Fire Safety in RMG Sector Bangladesh PDF
Fire Safety in RMG Sector Bangladesh PDF
               SAFETY ISSUES
    Readymade Garments Factories in Bangladesh 
                              
                 Senior Project Paper 
                              
                          By 
                N Sayem Uddin Ahammed 
                         1221756 
                        Summer 2013 
                              
                              
 
 
                              
             Graduate Program in Engineering 
 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                 
                                                                 
                                                                 
                                                                 
                                              ACKNOWLEDGEMENT 
I would like to acknowledge everyone who assists me to prepare this document. My utmost acknowledge goes 
to  my  project  supervisor  Dr.  Shahriar  Khan  for  his  support  and  guidance  to  prepare  this  document.    Without  his 
support and cooperation this document would have been impossible. I am also grateful to my employees who helped 
me with the information were needed to preparing this document. Some of the picture, references has been used to 
make this document more understandable to the readers.  
	
	
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                 
                                                                                                                     Page 2 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                               
                                                               
                                                               
                                                               
                                                               
                                                               
                                                     ABSTRACT 
Businesses  in  Bangladesh  are  growing  at  an  ever  fast  rate.  Everyday  new  businesses  are  opening  in  every 
possible sector. Recently WTO has ranked Bangladesh as the 4th largest exporter of readymade garments‟ in the 
world. RMG sector contributes  for 75% of foreign currency earning  for  Bangladesh. Taking advantage of poor 
surveillance  of  concerned  authorities‟  rules,  laws  and  codes  are  often  violated  in  construction  sector  of  our 
country and factory buildings are no exception. It is popularly believed and often proven true by incidences that 
the building codes are only maintained in paper works and hardly during the construction phase. Later as the 
owner focuses on the interior works, machine placement etc. the floors are often over loaded with machineries, 
causing more population load during operational hours, narrowing circulation spaces, thus making it difficult for 
the  people  to  access  the  emergency  route  during  an  emergency.  Many  factories  do  not  arrange  regular  drill; 
therefore  the  workers  discover  themselves  in  an  alien  situation  whenever  an  emergency  situation  arises, 
causing  panic,  stampede  etc.  that  further  escalate  the  degree  of  casualty.  In  the  conditions  as  above  the 
aforementioned  thesis  is  proposed  to  evaluate  the  design  of  garments  factories  from  a  safety  point  of  view 
especially  in  case of a fire out.  This  document will  focus  on the  standards  of the  safety  issues and  process  to 
assess a RMG factory for safety issues. Main purpose to prepare this document is to make all in this industry 
familiar to the safety issues and standards. 
                                                                                                                  Page 3 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
Contents: Safety Issues
                                                                                       
                      Acknowledgment                                           2 
                      Abstract                                                 3 
                      Introduction                                             4 
                      Safety Standards                                         15 
                      Reports on Safety Assessments                            79 
                      Structural Safety Assessment                             89 
                      Electrical Safety Assessment                             102 
                      Fire Safety Assessment                                   145 
                                                                                          Page 4 of 188 
 
Introduction: Readymade Garments Factories in Bangladesh 
 
          Readymade garments industry is originally a sector of the textile industry. However due to its own vastness 
nowadays RMG is also considered as an individual industry. While conducting the literature reviews for the origin of 
readymade  garments  industry,  it  was  discovered  that  the  early  literatures  refer  to  “textile  industry”  as  a  whole, 
rather  than  describing  the  “readymade  garments  industry”  as  a  separate  industry.  It  was  during  and  after  the 
industrial revolution that the readymade garments industry evolved as an individual industry. 
 
          The  exact  date  of  when  people  started  wearing  clothes  is  not  clear.  There  are  different  estimations  about 
when people started wearing clothes. One of the studies says that men started wearing clothes 190,000 years ago. 
Anthropologists believe that the earliest clothes were made from skin, vegetation etc. (Travis, 2009). 
 
          Till the 17th century the textile industry was more of a cottage industry localized within certain transportable 
zones. The clothiers fabricated the cloth via various processing, all carried out in their courtyards. The clothiers would 
keep a portion of their  product for the nearby  market and carry most of their products on horseback to relatively 
distant areas for selling their products. There are also evidences of silk being imported to Europe from China via the 
Silk Road. Cotton being one of the earliest clothing materials in India made its first steps in Europe only during the 
medieval period. Later cotton came up as the prime clothing material globally. 
 
          The  textile  industry  experienced  booming  growth  during  the  industrial  revolution  of  the  18th  and  19th 
century.  It  is  one  of  the  industries  to  get  maximum  advantage  from  the  Watt  engine8.  With  the  invention  of  the 
“flying  shuttle9”  by  John  Kay  in  1734  C.E  mass  production  of  yarn  and  cloth  became  a  mainstream  industry.  The 
industry while getting  geared up with  advanced technology of those times  also experienced labor protects against 
introduction  of  “flying  shuttle”  as  the  labors  feared  job  loss.  However,  soon  it  was  realized  that  because  of  the 
dramatic  increase  in  rate  of  production  the  demand  also  increased.  James  Watt‟s  modified  steam  engine  with 
separate condenser added another muscle to the industry in 1761. The industry received its biggest blessings in 1764 
with  the  invention  of  “Spinning  Jenny10”  by  James  Hargreaves.  This  invention  elevated  the  thread  production 
capacity of a single labor by eightfold and subsequently much further (Britannica Encyclopedia, 2011). 
           
                                                                                   
                    "Spinning Jenny", a magic machine during industrial revolution (Marsden, 1884) 
         
The  spinning  jenny  is  a  multi‐spool  spinning  frame.  It  was  invented  in  1764  by  James  Hargreaves  in  Stanhill, 
Oswaldtwistle,  Lancashire  in  England.  The  device  reduced  the  amount  of  work  needed  to  produce  yarn,  with  a 
worker able to work eight or more spools at once. This grew to 120 as technology advanced. 
         
