TECHNICAL SPECIFICATION
FOR
1. All the drawings, i.e. elevation, side view, plan, cross sectional view etc., in
AutoCAD format and manuals in PDF format, for offered item shall be submitted.
Also the hard copies as per specification shall be submitted.
2. The bidder shall submit Quality Assurance Plan with the technical bid.
3. The bidder shall have to submit all the required type test reports for the offered
item. In absence of this, the evaluation shall be carried out accordingly as non-
submission of type test reports.
4. The bidder must fill up all the points of GTP for offered item/s. Instead of
indicating refer drawing, or as per IS/IEC, the exact value/s must be filled in.
5. All the points other than GTP, which are asked to confirm in technical
specifications must be submitted separately with the bid.
7. Please note that the evaluation will be carried out on the strength of content of
bid only. No further correspondence will be made.
8. The bidder shall bring out all the technical deviation/s only at the specified
annexure.
INDEX
SECTION: I
DETAIL SPECIFICATION OF 500 MVA, 400/220/33 kV
THREE PHASE AUTO TRANSFORMER
1.1 SCOPE:
1.1.1 This section covers the design, manufacture, assembly, inspection, testing at
manufacturers works, supply and delivery include loading, transportation &
unloading on plinth at site, of the 500 MVA, 400/220 kV with 33 kV
loaded tertiary winding rated for 167 MVA active connected in
YNaOd11, three phase Auto transformers as detailed in the Schedule of
requirements, complete with all accessories required for safe, efficient,
satisfactory and trouble free operation of the equipment.
1.1.2 The scope of work shall also include EITHER complete erection, testing and
commissioning of all the equipments/accessories furnished under this
specification OR only supervision of erection, testing and commissioning of
all the equipment furnished under this Specification, as indicated in Schedule
A of the commercial bid.
1.1.2.1 Each transformer shall be supplied with two number of Oil storage tank as
per cl. no. 2.8 and 3 nos. of oil sampling bottles as per cl. no. 2.9, Fiber
optic sensors, On Line Moisture and Gas In Oil Analyser as per
Annexure II, Nitrogen Injection System For Protection against The
Fire & Explosion as per specification no. GETCO/E/TS-FF/2902
DTD.JUNE 2008, attached with this specification, On line PD measurement,
GPS/GRPS/GSM based on line transformer movement tracking system, Condition
controlled maintenance free on line breather as per specification. However,
Bidder has to quote the requirement of equipment / Material as indicated in
Schedule-A of commercial Bid.
1.1.3 GUARANTEE:
ii) The tenderer shall give the guarantee as satisfactory working of the
complete transformer for 36 months from the date of commissioning of
equipment or 42 months from the date of receipt of transformer at site,
whichever is earlier.
Guarantee period will be reckoned from the date of receipt of 100 %
accessories and not from the date of receipt of main tank only.
1.2 TRANSPORT:
1.2.1 The equipment to be furnished under this specification shall be packed for
transportation in such a manner as may facilitate easy handling and avoiding
any damage during transit.
1.3 STANDARDS:
1.3.1 The Power Transformers covered under this specification shall comply with
the requirements of the latest edition of IS: 2026 (amended up to date)
except specified herein. However, in the event the offered equipment
conforms to any other standard, the salient points of difference between the
standard adopted and the specified standard shall be clearly brought out in
the bid.
1.4 DRAWINGS:
1.4.1 Drawings in AutoCAD format and in hard copy, incorporating the following
particulars shall be submitted by the bidder with the bid.
v) Drawing showing the complete details of all class condenser bushing and
other relevant data.
1.4.2 The successful bidder shall submit the following drawings in AutoCAD format
and in hard copy for the approval of the purchaser within commencement
period.
i) General out line drawing showing front, side elevation and plan of the
transformer and accessories with detailed dimensions. The clearances
between HV and LV terminals and ground should also to be shown.
iv) Large scale drawings of high, medium and low-tension windings of the
transformers showing the nature and arrangement of insulators and
terminal connections.
1.4.3 The bidder may submit any other drawings found necessary in addition to the
drawings mentioned above or as asked during detailed engineering.
1.5.1 The transformers shall be of oil immersed type suitable for outdoor
installation. The type of working shall be as specified in specific Technical
requirements given in Section - II of this Specification.
1.6 DESIGN:
1.6.1 The autotransformer shall be used for bi-directional flow of rated power. The
transformer and accessories shall be designed to facilitate inspection,
cleaning and repairs and for operation where continuity of supply is the
primary consideration. All apparatus shall be designed to ensure satisfactory
operation under sudden variations of load and voltage as may be met with
under working conditions of the system including those due to short circuits.
1.6.2 All materials used shall be of the best quality and of the class most suitable
for working under the conditions specified and shall withstand the variations
of temperatures and atmospheric conditions arising under working conditions
without inner distortion or deterioration or setting up of undue stresses in any
part & also without affecting the strength and suitability of the various parts
for the work which they have to perform.
1.6.3 All outdoor apparatus, including bushing insulators with their mountings, shall
be so designed as to avoid pockets in which water can collect. All
connections and contacts shall be of ample cross-sections and surfaces for
carrying continuously the specified current without undue heating and fixed
connections shall be secured by bolts or set screws of ample size,
adequately locked. Lock nuts shall be used on stud connection carrying
current.
1.6.5 The transformer shall be capable of being loading in accordance with IS:
6600/IEC-354. There shall be no limitation imposed by bushings, tap
changers etc. or any other associated equipments.
1.6.6 The transformer and all its accessories including CTs etc shall be designed to
withstand without any injury, the thermal and mechanical effects of any
external short circuit to earth and of short circuits at the terminals of any
winding for a period of 3 secs. The short circuit level of the HV and LV
system to which the subject transformer will be connected is 40 kA (sym,
rms, 3 phase fault on 400 and 220 kV) & 25 kA (sym, rms, 3 phase fault on
33 kV).
1.7 TANK:
1.7.1 The transformer tank and cover or BELL type tank shall be fabricated
from good commercial grade low carbon steel suitable for welding and of
adequate thickness. The thickness of each side plate shall be indicated in
GTP. The tank and the cover shall be of welded construction. All seams shall
be welded and where practicable they shall be double welded. The tank wall
shall be reinforced by stiffener of structural steel for general rigidity. The tank
shall have sufficient strength to withstand without permanent distortion (i)
filling by vacuum, (ii) continuous internal gas pressure of 0.35 atmospheres
with oil at operating level and (iii) mechanical shock during transportation.
The tank cover shall be bolted to the tank and the transformer design shall be
such that the tank will not be split between the lower and upper cooler
connection for untanking. The tank covers shall be fitted with pockets at the
position of maximum oil temperature corresponding to MCR (Maximum
Continuous Rating) for RTD sensors and bulbs of oil and winding
1.7.2 A man-hole with a welded flange and a bolted cover shall be provided on the
tank cover. The man-hole shall be of a sufficient size to ease access to the
lower ends of the bushings, terminals etc.
1.7.3 All bolted connections to tank shall be fitted with suitable oil-tight gasket,
which shall give satisfactory service under the operating conditions. Special
attention shall be given to the methods of making the hot oil-tight joints
between the tank and cover as also between the cover and the bushings and
all other to ensure that the joints can be remade satisfactorily and with ease,
with the help of semi-skilled labours. Where compressible gaskets are used,
steps shall be provided to prevent over compression. Bushings, turrets, cover
of accessories, holes and other devices shall be designed to prevent any
leakage of water into or oil from the tank. There should not be any leakage at
least for three years and this should be guaranteed. All the gaskets to be
provided shall be of RC70C or RC80C grade. Necessary tests certificates from
manufacturer shall be submitted along with acceptance test report. The
gasket to be used shall not be older than One year.
1.7.4 Suitable guides shall be provided for positioning the various parts during
assembly or dismantling. Adequate space shall be provided between the
covers and windings and the bottom of the tank for collection of any
sediment.
1.7.5 Lifting eyes or lugs shall be provided on all parts of the transformer requiring
independent handling during assembly or dismantling. In addition, the
transformer tank shall be provided with lifting lugs and bosses properly
secured to the sides of the tank for lifting the transformers either by crane or
by jacks.
1.7.6 The design of the tank, the lifting lugs and bosses shall be such that the
complete transformer assembly filled with oil can be lifted with the use of
those lugs without any damage or distortions.
1.7.7 The tank shall be provided with two suitable copper alloy or any other
suitable material lugs for the purpose of grounding.
1.7.8 The tank shall be equipped with the following valves with standard screw
connection for external piping. All valves up to and including 100 mm shall be
of GM and larger valves shall be of Cast Iron bodies with GM fittings. They
shall be of full way type with internal screw and shall open when turned
counter clock wise when facing the hand wheel, along with suitable locking in
open and close positions.
i) One drain valve of adequate size with eccentric reducer and flange,
located on the low voltage side of the transformer. This valve shall be
equipped with a small sampling cock. The draining valve must be at
bottommost location of the tank.
ii) One filter valve of adequate size with eccentric reducer and flange,
located at the top of tank on the high voltage side. The opening of this
valve shall be baffled to prevent airation of oil.
iii) One filter valve of adequate size with eccentric reducer and flange,
located on the high voltage side of the transformer above the bottom
of the tank.
iv) Suitable valves shall be provided to take sample of oil from the OLTC
chamber during operation of transformer.
v) A valve of other suitable means shall be providing to fix the on line
dissolved Gas monitoring system to facilitate continuous dissolved gas
analysis. Location and size of the same shall be finalized during
detailed engineering.
vi) Pressure relief valve of adequate size & number/s shall be provided on
main tank as well as for OLTC.
vii) All hardware used shall be cadmium plated / electro galvanised.
viii) Necessary provision for installation of On Line monitoring system,
shall be made for satisfactory performance through out the life of
transformer. Location and size of the same shall be finalized during
detailed engineering.
