Candrian Jetty Bar Bending Schedule

This document provides a bar bending schedule and quantity for a candrian jetty project. It includes 15 different bar markings for concrete members like concrete blocks, footings, and pedestals. For each bar marking, it specifies the bar diameter, number of bars, bar shape, dimensions, length of each bar, total length, units of measurement, weight per meter, and total weight. The schedule allows tracking of rebar requirements for the different structural elements of the candrian jetty.

Uploaded by

rony 2222
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
139 views4 pages

Candrian Jetty Bar Bending Schedule

This document provides a bar bending schedule and quantity for a candrian jetty project. It includes 15 different bar markings for concrete members like concrete blocks, footings, and pedestals. For each bar marking, it specifies the bar diameter, number of bars, bar shape, dimensions, length of each bar, total length, units of measurement, weight per meter, and total weight. The schedule allows tracking of rebar requirements for the different structural elements of the candrian jetty.

Uploaded by

rony 2222
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

BAR BENDING SCHEDULE & QUANTITY

Project : Candrian Jetty Page


Sub Project : Prepared RF
Location project : Checked
Drawing Reference : DIL -01 Rev. A Internal Rev. A

Date Prepared 7-Feb-18


Length of
dia No. of Bar in each A B C D E F Total Length UoM Weight Total Weight
Member Name Bar Mark Size, Bar dia Shape Each Bar
(mm) (mm) /12 m Kg/m (Kg)
Qty Ea. Total mm mm mm mm mm mm (mm)

Detail 60mm

CB1 - Concrete Block Selimut beton 60


Type Size 2000.W 2500.L 500.Thc 1000.H Qty; 13

Footing
DECW 1 Stirrups Y dir
D- 13 13 25 13 325 1,880 380 60 - - - 4,640 1,508,000 125.67 1.04 1,571.16

Footing
DECW 2 Stirrups X dir
D- 13 13 11 13 143 2,380 354 60 - - - 5,588 799,084 66.59 1.04 832.55

Footing
DECW 3 Stirrups Middle
D- 13 13 1 13 13 2,354 1,854 60 - - - 8,536 110,968 9.25 1.04 115.62

Pedestal
DECW 4 Vertical
D- 13 13 25 13 325 380 880 60 200 - - 2,660 864,500 72.04 1.04 900.71

Pedestal
DECW 5 Diagonal 1
D- 13 13 50 13 650 1,351 - 60 - - - 1,471 956,150 79.68 1.04 996.20

Pedestal
DECW 6 Diagonal 2
D- 13 13 25 13 325 1,130 532 60 806 115 580 3,283 1,066,975 88.91 1.04 1,111.67
BAR BENDING SCHEDULE & QUANTITY
Project : Candrian Jetty Page
Sub Project : Prepared RF
Location project : Checked
Drawing Reference : DIL -01 Rev. A Internal Rev. A

Date Prepared 7-Feb-18


Length of
dia No. of Bar in each A B C D E F Total Length UoM Weight Total Weight
Member Name Bar Mark Size, Bar dia Shape Each Bar
(mm) (mm) /12 m Kg/m (Kg)
Qty Ea. Total mm mm mm mm mm mm (mm)

Pedestal
DECW 7 Stirrups X dir
D- 13 13 2 13 26 2,380 354 60 - - - 5,588 145,288 12.11 1.04 151.37

Pedestal
DECW 8 Stirrups X dir 2
D- 13 13 5 13 65 2,380 - - - - - 2,380 154,700 12.89 1.04 161.18

CB2 - Concrete Block Cover Under 60


Type Size 2000.W 2250.L 500.Thc 1000.H Qty; 10

Footing
DECW 9 Stirrups Y dir
D- 13 13 23 10 230 1,880 380 60 - - - 4,640 1,067,200 88.93 1.04 1,111.90

Footing
DECW 10 Stirrups X dir
D- 13 13 11 10 110 2,130 354 60 - - - 5,088 559,680 46.64 1.04 583.12