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                                  Introduction 
         
        In the year 1911 Triangle Shirtwaist factory was set on fire and 146 nos. of lives were lost. Since then the 
incident in garments factory not stopped. Incident in garments are a regular phenomenon nowadays in poor country 
like us. After the New York fire, new laws passed and enforced. In those less globalized times; the customers had to 
pay higher prices for the same stuffs. In Bangladesh the things are more complicated for the factories. After series of 
incidents  in  readymade  garments  manufacturing  (RMG)  factories,  the  foreign  customers  have  plenty  of  other  low 
costs countries they could switch their work to. Tragedy in Spectrum, Tazreen and Rana Plaza is well known to all. 
Thousands of lives of workers are lost either at the spot or partial or permanent disabled. Most of them were the 
only in the family to earn. 
        According  to  Export  Promotion  Bureau  (EPB)  data,  in  the  FY  2012‐13,  knitwear  fetched  $10475.88  million, 
representing  a  10.43  per  cent  growth  over  the  same  period  in  the  last  year,  while  woven  garments  earned  US$ 
11039.85 million, a growth of 14.96 per cent. 
                                                                                          
                                                       From a Statistics 
         
        For  the  upcoming  fiscal,  the  growth  in  export  of  knitwear  products  has  been  projected  at  10.5  per  cent, 
woven garments at 13.87 per cent, jute and jute goods at 12.89 per cent, computer service at 50 per cent and leather 
products at 30 per cent and frozen food at 6.42 per cent of setting the target for FY 2013‐14 has been decided to be 
at $30.50 billion. 
         
         
                                                                                                                      Page 6 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                                                                                           Introduction 
         
        Since  the  late  1970s,  the  RMG  industry  started  developing  in  Bangladesh  primarily  as  an  export‐oriented 
industry  although;  the  domestic  market  for  RMG  has  been  increasing  fast  due  to  increase  in  personal  disposable 
income  and  change  in  life  style.  The  sector  rapidly  attained  high  importance  in  terms  of  employment,  foreign 
exchange earnings and its contribution to GDP. 
         
                                                                                                                                                     
 
 
                       GDP                                 Last                    Previous    Highest    Lowest     Forecast                    Unit         Trend 
                                                                                                                                       
                        GDP                               115.61     2012‐12‐31    111.91      115.61      4.30      120.42      2013‐12‐31    USD Billion 
                                                                                                                                                                        
                    GDP ANNUAL 
                                                           6.01      2013‐06‐30      6.23       6.70       4.08        5.84      2013‐12‐31     Percent 
                   GROWTH RATE             
                                                                                                                                                                        
                 GROSS FIXED CAPITAL 
                                      2786.13                        2013‐06‐30    2436.91     2786.13    594.12     2802.72     2013‐12‐31    BDT Billion 
                    FORMATION          
                                                                                                                                                                        
                  GROSS NATIONAL 
                                                          4773.82    2013‐06‐30    4488.39     4773.82    2483.46    4797.85     2013‐12‐31    BDT Billion 
                     PRODUCT       
                                                                                                                                                                        
GDP Growth Rate | Notes 
        The  GDP  Growth  Rate  shows  a  percentage  change  in  the  seasonally  adjusted  GDP  value  in  the      certain 
quarter,  compared  to  the  previous  quarter.  Because  of  climatic  conditions  and  holidays,  the  intensity  of  the 
production varies throughout the year. This makes a direct comparison of two consecutive quarters difficult. In order 
to  adjust  for  these  conditions,  many  countries  calculate  the  quarterly  GDP  using  so  called  seasonally  adjusted 
method. The Gross Domestic Product can be determined using three different approaches: the product, the income, 
and the expenditure technique, which should give the same result. In sum, the product technique sums the outputs 
                                                                                                                                                                              Page 7 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                                     Introduction 
of every class of enterprise. The expenditure technique works on the principle that every product must be bought by 
somebody, therefore the value of the total product must be equal to people's total expenditures in buying products 
and services. The income technique works on the principle that the incomes of the productive factors must be equal 
to the value of their product, and determines GDP by finding the sum of all producers' incomes. 
 
         However, economists and many exporters have expressed their doubt about achieving the targeted export 
growth in the current FY. They cited the issue of the election year and the present edgy situation in the main export 
sector‐‐‐ ready‐made garment (RMG) ‐‐ as main hindrances to achieving the target. 
 
         In  2001,  Bangladesh's High Court  directed  the  government to set  up  a  committee  to  oversee  the safety of 
garment  workers  after  a  similar  fire  in  a  factory  killed  24  people.  But  that  directive  was  never  implemented,  and 
more than 1000 people have been killed in garment factory fires since 2006. 
          
For  the  past  couple  of  months  the  main  international  firms  buying  clothes  from  Bangladesh  have  been  meeting 
government representatives to try to agree on a broader strategy to improve factory safety.  
        No factory owner has ever been prosecuted over the deaths of workers. Other major fires 1990 and 2012, 
resulted  in  hundreds  of  accidental  deaths,  include  those  at  That's  It  Sportswear  Limited  and  the  fire  at  Tazreen 
Fashions  Ltd.  Spectrum  Sweater  Industries,  Phoenix  Garments,  Smart  Export  Garments,  Garib  and  Garib,  Matrix 
Sweater,  KTS  Composite  Textile  Mills  and  Sun  Knitting.  Foreign  buyers  looking  for  outsourcing  demanded 
compliance‐related norms and standards regarding a safe and healthy work environment, which includes fire‐fighting 
equipment and evacuation protocols. RMG insiders in Bangladesh complain about the pressure to comply and argue 
that  RMG  factory  owners  are  hampered  by  a  shortage  of  space  in  their  rental  units.  In  spite  of  this  the  industry 
exports totaled $19 billion in 2011‐2012. They expected export earnings to increase to $23 billion in 2012‐2013. 
        So far, however, most of the big global clothing brands and retailers seem minded to stay in Bangladesh, try 
harder to improve safety in their contractors’ factories and build goodwill among locals. On April 9th 2013 Walmart, 
some of whose products were found in the ashes of last year’s factory fire, gave $1.6m to the Institute of Sustainable 
Communities, a non‐governmental organisation (NGO), to help it set up a health‐and‐safety academy in Bangladesh. 
Walmart also recently introduced stricter fire‐safety audits, and a “zero tolerance” policy towards contractors caught 
using unauthorized factories to make Walmart products. 
 