1.8.1 The transformer tank shall be supported on a structural steel base equipped
with forged steel single flanged wheels suitable for moving the transformer
completely with oil.
1.8.2 Jacking pads shall be provided. It shall be possible to change the direction of
the wheels through 900 when the transformer is lifted on jacks to permit
movement of the transformer both in longitudinal and transverse direction. A
standard track gauge (preferably 1676 mm) in both longitudinal and
transverse directional shall be chosen.
1.8.3 Pulling eyes shall be provided to facilitate movement of transformer and they
shall be suitably brazed in a vertical direction so that bonding does not occur
when the pull has a vertical component.
1.9 CORE:
1.9.1 The transformer may be of core or shell type. The core shall be built up
with high-grade non-ageing cold rolled grain oriented silicon steel
laminations having high permeability and low hysterisis loss. The core
material shall be prime CRGO, which shall be procured directly from
manufacturer or through accredited marketing organization of reputation.
1.9.1 (a) The thickness of lamination shall be 0.27 mm or less. Surface insulation
of laminations shall be rust resistant and have high inter laminar
resistance. Insulation shall withstand annealing temperature as high as
1.9.1 (b) Bidder should have in house core cutting facility for proper monitoring &
control on quality & also to avoid any possibility of mixing of prime
material with defective/second grade material. This should be indicated
invariably in the QAP. The purchaser may witness the core-cutting
process. In case the in-house core cutting facility is not available, then
the same shall be carried out in the presence of the representative of
GETCO.
1.9.1(c) Bidder will offer the core for stage inspection and get approval from
purchaser during manufacturing stage. The bidder has to produce
following documents at the time of stage inspection for confirmation of use
of prime core materials.
i) Invoice of supplier
ii) Mills of approved test certificates
iii) Packing list
iv) Bill of lading
v) Bill of entry certificate by custom.
To avoid any possibility of mixing of Prime material with any other
second grade/ defective material, the imported packed slit coils of CRGO
materials shall be opened in the presence of the GETCO representative.
Only after the inspection and approval from purchaser, the core material
will be cut in-house OR sent to external agency for cutting individual
laminations. In case the core is sent to external agency for cutting,
GETCO representative will have full access to visit such agency for the
inspection of the cutting of core.
1.9.2 After being sheared, the laminations shall be treated to remove all burrs and
shall be re-annealed to remove all residual stresses. The insulation of the
lamination shall be insert to the action of hot transformer oil. Paper and
varnish insulation will not be accepted. The nature of insulation should be
specified in the tender.
1.9.3 The core shall be rightly clamped to ensure adequate mechanical strength
and to prevent vibration during operation. The clamping structure shall be so
constructed that eddy currents will be minimum.
1.9.4 The core shall be provided with lugs suitable for lifting the complete core and
coil assembly of the transformer.
1.9.5 The core and the coil assembly shall be so fixed in the tank that shifting will
not occur when the transformer is moved or during a short circuit.
1.9.6 The transformer shall be designed in such a way that the flux density in the
steel core corresponding to the Rated voltage and the rated frequency shall
be not exceeding 1.727 tesla.
1.9.7 Core and Frame terminals should be brought out on transformer top so as to enable
meggaring.
1.9.8 The core and the coil assembly shall be so fixed in the tank that shifting will not
occur and cause any damage when the transformer is moved shifted, or during a
short circuit. The maximum flux density in any part of core or yoke at 10%
continuous over voltage condition shall not exceed 1.9 tesla.
1.9.9 The complete core and core coil assembly of bolt less core type transformer shall be
so assembled that the axis and the plate of outer surface of the coil stack shall not
deviate from the vertical plane by more than 25 mm.
1.9.10 In case transformer with variable flux, the voltage variation which would affect flux
density at every tap shall be kept in view while designing the transformer.
Transformers shall be designed to withstand the following over fluxing conditions:
1.10 WINDING:
1.10.1 The conductor for winding shall be of electrolytic grade copper. The winding
shall be so designed that all coil assemblies of identical voltage ratings shall
be interchangeable and field repairs can be readily done, without special
equipment. The coils shall be supported between adjacent sections by
insulating spacers and the barriers, bracings and other insulation used in the
assembly of the windings shall be arranged to ensure a free circulation of the
oil and to reduce hot spots in the windings. The insulation paper shall be of
high quality and the value of degree of polymerization shall not be less
than 1200 Pv and the necessary test certificate shall be submitted
along with the stage inspection report. Provision shall be made in the
tank, for taking sample, in future, of paper for testing purpose and
location shall be easily accessible and indicated on the transformer
tank by affixing special caution plate.
1.10.2 The insulation of the coils shall be such as to develop the full electrical
strength of the windings. All materials used in the insulation and assembly of
the windings shall be insoluble, non-catalytic and chemically inactive in the
hot transformer oil and shall not soften or otherwise be adversely affected
under the operating conditions.
1.10.3 All threaded connections shall be provided with locking facilities. All leads
from the winding to the terminal board and bushings shall be rigidly
supported to prevent injury from vibration. Guide tubes shall be used where
practicable.
1.10.4 The windings shall be clamped securely in place so that they will not be
displaced or deformed during short circuits. The assembled core and
windings shall be vacuum dried and suitably impregnated before removal
from the treating tank. The copper conductors used in the coil structure shall
be best suited to the requirements and all permanent current carrying joints in
the windings and the locks shall be welded or brazed.
1.10.5 Windings shall be subjected to a shrinkage treatment before final assembly, so that
no further shrinkage occurs during service. Adjustable device shall be provided for
taking up any possible shrinkage of coils in service if required.
1.10.6 The conductor shall be transposed at sufficient intervals in order to minimize eddy
currents and equalize the distribution of currents and temperature along the
windings.
1.10.7 The tapping winding shall be provided separately from main winding to minimize the
out of balance forces in the transformer at all voltage ratios.
1.10.8 Transformer shall be designed and constructed to withstand, without damage, the
thermal effects on external short circuits (SC) for 3 seconds under conditions
specified in IS: 2026 (Part-I, amended up to date).
1.10.9 Bidder shall invariably indicate in the GTP, the cross sectional area of all windings
with respect to the current density adopted.
1.10.10 Bidder shall have to submit the calculations for thermal & dynamic ability to
withstand short circuits.
1.10.11 The cooling calculations shall be submitted with technical bid.
1.10.12 Fiber optic sensors shall be embedded in each phase of the winding located
where the temperature is highest. The location and details shall be indicated
in the respective drawings.
1.10.13 Tertiary Windings:
The tertiary windings shall be suitable for connection of reactors or capacitors
which would be subjected to frequent switching. All the windings shall be
capable of withstanding these stresses that may be caused by such
switching.
The Tertiary winding shall be designed to withstand mechanical and thermal
stresses due to dead short circuit on its terminals.
The tertiary winding shall be suitable for connection to LT Transformer for
auxiliary supply.
1.11.1 The oil for first filling together with 10% extra shall be supplied with each
transformer. The oil shall comply in all respects with Appendix A of the
specification. Particular attention shall be paid to deliver the oil free from
moisture having uniform quality throughout. The oil may be supplied either in
sealed tanker, or in non-returnable sealed steel drums, which will be opened
at site in presence of GETCO representative. The quantity of oil for first filling
& 10% extra of each transformer shall be stated in the tender.
1.11.2 The supplier of transformer shall furnish test certificates of the insulating
power oil supplied against their acceptance norms, prior to dispatch.
Subsequently oil samples shall be drawn
i) At manufacturers works before and after heat run test and shall be tested
for following:
a) BDV in kVrms
b) Moisture content
c) Dissolved Gas Analysis samples for DGA shall be taken from
sampling device within 24 hrs prior to commencement of heat run test
and immediately after this test. The acceptance norms shall be as per
IS:10593 (based on IEC-599)
ii) prior to filling in main tank at site and shall be tested for BDV and moisture
content and Corrosive sulphur detection test as per ASTM D1275
0
subjecting oil for 150 C for 48 hrs for acceptance norms as per Appendix
A.
iii) prior to energisation at site and shall be tested for the following:
a) BDV in kVrms
b) Moisture content
c) Tan Delta at 90 deg cen.
d) Resistivity at 90 deg cen.
e) Interfacial Tension
1.11.2.1 On Line Moisture and Gas In Oil Analyser For New Transformer With Model
Analysis Software And Remote Data Transfer/Communications through
internet shall be provided as per Technical Specifications attached.
1.12 INSULATION:
1.12.1 The dielectric strength of winding in insulation & of the bushings shall
conform to the values given in cl. 2.3.1.
