0% found this document useful (0 votes)
33 views1 page

Deadline: Assignment No. 1

The document provides instructions for Assignment No. 1, which is due on May 13, 2008. Students must upload their assignment submission through the Virtual University system before the deadline. Assignments submitted after the due date or copied work will not receive credit. The assignment asks students to explain the importance of the software process, define the requirements engineering process, and identify the inputs, outputs, and variability factors in requirements engineering. Students must submit a Word document with their answers.

Uploaded by

nnouman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views1 page

Deadline: Assignment No. 1

The document provides instructions for Assignment No. 1, which is due on May 13, 2008. Students must upload their assignment submission through the Virtual University system before the deadline. Assignments submitted after the due date or copied work will not receive credit. The assignment asks students to explain the importance of the software process, define the requirements engineering process, and identify the inputs, outputs, and variability factors in requirements engineering. Students must submit a Word document with their answers.

Uploaded by

nnouman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Assignment No.

Deadline

Your assignment must be uploaded/submitted before or on 13th May, 2008

Uploading instructions

Please view the assignment submission process document provided to you by the
Virtual University to upload the assignment.

Rules for Marking

It should be clear that your assignment will not get any credit if:

o The assignment is submitted after due date through email


o The assignment is copied

Objectives

 This assignment has been designed so that you would be able to understand the
basic concept requirements engineering process.

Assignment

1. What is the importance of software process?


2. What is requirements engineering process?
3. What are inputs and outputs of the requirements engineering process and what are
variability factors in requirements engineering process.

What to Submit

You are simply required to submit a word (.doc) document that contains the solution of
your assignment.

You might also like