Footing
DECW 11 Stirrups Middle
D- 13 13 1 10 10 2,104 1,854 60 - - - 8,036 80,360 6.70 1.04 83.73

Pedestal
DECW 12 Vertical
D- 13 13 23 10 230 380 880 60 200 - - 2,660 611,800 50.98 1.04 637.43

Pedestal
DECW 13 Diagonal 1
D- 13 13 46 10 460 1,351 - 60 - - - 1,471 676,660 56.39 1.04 705.00

Pedestal
DECW 14 Diagonal 2
D- 13 13 23 10 230 1,130 532 60 806 115 580 3,283 755,090 62.92 1.04 786.72
BAR BENDING SCHEDULE & QUANTITY
Project : Candrian Jetty Page
Sub Project : Prepared RF
Location project : Checked
Drawing Reference : DIL -01 Rev. A Internal Rev. A

Date Prepared 7-Feb-18


Length of
dia No. of Bar in each A B C D E F Total Length UoM Weight Total Weight
Member Name Bar Mark Size, Bar dia Shape Each Bar
(mm) (mm) /12 m Kg/m (Kg)
Qty Ea. Total mm mm mm mm mm mm (mm)

Pedestal
DECW 15 Stirrups X dir
D- 13 13 2 10 20 2,130 354 60 - - - 5,088 101,760 8.48 1.04 106.02

Pedestal
DECW 16 Stirrups X dir 2
D- 13 13 5 10 50 2,130 - - - - - 2,130 106,500 8.88 1.04 110.96

CB3 - Concrete Block Cover Under 60


Type Size 2000.W 2250.L 500.Thc 1000.H Qty; 4

Footing
DECW 17 Stirrups Y dir
D- 13 13 23 4 92 1,880 380 60 - - - 4,640 426,880 35.57 1.04 444.76

Footing
DECW 18 Stirrups X dir
D- 13 13 11 4 44 2,130 354 60 - - - 5,088 223,872 18.66 1.04 233.25

Footing
DECW 19 Stirrups Middle
D- 13 13 1 4 4 2,104 1,854 60 - - - 8,036 32,144 2.68 1.04 33.49

Pedestal
DECW 20 Vertical
D- 13 13 27 4 108 380 880 60 200 - - 2,660 287,280 23.94 1.04 299.31

Pedestal
DECW 21 Diagonal 1
D- 13 13 54 4 216 1,351 - 60 - - - 1,471 317,736 26.48 1.04 331.04

Pedestal
DECW 22 Diagonal 2
D- 13 13 27 4 108 1,130 532 60 806 115 580 3,283 354,564 29.55 1.04 369.41
BAR BENDING SCHEDULE & QUANTITY
Project : Candrian Jetty Page
Sub Project : Prepared RF
Location project : Checked
Drawing Reference : DIL -01 Rev. A Internal Rev. A

Date Prepared 7-Feb-18


Length of
dia No. of Bar in each A B C D E F Total Length UoM Weight Total Weight
Member Name Bar Mark Size, Bar dia Shape Each Bar
(mm) (mm) /12 m Kg/m (Kg)
Qty Ea. Total mm mm mm mm mm mm (mm)

Pedestal
DECW 23 Stirrups X dir
D- 13 13 2 4 8 1,130 354 60 - - - 3,088 24,704 2.06 1.04 25.74

Pedestal
DECW 24 Stirrups Y dir
D- 13 13 2 4 8 1,380 354 60 - - - 3,588 28,704 2.39 1.04 29.91

Pedestal
DECW 25 Stirrups X
D- 13 13 5 4 20 1,130 - - - - - 1,130 22,600 1.88 1.04 23.55

Pedestal
DECW 26 Stirrups Y dir
D- 13 13 5 4 20 1,380 - - - - - 1,380 27,600 2.30 1.04 28.76

Sub Total : Lgh@12m Kg

R6 R8 R10 D10 D13 D16 D19 D19 D25 D32


- - - 1,037 - - - - -