Mats Larsson, Corporate Research ABB Switzerland
Wide-area Monitoring and Control
for Electric Power Systems
HYCON2 Workshop on Energy, Bruxelles 2012-09-04
ABB Group
October 14, 2012 | Slide 1
Outline
Monitoring and Control of Power Networks
Angle and Frequency Dynamics in Power Systems
Wide-area Monitoring and Control
Power Damping Monitoring (PDM)
Pilot Experience from swissgrid
Conclusion
ABB Group
October 14, 2012 | Slide 2
A Simple Power System
Dam acts as long term
W mgh
Governor energy storage
Generator/turbine act as
Turbine
short term energy storage
d
Pmech 2H Pmech Pelec D
dt
Generator
d
s
dt
Pelec
Governor control adjusts
mechanical power to keep
frequency constant
Demand
Static Stability of a Generator
How do generators stay synchronized ?
V1 1 V2 0
jX
Pmax
V1 V2 0
i
jX
V1V2
P Re v1i1* sin
X
Increased generation requires increase
in load angle ( )
90 180 270 360
Stable only for
There is a maximum power transfer
capacity Pmax
ABB Group
October 14, 2012 | Slide 4
Generator Connected to a Strong Grid
Classical Generator Model
2H d 2 D d V1V2
Loss of 2
sin Pmech
synchronism s dt s dt X
linearise around 0 and
V1V2
set K cos( 0 ) :
X
2H d 2 D d
2
K 0
s dt s dt
Change Damping Synchronizing
in stored
energy power Power
Time (s)
ABB Group
October 14, 2012 | Slide 5
WSCC Blackout , USA
August 10, 1996
ABB Group
October 14, 2012 | Slide 6
Oscillations in an Interconnected Grid
Theoretically each pair of generation units can form an
oscillatory mode
Local modes
Inter-area modes
Video 1 (Macedonia, medium res)
Video 2 (Macedonia, high res)
Video 3 (Italy, high res)
ABB Group
October 14, 2012 | Slide 7
ABB Phasor Measurement Unit RES 521
Provides High Accuracy
Phasor Measurement Units (PMU)
Voltage and Current Phasors
Synchronization by GPS clock
Timestamp accuracy < 1
microsecond
PMU
Angle accuracy < 0.1 degree
Programmable action logic
4x3 Current inputs
2x3 Voltage inputs
8 binary inputs/outputs
Synchrophasor data format IEEE
1344 or C37.118 over TCP (IP &
UDP)
ABB Group
October 14, 2012 | Slide 9
Wide-area Monitoring and Control
GPS
Satellite
Time stamps
Synchronization
Control room
Voltage and current phasors
Communication network
ABB Group
October 14, 2012 | Slide 10
WAMS Application Overview
Advanced Visualization of Raw Measurements
Voltage and Phase Angle Profiles
Real-time Power Swing Display
Phasor-assisted or Linear State-estimation
Contour Mapping / Geographical Displays
Monitoring & Prediction of Transmission Capacity (Wide Area
Monitoring)
Corridor Voltage Stability Monitoring
Power Oscillation Monitoring
Line Thermal Monitoring
Coordination of Actions in Emergency Situations (Wide Area
Control and Protection)
Emergency FACTS/HVDC setpoint rescheduling
Wide-area control for Damping of Power Oscillations
ABB Group
October 14, 2012 | Slide 11
Ambient vs Transient Oscillations
50.1
50.05
Frequency (Hz)
50
49.95
49.9 ambient ambient
transient
49.85
-60 -40 -20 0 20 40 60
Time (sec)
ABB Group
October 14, 2012 | Slide 12
Power Damping Monitoring
PDM normalised trend MW1
G1 1
G2 2
Capabilities G3
G4
G5
G6
3
4
5
6
G7 7
G8 8
Accurate determination of damping G9
G10
G11
G12
9
10
11
12
level under ambient conditions G13
G14
G15
G16
13
14
15
16
T01 17
T16 18
Mode shape determination T61
T62
T74
T76
19
20
21
22
T77 23
T86 24
