750 m 250 mm
350 mm
wu = 1.4wDL + 1.7wLL
wu = 7.600 kpa Ln = 4.750 m 250 mm
150 150
350 350
200 200
250 250
Ecb x C Ecb x C
t = t =
2Ecs x Is 2Ecs x Is
100 C = (1-0.63x/y)xy/3 C = (1-0.63x/y)xy/3
75 = 1.121E+09 mm^4 = 1.121E+09 mm^4
100 Is = 1.406E+09 mm^4 Is = 7.383E+08 mm^4
90 t = 0.399 < 2.5 Use 2.500 t = 0.759 < 2.5 Use 2.500
Column strip: Exterior (-) M Column strip: Exterior (-) M
0.5 0.5 0.5 0.5 0.5 0.5
L2/L1 0.5 1.0 2.0 L2/L1 0.5 1.0 2.0
1L2/L1=0 t = 0 100 100 100 100 100 1L2/L1=0 t = 0 100 100 100 100
t 2.5 75 75 75 75 75 t 2.5 75 75 75 75
1L2/L11 t = 0 100 100 100 100 100 1L2/L11 t = 0 100 100 100 100
t 2.5 90 75 45 75 90 t 2.5 90 75 45 75
1.0 1.0 1.0 1.0 1.0 1.0
0.5 0.700 1.0 0.5 0.700 1.0
90.0 x 75.0 90.0 x 75.0
x = 84.000 % x = 84.000 %
(-) M = 84%(-19.505) (-) M = 84%(-10.449)
= -16.384 kN-m = -8.777 kN-m
85%(-)M = -13.926 kN-m (Beam) 85%(-)M = -7.460 kN-m (Beam)
15%(-)M = -2.458 kN-m (Slab) 15%(-)M = -1.317 kN-m (Slab)
Middle strip: Interior (-) M Middle strip: Interior (-) M
(-) M = -19.505-(-16.384) (-) M = -10.449-(-8.777)
= -3.121 kN-m = -1.672 kN-m
concrete
concretecover
cove= 20 mm
Thickness == 150
Thickness
mm
0.5
-0.5
0.35
0.35
-1
1
0.175
0.175
-1 -0.35
1 0.35
-0.65 0.375 -1 -0.175 1 0.175
0.525 0.375 1 -0.175 1 -0.175
1 -0.35
Col Strip (Ext): S/4 @ 333 mm, S/2 @ 333 mm, S/4 @ 333 mm
Mid Strip (Ext): S/4 @ 333 mm, S/2 @ 333 mm, S/4 @ 333 mm
-0.65 0.325 -1 -0.35
Col Strip (Int): S/4 @ 333 mm, S/2 @ 333 mm, S/4 @ 333 mm
Mid Strip (Int): S/4 @ 333 mm, S/2 @ 333 mm, S/4 @ 333 mm
0.475 0.375
0.475 -0.525
0.525 0.375
0.525 -0.525
Col Strip
Note: Int refers to interior span where both (Int):
ends L/4
are @ 500 mm,otherwise
continuous L/2 @ 500exterior
mm, L/4 @ 500
span mmone end is continuous.
where
Mid Strip (Int): L/4 @ 500 mm, L/2 @ 500 mm, L/4 @ 500 mm
Note: Int refers to interior span where both ends are continuous otherwise exterior span where one end is continuous.
Mid Strip (Int): L/4 @ 500 mm, L/2 @ 500 mm, L/4 @ 500 mm
Note: Int refers to interior span where both ends are continuous otherwise exterior span where one end is continuous.
350 mm
wu = 1.4wDL + 1.7wLL
wu = 7.600 kpa Ln = 3.250 m 250 mm
350 mm
wu = 1.4wDL + 1.7wLL
wu = 7.600 kpa Ln = 3.250 m 250 mm
150.000 150
350 350
200.000 200
250 250
Ecb x C Ecb x C
t = t =
2Ecs x Is 2Ecs x Is
100 C = (1-0.63x/y)xy/3 C = (1-0.63x/y)xy/3
75 = 1.121E+09 0.375 = 1.121E+09 0
100 Is = 1.406E+09 0.375 Is = 7.383E+08 0
90 t = 0.399 < 2.5 Use 2.500 t = 0.759 < 2.5 Use 2.500
Column strip: Exterior (-) M Column strip: Exterior (-) M
0.5 0.5 0.5 0.5 0.5 0.5
L2/L1 0.5 1.0 2.0 L2/L1 0.5 1.0 2.0
1L2/L1=0 t = 0 100 100 100 100 100 1L2/L1=0 t = 0 100 100 100 100
t 2.5 75 75 75 75 75 t 2.5 75 75 75 75
1L2/L11 t = 0 100 100 100 100 100 1L2/L11 t = 0 100 100 100 100
t 2.5 90 75 45 75 90 t 2.5 90 75 45 75
1.0 1.0 1.0 1.0 1.0 1.0
0.5 1.429 1.0 0.5 1.429 1.0
90.0 x 75.0 90.0 x 75.0
x = 62.143 % x = 62.143 %
(-) M = 62.143%(-13.045) (-) M = 62.143%(-6.848)
= -8.107 kN-m = -4.256 kN-m
85%(-)M = -6.891 kN-m (Beam) 85%(-)M = -3.618 kN-m (Beam)
15%(-)M = -1.216 kN-m (Slab) 15%(-)M = -0.638 kN-m (Slab)
Middle strip: Interior (-) M Middle strip: Interior (-) M
(-) M = -13.045-(-8.107) (-) M = -6.848-(-4.256)
= -4.938 kN-m = -2.592 kN-m