100% found this document useful (1 vote)
258 views4 pages

CCTV System Vendor Document Review

The document is a vendor document review from PetroChina International Jabung Ltd. for a CCTV system diagram block submitted by contractor PT. Petroflexx Prima Daya. It lists the contract and project details. The review code A indicates the diagram was accepted with minor comments. The document states this review does not relieve the contractor of its contractual obligations, including engineering and design responsibilities.

Uploaded by

Hendri Budiharto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
258 views4 pages

CCTV System Vendor Document Review

The document is a vendor document review from PetroChina International Jabung Ltd. for a CCTV system diagram block submitted by contractor PT. Petroflexx Prima Daya. It lists the contract and project details. The review code A indicates the diagram was accepted with minor comments. The document states this review does not relieve the contractor of its contractual obligations, including engineering and design responsibilities.

Uploaded by

Hendri Budiharto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

PetroChina International Jabung Ltd.

PROJECT DOC No :

Diagram Block CCTV System BCD5-815-00-195-CCTV-001-BD-02

VENDOR DOC No :

BCD5-815-00-195-CCTV-001-BD-02

CONTRACT NO. : BCD-497-CA


CONTRACTOR : PT. PETROFLEXX PRIMA DAYA
COMPANY : PETROCHINA INTERNATIONAL JABUNG LTD.
PROJECT NAME : WB-SB Non Asso Gas Early Permanent Facilities

CONTRACTOR JOB NO. : P-0701


VENDOR : PT. KUARTA POWERINDO PERKASA
P.O. NO. : 008.PO/MP/P0701/PPD/IX-16
EQUIPMENT : CCTV Systems
TAG NO. : -

VENDOR DOCUMENT REVIEW VENDOR DOCUMENT REVIEW


FOR CONFORMANCE WITH SPECIFICATIONS AND DESIGN DRAWINGS FOR CONFORMANCE WITH SPECIFICATIONS AND DESIGN DRAWINGS
Review Code Review Code
A Accepted as it is or with minor comments A Accepted as it is or with minor comments
B Accepted as noted - Resubmittal required B Accepted as noted - Resubmittal required
C Not Accepted C Not Accepted
D Information Only D Information Only

THIS REVIEW DOES NOT RELIEVE THE CONTRACTOR OF ANY THIS REVIEW DOES NOT RELIEVE THE SUBCONTRACTOR/VENDOR OF ANY
CONTRACTUAL OBLIGATION, INCLUDING THE RESPONSIBILITY FOR CONTRACTUAL OBLIGATION, INCLUDING THE RESPONSIBILITY FOR
ENGINEERING AND DETAIL DESIGN. ENGINEERING AND DETAIL DESIGN.

Date By Date By
PetroChina International Jabung Ltd. PT. Petroflexx Prima Daya

0 2-May-17 Approved For Construction FO PM HP


E 4-Jan-17 Re-Issued for Approval FO PM HP
D 7-Nov-16 Re-Issued for Approval FO PM HP
C 2-Nov-16 Issued for Approval FO PM HP
B 5-Oct-16 Issued for Review FO PM HP
A 5-Oct-16 Internal Discipline Check FO PM HP

REV. DATE REASON FOR ISSUE PREPARED CHECKED APPROVED


BLOCK DIAGRAM

CCTV SYSTEM
DRAWING INDEX

You might also like