PETROVIETNAM MARINE SHIPYARD
al
MOBILE SELF-ELEVATING DRILLING RIG PROJECT.
(Goontrotied Copy
17 tt note
PYAES Cup
@XOO1 Pra
inoooooooooc00
b [eee eee sees
[- (H) MOC Approved
| 15-1 ay
Rew ]
[Revise for approval | Obdea yg =|
| 08/07/09 | Issue for approval
This procedure is the property of PVMS C
the consent of the Managing Director or Management Representative.
Rev. | Issue 7a Prepared Checked Approved
| Objective |
No. | Date PVMS
|
: : i Total page: 17
Document No.: GiK001-GE-PP-003 | (including cover page)
Notes:
‘ompany. It shall not be copied in whole or part withoutGK001-GE-PP-003 7 16/11/2009
TABLE OF CONTENTS
1.0 PURPOSE
2.0 SCOPE..
3.0 REFERENCES
4.0 DEFINITION
5.0 PROCEDUR!I
5.1 Quality Policy.
5.2 General Project Information
5.3. Correspondence/Communication
5.4 Control of the Project Quality Plan
5.5. Manpower / Organization Chart...
5.6 Responsibilities and Roles of Key Personnel
5.7 Contract Review ..
5.8 Design Control...
5.9 Document and Data Control.
5.10 Procurement.
5.11 Material Acceptance/ Receiving Inspection .
5.12 Material Handling, Storage, Packing, Preservation And Delivery.
5.13 Material Identification & oa
5.14 Process Control ...
5.15 Inspection And Testing...
5.16 Control of Inspection, Measuring And Test Equipment
5.17 Inspection And Test Status .
5.18 Control of Non-Conforming Product..
5.19 Corrective and Preventative Actions .
5.20 Control of Quality Records
5.21 Internal Quality Audit
5.22 Safety
5.23 Training
5.24 Statistical Reports.
5.25 Serving / Warranty...
5.26 Final Documentation / Project Quality Record.
5.27 PBB’s Supplied Materials / Equipment.
5.28 QA Programmed...
6.0 SPECIAL REQUIREMENT
7,0 RECORDS..
8.0 LIST OF QA/QC FO)
were e IIIb ARAL
Rev: Page 1 of 16GKO01-GE-PP-003 16/11/2009
1.0 PURPOSE
This procedure describes PVMS’s practice and specific quality programs in
achieving quality standard of NEW BUILDING OF A 60M WATER DEPTH
OFFSHORE MOBILE SELF-ELEVATING DRILLING RIG PROJECT as to meet
PYN’s requirements.
2.0 SCOPE
The procedure covers all the activities related to the works during Design,
Procurement, Fabrication and Commissioning until the project delivery. It
covers all discipline of administrative and productive works.
3.0 REFERENCES
Quality Manual (STCL/CTGK)
4.0 DEFINITION
PVN - Vietnam National Oil and Gas Group.
PBB - PetroVietnam Drilling Platform Building Board
PVMS _ - PetroVietnam Marine Shipyard Company
POP - Project Quality Plan
QA - Quality Assurance
ac - Quality Control
Qus ~ Quality Management System
QMR - Quality Management Representative
NDT - Non Destructive Testing
ITP - Inspection and Test Plan
WPQT _ - Welding Procedure Qualification Test
wot - Welder Qualification Test
EDMS _ - Electronic Data Management System
PDMS __ - Plan, Design and Management System
JSA - Job Safety Analysis
NCR - Non Conformance Report
Rev: 1 Page 2 of 16GK00I-GE-PP-003 : 1G/1 1/2009
5.0 PROCEDURE
5.1 Quality Policy
Being established by industry leading groups in Vietnam including
VIETNAM NATIONAL OIL & GAS GROUP, LILAMA, VINASHIN and
5.2
BIDV, PetroVietnam Marine Shipyard Company is to implement and
accomplish the long term strategy of Vietnamese Government in
developing rig building industry in Vietnam with Quality up to
international standard.
