0% found this document useful (0 votes)
38 views1 page

Table V

The Jawaharlal Nehru National Solar Mission outlines targets for grid connected solar PV, off grid solar PV, solar thermal collectors, and solar lighting systems over three phases from 2010 to 2022. Phase I aims to install 1000-2000 MW of grid solar PV and 200 MW of off grid solar PV along with 7 million square meters of solar thermal collectors. Phase II increases these targets, with 3000 MW of grid solar PV, 800 MW off grid solar PV and 8 million square meters of solar thermal collectors. Phase III further scales up to 16,000 MW of grid solar PV, 1000 MW off grid solar PV and 5 million square meters of solar thermal collectors, with overall targets by 2022 being 20,000 MW

Uploaded by

mybhasker
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views1 page

Table V

The Jawaharlal Nehru National Solar Mission outlines targets for grid connected solar PV, off grid solar PV, solar thermal collectors, and solar lighting systems over three phases from 2010 to 2022. Phase I aims to install 1000-2000 MW of grid solar PV and 200 MW of off grid solar PV along with 7 million square meters of solar thermal collectors. Phase II increases these targets, with 3000 MW of grid solar PV, 800 MW off grid solar PV and 8 million square meters of solar thermal collectors. Phase III further scales up to 16,000 MW of grid solar PV, 1000 MW off grid solar PV and 5 million square meters of solar thermal collectors, with overall targets by 2022 being 20,000 MW

Uploaded by

mybhasker
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

JN-NSM Period Targets

Phases Grid Connected Off Grid Solar Solar Thermal Solar Lightening
Solar PV (MW) PV (MW) Collectors (million-m2) Systems (million)
Phase-I 2010-13 1000-2000 200 07 ---
Phase-II 20013-17 3000 800 08 ---
Phase-III 20017-22 16000 1000 05 ---
Total 2009-22 20,000 2000 20 20
(by 2022)

Table 5: Different phases and their targets of the Jawaharlal Nehru National Solar Mission
(Source: MNRE, India)