Resource Planning:: Task 1 Student: Jose Armando Cajahuaringa Paulino

This document outlines the resource planning for Task 1, including personnel, vehicles, equipment, tools, personal protective equipment, collective protection equipment, communication equipment, materials, and formats needed. It lists the coordinator, field supervisors, responsible supervisor, security supervisor, group leader, operators, winch operator, and helpers that make up the personal. It also lists the vehicles, equipment, tools, protective gear, first aid supplies, signage, fire extinguishers, radios, mobile phones, materials, and inspection formats required.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views3 pages

Resource Planning:: Task 1 Student: Jose Armando Cajahuaringa Paulino

This document outlines the resource planning for Task 1, including personnel, vehicles, equipment, tools, personal protective equipment, collective protection equipment, communication equipment, materials, and formats needed. It lists the coordinator, field supervisors, responsible supervisor, security supervisor, group leader, operators, winch operator, and helpers that make up the personal. It also lists the vehicles, equipment, tools, protective gear, first aid supplies, signage, fire extinguishers, radios, mobile phones, materials, and inspection formats required.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Task 1

Student:
 Jose Armando Cajahuaringa Paulino
Resource planning:
Personal
Own personal
 Coordinator.
 Field supervisors.
Contractor’s personal
 01 Responsible supervisor.
 01 Security Supervisor.
Typical quadrille
 01 Group leader (Operator).
 08 Operators (Linemen).
 01 Winche operator.
 04 Helpers.
Mobility
 4x4 trucks.
 Minibus or similar (Coaster) for transfer of personnel.
 Truck for transportation of equipment and tools.
Equipment and tools
 01 Tension developer.
 01 Insulating pole for developer.
 02 Pairs of dielectric gloves class 3 or 4.
 02 Grounding pole.
 06 Grounding Sets temporary for 220 kV lines.
 02 Service Sogas.
 01 Tool case.
 12 Pulleys maneuver 1.5 TN.
 06 Tirfor of 3 TN.
 01 Aluminum pen.
 06 Driver's clamp.
 03 Guard cable clamp.
 02 Service pulley.
 02 Service rope section 100 m c / u.
 01 Winch of 1.0 TN.
 04 Trico of 3 TN.
 20 shackles ¾ of maneuver.
 04 Fiber anchor stairs glass.
 Wooden blocks 4 "x 40 cm.
 16 AWG wire (mooring).
 01 Soga ¾ "x 150 m.
 02 Soga ½ "x 150 m.
 06 Eyebolt 2 "x 1.20 m.
 02 Comba of 20 lbs.
 08 Steel Stroke 1.20 m - 1.0 m.
 02 ½ "rope for feather wind - 10.
 06 trunks 1.5TN.
 8 steel struts 5/8 "- 3,0 m.
 Service pulleys.
Personal protection equipment – EPP
 Dielectric helmet.
 Dielectric safety footwear, with bakelite tip.
 Work uniform.
 Safety glasses.
 Sheepskin gloves
 Auditive protectors.
 Full body harness and double anchor line.
Collective protection equipment
 Fall arrest system (vertical and / or horizontal lifeline).
 First aid kit.
 Evacuation couch (for the work area).
 Table water (to minimize the risk of dehydration).
 Signaling according to the work signage procedure.
 Fire extinguisher.
Communication equipment
 Portable radios.
 Mobilephones.

Materials
 Insulators, line post, etc.
 Hardware.
 Profiles.
 Grounding material.
 Conductors.
 Guard cable.
Formats
 Light inspection format.
 Detailed inspection format.
 Insulator inspection format.
 Structure inspection format (posts and / or towers).
 Pole inspection format.
 Tool inspection format.
 Report format of the executed works.