100% found this document useful (1 vote)
275 views9 pages

Pile Design - CUP BLDG P6

This document summarizes the geotechnical capacity calculations for a single pile supporting a new maternity hospital building. It provides pile design parameters, soil data from boreholes with depth, calculations of side skin friction resistance along the pile, and allows pile capacity calculations. The end bearing capacity is 98 tons, skin friction is 151 tons, pile weight is 8 tons. The compression capacity is 249 tons and tension capacity is 113 tons, both meeting the design loads.

Uploaded by

fanta calcio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
275 views9 pages

Pile Design - CUP BLDG P6

This document summarizes the geotechnical capacity calculations for a single pile supporting a new maternity hospital building. It provides pile design parameters, soil data from boreholes with depth, calculations of side skin friction resistance along the pile, and allows pile capacity calculations. The end bearing capacity is 98 tons, skin friction is 151 tons, pile weight is 8 tons. The compression capacity is 249 tons and tension capacity is 113 tons, both meeting the design loads.

Uploaded by

fanta calcio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Project No:.

Date:

Design Calculation - 27/01/2018


Sheet Sheet No. Computed by:

- M.H.
Checked by: Approved by :
Project : NEW MATERNITY HOSPITAL
Title : Single Pile Geotechnical Capacity - CUP BLDG (P6) - -

Pile Design Data


Pile Diameter - D (m) : 0.80 Stress q constant
Bottom Level of Pile Cap (m) : -2.2 below depth (m)
Pile Length - L (m) : 10 12
Pile Toe Level (m) : -12.2
Concrete f'c (MPa) : 35
Concrete Allaw. Stress scmax (t/m2) : 1015
Steel Yield Stress fy (Mpa) : 420
Design Compression Load (t) : 235
Design Tension Load (t) : 100
Design Lateral Load (t) : 0

Factor of Safety
End Bearing, F.ST : 3
Side Skin Friction, F.Ss : 2

Soil Data
Top Bot
g f c d H
Layer Soil Type Kc Nspt Nq a Level Level
(t/m3) (deg) (t/m2) (deg) (m)
(m) (m)
1 S 1.7 26 0 0.8 5 19 20.8 1 2.3 -2.2 -4.5
2 S 2 34 0.5 0.8 50 62 27.2 0 45.5 -4.5 -50
3 N/A N/A N/A N/A N/A N/A 0 0.0 0 N/A -50 N/A
4 N/A N/A N/A N/A N/A N/A 0 0.0 0 N/A N/A N/A
5 N/A N/A N/A N/A N/A N/A 0 0.0 0 N/A N/A N/A
6 N/A N/A N/A N/A N/A N/A 0 0.0 0 N/A N/A N/A
7 N/A N/A N/A N/A N/A N/A 0 0.0 0 N/A N/A N/A
Natural Ground Water Level (m): 2.6
No friction depth (m): 2.00

Summary
End Bearing. (Al.) 98 t
Skin Friction Comp. (Al.) 151 t fs = 3 Nspt
Pile Weight (W) 8 t
Compression Capacity (Qc) 249 t OK

