1) The Tigasin Concrete Company has three plants with different weekly capacities located at different sites. Each plant has different shipping costs to three construction projects with different capacity requirements. The problem is to find a routing plan that minimizes total transportation costs. 2) A table shows the per unit profit for different dealer-factory combinations. The problem is to find the production and sales allocation that maximizes total profit using the MODI method. 3) A table shows the number of engineers required for four different projects. The problem is to determine the optimal assignment of management teams to the projects.

Uploaded by

Jerric Cristobal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views2 pages

Example Modi

1) The Tigasin Concrete Company has three plants with different weekly capacities located at different sites. Each plant has different shipping costs to three construction projects with different capacity requirements. The problem is to find a routing plan that minimizes total transportation costs. 2) A table shows the per unit profit for different dealer-factory combinations. The problem is to find the production and sales allocation that maximizes total profit using the MODI method. 3) A table shows the number of engineers required for four different projects. The problem is to determine the optimal assignment of management teams to the projects.

Uploaded by

Jerric Cristobal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

1) The Tigasin Concrete Company has three different locations and is

presently working on three construction projects, each located at a


different site. Weekly capacities and project requirements are as follows:

Plant A B C
Capacity 400 500 600

Project 1 2 3
Requirement 700 500 300

The shipping costs from the plants to the projects are given in the following table

Project Project Project


1 2 3
Plant A 12 6 13
Plant B 11 7 10
Plant C 10 9 8

Find a routing plan that minimizes total transportation cost.

2) The table indicates per unit profit at the upper right hand corner of each
cell. Find the right decision for maximum profit using the MODI method.
Find the maximum profit.
Dealers

A B C D Supply
70 20 10 40
1 x11 x12 x13 x14 25
20 60 30 20
Factories 2 x21 x22 x23 X24 15
30 40 50 20
3 x31 x32 x33 X34 45
50 40 30 50
4 X41 X42 X43 X44 25
Demand 20 10 40 40
3) Determine the assignment of the management teams to the four projects:

Projects

A B C D
1 11,000 8,000 10,000 7,000
Engineers 2 6,000 5,000 3,000 8,000
3 4,000 8,000 10,000 9,000
4 11,000 10,000 5,000 7,000

4) The Mabuhay Company wants to assign four newly hired management


graduates to Regions I, II, III and IV. Based on their course performance
on the company sales course which they have just completed, product
knowledge, and potential customers, management has rated each ones
expected success in each region. The ratings, on a scale from 1 to 10
(with 10 as the highest)

Person Region I Region II Region III Region IV


Jules 8 9 10 7
Aldwin 9 7 8 8
Justin 7 10 9 6
Kloyd 5 8 7 6

Find the best assignments.