By : ND
PROJECT & DEVELOPMENT INDIA
Date 11.07.17 MAHANAGAR GAS LIMITED
CHECKED : BK
PDIL
Date 11.07.17 Job No : EM00243 Office : VADODARA.
CONCRETE STAIRS
TR FLIGHT 1 & FLIGHT 2
W Enter Riser Height
Enter Tread Run
RH
Enter Stair Width
Enter # of Steps
Enter Stringer Thickness
0.36
TS
FLIGHT 3
Enter Riser Height
Enter Tread Run
Enter Stair Width
Enter # of Steps
Enter Stringer Thickness
0.30
ITEM NO'S WIDTH THK
RCC FOR LANDING 3 1.25 0.28
TOTAL VOLUME OF CONCRETE:
ReinforcementSTAIRS
Enter Riser Height
Enter Tread Run
W TR
Enter Stair Width
RH Enter # of Steps
Enter Stringer Thickness
Enter Spacing (M)
TS
0.15
Enter Spacing (M) Enter Steps Lateral Bar diameter (mm)
0.15 16
Enter Stringer Lateral Bar diameter (mm)
16
Enter Spacing (M)
By : ND
PROJECT & DEVELOPMENT INDIA
Date 11.07.17 MAHANAGAR GAS LIMITED
CHECKED : BK
PDIL
Date 11.07.17 Job No : EM00243 Office : VADODARA.
0.15
Enter Spacing (M) Enter Steps Lateral Bar diameter (mm)
0.15 10
Enter Stringer Horizontal Bar diameter (mm)
10 No. Length Dia
Number of 16 mm Lateral Bars required @ Stringer 10
15.00 0.016
Number of 10 mm Horizontal Bars required @ Stringer 101
1.25 0.01
Number of 16 mm Lateral Bars required @ Steps 10
18.00 0.016
Number of 10 mm Horizontal Bars required @ Steps 35
1.25 0.01
TOTAL STEEL QTY (STAIRCASE REINF):
HAND RAILING QTY
RAILING MEMBER LENGTH NOS WT/M QTY
RUNNER 32NB 36 3 3.9 421.2
VERTICAL 32NB 1.5 24 2.8 100.8
TOTAL STEEL QTY (HANDRAIL AND SUPPORT): 522Kg
FOOTING CONCRETE QTY
FOOTING: LENGTH( ll TO Z) LENGTH( ll TO X) COL( ll TO Z) COL( ll TO X) THICKNESS(D)
F1 2.5 2.5 0.5 0.5 0.45
FOOTING REINF QTY
ALONG Z DIRECTION ALONG X DIRECTION
,mm Spacing mm Nos. Length m ,mm Spacing mm
12 BOTTOM REINF 150 18 113.76 12 150
10 TOP REINF 150 18 113.472 10 150
COLUMN CONCRETE & REINF QTY
COLUMN LENGTH( ll TO Z) LENGTH( ll TO X) HEIGHT NO'S Qnty, m
C1 0.5 0.5 3.8 1 0.95
C1A 0.5 0.5 6.1 1 1.525
TOTAL 2.475
BEAM CONCRETE & REIF QTY
BEAM LENGTH WIDTH DEPTH NO'S Qnty, m
By : ND
PROJECT & DEVELOPMENT INDIA
Date 11.07.17 MAHANAGAR GAS LIMITED
CHECKED : BK
PDIL
Date 11.07.17 Job No : EM00243 Office : VADODARA.
B1 0.625 0.3 0.55 2 0.20625
T & DEVELOPMENT INDIA LTD.
Project:
Subject:STAIRCASE
AR GAS LIMITED QTY CALC
Rev. No. : R0
Dept. CV Sheet of
FLIGHT 1 & FLIGHT 2
RH (M) 0.19 M
TR (M) 0.25 M
W (M) 1.25 M
N 12.00 Steps
TS (M) 0.28 M
1.30 1.67 FOR SINGLE
FLIGHT 3
RH (M) 0.17 M
TR (M) 0.25 M
W (M) 1.25 M
N 11.00 Steps
TS (M) 0.28 M
1.15 1.44
LENGTH QTY
1.25 1.29 CU.M.
VOLUME OF CONCRETE: 6.06 CU.M.
RH (M) 0.19 M
TR (M) 0.25 M
W (M) 1.25 M
N 12.00 Steps
TS (M) 0.28 M
0.36 0.32 0.68
Steps Lateral Bar diameter (mm)
T & DEVELOPMENT INDIA LTD.
Project:
Subject:STAIRCASE
AR GAS LIMITED QTY CALC
Rev. No. : R0
Dept. CV Sheet of
Steps Lateral Bar diameter (mm)
Density(Kg/m3) Weight (Kg)
7,850.00
236.75
7,850.00
77.84
7,850.00
284.10
7,850.00
26.97
L QTY (STAIRCASE REINF): ###
(d) h=D-d Nos. Qnty, m
0 0.45 2 5.625
ONG X DIRECTION
Wt. kg
Nos. Length m
18 113.76 201.89305728
341.74162368
18 113.472 139.8485664
COLUMN REINF REMARKS
142.5Kg
FACTOR CONSIDERED 150KG/M3
228.75Kg
371.25Kg
BEAMREINF REMARKS
T & DEVELOPMENT INDIA LTD.
Project:
Subject:STAIRCASE
AR GAS LIMITED QTY CALC
Rev. No. : R0
Dept. CV Sheet of
18.5625Kg FACTOR CONSIDERED 90KG/M3