Tension Capacity (Qu) 113 t OK

Note : Qcompression = QT/F.ST + QS/F.Ss


Quplift = QS*0.7/F.Ss + W

Page 1
Pile Frictional Resistance

Depth Soil g' f c d q' fs Fs QS


Elev. Soil Type Nspt a Kc
(m) Layer (t/m3) (deg) (t/m2) (deg) (t/m2) (t/m )2
(t) (t)
0.0 -2.2 1 S 0.7 26 0 5 20.8 1 0 0.8 0.00 0.0 0
0.5 -2.7 1 S 0.7 26 0 5 20.8 1 0.35 0.8 0.00 0.0 0
1.0 -3.2 1 S 0.7 26 0 5 20.8 1 0.7 0.8 0.00 0.0 0
1.5 -3.7 1 S 0.7 26 0 5 20.8 1 1.05 0.8 0.00 0.0 0
2.0 -4.2 1 S 0.7 26 0 5 20.8 1 1.4 0.8 0.00 0.0 0
2.5 -4.7 2 S 1 34 0.5 50 27.2 0 1.9 0.8 15.00 18.8 19
3.0 -5.2 2 S 1 34 0.5 50 27.2 0 2.4 0.8 15.00 18.8 38
3.5 -5.7 2 S 1 34 0.5 50 27.2 0 2.9 0.8 15.00 18.8 57
4.0 -6.2 2 S 1 34 0.5 50 27.2 0 3.4 0.8 15.00 18.8 75
4.5 -6.7 2 S 1 34 0.5 50 27.2 0 3.9 0.8 15.00 18.8 94
5.0 -7.2 2 S 1 34 0.5 50 27.2 0 4.4 0.8 15.00 18.8 113
5.5 -7.7 2 S 1 34 0.5 50 27.2 0 4.9 0.8 15.00 18.8 132
6.0 -8.2 2 S 1 34 0.5 50 27.2 0 5.4 0.8 15.00 18.8 151
6.5 -8.7 2 S 1 34 0.5 50 27.2 0 5.9 0.8 15.00 18.8 170
7.0 -9.2 2 S 1 34 0.5 50 27.2 0 6.4 0.8 15.00 18.8 188
7.5 -9.7 2 S 1 34 0.5 50 27.2 0 6.9 0.8 15.00 18.8 207
8.0 -10.2 2 S 1 34 0.5 50 27.2 0 7.4 0.8 15.00 18.8 226
8.5 -10.7 2 S 1 34 0.5 50 27.2 0 7.9 0.8 15.00 18.8 245
9.0 -11.2 2 S 1 34 0.5 50 27.2 0 8.4 0.8 15.00 18.8 264
9.5 -11.7 2 S 1 34 0.5 50 27.2 0 8.9 0.8 15.00 18.8 283
10.0 -12.2 2 S 1 34 0.5 50 27.2 0 9.4 0.8 15.00 18.8 302
For Clay For Sands
Qs = Asfs or Qs = Asfs
As = effective pile surface area on which fs acts As = effective pile surface area on which fs acts
= perimeter x embedment increment ∆L = perimeter x embedment increment ∆L
fs = skin resistance = a.c + q.K.tan d fs = skin resistance = a.c + 3.N(spt)
 = summarization of contributions from different soil  = summarization of contributions from different soil
layers layers
a = adhesion factor a = adhesion factor
c = cohesion for the soil stratum of interest c = cohesion for the soil stratum of interest
K = coefficient of lateral earth pressure
d = effective friction angle between soil and pile material =
2/3 f (conventional)
f = angle of internal friction of soil

