JN-NSM Period Targets
Phases Grid Connected Off Grid Solar Solar Thermal Solar Lightening
Solar PV (MW) PV (MW) Collectors (million-m2) Systems (million)
Phase-I 2010-13 1000-2000 200 07 ---
Phase-II 20013-17 3000 800 08 ---
Phase-III 20017-22 16000 1000 05 ---
Total 2009-22 20,000 2000 20 20
(by 2022)
Table 5: Different phases and their targets of the Jawaharlal Nehru National Solar Mission
(Source: MNRE, India)