Revision No 0
JOB SAFETY ANALYSIS Page 1 of 2
JOB DESCRIPTION ELECTRICAL PRE-TEST & MECHANICAL INITIAL INSPECTION
WORK LOCATION
OBSERVATION TEAM BY EVALUATED / APPROVED BY
PLANNER MECHANIC LEADER ELECTRICAL TESTER HSE OFFICER
Signatute Signatute Signatute Signatute
Date : Date : Date : Date :
MAJOR STEPS OF THE SOLUTIONS / CONTROL
No. POTENTIAL HAZARD RISK
JOB / TASK MEASURES
1 Pre-test elektrikal motor, - Tersengan/Tersetrum listrik - Trauma akibat setruman Need Work instruction (WI) for
generator akibat kebocoran isolasi dan sampai kematian ketika Electrical testing & Inspection of
grounding tegangan setrum tinggi electric machines
Electrical pre-test of
Need personnel skill in-house
Electric Motor, - Tertimpa benda/objek yang - Menyebabkan kerusakan
training for using Testing &
Generator terjatuh pada objek dan dapat melukai
Measurement equipment’s
tubuh seperti memar
Check T&M equipment’s
- Peralatan (Tools) yang - maintenance & calibration /
digunakan seperti obeng, certification
kunci, peralatan yang lainnya
Wear PPE : Hand gloves, Safety
yang digunakan dapat
Hat, Safety shoes, Goggles.
terbentur dengan anggota
tubuh ketika terpeleset
Hit by falling equipment / parts Injury, physical defect
Electrical shock caused by Startled, shocked (for low voltage)
improper isolation and grounding and death (for high voltage
inspection)
2 Mechanical initial Hit by falling equipment / parts : Injury, physical defect Need Work instruction (WI) for
inspections bearing housing , rotor shaft Mechanical testing & Inspection
of electric machines
Revision No 0
JOB SAFETY ANALYSIS Page 2 of 2
JOB DESCRIPTION ELECTRICAL PRE-TEST & MECHANICAL INITIAL INSPECTION
WORK LOCATION
MAJOR STEPS OF THE SOLUTIONS / CONTROL
No. POTENTIAL HAZARD RISK
JOB / TASK MEASURES
Need personnel skill in-house
training for using Testing &
Measurement equipment’s
Check T&M equipment’s
maintenance & calibration /
certification
Wear PPE : Hand gloves, Safety
Hat, Safety shoes, Goggles.