Page 2
Pile Allowable Capacity

Depth Soil g' f c q' qT QT QS W Qca


Elev. Nc Nq Nqref
(t/m2) 2
(m) Layer (t/m3) (deg) (t/m ) (t/m2) (t) (t) (t) (t)
0.0 -2.2 1 0.7 26 0 0 0 0 0 0 0 0 0.00 0
0.5 -2.7 1 0.7 26 0 0 19 38 0.35 13 7 0 0.38 2
1.0 -3.2 1 0.7 26 0 0 19 44 0.7 31 15 0 0.75 5
1.5 -3.7 1 0.7 26 0 0 19 50 1.05 53 26 0 1.13 9
2.0 -4.2 1 0.7 26 0 0 19 56 1.4 79 40 0 1.51 13
2.5 -4.7 2 1 34 0.5 0 62 62 1.9 119 60 19 1.88 29
3.0 -5.2 2 1 34 0.5 0 62 62 2.4 150 75 38 2.26 44
3.5 -5.7 2 1 34 0.5 0 62 62 2.9 181 91 57 2.64 59
4.0 -6.2 2 1 34 0.5 0 62 62 3.4 212 107 75 3.02 73
4.5 -6.7 2 1 34 0.5 0 62 62 3.9 244 123 94 3.39 88
5.0 -7.2 2 1 34 0.5 0 62 62 4.4 275 138 113 3.77 103
5.5 -7.7 2 1 34 0.5 0 62 62 4.9 306 154 132 4.15 117
6.0 -8.2 2 1 34 0.5 0 62 62 5.4 337 170 151 4.52 132
6.5 -8.7 2 1 34 0.5 0 62 62 5.9 369 185 170 4.90 147
7.0 -9.2 2 1 34 0.5 0 62 62 6.4 400 201 188 5.28 161
7.5 -9.7 2 1 34 0.5 0 62 62 6.9 431 217 207 5.65 176
8.0 -10.2 2 1 34 0.5 0 62 62 7.4 462 232 226 6.03 191
8.5 -10.7 2 1 34 0.5 0 62 62 7.9 494 248 245 6.41 205
9.0 -11.2 2 1 34 0.5 0 62 62 8.4 525 264 264 6.79 220
9.5 -11.7 2 1 34 0.5 0 62 62 8.9 556 280 283 7.16 235
10.0 -12.2 2 1 34 0.5 0 62 62 9.4 587 295 302 7.54 249

Ultimate End Bearing Capacity


QT = Ap (cN’c + q′.N′q)
N’c = 9 (conventional).
N’q is taken from Berezantzev Chart.

Page 3
Project No:. Date:

Design Calculation - 27/01/2018


Sheet Sheet No. Computed by:

- M.H.

Project : NEW MATERNITY HOSPITAL


Checked by: Approved by :

Title : Structural Design of Working Pile - TYPE "P6" - -

Pile Design Data


Pile Diameter - D (m) : 0.80
Pile Length - L (m) : 10
Concrete f'c (MPa) : 35
Concrete All. Stress (t/m2) : 1015
Steel Yield Stress fy (MPa) : 420
Design Compression (t) : 235
Design Tension Load (t) : 100
Design Lateral Load (t) : 0

Pile Reinforcement
Vertical Reinf. 16 T20 mm Asv /Ac = 1.00% > 0.5%
Shear Reinf. T10 @ 150 mm rs = 0.0026

1.0 CHECK FOR STEEL REINFORCEMENT IN TENSION (Main Reinforcement)


Maximum Tension Load on Pile = 100 t
Allowable Tensile Stress
Ft = 0.5 x Fy
= 210.0 MPa
Minimum Area of Steel Required
Ast = Pt / Ft
= 4761.9 mm2
Area of Steel Provided
Asprov = 5027 mm2 > 4761.9 mm2 SAFE

2.0 BENDING MOMENT AND SHEAR REINFORCEMENT REQUIREMENTS

Horizontal Load on Pile @ Pile Head, Ph = 0.0 t


Consider Maximum Eccentricity allowed 1 : 50

Total Horizontal Load on Pile


PhT = Ph + Pc / 50
= 4.7 t

Maximum Allowed Error on Pile Position, e = 100.0 mm


Moment due to out of Position
Mecc = Pc x e
= 23.5 t.m This moment to be transferred in Pile cap/raft design.

Page 4
Project No:. Date:

Design Calculation - 27/01/2018


Sheet Sheet No. Computed by:

- M.H.

Project : NEW MATERNITY HOSPITAL


Checked by: Approved by :

Title : Structural Design of Working Pile - TYPE "P6" - -


2.1 ELASTIC ANALYSIS & VERTICAL REINFORCEMENT REQUIREMENTS
Mf = Fm x H x T
where:
Mf = Bending Moment in the Pile
Fm = Bending Moment Coefficient
H = Horizontal Load Acting on Pile Head
= 4.7 t
T = Stiffness Factor
= (E l / Nh) 1/5
E = 27806 MN / m2
l = 0.020106 m4
Nh = Coefficient of Sub-grade Modulus Variation (Reese et al) Fig. 1
5 MN / m3 (TOP LAYER)
T = 2.57 m
Zmax = L/T
where:
L = Pile Length
= 10 m
= 3.9

yf = Fy x H x T3
ExI
where:
yf = Pile Deflection
Fy = Deflection Coefficient
H = Horizontal Load
Fig. 2