        “The  rapid  growth  in  Bangladesh’s  garment  industry  has  provided  vital  jobs  to  women  and  men  and  is 
helping  to  pull  them  and  their  families  out  of  poverty.  However,  there  is  an  urgent  need  for  decisive  and 
collaborative action to make decent work a reality,” stated Guy Ryder, the Director‐General of the UN International 
Labour  Organization  (ILO).  “This  programme  will  improve  conditions  of  work,  especially  safety,  and  help  generate 
sustainable economic growth and investment,” he added in a news release.  
 
        The  plan  brings  together the  National Tripartite  Plan  of  Action on  Fire  Safety  in the  RMG  Sector signed on 
March 24, 2013 in response to the Tazreen factory fire and the Joint Tripartite Statement adopted on May 4 in the 
wake  of  the  Rana  Plaza  tragedy.  The  Plan  calls  for  an  assessment  of  all  active  export‐oriented,  RMG  factories  in 
Bangladesh to be completed by 31 December 2013. 
                                                                                                                         Page 8 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                                     Introduction 
 
         The RMG sector is vital to the economy of Bangladesh, which exported goods worth $19.3 billion for the 11 
months that ended in May 2013 – nearly 12 per cent more than a year earlier.  
 
         The  Plan  is  supported  by  other  parallel  initiatives  focused  on  the  RMG  sector  in  Bangladesh,  namely  the 
Accord on Fire and Building Safety in Bangladesh – signed by over 80 leading clothing brands and retailers – and the 
Alliance for Bangladesh Worker Safety with another 26 member company, a binding five‐year initiative undertaken 
by North American apparel companies and retailers to improve safety in more than 500 factories. 
 
         The  plan  sets  out  legislation  and  policy,  administrative  and  practical  activities,  as  well  as  the  respective 
partner(s) responsible for the implementation of the activities, and a timeframe for implementation. 
 
         The action plan has come at a time when Bangladesh is at risk of losing the Generalized System of Preference 
(GSP)  facility  for  apparel  products  in  the  US  market  on  the  ground  that  Dhaka  did  not  make  much  progress  in 
addressing the issue of workers' rights. 
        Less  than  a  year  before  a  tragic garment  factory  collapse  in  April killed  over  1,000  people  in  Bangladesh, a 
World Bank study laid out many logistical reforms to improve the country’s garment industry. An international outcry 
is now prompting some of those reforms, and could begin to change the logistics of the international clothing trade. 
        In  Bangladesh,  the  first  step  for  the  garment  industry  –  which  accounts  for  three‐fourths  of  the  country’s 
exports – is to improve worker safety, said Scott Nova, executive director of the Worker Rights Consortium. Because 
garment factories in Bangladesh compete intensely to piece together short‐term orders from multiple retailers, price 
makes all the difference in winning a deal. 
         Many  investigations  from  different  authorities  found  evidence  of  high‐rise  death  traps,  where  poorly 
maintained  electrical  systems,  locked  exits,  limited  firefighting  equipment,  and  mountains  of  combustible  fabric 
provided a recipe for disaster.  
 
Some facts 
Bangladesh Fire Statistics 
                          Year            Reported Fires  Garment Industry 
                          2009            12182               293 
                          2010            14682               220 
                          2011            15815               234 
Main cause:  
Electricals above 50%,  
70% Fire from burner/stove; from cigarette; from heated ash; from machine 
Source : Fire Service and Civil Defense Directorate 
         Bangladesh, the eighth most populous country overall, is the second‐largest garment exporter in the world, 
trailing only the Chinese mainland. With its wage levels among the lowest in the region and with its abundant labour 
supply, Bangladesh is hugely in demand as a garment production base, securing its status as one of the world’s major 
suppliers of low‐cost, ready‐made garments (RMG) over the past two decades. 
                                                                                                                         Page 9 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                                       Introduction 
Safety Issues in RMG: Safety Needs 
 
         Bangladesh currently has more than 5400 garment factories  that work for large western retailers, with those 
from  Europe  accounting  for  nearly  60%  of  the  country’s  apparel  exports  followed  by  the  United  States  at  23%  of 
exports.  In  order  to  attract  foreign  investments,  the  Government  of  Bangladesh  set  up  special  economic  zones  in 
Dhaka and surrounding cities, boosting the number of factories in the country.  The garment industry, especially the 
factories focused on exports have been less careful about adopting adequate safety measures, primarily due to the 
focus on cost reduction to ensure lucrative exports. 
          
         As a result, Bangladesh has become an established location for sourcing low‐cost production services, with a 
large  number  of  local  OEM  manufacturers  emerging.  This  rapid  growth,  however,  has  come  at  a  cost.  Overall,  the 
issue  of  compliance  with  the  required  safety  and  working  conditions,  as  set  down  by  the  International  Labour 
Organisation (ILO), has been frequently ignored. 
 
     The Bangladesh garment industry mishaps are a wakeup call to global citizens, governments and companies for 
taking sustainable measures to address the lack of safety in the garment factories. For the millions of workers who 
craft  apparel  in  these  factories,  their  daily  trek  to  work  in  the  quest  for  survival  is  a  toss‐up  between  life  and 
livelihood. 
          
         Dhaka  is  the  world’s  most  densely  populated  cities,  with  115,000  inhabitants  per  square  mile  and  land  is 
scarce  and  expensive  resource.  Given  the  scarcity  of  land,  multi‐storey  buildings  that  violate  building  codes  are  a 
common occurrence. Many of these buildings are residential apartment blocks for families converted into factories, 
and are inadequate in terms of fire escapes, proper ventilation and sanitation, for the increased number of people 
they now have to cater to. Adding illegal floors to buildings is also a common practice. Needless to say, these floors 
are added in violation of structural concerns and fire and other safety measures. 
 
         Many factories  are often run out of  a single building,  with multiple tenants on different  floors. Apart from 
limited  regular  and  emergency  exits,  high  density  of  people,  and  lack  of  safety  measures,  the  lack  of  coordination 
between  tenants  of  these  buildings  pose  greater  risks  as  compared  to  small  factories  with  single  tenants. 
Additionally,  these  buildings  house  power  generators  to  help  the  factories  cope  with  frequent  power  cuts.  In  the 
recent  incident  at  Rana Plaza,  according  to the initial  government  enquiry,  there  were  five  large  generators in the 
building which were fully functional right before the collapse. These generators were running due to a power cut and 
may  have  been  instrumental  in  the  collapse  of  the  building.   These  poorly  constructed  buildings  cannot  take  the 
heavy load that these generators create. Over 600 workers in the last five months have been killed in Bangladesh due 
to similar working conditions. 
 