1.12.1.1 The partial discharges in the transformer at the time of dispatch shall not be
more than 100 pC at 1.5 p.u.
1.12.1.2 The Maximum Limit of value of tan delta at 20 0C shall be 0.5% for windings,
0.4% for bushings and 0.2 % for oil.
1.12.2 For rated system voltage of 66, 132 and 220 kV, the following impulse and
power freq. withstand test voltage may be offered.
System Voltage Impulse Voltage Power Freq. Voltage
HV 400 1550 kVp 630 kV rms
MV 220 1050 kVp 460 kV rms
LV 52 250 kVp 95 kV rms
N 36 170 kVp 75 kV rms
1.12.3 The HV/MV winding of the transformer shall have graded insulation. The LV
winding of transformer shall have full insulation. The insulation class of
the neutral end of the windings shall be graded to 95 kV (Impulse) and 38 kV
(Power frequency) withstand.
1.13.1 The transformer shall be installed out-door without any protection from sun
and rain. The maximum hot spot temperature rise shall be limited to 1050 C
with Class - A insulation. Each transformer shall be capable of operating
continuously at its normal rating without exceeding the temperature rise limits
specified as under:
Winding (measured by resistance) Temp. rise in 0 C
ONAN 55
ONAF / ODAF 55
Top oil (measured by thermometer). Temp. rise in 0 C
ONAN 50
ONAF / ODAF 50
Cores Not to exceed that
permitted for the adjacent
part of the winding.
NOTE: The reference subject temperature for the purpose of temp. rise
shall be 50 0 C. The gradient in temperature between phases shall not
be more than 10 oC. Heat flow diagram shall be submitted by successful
bidder.
1.13.2 The transformer shall be free from abnormal noise (other than humming) and
vibration.
1.13.3 The transformer will deliver rated current without exceeding
temperature rise when operating on 105% of the rated voltages.
The transformer shall be capable of being operated without
danger on any tapping at the rated MVA with voltage of 10%
corresponding to the voltage of that tapping.
1.14 FREQUENCY:
1.14.1 The transformer shall be suitable for continuous operation with a frequency
variation of + 3 % from normal of 50 Hz without exceeding the specified
temperature rise.
1.15.1 The similar ratio transformers shall operate satisfactorily in parallel with each
other if connected between high voltage and low voltage bus-bars. Also,
wherever specified, the transformers shall be suitable for parallel operation
with existing transformers. The details of existing transformers will be
provided.
1.16 IMPEDANCES:
1.16.1 Supplier shall indicate the guaranteed impedance and tolerances and also
the upper and lower limits of impedances, which can be offered without an
increase in the quoted price. Impedance shall include positive and zero
sequence and shall be expressed in terms of the branches of the star
connected equivalent diagrams, all on the same KVA base and the range
shall be for each branch of the equivalent circuit in turn. The transformer
impedances shall be as specified in Section - II of this Specification.
1.17.1.1 Each transformer shall be provided with on load tap charging mechanism.
This shall be designed for remote control operation from switchboard in the
control room. In addition the tap changer shall include the followings:
a) An oil immersed tap selector and arcing switch for arc suppressing tap
selector, provided with reactor of resistor for reduction of make & break
arcing voltage and short circuits.
1.17.1.2 The on load tap changer shall be so designed that the contacts do not
interrupt arc within the main tank of the transformer. The tap selector and
arcing switch or arc suppressing selector switch shall be located in one or
more oil filled compartments. The compartment shall be provided with a
means of releasing the gas produced by the arcing. It shall be designed so as
to prevent oil in the tap selector compartment from mixing with the oil in the
transformer tank. A Buchholtz relay shall be provided to indicate
accumulation of gas and alarm thereof.
1.17.1.3 The tap changer shall be capable of permitting parallel operation with other
transformer of the same type.
1.17.1.4 The transformer shall give full load output on all taps. The manual operating
device shall be so located on the transformer that it can be operated by an
operator standing at the level of the transformer track. It shall be strong and
robust in construction.
1.17.1.5 The control scheme for the tap changer shall be provided for independent
control of the tap changers when the transformers are in independent
service. In addition, provision shall be made to enable parallel control also at
times so that the tap changers will be operated simultaneously, when one
unit is in parallel with another so that under normal condition the tap charger
will not become out of step and this will eliminate circulating currents.
Additional features like master, followers and visual indication during the
operation of motor shall also be incorporated.
1.17.1.6 Necessary interlock blocking independent control when the units arc in
parallel shall be provided.
1.17.1.7 Under abnormal conditions such as may occur, if the contactor controlling
one tap changer sticks, the arrangement must be such as to switch off
supply, to the motor so that an out of step condition is limited to one tap
difference between the units. Details of out of step protection provided for the
taps should be furnished in the tender.
1.17.1.8 The contactors and associated gear for the tap change driving motors shall
be housed in a local kiosk mounted adjacent to or on the transformer. The
motor shall be suitable for operation with 3 ph, 415 Volts, 50 Cycles external
power supply.
1.17.1.9 In addition to the above equipment, the supplier shall supply a separate panel
for installation in purchasers control room for remote operation with the
following accessories.
1.17.1.10 Complete particulars of the tap changing gear including the capacity of the
motor shall be stated in the tender.
1.17.1.11 Tap changer shall be suitable for bidirectional power flow. The tap changer
rating shall be more than maximum rated current of transformer.
The cranking device for manual operation of the OLTC gear shall be
removable and suitable for operation by a man standing at ground level. The
mechanism shall be complete with following:
a) Mechanical tap position indicator which shall be clearly visible
b) A mechanical operation counter
c) Mechanical stops to prevent over-cranking of the mechanism beyond the
extreme tap position
d) The manual control considered as back up to the motor operated load tap
changer control shall be interlocked with the motor to block motor start-up
1.17.2.1 The AVR relay shall be provided, if asked in particular bid, as per
specification indicted in Annexure I, The scheme shall detect (i) failure of
auxiliary supply, (ii) failure of PT supply and (iii) failure of mechanism to
complete the tap changing operation. The relay shall have necessary
contacts to be connected to the alarm & / or to the Annunciator available in
the panel for visual and audible indication of the failure of trip circuit. The
AVR relay shall be compatible to SCADA operation of any make.
1.17.2.2 All the necessary wiring shall be carried out in RTCC panel and schematic
drawings shall be submitted with the technical bid and during detailed
engineering for approval in duplicate.
1.18.1 Air cell type conservator tank is to be provided for oil conservator system.
1.18.2 Bidder shall offer diaphragm type oil sealing in the conservator to prevent
oxidation and contamination of oil due to contact with water. In this type of oil
preservation system, conservator shall be fitted with a dehydrating filter
breather.
1.18.3 In this system, using a flexible Diaphragm shall prohibit contact of oil with
atmosphere or nitryle rubber reinforced nylon cloth air cell.
(a) Diaphragm used shall be suitable for continuous operation in an
atmosphere of 100 0C to which transformer oil is likely to rise.
(b) The connection of the air cell to the top of the reservoir shall be by an
air proof seal permitting entrance of air into the cell only.
(c) The diaphragm of the conservator shall withstand the vacuum during
installation and maintenance. Otherwise provision shall be made to
isolate the conservator from main tank during vacuum by providing
vacuum sealing valve in the pipe connecting the main tank with the
conservator.
1.19 BUSHINGS:
1.19.1 The bushings shall have high factor of safety against leakage to ground and
shall be so located as to provide adequate electrical clearances between
bushings and grounded parts. Bushings of identical voltage rating shall be
interchangeable. All bushings shall be equipped with suitable terminals of
approved type and size and shall be suitable for bimetallic connection. The
insulation class of the high voltage neutral bushing shall be properly
coordinated with the insulation class of the bushings of the high voltage
winding.
1.19.2 Each bushing shall be so coordinated with the transformer insulation that all
flash over will occur outside the tank.
1.19.3 All main winding and neutral leads shall be brought out through out door type
bushings which shall be so located that the full flashover strength will be
utilized and the adequate phase clearance shall realized.
1.19.4 All porcelain used in bushings shall be of the wet process, homogeneous and
free from cavities or other flaws. The glazing shall be uniform in colour and
free from blisters, burrs and other defects.
1.19.5 The bushings for 66 kV and above shall be of the oil filled condenser type
(hermetically sealed) and shall conform to the latest edition of IS: 2099 &
IS:3347. The characteristics of the oil used in the bushings shall be the same
as that of the oil in the transformer.
1.19.6 All bushings shall have puncture strength greater than the dry flashover
value.
1.19.7 Main terminals shall be solder-less terminals and shall be suitable for ACSR
Moose Conductor. The spacing between the bushings must be adequate to
prevent flashover between phases under all conditions of operation.
1.19.8 Special adjustable arcing horns may also be provided for the bushings as per
IS: 3716 - 1966.
1.19.9 The bidder shall give the guaranteed withstand voltages for the above and
also furnish a calibration curve with different settings of the co-ordination gap
to the purchaser to decide the actual gap setting. Bidders recommendations
are also invited in this respect.
1.19.10 Bushing CTs should be provided for REF protection as specified in Section
II Cl. 2.5.
