C5. QCC - Young's Express - Electricity Generating Authority of Thailand
C5. QCC - Young's Express - Electricity Generating Authority of Thailand
Mr.Dusit Jitreepol
Mr.Sangob Thaiwong
Mr.Worapot Inthong Mr.Suthon Boonprasong
Assistant Governor-Transmission Deputy Governor-Transmission
Mr.Kornrasit Pakchotanon
Governor Mr.Apidech Pintong
System Operation System
QC
No. Name Duty Education Age
Experience
Mr.Tewan Tantanatewin
Director, Northeastern Region 1 Ms.Kulthida Tantanatewin Leader Master 32 7
Operation Division
2 Mr.Jarluke Sutthivong Member Bachelor 55 21
Job Description
Electricity Generation and Transmission Operation EGAT
Power System Dispatching QC TEAM
System Voltage Control
Power System Restoration
Maintenance Cooperation
Control System Maintenance (SCADA)
SCADA : Supervisory Control and Data Acquisition (Computer system at control center)
System Average Interruption Frequency Index : SAIFI (Times) Energy not Served : ENS (MWh)
System Average Interruption Duration Index : SAIDI (Minutes) Voltage Deviation : VD (Percentage)
1 1
Accumulated 4.13 2
3
Accumulated 3.64 2
3
Assessment chart for the first 6 months of 2015
4 4
Level
5 5.00 5
4.13 3.64
2.96
SAIDI assessment chart Voltage Deviation assessment
for the first 6 months of 2015 chart for the first 6 months of 2015
Index
Index 1 2 3 4 Index
1 1
Accumulated 2.96 2 2
3
3
4 Accumulated 5.00 4
5
5
Standard/
5
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
Incident events that affect the SAIDI value from January to June 2015
Equipment/ Outage power/
No. Date Time Cause
Station Failure time
1 2/Jan 09.43- Transformer Flashover due to a bird around lightning arrester at low side, 8.7 MW/
phase C.
1 /15 09.57 KT1A at KK2
Substation
14 Minutes
22 30/Jan 13.14-
/15 13.25
Line 115kV
KK1-CPA
Flashover due to fire over sugarcane field at the tower no. 96/3-
97/1, 39 km from KK1 substation.
25.8 MW/
11 Minutes 4
3
33 9/Feb 19.39-
/15 19.46
Delivery Point Flashover due to fire over sugarcane field at the tower no. 22/2-
115kV NH to 22/3, 22 km from NH substation.
0.9 MW/
7 Minutes
PEA: BDG 2 1
55 5/May 20.11- Line 115kV UB1- Flashover due to lightning strike at tower no. 44/3 of circuit#1,
18.5 km from UB1 substation. Flash mark at arcing horn.
9.6 MW/
/15 20.20 SRD#1 9 Minutes
6
6 17/May/ 17.03- Delivery point Flashover due to a squirrel causing crack in support insulator, 19.5 MW/
6 15 17.08 22 kV NR1 to phase C, of disconnecting switch no.2216. 5 Minutes
PEA#1
Standard/
6
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
6. Charge line 5B
6
End
Request PEA to transfer load
PEA : Provincial Electricity Authority to neighboring station
Distribute power from the neighboring station
Standard/
7
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
Work flow process chart of system restoration procedures from January to June 2015
Transmission Delivery
Inspection
Operation
Avera
Storage
M0ving
Transformer
Delay
No Line Point ge
.
