Corrosion Monitoring Section Procedure No:
Report UT/CPF1/2016/
Corrosion-Ultrasonic Testing Report No V15610/094
CPF1-Collection Tank V15610 Date 05-Jan-17
Genaral Notes:
1-Inspection standard: API 510.
2-Collection Tank V15610 commissioned on Sep 30, 2011.
3-Corrosion Allowance: 2mm.
4-Corrosion rate calculated for duration of 5.2 years.
5-28 points were not measured because of high location ,scaffold required.
6-Gauge type: Olympus 38DL PLUS Serial No.: 130772412 Sonic velocity: 5976m/s.
Corrosion Rate calculation = (tprevious- tactual)/Duration of year ( t- Thickness)
Commissioning 30-Sep-11
First measurement time 27-Apr-16
Last measurement time 05-Jan-17
Measurement interval in years 0.7
Duration in years 5.2
Test by: Calibrate by: Approved by:
Percentage
Material Nominal Actual Thk As Of Actual Thk As Of Total Metal Corrosion Rate Of Metal
Gauge Point Description Specification Size Thk (mm) 27-Apr-2016/(mm) 05-Jan-2017/(mm) Loss In Mm (mm/Year) Lost within Remarks & Comments
0.7 year
1 Head SA516 Gr.70 2800 12 11.20 11.20 0.0 0.0 0%
2 Head SA516 Gr.70 2800 12 11.00 11.00 0.0 0.0 0%
3 Head SA516 Gr.70 2800 12 11.22 11.20 0.0 0.0 0%
4 Head SA516 Gr.70 2800 12 11.64 11.60 0.0 0.1 0%
5 Head SA516 Gr.70 2800 12 11.20 11.20 0.0 0.0 0%
6 Head SA516 Gr.70 2800 12 11.10 11.10 0.0 0.0 0%
7 Shell SA516 Gr.70 2800 12 12.10 12.10 0.0 0.0 0%
8 Shell SA516 Gr.70 2800 12 12.10 12.10 0.0 0.0 0%
9 Shell SA516 Gr.70 2800 12 12.10 12.10 0.0 0.0 0%
10 Shell SA516 Gr.70 2800 12 12.10 12.10 0.0 0.0 0%
11 Shell SA516 Gr.70 2800 12 12.20 12.20 0.0 0.0 0%
12 Shell SA516 Gr.70 2800 12 12.00 12.00 0.0 0.0 0%
13 Shell SA516 Gr.70 2800 12 12.51 12.50 0.0 0.0 0%
14 Shell SA516 Gr.70 2800 12 12.30 12.30 0.0 0.0 0%
15 Shell SA516 Gr.70 2800 12 12.30 12.30 0.0 0.0 0%
16 Shell SA516 Gr.70 2800 12 12.20 12.20 0.0 0.0 0%
17 Shell SA516 Gr.70 2800 12 12.20 12.20 0.0 0.0 0%
18 Shell SA516 Gr.70 2800 12 12.30 12.30 0.0 0.0 0%
NOZZLES
Percentage
Material Nominal Actual Thk As Of Actual Thk As Of Total Metal Corrosion Rate Of Metal
Gauge Point Description Size Lost within Remarks & Comments
Specification Thk (mm) 27-Apr-2016/(mm) 05-Jan-2017/(mm) Loss In Mm (mm/Year)
0.7 year
N1, N Vent SA106 Gr.B 2" 8.74 / / / / /
N1, E Vent SA106 Gr.B 2" 8.74 / / / / /
N1, W Vent SA106 Gr.B 2" 8.74 / / / / /
N1, S Vent SA106 Gr.B 2" 8.74 / / / / /
N2, N PG SA106 Gr.B 2" 8.74 / / / / /
N2, E PG SA106 Gr.B 2" 8.74 / / / / /
N2, W PG SA106 Gr.B 2" 8.74 / / / / /
N2, S PG SA106 Gr.B 2" 8.74 / / / / /
N3, N Overflow connection SA106 Gr.B 4" 13.49 / / / / /
N3, E Overflow connection SA106 Gr.B 4" 13.49 / / / / /
N3, W Overflow connection SA106 Gr.B 4" 13.49 / / / / /
N3, S Overflow connection SA106 Gr.B 4" 13.49 / / / / /
N4, N PSV SA106 Gr.B 2" 8.74 / / / / /
N4, E PSV SA106 Gr.B 2" 8.74 / / / / /
N4, W PSV SA106 Gr.B 2" 8.74 / / / / /
N4, S PSV SA106 Gr.B 2" 8.74 / / / / /
N5, N TG SA106 Gr.B 2" 8.74 / / / / /
N5, E TG SA106 Gr.B 2" 8.74 / / / / /
N5, W TG SA106 Gr.B 2" 8.74 / / / / /
N5, S TG SA106 Gr.B 2" 8.74 / / / / /
N6, N Vent SA106 Gr.B 2" 8.74 / / / / /
N6, E Vent SA106 Gr.B 2" 8.74 / / / / /
N6, W Vent SA106 Gr.B 2" 8.74 / / / / /
N6, S Vent SA106 Gr.B 2" 8.74 / / / / /
N7, N LG SA106 Gr.B 1" 6.35 / / / / /
N7, E LG SA106 Gr.B 1" 6.35 / / / / /
N7, W LG SA106 Gr.B 1" 6.35 / / / / /
N7, S LG SA106 Gr.B 1" 6.35 / / / / /
N8, 3clock LG SA106 Gr.B 1" 6.35 4.63 4.40 0.2 0.3 5%
N8, 6clock LG SA106 Gr.B 1" 6.35 4.74 4.40 0.3 0.5 7%
N8, 9clock LG SA106 Gr.B 1" 6.35 4.66 4.50 0.2 0.2 3%
N8, 12clock LG SA106 Gr.B 1" 6.35 4.60 4.30 0.3 0.4 7%
N9, N Filling and draining SA106 Gr.B 1" 6.35 4.50 4.50 0.0 0.0 0%
connection
Filling and draining
N9, E connection SA106 Gr.B 1" 6.35 4.40 4.40 0.0 0.0 0%
N9, W Filling and draining SA106 Gr.B 1" 6.35 4.64 4.40 0.2 0.3 5%
connection
Filling and draining
N9, S connection SA106 Gr.B 1" 6.35 4.64 4.40 0.2 0.3 5%
N10, N Drain SA106 Gr.B 3" 11.13 12.33 12.30 0.0 0.0 0%
N10, E Drain SA106 Gr.B 3" 11.13 12.20 12.20 0.0 0.0 0%
N10, W Drain SA106 Gr.B 3" 11.13 12.20 12.20 0.0 0.0 0%
N10, S Drain SA106 Gr.B 3" 11.13 12.02 12.00 0.0 0.0 0%
M1, 3clock Man hole SA106 Gr.B 20" 12.00 12.15 12.10 0.0 0.1 0%
M1, 6clock Man hole SA106 Gr.B 20" 12.00 12.20 12.20 0.0 0.0 0%
M1, 9clock Man hole SA106 Gr.B 20" 12.00 12.20 12.20 0.0 0.0 0%
M1, 12clock Man hole SA106 Gr.B 20" 12.00 12.20 12.20 0.0 0.0 0%