         Labour  Behind  the  Label  is  an  international  campaign  funded  by  the  European  union,  striving  towards 
improving working conditions and empowering workers in the global garment industry. 
          
 
 
 
                                                                                                                          Page 10 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                                     Introduction 
Safety Issues in RMG: Clear Guidance to the Factories on Safety Issues 
 
          Identifying the Hazards in RMG sectors to make the work place safe for the workers driven the importance to 
prepare a guideline on the safety issues. There are three different specific areas to concentrate for the safety in RMG. 
Fire  Safety,  Electrical  Safety  and  Structural  Integrity  Safety  issues  has  been  classified  and  identified  to  make  the 
workplace safer. Negligence on any of these three issues can be a cause of a major disaster. Assessing a factory on 
these three categories and remedial on findings will reduce the incidents. 
 
From a baseline survey the below findings are facts to realize the safety concerns of the factories:  
 
     1. Only 2% know about hazards. 
     2. 39% do not know the hazard issues.  
     3. 45% of the surveyed are not trained fire safety. 87% have participated in a recent fire drill, but fire drills are 
        not always carried. 
     4. 57% of workers witnessed accident. 
     5. 25% of workers feel unsafe in their factories. 
     6. 86 form 18% of surveyed factories believe the security guards increase the risk of accidents by keeping the way 
        of egress locked. 
 
     With a combined understanding on the above issues by the government and the foreign buyers, different safety 
programs now are in place to make the factories risk free. The union of buyers has launched the safety assessment 
process in the factories. These assessments are in three different categories: a) Building and Structural Safety b) Fire 
Safety c) Electrical Safety 
 
     Main purpose is to introduce the safety assessment is to grow awareness among the factory owners against the 
risks  from  hazardous  issues.  An  assessment  on  the  safety  issue  opens  the  window  for  an  owner  on  corrective  or 
remedial of the identified nonconformities. 
 
     Very  recent  the  union  of  the  buyers  released  the  guide  of  standards  for  assessing  the  nonconformities  of  a 
factory building. This guide is a standard, which need to be followed by the assessors. Bangladesh National Building 
Code (BNBC) was used to prepare the guideline from the union of the buyers. In addition to the BNBC different codes 
and standards as stated below are also used to make the guideline more descriptive and can be used as extension of 
the standards. 
 
 
 
 
 
 
 
 
 
 
 
                                                                                                                        Page 11 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                                                         Introduction 
 
    Bangladesh Laws and Rules. 
 
    1.  Electricity Act, 1910. 
    2.  Electricity Rules, 1937. 
    3.  Boiler Act, 1923, Section 2 (b) and 6 
    4.  Petroleum Act, 1934 
    5.  Building Construction Act, 1952 
    6.  Fire Service Rules 1961 
    7.  Factories Rules, 1979, Sections 3 (1), 4, 41, 43, 51, and 52 
    8.  Statutory Regulatory Orders (S.R.O) 109, Act 1999, published on 25th May 
    9.  Fire Resist and Extinguish Act 2003 
    10. Bangladesh Labour Act, 2006 as amended by Bangladesh Labour (Amendment) Act, 2013. 
    11. Dhaka Mahanagar Imarat Nirman Bidhimala 2008 
    12. Chittagong Imarat Nireman Bidhimala 2008 
    13. Circular‐ Building Permit on 19 August 2010, Ministry of Housing & Public Works/Pari – 1/Occupant‐RMG 42/2007/256, circular no Ministry of Housing 
        & Public works/Pari – 1/Occupant‐RMG 42/2007/302 dated on 25 November 2008 
    14. Circular‐ Removal of temporary tin shade from Rooftop of RMG Factory Buildings. REF: BGMEA Letter no. BGA/Safety/18000/2011/28180, Dated: 28th 
        December, 2011 
    15. Circular on 19 Apr 2013_RAJUK_Building Permit inside Detailed Area Plan (DAP) 
 
    International Laws and Rules. 
 
    1.    ICC publications. International Code Council, 5203 Leesburg Pike, Suite 600, Falls Church, VA 22041 USA. 
    2.    IBC, International Building Code, 2012. 
    3.    IFC, International Fire Code, 2012. 
    4.    IEBC, International Existing Building Code, 2012. 
    5.    NFPA publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169‐7471 USA. 
    6.    NFPA 10, Standard for Portable Fire Extinguishers, 2013. 
    7.    NFPA 13, Standard for the Installation of Sprinkler Systems, 2013. 
    8.    NFPA 14, Standard for the Installation of Standpipe and Hose Systems, 2013. 
    9.    NFPA 20, Standard for the Installation of Stationary Pumps for Fire Protection, 2013. 
    10.   NFPA 22, Water Tanks for Private Fire Protection, 2013. 
    11.   NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water‐Based Fire Protection Systems, 2011. 
    12.   NFPA 30, Flammable and Combustible Liquids Code, 2012. 
    13.   NFPA30B, Code for the Manufacture and Storage of Aerosol Products, 2011. 
    14.   NFPA 37, Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines, 2010. 
    15.   NFPA 51B, Standard for Fire Prevention During Welding, Cutting, and Other Hot Work, 2014. 
    16.   NFPA 70, National Electrical Code®, 2011 
    17.   NFPA 72, National Fire Alarm and Signaling Code, 2013. 
    18.   NFPA 80, Standard for Fire Doors and Other Opening Protectives, 2013. 
    19.   NFPA 90A, Standard for the Installation of Air‐Conditioning and Ventilating Systems, 2012. 
    20.   NFPA 92, Standard for Smoke Control Systems, 2012. 
    21.   NFPA 101, Life Safety Code®, 2012. 
    22.   NFPA 110, Standard for Emergency and Standby Power Systems, 2013. 
    23.   NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems, 2013. 
    24.   NFPA 241, Standard for Safeguarding Construction, Alteration, and Demolition Operations, 2013. 
    25.   NFPA 252, Standard Methods of Fire Tests of Door Assemblies, 2012. 
    26.   NFPA 257, Standard on Fire Test for Window and Glass Block Assemblies, 2012. 
    27.   ACI publications. American Concrete Institute, 38800 Country Club Drive, Farmington Hills, MI 48331 USA. 
    28.   ACI 228.1R, In‐Place Methods to Estimate Concrete Strength, 2003. 
    29.   ACI‐318, Building Code Requirements for Structural Concrete and Commentary, 2011. 
    30.   AISC Publications. American Institute of Steel Construction, One East Wacker Drive Suite 700, Chicago, IL 60601 USA. 
           
