Part 9 of 9
Radiological Control Technician Training
Facility Practical Training Attachment Phase IV
Coordinated and Conducted
for the
Office of Health, Safety and Security
U.S. Department of Energy
DOE-HDBK-1122-2009
This page intentionally left blank
ii
DOE-HDBK-1122-2009
Table of Contents
Page
Introduction................................................................................................................................1
Facility Job Performance Measures ........................................................................................2
Final Verification Signatures ....................................................................................................3
iii
DOE-HDBK-1122-2009
This page intentionally left blank.
iv
DOE-HDBK-1122-2009
Introduction
Phase IV: Facility Practical At DOE sites with more than one facility, and where RCT
Training tasks at each facility may differ, site and facility tasks should
be separated. The tasks that are common to all the facilities on
the site should be included in Phase II training with the core
tasks. Tasks unique to a facility should be added to the
training program qualification standard, as an attachment, as
Phase IV training. Not all the DOE sites will include Phase IV
training in their programs. Phase IV training allows each site
to qualify technicians to a select facility. Since the core
training for the technicians is standardized, the transfer of
technicians between facilities, within a DOE site, requires that
only facility tasks be taught, provided the core qualification is
current.
Facility Job Performance Measures Next
1
DOE-HDBK-1122-2009
Facility Job Performance Measures
ACKNOWLEDGMENT OF SUCCESSFUL COMPLETION OF
FACILITY JOB PERFORMANCE MEASURES:
TRAINER/
JOB PERFORMANCE STUDENT DATE
EVALUATOR DATE
MEASURE SIGNATURE
SIGNATURE
QUALIFICATION AREA:
QUALIFICATION AREA:
QUALIFICATION AREA:
Final Verification Signatures Next
2
DOE-HDBK-1122-2009
Final Verification Signatures
I have verified that I have completed the above documented facility practical training
requirements.
___________________________________________________ _________________
Student RCT Date
I have verified that the facility practical training requirements for the above named individual
are satisfactorily completed and am assured that the individual is capable of safely
performing all the listed functions of a Radiological Control Technician at
________________________________ (facility).
____________________________________________________ _________________
Radiological Control Manager or designee Date
3
DOE-HDBK-1122-2009
This page intentionally left blank
4
DOE-HDBK-1122-2009
CONCLUDING MATERIAL
Review Activities: Preparing Activity:
DOE Ops Offices DOE HS-11
DP AL
HSS CH
EM ID Project Number:
ER NV
FM OR TRNG-0053
LM RL
NE SR
NS
PR
SA
National Laboratories
BNL
LANL
LLNL
PNNL
Sandia
FNL
SRNL
Area Offices
Amarillo
Ashtabula
Carlsbad
Columbus
Fernald
Kansas City
Kirtland
Los Alamos
Pinellas
5
DOE-HDBK-1122-2009
This page intentionally left blank.