Pre-Pouring Concrete Checklist

This document contains several pre-pouring, pouring, and post-pouring concrete checklists to ensure quality control of concrete work. The pre-pouring checklist verifies items like grade preparation, rebar fabrication and placement, formwork, and embedded items. The pouring checklist checks conditions during pouring like weather, temperature, placement method, and curing. The post-pouring checklist inspects curing, form stripping, surface preparation, waterproofing membrane installation, and foundation element release.

Uploaded by

usman82
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views4 pages

Pre-Pouring Concrete Checklist

This document contains several pre-pouring, pouring, and post-pouring concrete checklists to ensure quality control of concrete work. The pre-pouring checklist verifies items like grade preparation, rebar fabrication and placement, formwork, and embedded items. The pouring checklist checks conditions during pouring like weather, temperature, placement method, and curing. The post-pouring checklist inspects curing, form stripping, surface preparation, waterproofing membrane installation, and foundation element release.

Uploaded by

usman82
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

PRE-POURING CONCRETE CHECKLIST

Department Civil RFI No. CHECKLIST NO. C-001-015


Description Concrete Work
KKS No. Drawing No. ITP NO. SEP-01-ZAA-1QA-002
Location
SN Description Accepted Rejected N/A Remarks
Grade preparation
1 Blinding / Polyethylene Sheet
2 Elevation and Location
Rebar Fabrication
1 Dimension & Shape check
2 Visual check of coating
3 Check of identification NO
Form Work
1 Dimension (Shape, Position & Level) Check
2 Visual check of Strength and Stability
3 Visual Check of Form tie
4 Visual Check of Coating for release agent
5 Water stops
Rebar Placement
1 Placement of Rebar (rebar space , size ,overlap and tie
wire)
2
Placement Support Rebar
3 Visual check of Coating (Coated Rebar)
Confirmed Embedded Item
1
Steel structure Items

2
Electrical Items

3
Instrument Items

4
Mechanical Items

5
Piping Items

6
HVAC Items

7
Check the location and position

8
Check the fixing condition

Cleaning Condition Check


Check the fixing condition of Earthing cable

Note:

ORIGINATING
ISSUED BY SEPCOIII Engineer SEPCOIII QC OWNER
SUBCONTRACTOR
Signature
Name
Date
CONCRETE PLACEMENT CHECKLIST
Department RFI No. CHECKLIST NO. C-001-0016
Description
KKS No. Drawing No. ITP NO. SEP-01-ZAA-1QA-002
Location
SN Description Results Remarks
1 Weather

2 Ambient °C
Temperature
3 Concrete °C

4 Rate of Placement

5 Height of dropping □ ACCEPT □ REJECT

6 Compaction □ ACCEPT □ REJECT

7 Curing Method

8 Quantity of Concrete

9 Type of Finish

10 Start Time

11 Finish Time

12 Slump Spec: /Actual

13 Amount of super plasticizer (SP) added (if applicable )

14 Delivery ticket conformed to approved design mix ? □ YES □ NO

15 Were Cube taken for test □ YES □ NO

Note:

ORIGINATING SEPCOIII
ISSUED BY SEPCOIII Engineer OWNER
SUBCONTRACTOR QC
Signature
Name
Date
POST-POURING CONCRETE CHECKLIST
Department RFI No. CHECKLIST NO. C-001-017

Description

KKS No. Drawing No. ITP NO. SEP-01-ZAA-1QA-002

Location

SN Description Accepted Rejected N/A Remarks

1 Concrete Curing

2 Formwork stripping / Concrete protection


Surface Preparation

Concrete surface is clean, dry, free from dust and


1 impurities

Concrete surface repaired for pinhole and


2 imperfections removal

3 Concrete surface has been released for coating

Waterproof Membrane and Hard Board

1 Material Receiving Inspection

2 Primer applied as per requirement

3 Waterproof membrane installed as per requirement

4 Membrane is clean, without puncher & damage

5 Waterproof membrane protected with hard board

Note:

ORIGINATING SEPCOIII
ISSUED BY SEPCOIII Engineer OWNER
SUBCONTRACTOR QC
Signature

Name

Date
FOUNDATION RELEASE RECORD CHECKLIST

Department RFI No. CHECKLIST NO. C-001-018

Description

KKS No. Drawing No. ITP NO. SEP-01-ZAA-1QA-002

Location
SN Description Accepted Rejected N/A Remarks

1 Formwork removed

2 Elevation correct

3 Overall concrete finish accept

4 Landing surface prepared for grout

5 Anchor bolts center line and size verified

Anchor bolts are straight ,threads clean and sleeves


6
clear

7 Anchor bolts projection correct

8 Other embedded item checked

9 Centre lines of base are marked and identified

10 Protective coating

Note:

ORIGINATING SEPCOII
ISSUED BY SEPCOIII Engineer OWNER
SUBCONTRACTOR I QC

Signature

Name

Date