Quality statement:
“Prestige - Quality - Efficiency”
PETROVIETNAM MARINE SHIPYARD COMPANY commits
>
v
‘To Clients: To fulfill our client’s demands and expectations with high
and consistently improving quality products and services.
To Employees:
e To train, to retrain the employees to master industry technology
as well as international working practice.
° To establish a professional working environment, working
facilities in order to maximize employees capabilities and
contribution.
© To establish, implement, maintain and continuously improve a
Quality Management Systems in accordance with ISO
9001:2008 Standard.
To social community: To fulfill all social responsibilities as well as
actively contribute to community and society development.
This Quality Policy is issued & circulated among all PetroVietnam Marine
Shipyard employees. We are committed to pursuit this Policy.
General Project Information
Project Title: New Building A 60: Water Depth Ofishore Mobile
Self-Elevating Drilling Rig
Contract No.: 526/HD-DKVN
Rev: 1
Page 3 of 16GKO01-GE-PP-003 16/11/2009
5.3
54
55
5.6
Award Date: 21% Feb, 2009
Project Duration: 32 months from 21" May, 2009
Fabrication Location: PVSHIPYARD YARD — VUNG TAU - VIETNAM
Correspondence/Communication
For more detail refer to Project Coordination Procedure (GK001-GE-PP-
002) and Document Control Procedure (GK001-GE-PP-004)
Control of the Project Quality Plan
This plan shall be reviewed and revised as required to cater for changes
and improvement.
When revision is made, the revised copy shall be dispatched to all holders
of Controlled Copy of this plan for replacement and implementation.
Key personnel of the project managements shall be given controlled copy
of this plan.
Uncontrolled copy of this plan may be issued, upon request for information
purpose only. A register for issue of uncontrolled copy recipient shall not
be kept and hence the recipients are not informed of any amendment of the
plan.
Manpower / Organization Chart
‘The manpower for this project shall be filled by qualified and experienced
personnel. The project organization chart shall be prepared and maintained
by Project Manager.
For more detail refer to Project Coordination Procedure (GK001-GE-PP-
002)
Responsibilities and Roles of Key Personnel
5.6.1. Project Manager
(Refer to Project coordination procedure ~ Doc. No.: GK001-GE-PP-002)
5.6.2. Construction Superintendent A
(Refer to Project coordination procedure - Doo. No.: GK001-GE-PP-002)
5.6.3. QA/QC Manager
(Refer to Project coordination procedure ~ Doc. No.: GK001-GE-PP-002)
Rev. T
Page 4 of 16GK001-GE-PP-003 16/11/2009
5.6.4.. Procurement Coordinator AN
(Refer to Project coordination procedure - Doc. No.: GK001-GE-PP-002)
$.6.5. HSE Coordinator D\
(Refer to Project coordination procedure ~ Doc. No.: GK001-GE-PP-002)
5.6.6. Engineering Manager
(Refer to Project coordination procedure ~ Doc. No.: GK001-GE-PP-002)
5.6.7. Commissioning Manager
(Refer to Project coordination procedure ~ Doc. No.: GK001-GE-PP-002)
5.6.8. Planning Manager
(Refer to Project coordination procedure ~ Doc. N
5.6.9. Welding Engineer
> Reports directly to Project QA/QC Manager.
GK001-GE-PP-002)
> Prepares /Carties out the qualification of welding procedure
specification (WPS) and welder qualification test procedure (WQTP) in
accordance to applicable codes / standard and specification.
> Assists the construction team in preparing of welding sequence and
resolving other problems / activities related to the welding.
> Evaluates materials (metallurgical, mechanical, physical properties)
based on mill certificates and applicable standards and specification.
> Witnesses welders’ performance / qualification test, issues welders’ pass
and certificate as necessary and monitors the performance of these
welders.
> Monitors and maintains records of welders’ performance, welder’s
certificate and welding repair rate.