DEPTH Nh T Z Fm Fy Mf yf
3
X (m) (MN/m ) (m) (X / T) (Fig.2) (Fig.3) (t.m) (cm)
0 5 2.57 0.0 -0.9 0.9 -10.87 0.13
1 5 2.57 0.4 -0.5 0.8 -6.04 0.11
2 5 2.57 0.8 0.05 0.6 0.60 0.09
3 40 1.69 1.8 0.21 0.3 1.67 0.01
4 40 1.69 2.4 0.25 0.15 1.99 0.01
5 40 1.69 3.0 0.2 0.05 1.59 0.00
6 40 1.69 3.5 0.15 0 1.19 0.00
7 40 1.69 4.1 0.05 -0.01 0.40 0.00
8 40 1.69 4.7 0.03 -0.02 0.24 0.00 Fig. 3
9 40 1.69 5.3 0 0 0.00 0.00 Nh Soil Type
Zmax 40 1.69 5.9 0 0 0.00 0.00 40
35 Dense Soil
30
25
Medium Dense
20
Soil
15
10
5 Loose Soil
0

Page 5
Project No:. Date:

Design Calculation - 27/01/2018


Sheet Sheet No. Computed by:

- M.H.

Project : NEW MATERNITY HOSPITAL


Checked by: Approved by :

Title : Structural Design of Working Pile - TYPE "P6" - -


Maximum Bending Moment
Mfmax = Mf
= 10.87 t.m

As per ACI 318, consider resonable ultimate factor = 1.5


Mu = 16.30 t.m
Pu = 353 t

Using S-Concrete Software in accordance to ACI 318 and ACI 543 the provided steel is sufficient. Refer S-Concrete
calculation outputs.

2.2 SHEAR REINFORCEMENT REQUIREMENTS


Vu = f (Vc + Vs) ACI - 318
where:
Vu = Ultimate Shear Force Strength
f = 0.75 (Shear)
Vc = Concrete Shear Strength
= 0.17 0.8 D2 f'c
= 51.49 t

Vs = Shear Strength Provided by Shear Reinforcement


= Av fyt 0.8 D / S
where Av = Area of Shear Reinforcement (2 legs)
= 157.08 mm 2
S = Spiral / Ties Spacing
= 28.1 t

Vu = 59.7 t > 1.6 x Pht = 8 t SATISFIED

Check minimum Shear Reinforcement


As min = 0.062 D S f'c / fy
= 104.8 mm2 < 157 mm2 SATISFIED
OR
As min = 0.35 D S / fy
100.0 mm2 < 157 mm2 SATISFIED

Page 6
Project No:. Date:

Design Calculation - 27/01/2018


Sheet Sheet No. Computed by:

- M.H
Project : NEW MATERNITY HOSPITAL
Checked by: Approved by :

Title : PILES SETTLEMENT CALCULATION - TYPE "P6" - -

Pile Design Data


Pile Diameter - D (m) : 0.80
Pile Length - L (m) : 10
Concrete f'c (MPa) : 35
Design Compression Load (t) : 235

Soil Data
Top Bot
Es Esb H
Layer Nspt Level Level
(t/m2) (t/m2) (m)
(m) (m)
1 5 500 500 2.3 -2.2 -4.5
2 50 5000 5000 45.5 -4.5 -50
3 N/A N/A N/A N/A -50 N/A
4 N/A N/A N/A N/A N/A N/A
5 N/A N/A N/A N/A N/A N/A
6 N/A N/A N/A N/A N/A N/A
7 N/A N/A N/A N/A N/A N/A

1.0 SETTLEMENT OF SINGLE PILE


Total settlement of pile under vertical load Qw = Se1 + Se2 + Se3
where:
Se 1 = Elastic settlement of pile
Se 2 = Settlement of pile caused by the load at pile tip
Se 3 = Settlement of pile caused by the load transmitted along pile shaft