           
           
           
                                                                                                                                            Page 12 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                                                         Introduction 
           
    31.   AISC Code of Standard Practice. 
    32.   ASCE Publications. American Society of Civil Engineers, 1801 Alexander Bell Drive, Reston, VA 20191 USA. 
    33.   ASCE 7. Minimum Design Loads for Buildings and Other Structures, 2010. 
    34.   ASME Publications. American Society of Mechanical Engineers, Two Park Avenue, New York, NY 10016 USA. 
    35.   ASME A17.1 Safety Code for Elevators and Escalators, 2010. 
    36.   ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428 USA. 
    37.   ASTM A370, Standard Test Methods and Definitions for Mechanical Testing of Steel Products, 2012. 
    38.   ASTM C42, Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete, 2013. 
    39.   ASTM C823, Standard Practice for Examination and Sampling of Hardened Concrete in Constructions, 2012. 
    40.   ASTM – C39 /39M – 12a, Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens, 2012. 
    41.   ASTM‐ C856, Standard Practice for Petrographic Examination of Hardened Concrete, 2011. 
    42.   ASTM ‐ C295, Standard Guide for Petrographic Examination of Aggregates for Concrete, 2012. 
    43.   ASTM ‐ C457, Standard Test Method for Microscopical Determination of Parameters of the Air‐Void System in Hardened Concrete, 2011. 
    44.   ASTM E 84, Standard Test Method for Surface Burning Characteristics of Building Materials, 2010. 
    45.   ASTM E 119, Standard Test Methods for Fire Tests of Building Construction and Materials, 2010b. 
    46.   ASTM E 136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C, 2009b. 
    47.   ASTM E 814, Standard Test Method for Fire Tests of Through‐Penetration Fire Stops, 2010. 
    48.   FM Global publications. FM Global, 270 Central Avenue, Johnston, RI 02919‐4923 USA. 
    49.   FM Data Sheet 7‐1, Fire Protection for Textile Mills, January 2012. 
    50.   FM Data Sheet 8‐7, Baled Fiber Storage, January 2000. 
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
                                                                                                                                            Page 13 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                                     Introduction 
 
Safety Assessment Standards: Ensuring the Implementation of the Codes and Standards  
 
          To  help  ensure  consistency  in  the  countrywide  evaluation  of  RMG  factories,  the  technical  requirements  of 
the Buyers’ Standard have been harmonized with the requirements of the factory assessment guidelines developed 
by  Bangladesh  University  of  Engineering  and  Technology  (BUET)  for  the  NTPA.  Throughout  this  process,  input  was 
incorporated  from  factory  owners  in  the  Bangladesh  RMG  industry,  professors  from  BUET,  and  other  technical 
experts. In order facilitate dialogue on realizing this common set of standards, the International Labour Organization 
(ILO) also played a vital role. The Standard, which supports the Bangladesh National Tripartite Plan of Action (NTPA), 
strives  to  provide  clear  and  practical  technical  requirements  by  which  Bangladeshi  RMG  factories  producing  for 
foreign  buyers  may  be  consistently  and  fairly  evaluated  for  structural,  fire  and  electrical  safety.  Assessments  will 
prompt action plans that can be used by RMG factories to systematically and sustainably improve safety conditions 
for garment workers. 
 
Safety Assessments to ensure the workers safety covers the below issues. Alliance  
 
     A. Building and Structural Safety 
     B. Fire Safety 
     C. Electrical Safety 
 
          Statements  in  next  pages  to  explain  the  above  three  safety  issues  with  the  appropriate  photographs  are 
taken mostly from the Alliance for Bangladesh Workers Safety Standards. Error in interpretation in explanation may 
found but maximum attention was given to keep the statement as original. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                                                       Page 14 of 188 
 
                                                                                  Standards to Ensure Safety 
 
A. Building and Structural Safety Standards 
    General Building Requirements for a Factory: Structural issues of factory covered under this guideline. 
        
      1. High‐rise  Building:  Occupiable  floor  is  located  more  than  20  m  (65  ft)  above  the  grade  level  of  the 
          building. 
           
                                                                     
                                                High Rise Building 
       2. Occupiable Roof. A roof‐level shall be considered occupiable where access to the roof is provided and is 
          not limited to any other mechanical equipment. 
           
                                                                                
                                                  Dinning at Rooftop 
       3. Use  and  Occupancy.  Spaces  that  are  used  for  more  than  one  occupancy,  the  space  shall  be  classified 
          based on all the occupancies present and shall   meet the requirements of BNBC Part 3 Sections 1.3 and 
          shall be met. 
          3.1. Occupancy A: Residential. This occupancy includes structures or portions used for sleeping and living 
                accommodations to related or unrelated groups of people. [See BNBC Part 2 Section 2.1.1] 
          3.2. Occupancy B: Educational Buildings. This occupancy includes structures or portions used for daycare 
                (B2). [See BNBC Part 3 Section 2.1.2] 
          3.3. Occupancy E: Assembly Buildings. This occupancy includes structures or portions where large groups 
                of people congregate. Prayer halls and dining halls may be cited as an example. Most factories have 
                subcategories of E3 (Large Assembly without fixed seats) and E4 (Small Assembly without fixed seats, 
                less than 300 persons). [See BNBC Part 3 Section 2.1.5] 
          3.4. Occupancy  F:  Business  Buildings.  This  occupancy  includes  structures  or  portions  used  for  the 
                transaction of business including offices (F1). [See BNBC Part 3 Section 2.1.6] 
                 
                 
Safety Issues in Readymade Garments Factories 
                                                                                  Building and Structural Safety Standards 
               