> Maintains records of welding qualification test (PQR, WPS)
5.6.10. Discipline Supervisor
> Reports directly to Project Superintendent. AN
> Shall coordinate with his subordinates for the execution of the work in
his discipline as well as with other disciplines.
Rev: 1
Page 5 of 16GK001-GE-PP-003_ 16/11/2009
> Shall ensure design integrity and construction quality for his discipline
work in accordance to specification and classification practice,
> Shall be able to discuss with PBB representative on the progress and
resolve any issue arise at site.
5.6.11. Material Coordinator / Controller
> Liaise with PMT, Procurement Department and PBB on the procurement
and expediting of the material / items ordered
> Ensure that all material / items delivered are properly stored and
preserved prior to delivering,
> To compile all documentation required for the procured material.
(Refer to Material control procedure ~ Doc. No.: GK001-QA-PP-001)
5.6.12. Safety Officer A
Assist Project Safety Coordinator in promoting safety at construction
site.
> Advice project management on preventing injury to employees, health,
environment and property damage in accordance with safety
programmed.
> Carry out site safety inspection to ensure that safe methods of work are
being carried and initiate a safety report.
> Carry out accident/incident investigation and determine the causes and
recommend preventive measures.
> Prepare safety report as required
» Organize and conduct Weekly Safety Tool Box Talks & induction
courses to new employees.
> Promote safety to all levels of employees by safety promotion activities
and safety campaigns.
> Keep up to date on safety statistic board, bulletin boards, recommended
code of practices, safety information.
® Inspect physically, with the applicant of work permit, the area of
intended work, especially in compartment or pipelines.
Rev: 1
Page 6 of 16GKO01-GE-PP-003 = 16/11/2009
5.7
5.8
59
> To be on site at all times whilst work is in progress, enforce safety &
stop any work or operation that violates any safety procedures or
instruction or would endanger life & property.
Contract Review
The contract shall be reviewed for adequacy and capability to meet the
PBB’s requirements . If the contract has any discrepancy or changes, it
shall be raised by Procurement Manager.
Details shall be described in: Plan package (GK001-PL-PP-001), Item
Change control of Coordination procedure (GK001-GE-PP-002)
Design Control
(Refer to Design control procedure — Doc. No.: GK001-EG-PP-001)
Document and Data Control
Control of document shall follow Document Control Procedure - Doc.
No.: GK001-GE-PP-004. That procedure describes how all documents are
reviewed and checked prior to issuance by the originator’s department. It is
also to ensure that the latest revision is used by the relevant personnel and
department at all time.
5.10 Procurement
Rev
Purchasing of material is initiated by Design Department through
Preliminary Purchase Requisition. Procurement and expediting activities
for this project is coordinated by the Procurement Coordinator, which shall
control the purchasing of material from PBB approved vendor. Upon
completion of the project, the Procurement Dept. shall appraise the vendor
on their performance during project execution. Apart from purchasing, the
coordinator also provides information for sourcing and costing of material
to facilitate the preparation of quotation.
Details refer to: Quy trinh mua sim vat tw thiét bi va dich vu (GK001-PC-
PP-001), Quy trinh kiém soat va thuc hign hgp déng (GK001-PC-PP-002)
Page 7 of 16GKO01-
°P-003__ 1/1/2009.
5.11 Material Acceptance/ Receiving Inspection
Upon receipt of materials (inclusive of PBB’s supplied materials) to the
yard, Material Inspector shall liaise with Store to conduct Material
Receiving Inspection Report (MRIR) of the new arrived materials or
equipments. Inspection is based on the physical check as well as quantity
and quality of the goods. Only accepted materials will be delivery for the
fabrication.
Details refer to: Material Control Procedure (GK001-QA-PP-001)
5.12 Material Handling, Storage, Packing, Preservation and Delivery
Materials arrived at PVMS shall be protected and stored in a manner to
preserve them. Handling and transportation from the warehouse to the site
areas shall be supervised and monitored so as to avoid damages of
misidentification.
