Fc’ 30 Slump 18
water weight is taken 2% of 195 liters
the weight of cement is taken 2% from 390 kg
the weight of sand is taken 2% from 782 kg
the weight of sand is taken 2% from 1020.6 kg
materials that are ready to mix
insert the material into a portable mixer
the concrete mix is ready to be tested for slump
the concrete mixture is inserted into the cone mold for the slump test
compressing the concrete by stabbing the iron 25 times
lift the mold perpendicularly with care
measure the height of the slump with the meter.
Slump 18 ± 2.5