1.19.11 The tan delta and capacitor measurement tap shall be provided.
1.19.12 The STC rating shall be 40 kA for 3 sec for 132 kV & above class and 25 kA
for 3 sec for 66 kV and below class.
1.19.13 The height of live part shall be so arranged that minimum upto plinth shall be
maintained as per safety clearances from latest CBIP guide.
1.20 COOLING:
a) The cooler shall be designed using 4 x 33% unit Cooler arrangement. Design of cooling
system shall satisfy the performance requirements.
b) Each Unit Cooler shall have its own cooling fans, oil pumps, oil flow indicator, shut off
valves at the top and bottom of at least 80 mm size, lifting lugs, top and bottom oil
filling valves, air release plug at the top, a drain and sampling valve and thermometer
pocket fitted with captive screw cap on the inlet and outlet.
c) An oil flow indicator shall be provided for the confirmation of the oil pump operating in
a normal state. An indication shall be provided in the flow indicator to indicate reverse
flow of oil/loss of oil flow.
d) Cooling fans and oil pump motors shall be suitable for operation from 415volts, three
phase 50 Hz power supply and shall conform to IS: 325/IEC34. Each cooling fan and oil
pump motors shall be provided with starter thermal overload and short circuit
protection. The motor winding insulation shall be conventional class 'B' type. Motors
shall have hose proof enclosure equivalent to IP:55 as per IS:4691/IEC:34-5
e) The cooler and its accessories shall preferably be hot dip galvanised or corrosion
resistant paint should be applied to it.
f) Expansion joint shall be provided on top and bottom cooler pipe connections as per
requirement.
g) Air release device and oil plug shall be provided on oil pipe connections. Drain valves
shall be provided in order that each section of pipe work can be drained independently.
h) Cooling Equipment Control (OFAF or ODAF) Cooling
i) Suitable manual control facility for unit cooler shall be provided.
ii) The changeover to standby unit cooler bank oil pump in case of failure of any
service unit cooler shall be automatic.
iii) Selector switches and push buttons shall also be provided in the cooler control
cabinet to disconnect the automatic control and start/stop the unit cooler
manually.
iv) Cooler fans & oil pumps of all unit coolers (except standby cooler) shall operate
continuously. The starting of unit cooler shall be done as soon the Circuit Breaker
of HV/IV/LV side is switched on.
v) Once started the cooling shall remain in operation as long as the transformer is in
service. When the transformer is switched off the cooling shall continue to run for
a further duration of 30 minutes .This timer shall be at least adjustable from 15 to
60 minutes. Starting the pumps on load shall provide the cooling system a lead on
the temperature that is about to follow during high loading conditions. Spurious
operation should however be avoided by appropriate settings.
vi) Adequate warning/ safety labels are required to indicate that the fans may start at
any time.
vii) All settings shall be adjustable.
viii) If any one group(s) is out of service and isolated, this shall not affect the automatic
starting of the other unit cooler.
ix) Indicating Devices
One potential free initiating contact for all the above conditions shall be wired independently to
the terminal blocks of cooler control cabinet.
1.20.1.4 The unit cooler shall be attached to and mounted on the transformer tank.
1.20.1.7 The bidder shall specify the loading of the transformers in case of failure of
one or more set of fans or pumps.
1.21.1 The center of gravity of the assembled transformer shall be low and as near
the vertical centerline as possible. The transformer shall be stable with or
without oil.
1.22 ACCESSORIES:
The Maintenance Free Type of Breather shall fulfill the objectives like reduced
site inspections, no storage or replacement of the desiccant no pollution and
disposal problem of the used up desiccant.
Technical requirements:
1. Material & External Construction of the Breather shall be such that all
external parts are suitable for outdoor use & resistive to transformer
oil, ultraviolet rays, pollution & salt water.
2. The equipment shall work without any trouble for ambient temperature
between 0o C to +80 oC.
3. Degree of Protection shall be at least IP55.
4. The control unit shall be provided on the breather equipped with
suitable heater to prevent moisture condensation.
5. Status LEDs for local display shall be provided on breather along with
suitable contacts to take the signal to remote control room.
6. The moisture and temperature measurement system (sensor) installed
should be modular making it easy to replace the same if at all the same
is necessary during the service of breather. A self diagnostic system
shall be provided with LED indication and remote signal through a relay
shall be provided.
7. Micro fuse and an additional built in line filter shall be provided to
protect against over voltages & to avoid failures caused by high-
frequency interference.
8. The control unit in the breather shall provide analogue output signal of
4-20mA and also shall be equipped with a RS 485 port for data logging.
9. Suitable Data Logger shall also be provided in the control unit.
10. The size and type of Condition controlled maintenance free
dehydrating breather to be provided shall be selected ob the basis of
volume of oil of the offered transformer.
11. The Breather shall also be equipped with integrated test button which
should allow to carry out a self-test and to check the functions like relay
circuits, heating or the signal transmission in the control room, etc. at
any time.
12. Rated supply Voltages shall be 230 V AC or DC.
Rated insulation level - 500VAC 50 Hz, 1 min withstand voltage
500VAC 50 Hz, 1min. withstand, analog output against ground;
2.5kVAC 50 Hz, 1 min. withstand, relay contact against ground
13. Type Test report for shall be Degree of protection for control unit
submitted.
14. Successful bidder shall offer all acceptance tests on Condition controlled
maintenance free dehydrating breather and submit routine test report
during acceptance of transformer for each supply. List of acceptance /
routine tests shall be submitted with the tender.
15. All applicable clauses for breather shall be treated accordingly.
1.22.2 The equipment and accessories furnished with the transformer shall be
suitably mounted on the transformer case of operation, Inspection and
maintenance and the mounting details shall be subject to the approval of the
purchaser. All valves shall be provided either with blind companion flanges or
with pipe plugs for protection.
1.22.3 Indication, alarm and relay equipment shall have contacts suitable for
operation with 110 V DC supply.
1.23 TERMINALS:
1.23.1 The bushing shall be equipped with terminals suitable for connection with 4
IPS tube for 400 kV and twin moose ACSR conductor for 220 kV
terminals.
1.24.1 The bidder shall include in the scope of supply the multi ratio, type turret
mounted current transformer on all phases of HV, LV & neutral leads of the
power transformers for restricted earth fault protection, as well as for standby
earth fault / transformer differential protection. Also winding CT of required
ratio shall be provided in each phase.
1.25.1 Each terminal including the neutral shall be clearly marked on both the
primary and secondary side in accordance with the diagram of connection
supplied with the transformers.
1.26.1 Before painting or filling with oil or compound oil, un-galvanized parts shall be
completely cleaned and free from dust, sealed and grosses and all external
rough surfaces on casting shall be filled by metal deposition. The interior of
oil transformer tanks and other filled chambers and internal structural steel
work shall be cleaned of all sealed and rust by sand blasting or other
approved method. These surfaces shall be painted with an oil resisting
varnish or paint.
1.26.2 Except for nuts, bolts and washers all external surfaces shall receive a
minimum of three coats of paint. The primary coat shall be applied
immediately after cleaning. The second coat shall be of oil paint of weather
resisting nature. The final coat shall be of glossy, oil and weather resisting
non-fading paint.
1.26.3 All internal surfaces of mechanism chambers and kiosk except those, which
have received anticorrosion treatment, shall receive three coats of paints
applied to the thoroughly cleaned metal surfaces. The final coat shall be of
light coloured anti-condensation mixture. Any damage to paint work incurred
during transport and erection shall be made good by thoroughly cleaning the
damaged portion and by applying full number of coats of paints.
1.26.4 All steel surfaces exposed to weather shall be given primary coat zinc
chromate, second coat of oil & weather resistant paint of a colour distinct
from primary and final two coats of glossy oil & weather resistant light grey
paint in accordance with shade no. 631 of IS: 5. All paint shall be carefully
selected to withstand heat & extremes of weather. The paint shall not scale
off or crinkle or be removed by abrasion due to normal handling. The
minimum thickness of outside painting of tank shall be 20 microns per coat
the total thickness shall be within 70 to 100 microns.
1.27.5 Any material found short / damaged inside the intact packing shall be supplied
at no extra cost to the purchaser.
1.28 LABLES:
1.28.1 Lables shall be provided for all apparatus such as relays, switches, fuses
contained in cubicles or marshalling kiosk.
1.28.2 Labeling shall be clear, concise and adequate and shall be of standard size.
1.28.3 Descriptive labels for mounting indoor or inside cubicles and kiosk shall be of
material that will ensure permanence of the lettering. Danger notices shall
have red lettering on a white background. All plates shall be of material,
which will not be corroded.
1.28.4 Lables shall be attached to panels with brass screws or with steel screws,
which have received rust preventive treatment.
1.29 INSPECTION:
a) The contractor shall carry out a detailed inspection and testing program
for manufacturing activities of the various components. An indicative
program of inspection as envisaged by the Engineer is given below. This
is not, however, intended to form a comprehensive program, as it is
bidders responsibility to draw up and carry out such a program duly
approved by the Engineer.
b) Cost of Inspection / test is to be borne by the bidder.
c) Additional tests, if required, are to be deemed as included in scope of
work.
d) Stages of inspection and owners participation would be defined and shall
be as per purchaser requirement.
e) The bidder shall guarantee that the goods are new and of high quality
and the goods will be free from defects in design.