Details refer to: Material Control Procedure (GK001-QA-PP-001)
5.13 Material Identification & Traceability
Materials used for the fabrication shall be identified systematically either
by marking or tagging (or by positive material identification if required)
for traceability. This identification will be extended to all materials,
components and processes. Marking of heat number and piece/spool
number shall be by low stress stamping method.
Details refer to: Material Control Procedure (GK001-QA-PP-001)
5.14 Process Control
5.14.1, Planning
Project Planner shall be responsible on planning for works He shall also be
responsible for preparation of progress status and progress reporting.
Project Manager shall be informed of the delay and shall analyze the actual
progress against the plan and establish necessary action plan to maintain
the target date.
Details refer to: Planning Package (GK001-PL-PP-001)
Rev: T
Page 8 of 16GKO001-GE-PP-003 16/11/2009
5.14.2. Welder/ Welding Operator Qualification Test
Prior to commencement of work, PVMS shall qualify all welders,
according to Welder’s Qualification Test Procedure. All welders engaged
for this Project shall be tested under close supervision by and engaged by
PVMS and witnessed by Authority third party. Or pre-qualify welders who
have valid certificates from authority third party shall be mobilized for
welding works.
Details refer to: Welder & welding operator qualification test procedure
(GK001-QA-PP-006)
5.14.3, Subcontractor Control
To ensure the effective implementation of QMS, Project Manager shall
brief the subcontractors on the system and project requirements as to
communicate the quality and safety awareness to all personnel.
All sub-contractors of this project shall fully comply to all PBB
requirements in term of safety and quality. PVMS shall ensure only skilled,
experienced workers are employed for this project.
5.14.4, Control of Production Equipment
Works and Facilities Dept. shall provide necessary facilities and equipment
to the Project such as welding machines, cranes, forklift and electrode
ovens etc. Regular maintenance shall be conducted to ensure their fit for
use condition. All equipments have identification and certificate which
indicate their expiry and condition.
For details refer to: Equipment Calibration Procedure (GK001-QA-PP-
020)
5.15 Inspection and Testing
5.15.1. Inspection and Test Plan
‘The Inspection and Test Plan (ITP) and Quality Control Flow Chart shall
cover all inspection activities relevant to fabrication i.e., incoming, in-
process and final inspection. ITP shall identify details of inspection/ test
activities, related documents and acceptance criteria.
Rev: I
Page 9 of 16GKO01-GE-PP-003 16/11/2009
For details refer to individual ITP:
- ITP for piping Fabrication & Erection (GK001-QA-IT-004)
- ITP for structural Fabrication & Erection (GK001-QA-IT-005)
- IEP for Coating Operation (GK001-QA-IT-006)
ITP for electrical & instrumentation (GK001-QA-IT-002)
ITP for mechanical (GK001-QA-IT-001)
ITP for dimension (GK001-QA-IT-007)
ITP for Heating, Ventilation and Air Conditioning (GK001-QA-IT-003)
ITP for Jack-up Inclining test (GK001-CM-IT-001)
ITP for Testing and Pre-commissioning (GK001-CM-IT-002)
ITP for Commissioning (GK001-CM-IT-003)
5.15.2. Source Inspection
PVMS shall utilize its QC inspectors or appoint qualified Third Party
Inspection Agency (TPI) to carry out inspection of the materials or
equipments which were manufactured or fabricated away from PVMS
jobsite.
5.16 Control of Inspection, Measuring and Test Equipment
All measuring and test equipment shall be calibrated and maintained in an
orderly manner. PVMS will engage a “Third Party” (ie. QUATEST 3 or
Petrol Vietnam Manpower College), a calibration body to calibrate Master
equipment/tape. For measuring tapes and pressure gauges, welding
equipments... calibration may be done by QA/QC Dept of PVMS.
