Rab Urugan Tanah Pt. Pupuk Kujang

RAB Urugan Tanah

Uploaded by

Handri Winata
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
189 views6 pages

Rab Urugan Tanah Pt. Pupuk Kujang

RAB Urugan Tanah

Uploaded by

Handri Winata
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

LAMPIRAN PENAWARAN

PEKERJAAN URUGAN TANAH


PROYEK CO2 PLANT PROJECT - CIKAMPEK

NO ITEM SPECS. UNIT QTY

A Pekerjaan Pesiapan, Prasarana & Penunjang (Preliminaries)


1 Mobilisasi & Demobilisasi ls 1
2 Survey dan Pengukuran ls 1
3 Management dan Administrator Proyek ls 1
4 Keamanan termasuk Koordinasi Aparat & Masyarakat ls 1
5 Kantor / Bedeng sementara ls 1
6 Kebersihan Jalan Lintasan ls 1

B Site Development
Top-soil which includes trees, grass, crops, weeds,
Top-Soil and other similar matter, stripped to a depth of
Stripping 200 mm including disposal, transportation.
1 m2 29,200.00
and
Clearing Including removing root of trees

Use excavated materials


Not more than 200 mm in loose depth for each
2 Soil Filling layer m3 20,440.00
Compaction : 95% of the maximum density
Including compaction

TOTAL
PEMBULATAN
PPN 10%
GRAN TOTAL

Hal. 1
LABOR
MATERIAL Manday Cost
U. PRICE AMOUNT UNIT TOTAL U. PRICE AMOUNT

- - 14.00 14.00 421.92 Rp 12,320,000

Rp 135,882 Rp 2,777,435,294 60 60.00 Rp 2,583 Rp 52,800,000

Hal. 2
CONST. EQUIPMRNT T&C
U. PRICE AMOUNT U. PRICE AMOUNT

Rp 16,500 Rp 481,800,000 Rp 5,500 Rp 160,600,000

Rp 33,000 Rp 674,520,000 Rp 11,000 Rp 224,840,000

Hal. 3
CONST. EQUIPMRNT T&C
U. PRICE AMOUNT U. PRICE AMOUNT

Hal. 4
Total
U. PRICE AMOUNT

Rp 25,000,000.00
Rp 15,000,000.00
Rp 20,000,000.00
Rp 30,000,000.00
Rp 15,000,000.00
Rp 55,000,000.00

Rp 160,000,000.00

Rp 22,422 Rp 654,720,000.00

Rp 182,466 Rp 3,729,595,294.12

Rp 4,384,315,294.12

Rp 4,544,315,294.12
Rp 4,544,315,000.00
Rp 454,431,500.00
Rp 4,998,746,500.00

Hal. 5
Total
U. PRICE AMOUNT

Bekasi, 12 Maret 2018

PT. KALIABANG JAYA PRATAMA

HANDRI WINATA
Direktur Utama

Hal. 6