CORE:
a) Samples testing of core material for checking specific loss, bend
properties, magnetization characteristics and thickness.
b) Check on the quality of varnish if used on the stampings.
INSULATING MATERIAL:
a) Sample check for physical properties of material.
b) Check for dielectric strength.
c) Visual and dimensional checks.
d) Check for the reaction of hot oil on insulating materials.
e) Certification of all tests results.
WINDING:
a) Sample check on winding conductor for mechanical properties and
electrical conductivity.
b) Visual dimensional checks on conductor for scratches, dent marks etc.
c) Sample check on insulating paper for PH value, electric strength.
d) Check for the reaction of hot oil on insulating paper.
e) Check for the bonding of the insulating paper on conductor.
f) Check for absence of short circuit between parallel strands.
g) Check and ensure that physical condition of all materials taken for
winding in satisfactory and free of dust.
h) Check for brazed joints wherever applicable.
i) Measurement of voltage to be carried out when core / yoke is
completely restacked and all connections ready.
j) Conductor enamel test for checking of cracks, leakage and pin holes
ASSEMBLED TRANSFORMER:
a) Check completed transformer against approved outline drawing,
provision for all fitting, finish level etc.
b) Taking test on all the assembled transformers.
The contractor shall also prepare a comprehensive inspection and
testing program for all bought out / sub-contracted items and shall submit
the same to the Engineer for approval. Such program shall include in
following:
i) Buchholtz Relay.
ii) Sudden/Rapid pressure rise relay.
iii) Axels and wheels.
iv) Winding temperature indicator for local and remote mounting.
v) Oil temperature indicators.
vi) Bushing.
vii) Bushing Current Transformer.
c) Test to check effective shielding of the tank
d) Jacking test with oil on all the assembled transformers
e) Dye penetration test shall be carried out after the jacking test
Test on oil samples taken from main tank top and bottom and cooling system
as per IS: 335. Sample shall be taken only after the oil has been allowed to
settle for 24 hours.
a) Check the whole assembly for tightness, general appearance etc.
b) Oil leakage tests.
c) The contractor shall warrant that oil furnished is in accordance with the
specifications given in this specification.
1.30.3 TESTING:
Following type test reports as mentioned below and as specified in IS: 2026
(amended up to date) shall be submitted for the offered type rating of
transformer, invariably with the technical bid. Bid without type test reports will
not be considered for evaluation. The type test reports shall not be older
than FIVE years and shall be valid up to expiry of validity of offer.
Important note for type tests: The type test report shall be submitted for the offered class
and rating of transformer. However, the type test report for higher class/rating can be
accepted for scrutiny of technical bid but the same test/s shall have to be carried out on the
offered class/rating transformer. Bidder shall invariably confirm to carry out the required type
test/s, special tests, before commencement of supply, without affecting delivery schedule, free
of cost, at NABL approved laboratory or at suppliers works in presence of GETCO
representative, in the event of order.
SPECIAL TEST: Following test reports shall be submitted for the offered type rating of
transformer & bought outs, invariably with the technical bid.
e) Zero phase sequence impedance measurement.
f) Degree of protection (IP55) for control cabinets & RTCC panel, OLTC
driving mechanism, terminal boxes of PRV, MOG, Buchholz Relay,
pump motors, fans, etc.
e) Short Time Current withstand test on offered HV and LV terminal
connectors for 40 kA 3 sec.
f) Measurement of acoustic noise level
g) Measurement of power taken by all auxiliaries
h) Measurement of harmonic level in no load current
i) Measurement of transferred surge in LV due to Lightning impulse on HV
& IV
CALCULATIONS: Following calculations shall be submitted with bid.
a) Thermal and Dynamic ability to withstand terminal short circuits
b) Cooling calculations for ONAN, ONAF & OFAF.
If the above tests are carried out at bidder works then the bidder shall have to
repeat these tests again on any one unit without affecting delivery schedule
at no extra cost to GETCO. The necessary confirmation shall invariably be
submitted with the technical bid otherwise the offer shall be evaluated
accordingly.
1.30.3.3 Unit coolers, valves and other parts necessary with complete transformer
shall be tested for leaks and strength applying to the complete tank filled
with oil air pressure not less than 0.7 atmospheres for a period of 24 hours
or not less than 1.0 atmosphere for a period of 6 hours.
1.30.4.1 In addition to the routine tests on welds in the tank, the following type tests
shall be carried out on one of the transformer tanks in presence of GETCO
representative.
b) PRESSURE TEST:
The transformer tank along with unit coolers, conservator and other fittings
shall be subject to a pressure corresponding to twice the normal head of oil in
the transformer or normal pressure plus 0.36 Kg / Sq. cm, whichever is lower.
The permanent deflection of plates after release of excess pressure shall not
exceed the figures specified under vacuum test.
1.31.1 The various test (routine and type) as stipulated in the IEC Publication No.
60214 (as amended upto date) shall be carried out.
1.31.2 Type test certificate copies of oscillogram as called for in IEC Publication No.
60214 shall be furnished by the supplier.
1.32.1 After all the tests have been completed 4 copies of each test report shall be
furnished to the purchaser for this approval prior to the dispatch of
equipment. Soft copy of test reports for tests results obtained from
software shall be submitted for approval and record.
1.32.2 All the reports of inspections like stage, acceptance, routine & type tests
carried out on each transformer including test certificates for bought out
items, in bound volume, shall be submitted before dispatch. Also one copy
shall be sent along with transformer.
1.33.1 The purchaser reserves the right of having any other reasonable test carried
out at his own expense to ensure that the transformer complied with the
requirements of this specification.
1.34 LOSS/DAMAGES:
1.34.1 The Purchaser shall not be responsible for any damage to the equipment
during commissioning if such damage results from faulty or inadequate
action.
1.34.2 Purchaser shall not be liable for any loss, damage or injury to property or
persons at the installation site.
1.35.1 The bidder shall furnish all guaranteed technical particulars as called for in
Section - III, Schedule - A of this specification. Particulars, which are subject
to guarantee, shall be clearly marked. Bid not containing this information are
likely to be rejected.
1.37.1 All deviations from this specification shall be separately listed in specified
Schedule, in the absence of which, it will be presumed that the provision of
the specification are complied with by the bidder.
1.38.1 The quoted losses shall be considered as maximum, without any positive
tolerance. The bidders are, however, at liberty to quote the guaranteed
losses. The evaluation of the offer shall be done on basis of maximum
guaranteed loss.
In case of any order, if the figure/s of losses during test are found, higher than
the figures guaranteed for maximum losses without any positive tolerance on
individual components of losses, the transformer will, at the option of the
purchaser / owner be rejected, or accepted with the reduction in prices as
under. The measurement of losses shall be carried out with digital 3 (Three)
Watt meter method only and CTs, PTs and meters used for these
measurements shall be of class of accuracy of 0.2.
1.38.2 For the purpose of evaluation of bids, the quoted losses shall be compared for
all the bidders of particular tender.
The following formula adopted by the GETCO for working out comparable costs
with difference in prices and losses is:
1.40 REJECTION:
1.40.1 The Purchaser may reject transformer, if any of the following conditions
during or service arises:
1.41.1 The successful bidder will be required to grant training for not less than two
Engineers nominated by the GETCO, as follow, in his works and more
particularly in the manufacture, assembly, operation and maintenance of
transformer and other accessories indicated in this specification. Training in
respect of Fiber Optic system, On line moisture and multi gas in oil analyzer,
Nitrogen injection system for protection, AVR relay, etc., shall also be
arranged. The bidder shall state the general condition of training and number
of Man days (minimum 15) for training for which such training will be
arranged by him. GETCO may nominate different Engineers for different
items.
1.41.2 Bidder shall at his cost arrange for the above training facilities and in addition
shall bear all living expenses plus inland travel expenses of all the trainees.
The Purchaser shall only pay to and fro passage of the trainees. Bidder shall
indicate following in the prices schedule.
a) The lump sum amount of training for the above training facilities.
b) Price reduction / addition for number of trainees specified herein.
1.41.4 If GETCO Engineer will return without inspection of offered equipments due
to non-readiness of materials at their works than financial loss to the GETCO
for deputing their representative will be recovered from the concerned
supplier.
1.42.1 (1) Manufacturers / Suppliers will have to supply the transformer oil as per
GETCOs Specification of Transformer oil attached herewith at
APPENDIX A.
1. QAP for incoming material, in process and final checks and testing.
2. Statement giving list of important raw materials, names of sub
suppliers for the raw materials, list of standard according to which
the raw materials are tested. List of tests normally carried out on raw
materials in presence of bidder's representatives, copies of test
certificates.
3. Information and copies of test certificates as in (i) above in respect of
bought out accessories.
4. List of manufacturing facilities available.
5. Level of automation achieved and list of areas where manual
processing exists.
6. List of areas in manufacturing process, where stage inspections are
normally carried out for quality control and details of such tests and
inspections.
7. Special features provided in the equipment to make it maintenance
free.
8. List of testing equipments available with the supplier for final testing
of transformer specified and test plant limitation, if any, for the
special acceptance and routine tests specified in the relevant
standards. These limitations shall be very clearly brought out in 'The
schedule of divinations' for specified test requirements.