For details refer to: Equipment Calibration Procedure (GK001-QA-PP-
020)
5.17 Inspection and Test Status
All inspection and test status shall be identified, maintained and
documented as per ITP and approved procedures. The inspected items shall
be marked directly to the materials by crayons, colored paint or by using
identification tags.
‘Rev: T : a Page 10 of 16GKOOI-GE-PP-003 16/11/2009
Il the inspections and testing activities shall be recorded in the formats as
per attachment in specific procedure. Other relevant inspection formats
shall be complied with the project standard procedures.
5.18 Control of Non-Conforming Product
Control of non-conformance and corrective actions shall follow Non
Conformance Control Procedure. QC inspectors or PBB’s representatives
shall conduct Non-Conformance Report (NCR) for Non ~conformity of all
items e.g. materials, products, services, process, etc. with Drawing, PBB
Specification and code. Base on the report, Discipline engineer shall
propose a remedial action to decide whether the items are to be: Rejected,
Repaired, Reworked or Accept-As-Is. Copies of NCRs shall be forwarded
to PBB for review.
For details refer to: Non-conformance contro! Procedure (GK.001-QA-PP-
019)
5.19 Corrective and Preventative Actions
Any non-conformance of the products, services or processes shall be
investigated to find the nature and root causes, Discipline
Supervisors/Engineers shall liaise with QA/QC Engineer and propose @
corrective action to correct the non-compliances.
Once root cause has been identified, it shall be eliminated to prevent the
non-conformities’ occurrence
For details refer to: Non-conformance control Procedure (GK001-QA-PP-
019)
5.20 Control of Quality Records
All inspection and testing reports shall be indexed, filed, documented and
kept updated by QC Division. in an orderly manner. These records shall
reflect full traceability to the actual inspection activities and PVMS shall
provide full access of records upon PBB request.
Page 11 of 16GK001-GE-PP-003. 7 16/11/2009
5.21 Internal Quality Audits
PVMS shall plan and carry out Internal Quality Audit to ensure the
adequacy and effective of Quality System. The audit findings shall be
extended to the fabrication subcontractors for their implementation and
correction
The audit shall cover but not limited to:
i Engineering Every 6 months
2 | PQP Procedure Every 6 months
3 Relevant Procedures Every 6 months |
4 Material Receiving / Storage ~ | Every 6 months
5 Site Preparation a ~ | Bvery 6 months |
6 ' Subcontractors (If any) Every 6 months
[7 Consumables and Electrodes Every 6 months
8 Handling Every 6 months
feeeeS Welding Control | Byery 6 months
10 Paint Material / Application Every 6 months
ul Project Implementation Every 6 months
12 | Inspection Reports & Progress Every 6 months
13. |NDT ce [Every 6 months
14 Safety Measures Every 6 months
‘Note: The first internal audit will be hold after contract takes effective 06
‘months.
5.22 Safety
PVMS is fully committed to uphold safety within the company.
Requirements of PVMS Manual and HSE Plan shall be the basic for
implementing the safety programs.
Rev: T Page 12 of 16GK001-GE-PP-003 7 16/11/2009
During project execution, detailed safety programs are being planned for
all personnel, subcontractors.
5.23 Training
In line with company’s quality objective on Human Resources
development PVMS shall provide relevant training courses to personnel
involved in the project. A
5.23.1. Morning Safety Training / Briefing
This briefing for fabrication workers shall be conducted weekly or as
necessary and coordinated by the Safety Promoters, Safety Officers and
QA/QC Dept. This briefing is conducted for all personnel, subcontractors
and PBB’s personnel.
5.23.2. Tool Box Briefing
This briefing will be conducted either by PVMS foreman or sub-contractor
supervisor on relevant discipline before performing their duties. Topics
discussed are basically on safety, quality, workmanship as well as
housekeeping,
5.23.3, Job Safety Analysis Training
Activities that required Job and Safety Analysis, PVMS Safety Coordinator
shall ensure that personnel are trained and briefed prior to conducting the
tasks. Job Safety Analysis shall be implemented and submitted for PBB
approval.
