Package Units Checklist

This document contains information from testing and inspecting a HVAC package unit air conditioner rooftop unit. It includes: 1) Test data from the unit's condenser, compressors, air side, electric heater, and motor. 2) A checklist of installation inspections covering the unit's pad, mounting, ductwork, wiring, and controls. 3) Electrical, control, and air balancing checklists to verify proper functioning. 4) Air balancing data tables with velocity readings from the main supply, return, and fresh air ducts.

Uploaded by

emanuel92
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views11 pages

Package Units Checklist

This document contains information from testing and inspecting a HVAC package unit air conditioner rooftop unit. It includes: 1) Test data from the unit's condenser, compressors, air side, electric heater, and motor. 2) A checklist of installation inspections covering the unit's pad, mounting, ductwork, wiring, and controls. 3) Electrical, control, and air balancing checklists to verify proper functioning. 4) Air balancing data tables with velocity readings from the main supply, return, and fresh air ducts.

Uploaded by

emanuel92
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 11

HRH Prince Khaled Bin Sultan Project - Riyadh

Saudi Diyar Consultants

HVAC System
Package Unit AC Rooftop
Project :
Date : Ambient Temp, °F:
a- General :
1- Unit No :
2- Location :
3- Served area :
4- Serial Number :
5- Model Number :
6- Type :
7- Voltage :
8- Amperage :
CONDENSER
9- No. Of Condenser Fans
10- Ambient temperature db/wb, ° F : /
Design Actual
11- Airflow, cfm :
Compressors comp 1 comp 2 comp 3
12- Suction pressure
13- Condenser pressure
14- Oil pressure / temperature
15- Stages :
16- Voltage
17- Amperage :
18- KW input
19- Low pressure cutout
20- High pressure cutout
Air Side
14- Leaving air temperature db/wb, ° F : /
15- Entering air temperature db/wb, ° F : /
Design Actual
16- ESP :
Electric Heater
17- Heater , Kw :
18- Stages :
19- Reheat, Kw :
20- Stages :
21- Motor RPM :
Design Actual
22- Supply air, cfm
23- Return air, cfm
24- Fresh air, cfm
NOTES :
Name Signature

05/02/2018
1
02:12:11
HRH Prince Khaled Bin Sultan Project - Riyadh
Saudi Diyar Consultants

b- Check List :

1 - Unit installed on concrete pad with 2" thick coark ok not ok


2 - Unit is installed on anti vibration mounts ok not ok
3 - Alignment and Levelling good bad
4 - Condensate drain pipe directed to nearest roof drain ok not ok
5 - Condensate drain pipe shall have a P-Trap found not found
6 - General cleaning ok not ok
7 - Smoke detector installation found not found
8 - Differential pressure on PACU's filter found not found
9 - Differential pressure on PACU's fan found not found
### - Ducts installations good bad
11 - Ducts insulation good bad
### - Ducts identification ok not ok
### - Canvas installation at main supply and return ducts found not found
### - Fresh air duct installation good bad
### - Volume damper installation at FA duct with filter found not found
### - All wires are installed inside liquid tight conduits found not found
### - Disconnect switch installation near the unit at roof found not found

NOTES :

Name Signature Date

05/02/2018
2
02:12:11
HRH Prince Khaled Bin Sultan Project - Riyadh
Saudi Diyar Consultants

c- Electrical Checklist

PACU is connected to MCC panel No. :


Voltage :
Amperage :

1 - Control panel installation good bad


2 - Indication lamps found not found
3 - Phase failure unit protection found not found
4 - Overload protection found not found
5 - Wires are tightly connected good bad

c- Control Checklist

PACU is connected to DDC panel No. :


Thermostat setting:

Min, ° F Max, ° F
occupied
not occupied
RH %

1 - Smoke detector connection to DDC panel ok not ok


2 - Filter differential switch connection to DDC panel ok not ok
3 - Fan differential switch connection to DDC panel ok not ok
4 - Thermostat installation and connection to DDC ok not ok
5 - Humidistat installation and connection to DDC ok not ok
6 - Outside air temperature sensor installation ok not ok
7 - Outside air humidity sensor ok not ok
8 - Heater and reheat stages connection to DDC panel ok not ok
9 - Sequence of operation programming ok not ok
### - Interlocking with fire alarm system ok not ok

NOTES :

Name Signature Date

05/02/2018
3
02:12:11
HRH Prince Khaled Bin Sultan Project - Riyadh
Saudi Diyar Consultants

d- Air Balancing

Velocity Reading

UNIT No. : Section: Main Supply Location:


Width, in Av. FPM 0.0 SCFM 0.0 Design CFM
Duct

Depth, in Reading No. 1 ACFM 0.0 Actual CFM


Area, ft² 0.0 Corr, Factor 0.90 Deviation % 100.00
INPUT DATA
CALCULATED

XY 1 2 3 4 5 6 7 8 9
1
2
3
4
5
6
7
8
9
10

Measured data
INPUT DATA
CALCULATED

NOTES :

Name Signature Date

05/02/2018
4
02:12:11
HRH Prince Khaled Bin Sultan Project - Riyadh
Saudi Diyar Consultants

1
0
100.00

05/02/2018
5
02:12:11
HRH Prince Khaled Bin Sultan Project - Riyadh
Saudi Diyar Consultants

d- Air Balancing

Velocity Reading

UNIT No. : Section: Main Return Location:


Width, in Av. FPM 0.0 SCFM 0.0 Design CFM
Duct

Depth, in Reading No. 1 ACFM 0.0 Actual CFM


Area, ft² 0.0 Corr, Factor 0.90 Deviation % 100.00
INPUT DATA
CALCULATED

XY 1 2 3 4 5 6 7 8 9
1
2
3
4
5
6
7
8
9
10

Measured data
INPUT DATA
CALCULATED

NOTES :

Name Signature Date

05/02/2018
6
02:12:11
HRH Prince Khaled Bin Sultan Project - Riyadh
Saudi Diyar Consultants

1
0
100.00

05/02/2018
7
02:12:11
HRH Prince Khaled Bin Sultan Project - Riyadh
Saudi Diyar Consultants

d- Air Balancing

Velocity Reading

UNIT No. : Section: Fresh Air Duct Location:


Width, in Av. FPM 0.0 SCFM 0.0 Design CFM
Duct

Depth, in Reading No. 1 ACFM 0.0 Actual CFM


Area, ft² 0.0 Corr, Factor 0.90 Deviation % 100.00
INPUT DATA
CALCULATED

XY 1 2 3 4 5 6 7 8 9
1
2
3
4
5
6
7
8
9
10

Measured data
INPUT DATA
CALCULATED

NOTES :

Name Signature Date

05/02/2018
8
02:12:11
HRH Prince Khaled Bin Sultan Project - Riyadh
Saudi Diyar Consultants

1
0
100.00

05/02/2018
9
02:12:11
HRH Prince Khaled Bin Sultan Project - Riyadh
Saudi Diyar Consultants

d- Air Balancing

Velocity Reading

UNIT No. : Served Area: Location:


Length, ft Av. FPM 0.0 SCFM 0.0 Design CFM
Area factor Reading No. 1 ACFM 0.0 Actual CFM
Type Corr, Factor 0.90 Deviation % 100.00
INPUT DATA
CALCULATED

Measured data, FPM

NOTES :

Name Signature Date

05/02/2018
10
02:12:11
HRH Prince Khaled Bin Sultan Project - Riyadh
Saudi Diyar Consultants

1
0
100.00

05/02/2018
11
02:12:11