Restoration procedures 1 2 1 2 1 2 (Minutes
KK1 UB1 KK2 SO1 NH NR1 )
1 Contact station operator 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Wait for information from station
2 operator 6.00 4.00 9.00 8.00 2.00 1.00 5.00
3 Verify the information 2.00 2.00 2.00 2.00 2.00 1.00 1.83
5
Energize outage device / transfer Step 2 takes maximum
1.00 1.00 1.00 1.00 1.00 1.00 1.00
6
load to neighboring station
Charge line
average time 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Total 11 9 14 13 7 5 9.83
Customer complain for Equipment damages / loss of Not enough power at delivery point
compensation (147,400 Baht) income (271,200 Baht) (88,400 kW outage)
Standard/
9
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
100
100 % Reduce 96.6%
Outage
Device
5 450 Mins
Secs
Mins
Performance Agreement (PA) 0 10 Secs
SAIDI for the first 6 months of 2015
Before Activity Goal
Outage/time = 30 mins/6 = 5 mins
1
2
3
Reduce waiting time in the
4 restoration process
Level 4; Power outage less than 30 minutes 5
from 5 minutes to 10 seconds
by December 2015
Standard/
10
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
WHEN
Items Process Responsible person
Jul15 Aug15 Sep15 Oct15 Nov15 Dec15
Plan Plan
Actual Actual Activity duration of 6 months from 1st July to 31st December 2015
Standard/
11
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
2 3 1 1
Control center Substation
Local operator/
KK1 Substation 10% Man 1 Control center
operator
10%Control Center SCADA System
Substations Control Center
RCC DSPServer
Line Buffer
Conventional RTU
Computer/
/IP
P
TC
Conventional RTU
IEN
2 Incident
OPWAN
Network
information
80% KK1GCC
80% Information
PO Substation KK1 Group Control Method 3 access
Center (GCC)
procedure
Standard/
12
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
Proof C1
Why takes a long time Incident information
waiting for incident Waiting for GCC operator to check
information? information for control center operator is 80% at GCC
10%
100% Control Center
Incident information at GCC
100%
80%
2 minutes
80%
PO Substation KK1 GCC
Standard/
14
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
Proof C2
Why takes a long time Taking long time to perceive 7 alarm groups, 3
waiting for incident Several alarm
information from SCADA pages/group
information? displays
computer (total 21 pages)
When an incident occurs, searching process through several alarm pages takes a long time.
Proof results of an incident event :
Alarm Display at GCC When an incident event occurred, GCC
operator had to search through several alarm
pages at GCC.
2 minutes
Standard/
15
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
Proof C3
Why takes a long time Taking long time to perceive Many sets of
waiting for incident A lot of event A lot of incident
information from SCADA protection system
information? logs on display information
computer data
When an incident occurs, operators take a long time searching many sets of protection information.
Proof results of transformer outage event :
2nd January 2015 09.43 - 09.57 AM From an incident event, local information has
KT1A transformer at KK2 tripped by
been grouped before sending to control center.
transformer differential relay (phase
A,C) caused power outage 8.7 MW Control center had to contact local operator for
for 14 minutes. more information.
Alarm group at control center
Major/Minor Alarm Displays
NAMPONG-1
KHON KAEN-1
4 minutes
Standard/
16
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
Proof C4
Why takes a long time Taking long time to perceive Mix of irrelevant Incoming information
waiting for incident A lot of event
information from SCADA and incident includes maintenance
information? logs on display
computer information and operation data
Operators take a long time finding the problem due to incoming information irrelevant to incident.
Proof results of transformer outage event :
23rd August 2015 09.59-10.10 AM KT6A transformer at KK1 During 09.59-10.05 AM, event lists can be categorized
tripped by transformer lockout relay showing phase A and 86K as follows :
caused power outage 16.8 MW for 11 minutes. 1. Event lists of KK1 14 items.
2. Event lists of other impacted stations 124 items.
3. Event lists of operation and maintenance 102 items.
Graph shows amount of information
Major Alarm by event type.
Items
124
102
Major Alarm
14
Type
KK1 Impacted Operation&
stations maintenance
3 minutes
Standard/
17
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
Proof C5
Why takes a long time Taking long time to perceive Alarm display Incident information
waiting for incident information from SCADA changed due to many sorted by sequence
information? computer of event log feeds of time
Operators take a long time discover the problem due to event log feeds.
Proof results of transformer outage event :
23rd August 2015 09.59-10.10 AM KT6A transformer at KK1 Event display showed alarm lists in
tripped by transformer lockout relay showing phase A and 86K sequence of time and constantly shift when new
caused power outage 16.8 MW for 11 minutes. information coming.