5.23.4. Scaffolding Training A
Personnel involved in construction of scaffolding shall be fully trained and
equipped with safety harness.
5.23.5. QA/QC Training
In order to have smooth implementation of the project, all personnel
involved shall be fully trained and aware of PVMS Project quality
objective.
In doing so, PVMS QA/QC Department shall train, brief and instill quality
awareness on all subjects related to the project. A
“Rev: 1
Page 13 of 16GKOO1-GE-PP-003 16/11/2009
5.24 Statistical Reports
One way to measure the performance of the project as overall is through
measuring its performance in selected areas such as:
a) Welding Repair Status
b) Welder Performance
©) Project Progress Report
@) Audit and NCR Status
e) Safety Statistics/Analysis
) Weld and NDT Summary
5.25 Serving / Warranty
Upon handling over the whole package, items ot equipment classified and
identified to have a warranty period, PVMS shall provide services and
assistance where required as spelled out in contract requirements.
5.26 Final Documentation / Project Quality Record
Final Documentation shall be compiled and stored in a manner to ease for
retrieval. These documents must be retained for at least 3 years or
contractual duration, PVMS shall confirm in writing that documents to be
retained are completed and available for review by agreed dates.
5.27 PBB’s Supplied Materials / Equipment
Upon starting of the project, PVMS Project Manager shell request from
PBB a material list of PBB’s supplied materials/equipment. The list shall
then be forwarded to Material Coordinator for monitoring and follow up.
Details of inspection and segregation of PBB’s materials and equipments
shall refer to Material Control Procedure.
Surplus materials are off-cut materials which are one meter or more.
PVMS shall identify and segregate the surplus materials from others. A list
of surplus shal] be updated and submitted to PBB upon request.
Off-cuts which are less than one meter length are considered as scraps and
shall not be mixed with the surplus. Other materials that are good for
future use shall be stored and kept for handover to PBB.
“Page 14 of 16GKOO1-GE-PP-003__ 16/11/2009
5.28 QA Programmed
PYMS shall implement a comprehensive and approached quality program
in order to meet project quality objective. Such quality programs are
QA/QC meeting, Too! Box, Quality Audit, Welders Performance and Non-
Conformance Analysis to name a few.
6.0 SPECIAL REQUIREMENT
Not applicable
7.0 RECORDS
QA/QC Manager or his representative shall be responsible on overall
documentation and retention of quality records.
All records shall be retained and filed as specified in CONTRACT documents.
8.0 LIST OF QA/QC FORM
i
2
y~aunew
Project Procedures Index A
Project Management Team Organization Chart (Key
Personnel)
Material Receiving Inspection Report
Piping Material Traceability Record
Structure Material Traceability Record A
Inspection Report Format - Welding Summary For Structure
Inspection Report Format - Welders Repair Rate Report For
Structure
Inspection Report Format - Visual For Structure
Inspection Report Format - Welding Summary For Piping
Inspection Report Format - Welders Repair Rate Report For
Piping
Inspection Report Format - Visual For Piping
Inspection Report Format - Fit-up For Piping (ifany) A
Inspection Report Format — PWHT Report (if any)
Inspection Report Format - Hardness Test Report (if any)
Rev:
Page 15 of 16GKOOI-GE-PP-003 err 16/11/2009
15
16
17
18
19
20
21
22
23
24
25
Non-conformance report
Non-Conformance Report Register
Request for Flushing and Hydrotesting
Hydrostatic Pressure Testing Record
Flushing Certificate
Request for Valve Leak Test
Valve Leak Test Data Sheet
Blasting and Painting Inspection Report
Painting Summary
Acid Cleaning Report
Inspection Report Format ~ Leveling and Dimensional Control
Report (Before and After Welding)
Rev: 7
Page 16 of 16