Pearl GTL
Project
                                        LINDE ENGINEERING
      Shell Project No: HP-3000-QAT                Contractor Project No :   5887
Project Document Number: T- 4.234.576       Project Rev.: D   Page 2 of 6
Purchase Order Number:    2MH127
Tag/Item Number(s):       N/A
Unit(s):                  ASU
PCWBS:                     Z
                     QATAR SHELL GTL PROJECT (PEARL)
                  C2 AIR SEPARATION UNITS CONSTRUCTION
  G          D    22.11.08           Ready for Construction                     SB         EO       AG     RFC
  F          C    24.08.08      Issued for Company Comments                     SB         EO       AG      ICC
  E          B    26.04.08           Ready for construction                     SB         SB      MC/ZG   RFC
  D          A    26.01.08           Ready for construction                     SB         UA      MC/ZG   RFC
  C          O    21.11.07      Issued for company comments                     IU         UA      MC/ZG    ICC
  B                                     Issued for review                       IU        IO/UA    MC/ZG    IFR
  A                                 Issued for internal review                  IU        IO/UA    MC/ZG    IIR
GAMA    Project                                                               Prepared Checked Approved
                   Date                    Description                                                     Status
 Rev.    Rev                                                                     By      By       By
 No.     No.                                                                         ORIGINATOR
                                                                 Document Title:
 LINDE ENGINEERING
                             INSPECTION TEST PLAN FOR GROUTING WORKS
         AG
Contractor                                      Document No.
                                                                                                     LOC470
                             GAM         ITP         QAC            GTL            024       G
Gama Qatar Co. W. L. L.      Org.        Doc.         Disc.          Geogr.        Seq.     Rev.
                                                                                                    Vendor Code
                             Code        Type         Code            Area          No       No
Project Document Number: T-4.234.576                                                                Rev No: D
                                        QSGTL PEARL PROJECT                                  ITP No.:              GAM-ITP-QAC-GTL-024
                                          C2 ASU Construction Works
                              ITP FOR GROUTING WORKS(FSI)                                     DATE:                 22.11.2008 - REV-G
          S. GAMA QATAR                   E. Not used     X. CONTRACTOR QC         C. COMPANY               A. THIRD PARTY (TPI)
             I: INSPECTION / TEST        R: DOCUMENT REVIEW              S: SURVEILANCE        H: HOLD POINT. W:         WITNESS
                             Characteristic to be    Control Procedure      Responsible                             Verifying
Item         Activity                                                                     Acceptance Criteria                        S   X   C
                                  Verified              Reference              Party                               Documents
                                As per Method       GAM-MTS-CIV-GTL-                                                GAM-MTS-
  1    Method Statement                                                       QA-QC         Client Approval                          H   R   R
                                  Statement               010                                                      CIV-GTL-010
                            a) Free from oil,                                              Surface should be        GAM-QCR-
       Surface                                          T-4.184.248 &
  2                         Grease & Dust.                                                 rough & clean and        QAC-GTL-         I   W   S
       Preparation                                       T.4.234.076
                            b) Soaking                                                            wet                  025
                                                                                             Forms should           GAM-QCR-
                               As per Drawing
  3    Form work                                        As per Drawing                      be150mm above           QAC-GTL-         I   S   S
                                Dimensions
                                                                                                 grout                 025
       Type of grout                                                           Si te                                 Material
       material                                     T-4-234-076 -Rev E ,
                                                                             Engineer       Only approved          Data sheet &
       (BASF – Master           Manufacture          DEP-34-19-20-31 &
  4                                                                                       materials by client to   GAM-QCR-          I   W   S
       Flow 928T or          recommendations            Manufacturer
                                                                                                be used             QAC-GTL-
       FOSROC Conbextra                              Recommendations
       BB 80) - FSI                                                                                                    025
                                                                                              As Per
