This document provides an electrical load computation for air conditioning units in the Forestry and HRM buildings. It calculates the total connected load, ampacity, panel sizes, wire sizes, and voltage drop for the main panel, subpanels, and transformer. The key details are:
- The total connected load for the Forestry building is 57,960VA and requires a 149.16A main.
- The total connected load for the HRM building is 25,760VA and requires a 68.23A main.
- The main panel has a total connected load of 158,525.2VA and requires a 398.40A main feeder.
- Voltage drop calculations show the voltage
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
2K views
HRM Acu Load Computation
This document provides an electrical load computation for air conditioning units in the Forestry and HRM buildings. It calculates the total connected load, ampacity, panel sizes, wire sizes, and voltage drop for the main panel, subpanels, and transformer. The key details are:
- The total connected load for the Forestry building is 57,960VA and requires a 149.16A main.
- The total connected load for the HRM building is 25,760VA and requires a 68.23A main.
- The main panel has a total connected load of 158,525.2VA and requires a 398.40A main feeder.
- Voltage drop calculations show the voltage
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4
DATE: APRIL O4, 2018
PROJECT : HRM & Forestry Building Aircon Power Supply
SUBJECT : Electrical Load Computation
Forestry (18- 2.5HP Units Aircon) Voltage drop calculations fr
PB-01 Total Connected Load : VA = 14.0 x 230 x 18 Vd = 1.732 (I) (Z/m) (L) VA = 57,960 VA Vd = 1.732 (149.16) (0.094 AMPACITY Vd= 5.09 AT = ( 57,960 / (1.73 x 230)) + (0.25 x 14.0) Voltage at Panelboard PB-0 AT = 149.16 A V = 230-5.09 =224.91V %VD = 5.09 x 100%/230= 2 Main : 200AT, MCCB, 3P, B.O., 36KAIC @ 240V Note: Percent voltage drop Branches: 18 - 40AT, MCB, 2P, B.O., 20KAIC @ 240V 6 - Spare
Use : 3- 80 mm2 THW Wire in 50mmø RMC Pipe.
1-14mm2 THW Wire
HRM (8 - 2.5HP Units Aircon)
PB-02 Voltage drop calculations fr Total Connected Load : VA = 14.0 x 230 x 8 Vd = 1.732 (I) (Z/m) (L) VA = 25,760 VA Vd = 1.732 (68.23) (0.20/3 AMPACITY Vd= 2.32 AT = (25,760 / (1.73 x 230)) + (0.25 x 14.0) Voltage at Panelboard PB-0 AT = 68.23 V = 230-2.32 =227.68V %VD = 2.32 x 100%/230= 1 Main : 1- 125AT, MCCB, 3P, B.O., 36KAIC @240V Note: Percent voltage drop Branches: 8- 40AT, MCB, 2P, B.O., 20KAIC@240V 6 - Spare
Use : 3-30mm2 THW Wire in 40mmø RMC Pipe
MAIN PANEL :
Total Connected Load :
= PB-01 + PB-02 +75KVA Existing Load = 57,960+25,760+74,805.2 = 158,525.2 AMPACITY I= 158,525.2 VA √3 x 230V I = 398.40A
PANEL : MTS/MDP Free Standing w/ Swinging Front door opening
MAIN : 2-800AT, MCCB, 3P,B.O. 50KAIC@240V Branches: 2 -200AT,3P,36KAIC@240V 1-125AT,3P,36KIAC@240V 1-150AT,3P,36KAIC@240V 2 -Spare 200AF as spare busbar
Size of Main Feeder
Use: 2 sets of (3 - 250mm2 THW Wire in 80mmø RMC Pipe) Voltage drop calculations from MDP to PB-01(FORESTRY)
Vd = 1.732 (I) (Z/m) (L) Where:
Vd = 1.732 (149.16) (0.094/305) (64)/1 I = Load Current AT Z/m = Impedance of cable per 305meter ( Note: Refer to PEC table 9.119) Voltage at Panelboard PB-01 L= length of cable from MDP to PB V = 230-5.09 =224.91V n = number of parallel path %VD = 5.09 x 100%/230= 2.21% Note: Percent voltage drop must not be more than 5%
Voltage drop calculations from MDP to PB-01(FORESTRY)
Vd = 1.732 (I) (Z/m) (L) Where:
Vd = 1.732 (68.23) (0.20/305) (30)/1 I = Load Current AT Z/m = Impedance of cable per 305meter ( Note: Refer to PEC table 9.119) Voltage at Panelboard PB-01 L= length of cable from MDP to PB V = 230-2.32 =227.68V n = number of parallel path %VD = 2.32 x 100%/230= 1.0% Note: Percent voltage drop must not be more than 5%
TRANSFORMER CAPACITY
KVA =1.732 X398.40X230/1000
KVA = 158.71 USE: 3 X100KVA SINGLE PHASE DISTRIBUTION TRANSFORMER 7.96KV/230V,DOUBLE BUSHING OISC,BANKED INTO WYE-DELTA CONNECTION