Activity Relationship Chart (REL Chart)
Activity Relationship Chart (REL Chart)
Relationship Chart
(REL chart)
SYSTEMATIC LAYOUT PLANNING (Muther 1961)
Activity Relationship Chart (REL chart)
Rating Definition
A Absolutely
E Especially Important
I Important
O Ordinary closeness OK
U Unimportant
X Undesirable
Code Reason
1 Flow of materials
2 Ease of supervision
3 Common personnel
4 Contact necessary
5 Convenience
6
Activity Relationship Diagram
Production Space Requirements
Machine
Center Machine
Dimensions Center Area Total Process
Process Equipment No.
Per Machine per Machine Area (ft2 )
(ft) Depth x (ft2)
Width
Armstrong
SAW 3 10 x 9 190 570
hack saw
K & T plain
5 13.5 x 10.5 142 710
mill
MILL Vertical mill 7 11 x 10.25 113 791
Hand mill 4 7.25 x 9.75 71 284
Contd. Machine
Center Machine
Dimensions Center Area Total Process
Process Equipment No.
Per Machine per Machine Area (ft2 )
(ft) Depth (ft2)
Width
2 Spindle
2 8.25 x 6.5 54 108
Avey 1
DRILL Spindle Delta
2 7.5 x 4.5 34 68
6
Spindle Delta 1 7.45 x 10.5 82 82
Gisholt 1 9.25 x 17.75 164 164
Monarch 2 14 x 6.25 88 176
1 Receiving 12000 6
2 Milling 8000 4
3 Press 6000 3
4 Screw M. 12000 6
5 Assembly 8000 4
6 Plating 12000 6
7 Shipping 12000 6
1. Select the first department to
enter layout (using diagramming
worksheet)
2. Select the second dept. to enter
the layout.
3. Select the third department to
enter the layout
4. Select the fourth department to
enter the layout
5. Place dept. n similar to 3rd and
4th steps.
1 1 1
4 4 1 1
4 4 3 1
4 2 3 3
4 2 2 2
5 6 6 6
5 6 6 6
5 7 7 7
5 7 7 7
Graph-based construction method for new layouts
• Example
Dr. Muzaffer Kapanoglu-Copyright 2005
Dr. Muzaffer Kapanoglu-Copyright 2005
SUMMARY
• Objectives in different kinds of Layout.
- Process, Product, Mixed.