0% found this document useful (0 votes)
509 views

Quatation For Sub Soil Investigation

This document is a quotation for sub-soil investigation works for a proposed multi-storied residential building in Bashundhara. It provides a breakdown of the work, including mobilization and demobilization of equipment, execution of 5 bore holes to 100ft depth each, necessary field and laboratory tests, and submission of a final report. The total quoted price is 35,000 BDT, with 50% required as an advanced payment to start the field test work.

Uploaded by

SIDDIQUE SIDD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
509 views

Quatation For Sub Soil Investigation

This document is a quotation for sub-soil investigation works for a proposed multi-storied residential building in Bashundhara. It provides a breakdown of the work, including mobilization and demobilization of equipment, execution of 5 bore holes to 100ft depth each, necessary field and laboratory tests, and submission of a final report. The total quoted price is 35,000 BDT, with 50% required as an advanced payment to start the field test work.

Uploaded by

SIDDIQUE SIDD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

e

73/D, Central Road, (1st Floor) Dhanmondi, Dhaka-1205, Mobile: 01552-413392,


01727-285500,
[email protected]

To,
Mr. Md. Mustafijur Rahman
BION Limited

Subject: Quotation for Sub-Soil Investigation Works for the proposed Construction of
Multi-Storied Resideatial Building at Bashundhara.

Dear Sir,
With due Respect we submit the following Quotation for above mentioned
works.

Sl
Description Quantity Rate in BDT Total Amount
.
Mobilization of equipments
and Demobilization after
completion of Field works,
Execution of wash boring 1 site
1.
including necessary field 5 bore hole L.S 35,000/=
and laboratory test and 100ft
submission of final report.

In word: (Thirty FiveThousand Taka Only) Total 35,000/=

N.B: 1stRunning advanced payment 50% for starting the Field test work.

Your Necessary Action Will highly be appreciated.

Thanking You

Yours faithfully

Managing Partner

You might also like