9. Field Quality Plan shall be submitted with the technical bid.
SECTION I I
TECHNICAL SPECIFICATION
FOR 400 kV CLASS AUTO TRANSFORMERS.
SPECIFIC REQUIREMENTS
2.1 SCOPE:
2.1.1 This section covers the specific technical requirements, climatic and
isoceranic conditions and system particulars for which the power transformer
shall be offered as per the general technical requirements given in Section I
of this specification and the Schedule of requirements specified herein for the
various sub-stations.
2.2.1 The climatic conditions under which the equipments shall operate
satisfactorily.
2.2.2 All equipment offered shall be suitable for continuous satisfactory operation
at the full rated capacity under the above climatic conditions.
2.2.3 Since the sub-station may be near sea shore or industrial area, the equipment
offered shall be suitable for heavily polluted atmosphere.
r) Service Outdoor
s) Duty Continuous
t) Overload capacity As per IS:6600 / IEC354 / IEC 60076-7
u) Partial Discharge level 100 pico-columb, Max.
v) HV/MV winding neutral end 36 kV porcelain without arcing horns
w) Bushings:
Winding Rated kV P F Volt Full Chopped Switching Rated STC,3s
DRY/WET Impulse Impulse Impulse Amp kA
2.3.2 The equipment offered shall be suitable for continuous operation under the
above conditions at the full rated capacity.
2.3.3 The autotransformers shall in general have constant percentage
impedance between HV and LV on all taps. However, in case of parallel
operation with the existing transformer,
i) The impedance, vector group, OLTC connection & range etc. of the
transformer is to be matched with that of the existing transformer
ii) Necessary provision is to be kept in the transformer control scheme for
parallel operation with the existing Master/Follower/Independent/Off type
OLTC control system.
iii) Matching of physical dimension, orientation etc. to facilitate
interchangeability with the existing transformer, if necessary.
2.3.4 External or internal reactors shall not be used to achieve the HV/LV
impedance specified.
2.6.1 One multi ratio bushing type / turret mounted current transformer shall be
provided on common neutral lead. In case of 2 winding transformer neutral
CT each for HV, LV and neutral comply in with the following requirements:
2.7.1 The AC power supply for auxiliaries will be available at 240 volts, 1 phase and
415 V, 3 phases, 50 Hz. The frequency can vary between 3% of normal
frequency of 50 Hz and voltage can vary from 85 % to 110 % of the normal
value.
2.7.2 The DC supply at 110 / 220 Volts will be available from station battery. The
DC supply is subject to variation of 10 %.
2.7.3 Each of the foregoing supplies will be made available by the
purchaser at one terminal for each transformer for operation of
accessories & auxiliary equipments. Bidders scope shall include
distribution this point.
2.8.1 General
This specification covers supply of TWO nos. of oil storage tank of 25 cubic
meter capacity along with complete accessories.
2.8.2 Standard
The oil storage tank shall be designed and fabricated as per relevant Indian
Standards e.g. IS: 803 or other internationally acceptable standards.
2.8.3 Specifications
Transformer oil storage tanks shall be tow able & rested on pneumatic types
of adequate quality & size. The tank shall be to cylindrical shape & mounted
horizontally and made of mild steel plate of adequate thickness. Size of the
storage tank shall be follows:
2.8.3.1 The Bidder may further note that maximum height of any part of the complete
assembly of the storage tank shall not exceed 4.0 meters above road top.
2.8.3.2 The tank shall have adequate number of jacking pad so that it can be kept on
jack while completely filled with oil. The tank shall be provided with suitable
saddles so that tank can be rested on ground after removing the pneumatic
tyres.
2.8.3.3 The tank shall be also fitted with manhole, outside & inside access ladder,
silica gel breather assembly, inlet & outlet valve, oil sampling valve with
suitable adopter, oil drainage valve, air vent etc. Pulling hook on both ends of
the tank shall be provided so that the tank can be pulled from either end while
completely filled with oil. Bidder shall indicate the engine capacity in horse
power to pull one tank completely fitted with oil. Oil level indicator shall be
provided with calibration in terms of litre so that at any time operator can
have an idea of oil in the tank. Four nos. suitable rubber hoses with couplers
and unions each not less than 10 meter long shall also be provided.
2.8.3.4 The internal & external surfaces to be painted shall be short or sand blasted
to remove all rust and scale of foreign adhering matter or grease. All steel
surfaces in contact with insulating oil shall have painted with two coats of
heat & oil resistant anti-corrosive paint.
All steel surfaces exposed to weather shall be given primary coat zinc
chromate, second coat of oil & weather resistant paint of a colour distinct
from primary and final two coats of glossy oil & weather resistant light grey
paint in accordance with shade no. 631 of IS: 5. All paint shall be carefully
selected to withstand heat & extremes of weather. The paint shall not scale
off or crinkle or be removed by abrasion due to normal handling. The
minimum thickness of outside painting of tank shall be 20 microns per coat
the total thickness shall be within 70 to 100 microns.
2.8.3.5 The tank shall contain a self mounted centrifugal oil pump with inlet and
outlet valves, with couplers suitable for rubber houses and necessary
switchgear for its control. There shall be no rigid connection to the pump. The
pump shall be electrical motor driven and shall have a discharge of not less
than 6 kLph with a discharge head of 8 Mtr. The pump motor and the control
cabinet shall be enclosed in cubicle with IP55 enclosure.
2.9.1 THREE nos. oil sampling bottle suitable for collecting oil sample from
transformer and shunt reactors for dissolved gas analysis shall be supplied.
Bottles shall be robust enough so that no damage occurs during frequent
transportation of samples.
2.9.2 Oil sampling bottle shall be made of Stainless Steel having capacity of ONE
litre.
2.9.3 Oil sampling bottle shall be capable of being sealed gas tight and shall be
fitted with cocks on both ends.
2.9.4 The design of bottle & seal shall be such that loss of hydrogen shall not
exceed 5% per week.
2.9.5 An impermeable oil proof transparent plastic or rubber tube of about 5 mm
diameter and of sufficient length shall also be provide with each bottle along
with suitable connectors to fit the tube on to the oil sampling valves of the
equipment and the oil collecting bottle respectively.
SECTION III
BIDDING SCHEDULE
(To be filled in and signed by the Bidder)
SCHEDULE A
1. Name of manufacturer :
H.V. Winding :
M.V. Winding :
Tertiary winding :
9. Tapping a) Number :
b) Range :
c) Location :
12. Limit for hot spot temp. for which the transformer :
is designed (oC)
25. Maximum current density & c/s area in the winding : Guaranteed As per short ckt calculation
i) H.V. :
ii) M.V. :
iii) Tertiary :
H.V. Winding :
M.V. Winding :
Tertiary winding :
H.V. Winding :
M.V. Winding :
Tertiary winding :
i) Sides (mm) :
41. Clearance :
42. a) Net weight of the core lamination (Kgs.) (only CRGO) (tol. -2%):
a) H.V. (Kgs.) :
b) M.V. (Kgs.) :
c) Tertiary (Kgs.)
d) Total (Kgs.) :
47.1 Tank
Dimensions :
Material :
Type :
Thickness of side, bottom, cover :
a) Make :
b) Type :
c) Rating :
i) Rated Voltage :
f) Control :
i) Protection devices :
4) Material of Tube :
5) Material of Fins :
6) Header :
7) Casting and framework :
8) Fan casing :
9) Impeller blade :
10) Impeller hub :
11) Safety switches material, degree of protection:
12) Electric motor rating :
13) Pump capacity :
14) Fan guard material & finish :
15) Max. Working pressure :
16) Max. Working temperature :
17) Test pressure :
*******
i) Make
Signature of Bidder
Date :-
CONTROL CABINET
(To be filled by the Bidder)
9) Control wiring
SR. ITEM
NO.
Signature of Bidder
Date :-
2 Applicable standards
3 Application
4 Type
5 For connection to
5.1 Conductor size and arrangement
5.2 Equipment terminal size and
arrangement
6 Material
(state percentage composition of
constituents and impurities present)
6.1 Clamp body
6.2 Bolts and nuts
6.3 Spring washers
6.4 Liners if any
7 Rated current
4. Type Tests
Signature of Bidder
Date :
APPENDIX A (Revised)
SPECIFICATION FOR TRANSFORMER OIL (uninhibited)
(for 132 kV & ABOVE CLASS UP TO 400 kV Transformers and 400 kV Reactors)
Note:
1) P N A content shall be taken as finger print value by oil supplier and shown in
acceptance test report.
2) When pour point (max) has been decided as (-30 0C), Lowest Cold Start
Energizing Temperature shall be (-20 0C).
-----------------------
APPENDIX B
1.1 The bidder should have carried out erection, testing, commissioning of
and test charging of at least two nos. of 220 kV or above class
transformers at 220 kV &/or 400 kV switch yard of sub stations
satisfactory during last five years before date of submission of the bid.
1.2 The bidder should arrange requisite tools and tackles including adequate
capacity hydraulic crane having suitable adjustable boom length for
erection of bushing, unit coolers, conservator, and other associated costly
equipments.
1.3 The bidder should have team of trained personnel and skilled labour force
and supervising engineers to carry out erection, commissioning, testing
and test charging work including laying of control cables and wiring of
OLTC gear scheme and inter connection of RTCC panel with D.M., of
OLTC., wiring of cooler control scheme and cooling fans including
automatic operation of cooler control etc.
