100% found this document useful (1 vote)
350 views2 pages

Scar

This document is a Supplier Corrective Action Request (SCAR) from SFO Technologies in Bangalore to Supplier METALURGICA SCHIOPPA LTDA regarding a non-conformance with castor swivels. 56 pieces were found to have issues with moulding or not swiveling freely after assembly. The supplier's containment plan is to use a manual cutting machine to avoid insulation damage. The supplier will monitor future production and perform a root cause analysis relating to failed visual inspections. Corrective actions include process control improvements and visual inspection of wheel assemblies. SFO will follow up on the effectiveness of the supplier's actions.

Uploaded by

alyanka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
350 views2 pages

Scar

This document is a Supplier Corrective Action Request (SCAR) from SFO Technologies in Bangalore to Supplier METALURGICA SCHIOPPA LTDA regarding a non-conformance with castor swivels. 56 pieces were found to have issues with moulding or not swiveling freely after assembly. The supplier's containment plan is to use a manual cutting machine to avoid insulation damage. The supplier will monitor future production and perform a root cause analysis relating to failed visual inspections. Corrective actions include process control improvements and visual inspection of wheel assemblies. SFO will follow up on the effectiveness of the supplier's actions.

Uploaded by

alyanka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SCAR Format.

xls

SFO Technologies - Bangalore


Note : Supplier should complete SCAR and submit to SFO-E within 15-working days

Supplier Corrective Action Request


SCAR Number : IQA-ELUL-007 Date:16-May-13

METALURGICA
Supplier: SCHIOPPA Part Name Caster Swivel with brake Part No. 2051473-001
LTDA
Find area IQC In process Customer complaint Warehouse

NC Qty 56 nos Invoice no: SCH-0333-2013 Part Sl# NA

1) Moulding issue (short fill) observed- 48#


NC/Defect description 2) Castor wheels are not swivels freely after assembly- 8#

Attachment if any ( Photo / report etc ) :

Below should be finished by supplier


1.0 Containment/Correction plan :
Now we have started using manual cutting machine where there is no insulation damage .

2.0 Investigation:
Action Owner Date

Engineering
monitoring the next production for verification of potential fail and Quality
5/22/2013

3.0 Root cause analysis :


Failed visual inspection when injected.

4.0 Corrective action


Corrective action
Action Owner Date
Include the CP-Process Control failures images presented in the
complaint. Quality 5/31/2013

4.2 Does these action documented?(If Yes pls provide the Document no with Effective date)
Yes No Document No Effective date
x CP 7.5.1-02-10.001 5/27/2013
x CP 7.5.1-09-01.001 5/27/2013

5.0 Preventive Action


Action Owner Date

Page1/2
SCAR Format.xls

include visual inspection of the wheel assembly

Quality 5/27/2013

6.0 Verification and Validation ( If all the action have been implemented? )

7.0 Effectivity statement ( when the action taken - date , serial number & other traceable date for the change )

Prepared by Approved by

QA/QC Engineer name QA Head

Below should be finished by SFO-Electronics Bangalore.


8.0 Effectiveness of SCAR / Implementation record (Enclose with Evaluation Tracker form)

Notes , if any :

QA/QC Engineer

Format no: SFQ47.010 Rev 03