                            Grouting to be done     As Per Manufacturers
  5    Free flow of grout                                                                  Manufacturers              Visual         I   S   S
                            from one side only       Recommendations
                                                                                          Recommendations
T-4.234.576 – Rev D                                                                                                    Page 4 of 6
                                     QSGTL PEARL PROJECT                              ITP No.:               GAM-ITP-QAC-GTL-024
                                       C2 ASU Construction Works
                             ITP FOR GROUTING WORKS(FSI)                              DATE:                   22.11.2008 - REV-G
           S. GAMA QATAR               E. Not used   X. CONTRACTOR QC      C. COMPANY               A. THIRD PARTY (TPI)
              I: INSPECTION / TEST    R: DOCUMENT REVIEW         S: SURVEILANCE         H: HOLD POINT. W:          WITNESS
                              Characteristic to be   Control Procedure   Responsibl      Acceptance            Verifying
 Item          Activity                                                                                                       S   X   C
                                   Verified             Reference         e Party          Criteria           Documents
                                                                                      Forms remove only         GAM-
  6                           Chamber , surface                            Site                                               I   S   S
         Removal of forms                             As per Drawing                      after getting       QCR-QAC-
                                &Dimension                               Engineer
                                                                                       sufficient strength     GTL-025
                                                                                          Minimum 7             GAM-
                               Exposed Surface       DEP-34-19-20-31-      Site
  7     Curing (FSI)                                                                   days/manufacture       QCR-QAC-        S   S   S
                                  wetness             Clause 10.3.2      Engineer
                                                                                       recommendations         GTL-025
                                                       Manufacturer        Site         Below 25 º C
  8     Water for Mixing     Temperature of Water                                           (using               Visual       S   S   S
                                                     recommendations     Engineer
                                                                                        Thermometer)
        Compressive
        strength(FSI)        Grout - Compressive     Manufacturer Data                 70N/mm2@7Days
                                                                            Lab                                Lab report     R   R   R
            a) Conbextra           strength               Sheet                       85N/mm2@28Days
  9            BB80
           b) Master Flow    Grout - Compressive     Manufacturer Data                 68N/mm2@7Days
                                                                            Lab                                Lab report     R   R   R
              928T                 strength               Sheet                       80N/mm2@28Days
T-4.234.576 – Rev D                                                                                             Page 5 of 6
                                                         GROUT POUR CARD
                                                                    (PRE/POST POUR)
                                                      Form No: GAM-QCR-QAC-GTL-025             Inspection Gr.:
         C2-ASU GTL PROJECT                           ITP No.:                                 Laboratory:
                                                      Record No:                               Date:
TAG NO.:                                                                                       LOCATION:
DESCRIPTION:                                                                                   DRAWING:
TYPE OF GROUT:                                                                                 QUANTITY OF GROUT:
Item                                                   GAMA - QC             CONTRACTOR                COMPANY             THIRD PARTY          REMARKS
 No.           TYPE OF ACTIVITY                    Signature       Date    Signature   Date      Signature       Date   Signature        Date
 1.0                  Setting Out
 2.0        Concrete   Surface Preparation
 3.0      Equipment / Surface Alignment
 4.0                  Formworks
 5.0                Isolation Joint                 N/A            N/A       N/A       N/A         N/A           N/A     N/A             N/A
 6.0         Metal Surface Preparation
 7.0   Mixing / Placing / Finishing of Grout (1)
 8.0             Curing of Grout (1)
 9.0              Removal of Shims                  N/A            N/A       N/A       N/A         N/A           N/A     N/A             N/A
10.0 Mixing / Placing / Finishing of Grout (2)
11.0             Curing of Grout (2)
12.0          Sealant to Isolation Joint            N/A            N/A       N/A       N/A         N/A           N/A     N/A             N/A
13.0               Final Inspection
Remarks:
                                                       Name                             Date                                 Signature
        GAMA QATAR
  CONTRACTOR (Linde)
       QSGTL or its PMC
GAM-QCR-QAC-GTL-025