General Notes and Specifications: Schedule of Load Computation

This document provides a schedule of load computation for a building's electrical panels. It shows the lighting panel has a 40-amp, 2-pole, 230-volt circuit breaker as its main breaker, along with various 15-amp and 20-amp breakers. The power panel also has a 40-amp, 2-pole, 230-volt main breaker and an assortment of 20-amp and 30-amp breakers. Both panels are grounded.

Uploaded by

sedexx
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

General Notes and Specifications: Schedule of Load Computation

This document provides a schedule of load computation for a building's electrical panels. It shows the lighting panel has a 40-amp, 2-pole, 230-volt circuit breaker as its main breaker, along with various 15-amp and 20-amp breakers. The power panel also has a 40-amp, 2-pole, 230-volt main breaker and an assortment of 20-amp and 30-amp breakers. Both panels are grounded.

Uploaded by

sedexx
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SCHEDULE OF LOAD COMPUTATION

GENERAL NOTES AND SPECIFICATIONS

LOAD COMPUTATION: ²

LIGHTING POWER
PANEL PANEL

MAIN 40A, 2P, MAIN 40A, 2P,


BREAKER 230V CB BREAKER 230V CB

15 AT 15 AT 20 AT 20 AT

15 AT 15 AT 30 AT 30 AT

15 AT 15 AT 20 AT 20 AT

20 AT 20 AT 20 AT 20 AT

20 AT SPARE 30 AT 30 AT

SPARE SPARE 30 AT 30 AT

SPARE SPARE

GROUND

GROUND