Possibility of incorporating probing 5600 5800 6000 6200
time/sample interval
6400 6600
signals
Use of multiple input signals
Simultaneous detection of multiple
modes
ABB Group
October 14, 2012 | Slide 13
Power Damping Monitoring (PDM)
Principle
Sliding window of 10-15 minutes length
Estimate MIMO statespace model
x(k 1) Ax(k ) Bu(k ) Ke(k )
y(k ) Cx(k ) Du(k ) e(k )
e(k) background power system load variations
u(k) probing signals (optional)
y(k) angle difference measurements
Carry out modal analysis
Damping & frequency of critical modes
Visibility in different measurements (mode shape)
Activity in each mode
ABB Group
October 14, 2012 | Slide 14
swissgrid PSGuard
ABB Group
October 14, 2012 | Slide 15
ENTSO-E
Major Oscillation Modes found by PDM
Mode 3: 0.18Hz
North-south
mode
Old East West
Mode
ABB Group
October 14, 2012 | Slide 16
ENTSO-E Disturbance 2011-02-19
Summary of Events
At 08:00 on morning of 2011-02-19 a major oscillation
starts growing in the north-south direction
The north-south mode is significantly excited
The oscillation grows to a peak amplitude at 08:09
of +/- 100 MW measured at Soazza on the connection
to Italy
of +/- 120 mHz measuread in southern Italy
The oscillation is damped out at around 08:16
Two smaller oscillations are excited at 08:38 and 09:00,
respectively
ABB Group
October 14, 2012 | Slide 17
PSGuard Frequency Recording
Raw Data
50.15
f1bas
f2bri
50.1 f3kas
f4rec
f5div
50.05 f6the
Raw Frequency (Hz)
f7tem
50
49.95
49.9
49.85
07:30 08:00 08:30 09:00 09:30 10:00
ABB Group
October 14, 2012 | Slide 18
Filtered PSGuard Frequency Recording
Zoomed in at 8:09
Peak of oscillation
150
4*Tperiod = 16.1s ~ 0.248Hz f 1bas
f 2bri
100 f 3kas
f 4rec
f 5div
Filtered Frequency (mHz)
50 f 6the
f 7tem
-50
-100
-150
2320 2330 2340 2350 2360 2370 2380
Time (s)
ABB Group
October 14, 2012 | Slide 19
PDM Results
I Oscillatory Activity (xy-plot)
0.5 0.2
0.45
0.4 0.15
Frequency
0.35
Activity (Hz)
0.3 0.1
0.25
0.2 0.05
0.15
0.1 0
-20 0 20 40 60 80 0.1 0.2 0.3 0.4 0.5
Damping (%) Mode Frequency (Hz)
Very poorly damped oscillations at 0.25 Hz main oscillation
(worst -2%)
East west-mode (0.13 Hz) still detected, but well damped
ABB Group
October 14, 2012 | Slide 20
PDM Results
II Time Series
Mode 1 Mode 2
0.28 1
Frequency (Hz)
Frequency (Hz)
0.26 0.5
0.24 0
0 50 100 150 0 50 100 150
20 100
Damping (%)
Damping (%)
10
50
0
-10 0
0 50 100 150 0 50 100 150
modal Activity (mHz)
modal Activity (mHz)
200 200
f f
2bri 2bri
modAct modAct
0 0
-200 -200
0 50 100 150 0 50 100 150
Time (min) Time (min)
ABB Group
October 14, 2012 | Slide 21
Wide-area Control
Pilot Test in Norway
Wide Area Power Oscillation
Damping control WA-POD
Chose feedback signals from any
PMU equipped substation in
Nordel
Coordinated POD action from
several actuators (SVC, FACTS,
Generators)
Prototype WACS implemented
and tested
PMU-PCU400 PDC-MACH2
control system
Wide Area Power Oscillation
Damper (POD) with local signal
based POD as backup
ABB Group
October 14, 2012 | Slide 22
Conclusion
Wide-area Monitoring and Control improves upon traditional
SCADA/EMS system with a factor of 10-100 in terms of resolution
Enables monitoring and control of dynamic (stability) phenomena
Power damping monitoring validated and transferred to
commercial product
Active control of oscillations demonstrated in pilot test