1.1 Elastic Settlement of Pile


Se1 = (Qwp + xQws)L / ApEp
where:
Qwp = Load carried at the pile tip at working condition = 0t
Qws = Load carried by friction resistanceat working cond. = 235 t (90% ULTIMATE fs)
L = Length of Pile = 10 m
Ep = modulus of elasticity of the pile material = 2.78E+06 t / m2
Ap = Area of cross section of pile = 0.503 m2
x = Unit skin friction distribution = 0.6

Se1 = 1.01 mm

Page 7
Project No:. Date:

Design Calculation - 27/01/2018


Sheet Sheet No. Computed by:

- M.H
Project : NEW MATERNITY HOSPITAL
Checked by: Approved by :

Title : PILES SETTLEMENT CALCULATION - TYPE "P6" - -

1.2 Settlement of pile caused by the load at pile tip


Se2 = qwp D (1- ms2) Iwp / Es
where:
D = Diameter of pile = 0.80 m
qwp = point load per unit area at the pile point = 0 t / m2
Es = modulus of elasticity of Soil at or below tip = 5000 t / m2
m = Poisson's ratio of soil = 0.25
Iwp = influence factor = 0.85

Se2 = 0.00 mm

1.3 Settlement of pile caused by the load carried by the pile shaft
Se3 = (Qws /pL) (D/Es) (1- ms2) Iws
where:
p = perimeter of pile = 2.51 m
L = Pile length = 10 m
Es = Average modulus of elasticity of Soil along shaft = 3965 t / m2
m = Poisson's ratio of soil along shaft = 0.25
Iws = influence factor
= 2 + 0.35(L/D)0.5
= 3.24

Se3 = 1.77 mm

Total Settlement for single pile

Stotal = 2.8 mm

Page 8
Material Properties Miscellaneous
fc' = 35 MPa Quantities (Approx.)
fy (vert) = 413.7 MPa Concrete = 1196 kg/m
fy (ties) = 413.7 MPa Steel = 49.9 kg/m
Wc = 2403 kg/m3 ---------------------------
Ws = 8009 kg/m3 Clear Cover = 75.0 mm
Poisson's Ratio = 0.2
hagg = 19 mm
Es = 199948 MPa
Ec = 35596 MPa
Gc = 14831 MPa

800

Vertical Bars
Z
800 mm Diameter Column
16Y20 Vert
As = 5027 mm2
Rho = 1.0 %
Tangential Splice
Y
c.g. Spiral
Y10 Spiral x 150 mm

Shear / Torsion Results


Vuz = 70.5 kN
Section Properties Vuy = 0.0 kN
Zbar = 0 mm Vuz / ?Vnz = 0.091
Ybar = 0 mm Vuy / ?Vny = 0
Ag = 502655 mm2 Shear Util = 0.091
Ig (y-y) = 20106xE6 mm4 Avz/S (req'd) = 0.00 mm
Ig (z-z) = 20106xE6 mm4 Avy/S (req'd) = 0.00 mm
Ashear (Y) = 376991 mm2 S (req'd) = 800.0 mm
Ashear (Z) = 376991 mm2 Summary
Jg = 40212xE6 mm4 Concrete Section Flexural / Axial Results
--------------------------- Job # A123.45 Nu = 1600.0 kN
Ae = 502655 mm2 ACI 318-08 Standard Theta = 0 Degrees
Ie (y-y) = 20106xE6 mm4 --------------------------- Mu = 0.0 kNm
Ie (z-z) = 20106xE6 mm4 TASC ?Mn = 84.3 kNm
Ase (Y) = 376991 mm2 Mhasan N vs M Util = 0.855
Ase (Z) = 376991 mm2 --------------------------- As (Req'd) = 5027 mm2
Je = 40212xE6 mm4 Status = Reviewed-OK Rho (Req'd) = 1.0 % approx.