         3.5. Occupancy  G:  Industrial  Buildings.  This  occupancy  includes  structures  or  portions  used  where 
              materials  are  fabricated,  assembled,  or  processed.  The  G2,  Moderate  Hazard  Industrial  Occupancy 
              will be the predominant occupancy type in most RMG factories. [See BNBC Part 3 Section 2.1.7] 
         3.6. Occupancy H: Storage Buildings. This occupancy includes structures or portions used for the storage 
              of  material,  products,  and/or  equipment.  The  H2,  Moderate  Risk  Fire  Storage  will  encompass  the 
              majority of the storage facilities used in the RMG factories. [See BNBC Part 3 Section 2.1.8] 
         3.7. Occupancy  J:  Hazardous  Buildings.  This  occupancy  includes  structures  or  portions  used  for  the 
              storage, processing, handling, or manufacture of any hazardous material. [See BNBC Part 3 Section 
              2.1.9] 
         3.8. Occupancy  K:  Miscellaneous  Buildings.  This  occupancy  includes  structures  or  portions  used  for 
              special  structures  not  classified  above.  This  could  include  water  treatment  plants,  generator 
              buildings,  electrical  buildings,  and  other  utility  buildings.  [See  BNBC  Part  3  Section  2.1.10].  Each 
              portion of a building or structure shall be classified individually according to above classes. When a 
              building contains more than one occupancy, the building or portion shall comply with the applicable 
              requirements as stated below. The mixed use provisions of BNBC Part 3 Section 2.3 shall apply. 
      4. Accessory  occupancies.  Occupancies  that  are  incidental  to  the  main  occupancy  shall  be  considered 
         accessory occupancies to the main occupancy when they do not exceed 10 percent of the building area of 
         the story in which they occur. [See BNBC Part 3 Section 2.1]. No occupancy separation shall be required 
         between accessory and main occupancies except where required by the use as stated below 
         4.1. Daycare‐  Daycare  occupancies  which  are  accessory  to  other  occupancies  shall  be  located  on  the 
              ground floor with a maximum travel distance of 9 m (30 ft). If located on a higher floor, direct access 
              to an exit enclosure shall be provided. 
         4.2. Boiler  or  Furnace  Rooms‐  Any  room  or  space  housing  boilers  or  other  heat  producing  equipment 
              shall be separated from other occupancies by a minimum 1 hour construction. 
         4.3. Generators‐ Generator sets shall be separated from all other occupancy areas by a minimum 2 hour 
              construction. Fuel tanks shall be limited to a maximum 2500 L (660 gal) when located in a building 
              with  other  occupancies.  Exhaust  shall  be  in  accordance  with  NFPA  37.  All  exhaust  systems  shall 
              discharge to the exterior of the building in a safe location. 
         4.4. Oil Filled Transformers‐ Rooms used for the housing of oil‐filled transformers shall be in compliance 
              with  BNBC  Part  4  Section  D  15  for  high‐rise  buildings.  Oil  filled  transformers  for  non‐high‐rise 
              buildings shall be separated by a minimum 2‐hour fire resistive rated construction. 
         4.5. Storage‐ Rooms used for storage of combustible materials shall be separated from the surrounding 
              occupancy  with  a  minimum  1  hour  construction.  In  process  storage  open  to  the  surrounding 
              occupancy  is  not  required  to  be  separated  when  the  floor  is  provided  with  automatic  sprinkler 
              protection in accordance with the specified standards. 
         4.6. Miscellaneous  Storage‐  Storage  that  does  not  exceed  2.45  m (8  ft.)  in  height,  is  accessory  to other 
              occupancies, does not exceed 23 m2  (250 ft2 ) in any one area and is separated by a minimum 3.0 m 
              (10 ft) from other storage areas. 
               
               
               
                                                                                                                   Page 16 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                      Building and Structural Safety Standards 
                
         4.7. Parking‐  Parking  of  personal  motor  vehicles  shall  not  be  allowed  in  existing  buildings  unless  the 
               parking area is separated by 1 hr fire‐resistive rated construction or automatic sprinkler protection is 
               provided.  In  addition,  parking  shall  only  be  permitted  if  adequate  provisions  for  carbon  monoxide 
               detection/removal  are  provided,  and  if  parking  areas  were  originally  designed  or  subsequently 
               approved for the parking of vehicles by appropriate legislative parties. 
      5. Flammable and Combustible Liquid. 
         5.1. A license must be obtained in accordance with the Petroleum Act for all storage of Class I petroleum 
               greater than 25 L (6 gal). 
         5.2. A license must be obtained in accordance with the Petroleum Act for all storage of Class II petroleum 
               greater than 1000 L (264 gal) individually and 2000 L (528 gal) aggregate. Licenses required by this 
               section must be prominently posted and kept up‐to‐date. 
      6. Chemical Storage. All other chemical storage shall be in compliance with BNBC Part 3 Section 2.1.13.  
         Standard Practice of Chemical Store: All stored chemicals must be labeled with their correct name and 
         any  specific  hazards  and  requirement  to  wear  personal  protective  equipment  clearly  identified. 
         Flammable  chemicals  (e.g.  solvents)  must  be  segregated  and  stored  separately,  preferably  in  a  locked, 
         secure area. An authentic Material Safety Data Sheet (MSDS) for each chemical must be available in the 
         local language and kept in close proximity to the chemical for ease of access. Bulk quantities of hazardous 
         chemicals must be stored appropriately to avoid the risk of a spillage. The recommended approach is to 
         enclose containers of chemicals with bunds or bund trays that are capable of holding the entire amount of 
         chemicals in the container. All chemicals must be stored to minimize the risk of dangerous reaction with 
         other  chemicals.  For  example  acids  and  alkalis  must  be  segregated  and  oxidizing  and  reducing  agents 
         should be separated. Storage advice on the MSDS must be followed at all times. 
 
                                                                                   
                                                     Storage of Chemicals 
         
      7. No separated Occupancies. Where more than one occupancy occurs and is not separated in accordance 
          with  8,  the  most  restrictive  requirements  for  each  occupancy  shall  apply  for  fire  protection,  means  of 
          egress, type of construction, and allowable building height and area. No separation is required between 
          no separated occupancies meeting the requirement of this section. 
      8.  Separated  Occupancies.  New  and  existing  occupancies  shall  be  separated  from  other  occupancies  in 
          accordance with BNBC Part 3 Sections 2.3 and 3.1.5. 
           