2.1 Erection includes entire vacuum by proper capacity of vacuum pump, for
not less than 48 hours, or more if required as per the instruction of
engineer in charge.
held from contractors bill till the time claim is finalized by insurance
company.
2.7 Minimum 15 Nos. of good skilled fitters, with 2 Nos. qualified supervisors
and senior engineer having sufficient experience should be posted at site
during the above work.
2.8 Contractor has to repaint the transformer tank with two coat of anti rusting
good finish LTBS grey shade 631 of IS:5 by spray painting as per the
direction of engineer in charge.
2.9 Contractor is required to carry out all minor/major fabrication work of pipes
and hangers if required at site as per direction of engineer in charge.
2.10 All tools and tackles, testing equipments listed here under are to be
arranged by the contractor.
2.11 Contractor shall arrange required capacity of oil tanker at site.
2.12 Any other items not mentioned above but required for successful
completion of erection shall have to be arranged by the contractor.
1. One or two mobile crane hydraulic of adequate capacity with long boom of
30 ft. bearing free vertical lifts suitable for lifting HV bushing.
2. Steel/Manila/Nylon ropes and D shackle for lifting of 3-ton weight.
3. 4000 or 6000 liters. / hr. capacity filter machine in excellent working
condition. It must be capable of heating transformer oil up to 800 C and
must be equipped with built in high vacuum pump and chamber filter
elements.
4. Following accessories should also be made available.
a) Non-collapsible hose piping of size 40 mm to 80 mm with nipple and
flange.
b) Hosepipe should be of oil resistant 2 to 3 BSP suitably threaded for
connecting hose pipes & provided with holes for fastening.
c) 2 Nos. storage tanks for insulating oil of adequate capacity provided with
2 bottom drain cum filter valve and another 2 top valve.
d) Two complete sets of ring and flat spanners of metric size up to 4 to 36.
e) One complete set of Allen keys.
f) One complete set of screw derivers.
g) 1/4 shackle 3-ply nylon rope of 15 mtr. Length.
h) 4 nos. of flange each of 1, 2 to3 BSP suitably threaded for connecting
hose pipe & provided with holes for fastening.
i) Multi stage vacuum pumping system capacity 250-500 mm cu/hr. & should
be able to create absolute vacuum of 1 tor or 1.3 m bar or less having
following accessories.
j) Non return valve at inlet.
k) GI pipe/non-collapsible pipes with flange for connecting vacuum pump to
transformer main tank.
l) Vacuum gauge for reading 0 to 50 mm along with flange for fitting at top of
transformer of any suitable size 3/16 and 3/8 set in good quality.
m) Oil testing kit in good working condition having 2.5mm and 4 mm guage for
adjusting the gap, 2.5/5 KV megger motor driven and capable of reading
up to 50000 M-OHM.
n) 3 Ltrs. Of CTC.
o) Hot air blower for drying out of bushing.
p) Required nitrogen cylinder.
q) Stainless steel bottles for samples.
r) Gas cylinder with nozzle torch for gas cutting etc.
s) Any other item required for successful completion of work.
t) Tools required for erection are on returnable basis.
ANNEXURE - I
6. The relay bandwidth shall be adjustable between 5 to +15 of set point voltage.
7. The relay shall have following options regarding time behavior with Time factor
selectable from 0.1 to 30.
Linear
Integral
Fast integral
8. The relay shall incorporate an under voltage / over voltage blocking facility which shall
make the control inoperative if voltage falls / rises by percentage value of set point value
(as mentioned in Guaranteed technical particulars) with automatic restoration of control
when nominal voltage rises / falls to value as mentioned in the Guaranteed technical
particulars.
9. The AVR relay shall have integrated features for the display of following parameters
Master Follower
Master Slave
I Sin (Circulating current)
14. The AVR relay shall have facility to monitor or control the following parameters
15. The AVR relay shall have facility to record specific events (Event-Recorder) like under
voltage, over voltage, Over current, Auto/Manual, local/remote etc. with date and time
stamping.
16. The AVR relay shall have facility to make selection of Auto/Manual and Local/Remote.
17. The AVR relay shall have different LEDs to indicate Service and Blocked condition.
18. It is preferred that 12 nos of freely programmable LEDs shall be available to indicate
different Operations / Alarm / Faults condition.
19. The AVR relay shall have freely programmable Binary Inputs, Binary outputs, Analog
Inputs and Analog Outputs.
20. The AVR relay shall have software to make the parameter settings of the device and it
shall also be possible to do the parameter setting through keyboard of relay.
21. The AVR relay shall have suitable interface to make communication with higher level
SCADA system. The following ports a minimum shall be available on the device.
a. Rs 232 port (COM 1) for doing the parameter setting and local
communication with device.
b. RS 232 port (COM 2) for communication with higher level SCADA with
optional protocols like MODBUS, SPABUS, PROFIBUS DP, LON, IEC
60870-5-101, -103 and 104, IEC 61850 in preparation.
22. It shall be possible to communicate via bus with all similar devices located at different
location by making communication link with any one device through its RS 485- port (E-
LAN) meant for local communication.
23. It shall have facility by which a customer specific software programme can be written
and incorporated as feature in the relay.
ANNEXURE C
DATE:
PLACE:
Annexure - II
ON Line Dissolved Gas Analysis
Technical Specification For On Line Gas In Oil Analyser
1.0 GENERAL:
The transformer shall be equipped with on line gas in oil analyzer system
and remote data transfer /communications. It is intended to individual
monitor the evolution of dissolved gases from the oil of transformer to
detect and continuously monitor a individual value of gases like
H2(Hydrogen), CH4 (Methane),C2H4 (ethylene),C2H6 (Ethane), C2H2
(Acetylene), CO2 (Carbon dioxide), CO (Carbon monoxide).,O2
Oxygen,N2 (Nitrogen).The system shall be installed on a single, open bore
ball or gate valve.
2.2 One set of centralized monitoring system with suitable software for
communicating with IEDs simultaneously with a provision for
communicating to two or more IEDs if required in future. The required
software shall be loaded in GETCO system at desired location such
that all the data/display associated with the system can be visualized
and all archiving / trending can be achieved. It shall also give printouts
of all required data as desired.
2.3 All required interconnection, wiring, cabling with fiber optic cables/RS
485 cables etc., including all required accessories for successful
operation of the system.
2.4 Required earthing & connection for the system at required location is
to be carried out by bidder.
2.8 The system interface shall also include required field cable, patch
cable, patch box, associated accessories & hardwares to connect to
the GETCO system as required.
Glass Fiber Optic mono mode cables /RS485 cable shall be provided for
interconnection of all IEDs and the central monitoring system. The cable
shall be laid in HDPE conduits. All required terminations, splicing kits shall
be arranged by bidder. Provision shall be kept for installing and terminating
cables from future IEDs. It is also intent to monitor gas in oil of transformer
through internet. There will not be any wire connection. It will be wireless
communication. Any suitable modem shall be provided. Data is to be seen
and analyze at corporate office or any other remote locations as desired by
GETCO.
4.0 List of routine & acceptance tests shall be submitted with the technical
bid. Successful bidder has to perform acceptance tests in presence of
GETCO representative, as per relevant standard.
5.0 Services of on line moisture and gas in oil analyzer system supplier
during supply, mounting, erection, testing, commissioning and after
sales even beyond guarantee period shall have to be arranged and
provided by the bidder.
6.0 The bidder shall furnish all guaranteed technical particulars as called
for in this specification. Bid not containing this information are likely to
be rejected.
8.0 It can be shifted from one place to other place as per our need.
9.0 Guarantee for the unit should be 36 months from date of installation
or 42 months from the date of supply whichever is earlier. It is
submitted in the form of Performance bank Guarantee in 10% of the
value.
Data management
Software: Window based, suitable for
Data analysis of measuring
results.
Display: External PC or laptop
Storage: Simple xml format
PC communication: RS232 or equivalent port
Software analysis : Key gas method, Rogers ratio &
Duval triangle
Environmental
Operating temp: -10 to 55 deg. C
Humidity: 100% RH, Non condensing
2 Measurement of gases
5 Oil Temp.
6 Operating temperature
7 Humidity
8 Technology
10 Extraction method
11 Extraction time
12 Accuracy
13 GS separating Column
14 Sensor type
Corrignedum-1
ON LINE DGA
Page No. 3
Point No. 1:
Intelligent Electronic Device (IED)
Specific technical requirement (On line DGA)
Please add following sentence after completion of first para:
However, if the bidder desires floor mounting IED system on a movable trolley can
offer for the same.
Page No. 3
Point No. 3:
Specific technical requirement (On line DGA),
Interconnecting cabling
Please replace first sentence by following sentence:
Glass Fiber Optic mono mode cables /RS485 cable/ armored instrumentation cable
shall be provided for interconnection of all IEDs and the central monitoring system.
Page No. 4
Point no. 9 & 10 are not applicable.