1 minute
Standard/
18
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
Develop automatic
No repeat problem
Create
approach procedure to import
No new problem
Direct
access to
database and
picture
to transfer substation data Summ
information and GCC monitoring
ary
Total score
Self action
information management
Easy to do
to control system at control
system center
center
Collaborate
for analysis information action
and simplify Import data and create cloning 1
information
Create a display
GCC SCADA system
5 Action
showing only
No
abnormal Implement a new computer to
Display Information monitor abnormal information 2
important Develop a new Collaborate
information approach to
action
major and
display major minor alarm
Create alarm-filtered display 2
and minor from all Display all
at GCC SCADA system
5 Action
Display alarms substation information
instant In one page Create a display containing 3
information all major and minor alarms 5 Action
Standard/
19
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
1 2 3 4
Remote GCC
installation
procedure Select an unused
Select installation location Setup a computer set
Install program and
computer train operators
Daily update structure database at 3.00 AM and real-time database every minute.
10%
80%
Substation GCC
Remote GCC server Monitor remote GCC
RE1 NR2
RE2GCC NPO2GCC
KK
UB2 NN2 UD3
2
KK
2
KK
2
KK
UB2GCC NR2GCC 2
KK
2
KK
2
KK
2
KK
2
KK
2
KK
2
NN2GCC UD3GCC KK
2
KK
2
KK
2
KK
2
KK
2
KK
1.1 Configure the automatic data transfer 1.2 Create virtual machines to 1.3 Install remote GCC client
2
KK
2
system from GCC to control center. simulate GCC systems. at control center.
Result : Control center can check an incident information instantaneously (Status updated every minute).
Standard/
20
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
Substation
3 Create a Major / Minor Alarm display for all substations in one page.
Concept : CCTV
system displays
all cameras in
one screen.
R
N
P
O
2
N
C
Y
P
Power Outage
E R
1 2
U S U
B O D
2 2 3
5. Charge line 4B
5
End
Request PEA to transfer load
to neighboring station
Distribute power from the neighboring station
Standard/
23
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
Checking the results : After the improvement between 1st - 31st October 2015,
operators can access incident information immediately.
The result of system restoration in an outage case at KK1 October 19 th, 2015
Outage power/
No. Date Time Equipment/ Station Cause Failure time
1 19/Oct/ 10.18 Transformer Pressure Relay of OLTC KT6A Transformer failed 17.4 MW/
15 KT6A at KK1 Substation 4 Minutes
Inspection
Operation
form Average
Moving
Storage
No. Restoration procedures
Delay
er (Minutes)
KK2
KK2
KK1
1 Contact station operator 0.50 0.50
KK2
KK2
KK2
KK2
KK2
2 Verifyinformation 1.00 1.00
3 Analyze events 1.00 1.00
KK2
KK2
KK2
4 1.00 1.00
KK2
to neighboringstation
KK2
KK2
5 Charge line
KK2
KK2
KK2
0.50 0.50
Total 4 4.00
Standard/
24
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
Inspection
Operation
Transformer DeliveryPoint Trans
M0ving
Inspection
Storage
Operation
Delay
Average
No. Restorationprocedures Line form Average
Moving
Storage
(Minutes)
No. Restoration procedures
1 2 1 2 1 2
KK1 UB1 KK2 SO1 NH NR1
Delay
er (Minutes)
4 Analyzeevents 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3 Analyze events 1.00 1.00
Restoration time at the “waiting for information” step can be reduced 100%,
higher than the target 3.4%
(%)
50
5 450 MSecs
ins 0
Mins
Mins
Higher than the target 3.4%
10 Secs 10 secs
0
Before Activity Goal After Activity
Standard/
25
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
Expansion
Accumulated SPI > 4
North Northeast
Reduce EGAT loss ~ 1,200,000 Baht/year
Metropolis Central
Power system
Restoration time < 4
reliable for 24
minutes/time
hours a day
Installed
South Do not installed
Immediate access to incident information
Standard/
26
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
KK2
restoration in
KK2
KK2
KK2
KK2
Thailand. KK2
KK2
KK2
KK2
KK2
KK2
KK2
KK2
Activity follow-up
Graph showing the result of restoration time at the “waiting for information” step when an
incident occurs.
10
9 Activity
Before After
Follow up
9 Activity
8
8
7 1st November 2015 – Present
6
When incidents occurs, control center
6
Minute
Station/date
Standard/
28
Select Topic Current Situation Target Plan Activities Analyze Cause Implement Result Next Project
Establish Control
3
3
4
4
5
5