           
           
           
                                                                                                                    Page 17 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                   Building and Structural Safety Standards 
             
      9.     Building Height and Areas. 
            9.1. General.  The  general  requirements  for  height  limitations  for  buildings  based  on  open  space, 
                  frontage, and floor area ratios in accordance with BNBC Part 3 Section 1.8 shall be met for all new 
                  construction.  Note:  no  non‐rated  construction  is  allowed  for  the  occupancies  found  in  the  RMG 
                  factories for new construction per the BNBC. 
      10.    New Construction. 
            10.1. Construction of new non‐high‐rise factories containing G and/or H2 occupancies (factories) shall be 
                   Type 1 or Type 2 construction as required in BNBC Part 2 Table 3.2.4. 
            10.2. Construction of new non‐high‐rise buildings containing J occupancies shall be Type 1 construction. 
      11.    Existing Buildings. 
            11.1 Existing buildings greater than 2 stories with nonrated construction shall not exceed 2000 m2 (22,000 
                  sq. ft.) per floor unless automatic sprinkler protection is provided throughout. 
      12.    High Rise Buildings. 
            12.1. General.  High  rise  buildings  shall  be  defined  as  those  structures  or  buildings  where  the  highest 
                   occupiable floor is located more than 20 m (65 ft) above the grade level around the building. The 
                   requirements of this section shall apply to both new and existing buildings. See BNBC Part 3 Section 
                   2.10.6. 
      13.    Construction. 
            13.1. New construction. Construction of new high‐rise buildings shall be limited to Type 1 construction as 
                   required  in BNBC Part  3  Section  2.10.6.2.  This  requirement shall  apply  to  all  occupancy  types  and 
                   not just Type F. 
            13.2.  Existing buildings. 
                    13.2.1. Type 3 and nonrated construction shall not be allowed for high‐rise buildings. 
                    13.2.2. Automatic  sprinkler  system.  Automatic  sprinkler  systems  shall  be  provided  throughout  all 
                             new and existing high‐rise buildings with an occupiable floor greater than 23 m (75 ft) above 
                             the finished grade in accordance with Section 5.3 Alliance Standards. 
                    13.2.3. Fire  detection  and  alarm  system.  An  automatic  fire  detection  and  alarm  system  shall  be 
                             provided throughout all new and existing high‐rise buildings in accordance with Section 5.7 
                             Alliance Standards. 
      14.   Emergency power. An emergency power system shall be provided to supply power to the following loads: 
                  a. Exit signs and means of egress illumination 
                  b. Automatic fire detection systems 
                  c. Fire alarm systems 
                  d. Electrically powered fire pumps. 
                  e. Smoke control systems 
                  f. Elevators/lifts 
      15.   Battery powered signs and exit lights. Existing battery‐operated or uninterruptable power supply systems 
            can be continued to be used to supply exit signs and means of egress illumination where monthly testing 
            of  such  systems  is  conducted  and  properly  documented.  Emergency  power  shall  be  provided  for  a 
            minimum duration of 60 min. 
             
                                                                                                                    Page 18 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                   Building and Structural Safety Standards 
           
           
                                                                                
                                                   Battery backed Signs 
      16. Atriums. 
          16.1. General.  This  section  shall  apply  to  buildings  or  structures  containing  vertical  openings  known  as 
                 atrium. 
          16.2. Definition. An atrium is an opening connecting two or more stories other than enclosed stairways, 
                 elevators,  plumbing,  electrical,  mechanical,  or  other  equipment  that  is  enclosed  in  fire‐rated 
                 enclosures. Stories do not include mezzanines that are open. 
                
                                                                                 
                                                            Atrium 
          16.3. Fire alarm system. An automatic fire alarm system shall be provided throughout all new and existing 
                buildings containing an atrium in accordance with Section 5.7. 
          16.4. Separation. Enclosure of new and existing atrium shall be in accordance with BNBC Part 3 Section 
                3.1.17.f) with the following modification. Glass walls and inoperable windows shall be permitted in 
                lieu of the 1‐hr. fire barrier where all of the following items are met: 
               a. Automatic sprinklers are placed on both sides of the glass at maximum 1.83 m (6 ft) intervals. 
               b. These sprinklers are placed no more than 305 mm (12 in.) from the glass to allow wetting the 
                   entire surface of the glass. 
               c. The glass is of wired, tempered, or laminated glass held in place by gasketed frames allowing the 
                   glass to deflect without breaking prior to operation of the sprinklers. 
               d. Sprinklers  can  be  eliminated  from  the  atrium  side  of  the  glass  on  levels  where  there  is  not  a 
                   walking surface on the atrium side above the lowest level of the atrium. 
               e. Doors in the glass walls are smoke‐resistant and are self or automatic‐closing. 
               f. The  glass  is  vertically  continuous,  not provided  without horizontal  elements that  would  prevent 
                   the sprinklers from wetting the entire surface of the glass. 
                    
                    
                    
                                                                                                                    Page 19 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                    Building and Structural Safety Standards 
                      
