Lighting calculation
L= 4.9 M E*A
W= 4.5 M N= 1.8 2
meting room 02
A= 22.05 m2 UF*MF*LUM/LAMP*LAMP/FIXTURE
E= 300 LUX
L= 6.5 M
W= 5.8 M 2.5= 3
meting room 05 =
A= 37.7 m2
E= 300 LUX
L= 4.6 M
W= 3.3 M
HALL
A= 15.18 m2 = 0.9= 1
E= 100 LUX
L= 2.9 M
W= 1.5 M
KECHEIN =
A= 4.35 m2 0.54= 1
E= 300 LUX
L= 1.8 M
W= 1.6 M
wc male 2 =
A= 2.88 m2 0.49= 1
E= 200 LUX
L= 1.8 M
W= 1.6 M 0.49= 1
WC FEMALES =
A= 2.88 M2
E= 200 LUX
L= 1.5 M
W= 1.5 M
UTILITY
A= 2.25 M2 = 1
E= 50 LUX
POWER PLAN
3*35 105 W
LITING 02
2*35 75 W
LITING 05
1*35 35 W
LITING 06
1*35 35 W
LITING 07
1*35 35 W
LITING 08
1*35 35 W
LITING 04
1*35 35 W
LITING 03
TOTAL LOAD LITING 355W
RECEPTACLE PLAN
21*180 =
TOTAL LOAD 3780w
TOTAL LOAD
LOAD LITING = 355W
=
4135w OK 4.135kw
LOAD RECETECL = 3780w
4135w
= 18.79A
TOTAL CARENT = 220V
voltage drap
2*I*R*L*100 2*18.79*0.520*0.05*100
VD%= = = 0.40%
V(N‐L) 220
TOTAL LOAD= 4.135KW
2 8945KW
2.8945KW
DEMAND FCATER= 0.7
TOTAJ CARENT = 18.79A
=
25% FUTURE LOAD 0.25
1; 2*(2.5 ) MM2 LITING FLORECELT
2; 2*(4) MM2 SOCKET
3; 1*(6) MM2 MP