----------------------------------------------
ANNEXURE - III
TECHNICAL SPECIFICATIONS
Name of work: Turnkey contract for the work of design, supply, erection and
commissioning of Nitrogen Injection system for protection against the
transformer explosion for 400 KV Transformers and Shunt Reactors as indicated
in Schedule A including all required civil works of oil sump, foundations, any other
required for satisfactory working of system.
Each oil filled transformer / reactor shall be provided with a dedicated Nitrogen
Injection system for prevention against the transformer explosion which shall
use nitrogen as quenching medium. The system shall prevent transformer /
Reactor oil tank explosion and possible fire in case of internal / external cause.
In the event of fire by external causes such as bushing fire. OLTC fires, fire from
surrounding equipment etc., it shall act as a fast and effective fire fighter. It
shall accomplish its role as fire preventer and extinguisher without employing
water or carbon dioxide. Fire shall be extinguished within reasonable with time
(not more than 3 minutes so as not to harm the transformer) of system
activation and within 30 seconds (maximum) of commencement of nitrogen
injection. The system shall have been in successful operation / commissioned in
Indian / Abroad installations for at least last five years for protection of
transformers of 220 KV and higher voltage class. The list of past supplies in
India / Abroad along with performance certificate from users of the system shall
be submitted for approval of purchaser.
Auto Mode
For prevention:
For extinguishing
Fire Detector
Buchholz relay paralleled with pressure relief valve or RPRR (Rapid
Pressure Rise Relay).
Tripping of all circuit breakers (on HV & LV/IV side) associated with transformer
/ reactor is the pre-requisite for activation of system.
General description
Nitrogen Injection system should be a dedicated system for each oil filled
transformer / reactor. It should have a Fire Extinguishing Cubicle (FEC) placed
on a plinth at a distance of 5-10 m away from transformer / reactor or placed
next to the firewall (if fire fighting wall exists). The FEC shall be connected to
the top of transformer / reactor oil tank for depressurization of tank and to the
oil pit (capacity is approximately equal to 10% of total volume of oil in
transformer / reactor tank / or existing oil pit) from its bottom through oil pipes.
The FEC should house a pressurized nitrogen cylinder (s) which is connected to
the oil tank of transformer /reactor oil tank at bottom. The Transformer
Conservator Isolation Valve (TCIV) is fitted between the conservator tank and
Buchholz relay. Cable connections are to be provided from signal box to the
control box in the control room, from control box to FEC and from TCIV to signal
box. Detectors placed on the top of transformer / reactor tank are to be
connected in parallel to the signal box by Fire survival cables. Control box is
Operation
System components
CUBICLE (FEC)
Nitrogen gas cylinder with regulator and falling pressure electrical contact
manometer.
Oil drain pipe with mechanical quick drain valve.
Electro mechanical control equipment for draining of oil of pre-determined
volume and injecting regulated volume of nitrogen gas.
Pressure monitoring switch for back-up protection for nitrogen release.
Limit switches for monitoring of the system.
Butterfly valve with flanges on the top of panel for connecting oil drain
pipe and nitrogen injection pipes for transformer / reactors.
Panel lighting (CFL Type)
Oil drain pipe extension of suitable sizes for connecting pipes to oil pit.
Space heater.
Control box
Control box is to be placed in the control room for monitoring system operation,
automatic control and remote operation. The following alarms, indications,
switches, push buttons, audio signal etc. shall be provided.
System Oil.
TCIV open.
Oil drain valve closed.
Gas inlet valve closed
TCIV closed
Detector trip
Buchholz relay trip
Oil drain valve open
Extinction in progress
Cylinder pressure low
Differential relay trip
PRV / RPRR trip
Transformer / reactor trip
System out of service
Fault in cable connecting fault detector
Fault in cable connecting differential relay
Fault in cable connecting Buchholz relay
Fault in cable connecting PRV / RPRR
Fault in cable connecting transformer reactor trip
Fault in cable connecting TCIV
Auto / Manual / Off
Extinction release on / off
Lamp test
Visual / Audio alarm for AC supply fail
Visual / Audio alarm for DC supply fail
As far as possible the control box should be such devised that all the
transformers and reactors or group thereof should be controlled from single
spot.
of tank or bursting of bushing. The valve shall not isolate conservator during
normal flow of oil during filtration or filling or refilling, locking plates to be
provided with handle for pad locking. It shall have proximity switch for remote
alarm, indication with visual position indicator.
The TCIV should be of the best quality as malfunctioning of TCIV could lead to
serious consequence. The closing of TCIV means stoppage of breathing of
transformer / reactor.
Detectors
The system shall be complete with adequate number of detectors (quartz bulb)
fitted on the top cover of the transformer / reactor oil tank.
Signal box
It shall be mounted away from transformer / reactor main tank, preferably near
the transformer marshalling box, for terminating cable connections from TCIV &
detectors and for further connection to be control box. The degree of protection
shall be IP55.
Cables
Fire survival cables (capable to withstand 750 C.) of 4 core x 1.5 sq. mm size
for connection of detectors in parallel shall be used. The fire survival cable shall
conform to BS 7629-1, BS 8434-1, BS 7629-1 and BS 5839-1, BS EN 50267-2-1
or relevant Indian standards.
Fire Retardant Low Smoke(FRLS) cable of adequate size shall be used for
connection of signal box / marshalling box near transformer / reactor and FEC
mounted near transformer/ reactor with control box mounted in control room.
Fire Retardant Low Smoke (FRLS) cable of 4 core x 1.5 sq. mm size shall be
used for connection between control box to DC & AC supply source, FEC to AC
supply source, signal box / marshalling box to transformer conservator isolation
valve connection on transformer / reactor. Separate cables for AC supply & DC
supply shall be used.
Pipes
Pipes complete with connections, flanges, bends and tees etc. shall be supplied
along with the system.
(a) Oil drain and nitrogen injection openings with gate valves on transformer /
reactor tank at suitable locations.
(b) Flanges between Buchholz relay and conservator tank for fixing TCIV.
(d) Spare potential free contacts activating the system i.e. in differential relay,
Bucholz relay. Pressure Relief Device / RPRR , Circuit breaker of
transformer / reactor.
(e) Pipe connections between transformer / reactor and FEC and between FEC
and oil pit required for collecting top oil.
(g) Inter cabling between signal box, control box and FEC.
(h) Butterfly valves / Gate valves on oil drain pipe and nitrogen injection pipe
which should be able to withstand full vacuum.
(i) Supports, signal box etc. which are to be painted with enameled paint.
Power supply
The bidder apart from the below mentioned spares shall submit a list of
recommendation spares for three years trouble free operation of the equipments
and also furnish unit rates. The owners will scrutinize the said list and decide on
the items on spares to be ordered and the quantities. These spares shall be
supplied by the contractor before end of guarantee period. The owner reserves
right to order the spares with twelve (12) months from the date of order for
main equipments and the rate shall be kept valid till this date. The prices of
these spares shall not be considered for evaluation of the bid.
Mandatory Spares
Interlocks
It shall be ensured that once the NIFPES gets activated manually or in auto
mode, all the connected breakers shall not close until the system is actually put
in OFF mode. Also PRV shall get closed only if all the connected breakers are
open.
Tests
Contractor has to carry out the type test as per relevant IS/IEC. Specifically IP
55 on FEC or have to produce the report from NABL approved Lab.
Reports of all routine test conducted as per relevant IS/IEC standards in respect
of various bought out items including test reports for degree of protection for
FEC / control box / signal box shall be submitted by the supplier.
The supplier shall demonstrate all the functional test associated with the
following as Factory Acceptance Tests:
The performance test of the complete system shall be carried out after erection
of the system with transformer at site.
Detailed layout drawings, equipment drawing along with 4 sets of Operation and
Maintenance manual along with soft copies (In CDs) shall be submitted by the
supplier along with the consignment.
The guaranteed and other technical particulars for the offered system are
indicated in Section - "Guaranteed and Other Technical Particulars". Any
other particulars considered necessary in addition to those listed in that Section
may be furnished by the Bidder.
5.2 mm
5.3 Type & Thickness of sheet steel
5.4 Details of components provided in the control box
5.5 Control voltage
5.6 Method of mounting
5.7 Whether audio and visual alarm provided?
6. Transformer Conservator Isolation Valve
6.1 Make
6.2 Type
6.3 Location
6.4 Whether suitable for pipe of size 80 mm dia
6.5 No. of contacts & spare contacts (NO & NC)
6.6 Padlocking provision
7 Detectors
7.1 Make
7.2 Type
7.3 Quantity required
7.4 Method of fixing
7.5 Effective heat sensing area
7.6 Temperature recommended for effective heat
sensing
7.7 Number of contacts NO / NC
7.8 Necessity and condition of Refilling
8 Whether approved by Tariff Advisory Committee of
India
9 TECHNICAL PARTICULARS FOR NITROGEN
INJECTION SYSTEM FOR PREVENTION OF
TRANSFORMER EXPLOSION
10 Power Supply
10.1 Control box
10.2 FEC (lighting)
10.3 Extinction period
10.4 On system activation
10.5 On commencement of Nitrogen injection
11 FEC Suitable for capacity
11.1 Dimensions (LXBXH) mm
11.2 Weight
11.3 Nitrogen cylinder capacity
12 Control Box
12.1 Dimensions (LXBXH) mm
12.2 Weight
13 Detectors
13.1 Heat sensing temperature