0% found this document useful (0 votes)
583 views4 pages

Risk Assessment For Rectification of Awl

This document provides a task-based risk assessment for work being conducted on a 400kV overhead line connection to Ajman Grid Station. It identifies three main hazards: 1) Vehicle movement which could result in asset damage or personnel injury/fatality due to factors like poor visibility or road conditions. Controls include following safety procedures and speed limits. 2) Severe weather conditions like high winds, heavy rain, or poor visibility that could lead to injury, asset damage, or dehydration. Work will stop under certain conditions and breaks/refreshments will be provided. 3) Personnel falling from height, which could cause injury or fracture. Controls are conducting toolbox talks, providing height safety training, and using proper fall protection equipment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
583 views4 pages

Risk Assessment For Rectification of Awl

This document provides a task-based risk assessment for work being conducted on a 400kV overhead line connection to Ajman Grid Station. It identifies three main hazards: 1) Vehicle movement which could result in asset damage or personnel injury/fatality due to factors like poor visibility or road conditions. Controls include following safety procedures and speed limits. 2) Severe weather conditions like high winds, heavy rain, or poor visibility that could lead to injury, asset damage, or dehydration. Work will stop under certain conditions and breaks/refreshments will be provided. 3) Personnel falling from height, which could cause injury or fracture. Controls are conducting toolbox talks, providing height safety training, and using proper fall protection equipment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

TASK BASED RISK ASSESSMENT

Location : CONTRACT No: N6445 400kV OHL CONNECTION TO AJMAN GRID STATION Date : 29 June 2016
Team Members : Mr. A.L.N Acharyulu Mr. Selvamani Mr. Srinivasan Mr. Anil Khurne
Designation: Project Manager Engineer Competent Person HSE Officer

Site 400kV OHL NEAR WASIT


Est. Duration to complete the Task 15 Days Estimated Manpower Involved 6
Activity Rectification of Medium Intensity Warning Lights
Tools and Equipment Needed Rope Slings, Single Sheave Pullies, D- Shackles, P.P Rope etc..,
Hazardous Area Classification Zone 0/1 Yes/No Zone 2 Yes Unclassified Zone Yes

Hazard Initial Risk


Threat Top Event / Recommended / Consequence Barrier Residual Risk
The potential to cause H/M/L
(Possible causes that Consequences Describe all Recommended / Consequences H/M/L
Sr. No harm (Health, Injury, (With no Action By
will potentially release a (The harm which could controls / barriers for each hazard to reduce (with controls in
Property damage, controls in
hazard) possibly occur). its severity, probability or both place
environment etc) place)
1 Vehicle movement Poor Visibility Asset Damage. M All passengers on board to fasten the Job Performer & L
Site In- charge.
Bad Road Personnel injury / seat belts.
condition fatality. Limit the number of passengers to be
Poor Vehicle Damage to the limited to number of serviceable seat
condition vehicle belts.
Blind spots Rollover Follow the journey management system.
Always engage 4 wheels Drive.
Maintain the tyre pressure as per the
requirement.
Mobile phones not to be used while
driving.
Night driving is prohibited.
Speed limit in desert should not exceed
80 km/hr.
Always drive with in the speed limit in
desert <80 and on Black top <120.
All drivers will have mobile phones.
On the roads crossings banks men on
either side of road will be there.
All vehicles and equipments to be fitted
with reverse alarm.
2 Severe Weather Poor visibility Injury M Work to be stopped at a wind speed Job Performer & L
condition Site In-charge.
High speed wind Asset Damage above 15 knots.
Heavy rain Dehydration In case of poor visibility / sand storm /
Hazard Initial Risk
Threat Top Event / Recommended / Consequence Barrier Residual Risk
The potential to cause H/M/L
(Possible causes that Consequences Describe all Recommended / Consequences H/M/L
Sr. No harm (Health, Injury, (With no Action By
will potentially release a (The harm which could controls / barriers for each hazard to reduce (with controls in
Property damage, controls in
hazard) possibly occur). its severity, probability or both place
environment etc) place)
High temperature rain etc job to be stopped.
A system of convenient interval of work
breaks to be followed for the comfort of
the technicians during peak summer.
Welfare facilities are to be properly
available during all along the period of
performing the job.
Ensure shade for adequate rest.
All necessary refreshments are to be
provided at the location & closely
supervised.

3 Person Falling from Risk not properly Personnel injury H Tool box talk to be conducted prior Job Performer L
height identified Fracture. starting the job.
Employees not Proper training to be given on topic
properly trained to height safety to all employees.
do work. Adequate PPE to be used while working
No proper PPE at height.
being used. To ensure harness is hooked up at all
times during work.
Full body harness with double lanyard
should be used.
Tower Rescue kit must be available at
site all time.
Proper training to be given to all workers
for use of tower rescue kit.
4 Working near live Risk not Properly Electric shocks/ M Risk assessment to be reviewed before Job Performer & L
Overhead line. identified Burns/Personnel starting the job. Site In-charge
Incorrect isolation injury /fatality Tool box talk o be conducted prior
of conductors. Damage property starting the job.
No proper PPE Proper training to be given on topic
being used. Electrical safety to all employees.
No proper lock out Lock out tag out system to be
tag out system. implemented.
Using inappropriate Only trained employees to be allowed to
tools. do work.
Used equipments which are suitable for
the job only.
Provision of cut off switch in position to
turn off the machine in case of any
Hazard Initial Risk
Threat Top Event / Recommended / Consequence Barrier Residual Risk
The potential to cause H/M/L
(Possible causes that Consequences Describe all Recommended / Consequences H/M/L
Sr. No harm (Health, Injury, (With no Action By
will potentially release a (The harm which could controls / barriers for each hazard to reduce (with controls in
Property damage, controls in
hazard) possibly occur). its severity, probability or both place
environment etc) place)
emergency.
Adequate PPE to be used while working
with electricity.
Permit to work system to be introduced
where it is necessary.
Follow Safe system of work as per
TRANSCO safety Rules.
Make provision of Safe access & egress
route under live overhead lines.
Warning height gantry must be provide
to indicate height warning to
vehicle/equipments operator.
Warning signs and tapes, lights or other
illumination must be maintained as
necessary for the safety of the public and
employees from sunset to sunrise if
necessary.
PROBABILITY
Happens
Happens
Has Has Has several
several
occurred in occurred in occurred in times each
times each
world-wide other specific year in
SEVERITY PEOPLE ASSETS ENVIRONMENT REPUTATION year in
industry but ADWEA ADWEA specific
same
not in Group Group ADWEA
location or
ADWEA Company Company Group
operation
Company
1. Catastrophic Multiple Extensive Massive effect International
Fatality damage impact

2. Severe Single Major Major effect National


Fatality or
Permanent
damage impact
HIGH
Disability
3. Critical Major Injury Local Localised effect Consider able
or Health
Effects
damage impact
MEDIUM
4. Marginal Minor Injury Minor Minor effect Minor impact
or health
effects
damage
(ALARP)
5. Negligible Single injury Slight Slight effect Slight impact
or health
effects
damage
LOW