            16.5. Engineering Analysis. An engineering analysis shall be conducted of the atria that demonstrates that 
                   the building is designed to keep the smoke layer interface above the highest unprotected opening 
                   to adjoining spaces , or 1830 mm (6 ft) above the highest floor level open to the atrium for 20 min. 
                   The results of the engineering analysis may require smoke control, separation, sprinkler protection 
                   and/or other protection features. 
            16.6. Smoke control. Smoke control required by the engineering analysis in new and existing construction 
                   shall be designed in accordance with NFPA 92 unless the below requirements of are met. 
            16.7. Atria in existing buildings shall not be required to have a smoke control system provided the entire 
                   atrium  is  separated  from  the  rest  of  the  building  by  2  hr  fire‐resistance  rated  construction  and 
                   where egress paths do not pass through the atrium and where emergency workers are not required 
                   to access the atrium. 
      17.   Type of Construction. 
            17.1. General.  Buildings and structures that are erected or to be erected, altered or extended in height or 
                   area shall meet the construction types as listed in BNBC Part 3 Chapter 3. 
            17.2. Separation.    Construction  types  shall  be  separated  by  fire  walls  or  provided  with  fire‐resistance 
                   rated walls and separation distance in accordance with Section 3.9. 
      18.   Fire walls.  Fire walls shall be built in accordance with IBC Section 706. 
      19.   No separation.  When no separation is provided between construction types, the lesser construction type 
            shall apply to each building that is not separated in accordance with Section 3.8.2 and 3.9. 
      20.   Separation  Distances.    Buildings  and  structures  shall  be  separated  from  other  buildings  in  accordance 
            with BNBC Part 3 Table 3.2.2 and BNBC Part 3 Section 2.4.1.3. 
      21.   Fire Protection Construction 
            21.1. Fire wall. A  fire‐resistance‐rated wall having protected openings, which restricts the spread  of fire 
                   and  extends  continuously  from  the  foundation  to  or  through  the  roof,  with  sufficient  structural 
                   stability under fire conditions to allow collapse of construction on either side without collapse of the 
                   wall. [IBC 702.1] 
            21.2. Fire  Resistance.  The  fire  resistance  ratings  of  structural  elements,  building  components  or 
                   assemblies shall be determined in accordance with the test procedures outlined in ASTM E 119 or 
                   UL 263. 
            21.3. Fire  resistance  of  structural  members.  The  fire  resistance  of  structural  members  shall  be  in 
                   compliance with BNBC Part 3 Chapter 3 and Table 3.3.1 (repeated below). 
      22.   Fire Protection Construction. Table 3.3.1 from BNBC Part 3 CHAPTER 3 
 
                                                                                                                      Page 20 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                     Building and Structural Safety Standards 
                                                                              
 
 
 
 
                                                                                   Page 21 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                    Building and Structural Safety Standards 
 
          22.1. Fire  Resistance  Ratings  of  Common  Elements.  See  Table  4.1.1  from  BNBC  Part  4  relisted  as  Table 
                4.4.1 below. 
           
                                     Structural Element                     Fire Resistance Rating 
                    1.  SOLID WALLS 
                    a.  75 mm thick walls of clay bricks                             0.75 hour 
                    b.  125 mm thick walls of clay bricks                            1.5 hours 
                    c.  250 mm thick walls                                           5.0 hours 
                    2.  RC WALLS 
                    a.  150 mm thick RC wall                                           3.0 hours 
                    b.  200 mm thick RC wall                                          4.0 hours 
                    c.  250 mm thick RC walls                                          5.0 hours 
                    d.  300 mm thick RC walls                                          6.0 hours 
                    3.  RC SLABS 
                    a.  100 mm RC slabs with 13 mm cover               
                        over reinforcement                                            1.0 hours 
                    b. 150 mm RC slabs with 19 mm cover                
                        over reinforcement                                            2.5 hours 
                    c. 200 mm RC slabs with 19 mm cover                
                        over reinforcement                                           3.75 hours 
                    d. 250 mm RC slabs with 25 mm cover                
                        over reinforcement                                            5.0 hours 
                    4.  RC COLUMNS (1:2:4) 
                    a.  250 mm x 250 mm with 25 mm cover                              3.0 hours 
                        over reinforcement 
                    b.  300 mm x 300 mm with 25 mm cover
                                                                                      4.0 hours 
                        over reinforcement 
                    c.  400 mm x 400 mm with 25 mm cover
                                                                                      6.0 hours 
                        over reinforcement 
                    d.  400 mm x 400 mm with 50 mm cover
                                                                                      8.0 hours 
                        over reinforcement 
                                            Table 4.1.1 from BNBC Part 4 
                                                            
      23. Parapets. Parapets that are constructed on rated exterior construction shall be of the same rating as the 
          exterior wall rating in accordance with BNBC Part 3 Section 3.1.15. 
           
                                                                                 
                                                    Parapets at Roof 
                                                            
                                                            
                                                            
                                                            
                                                            
                                                            
                                                                                                                  Page 22 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                    Building and Structural Safety Standards 
                                                                 
 
      24. Separation. 
          24.1. General.  Separation  of  floors,  occupancies,  hazards,  exit  enclosures  shall  be  provided  with  fire‐
                 resistive rated construction fire barriers in accordance with this section. 
          24.2. Fire Barriers. Fire barriers shall be classified as 1‐, 2‐, or 3‐hr fire‐resistive rated construction. 
                  24.2.1. Fire barrier shall be continuous from outside wall to outside wall, from one fire barrier to 
                          another or combination thereof and shall be continuous through all concealed spaces. 
                  24.2.2. Fire barriers shall be constructed of materials meeting the testing requirements of ASTM E 
                          119. 
                  24.2.3. All  openings  in  fire  barriers  shall  be  protected  with  fire‐resistant  protective  opening 
                          protection in accordance with 4.6. 
          24.3.  Vertical  openings.  Openings  through  a  floor/ceiling  assembly  shall  be  protected  shafts  in 
                 accordance with unless meeting the requirements of 27.3.1 or 27.3.2. 
                  24.3.1. A  shaft  enclosure  is  not  required  for  penetrations  by  pipe,  tube,  conduit,  wire,  cable  and 
                          vents protected in accordance with 34. 
                  24.3.2. A  shaft  enclosure  is  not  required  for  stairs  or  other  floor  openings  connecting  only  two 
                          stories and is separated from floor openings serving other floors by construction as required 
                          for shafts, and does not connect to a basement area or storage or hazardous occupancies. 
      25. Doors. 
          Fire doors assemblies shall conform to NFPA 252, BS 476 Part 22, EN 1364‐1, GB 12955‐2008, or IS 3614 
          Part II. The ASTM standard referenced in the BNBC Part 4 Section 1.5.4 has been withdrawn. 
 
                                                                                 
                                                          Fire Door 
      26. Windows. 
          Fire windows shall conform to NFPA 257 or British, European, Chinese, or Indian standard for fire window 
          tests. The ASTM standard referenced in the BNBC Part 4 Section 1.5.5 has been withdrawn. The area of 
          the fire window assembly shall be not be less than 100 ft 2 (9.3 m 2 ), with no dimension less than 9 ft 
          (2745  mm).  5.1.4  When  the  conditions  of  use  limit  the  construction  to  smaller  dimensions,  a 
          proportionate reduction shall be permitted to be made in the dimensions of the tests used to qualify the 
          fire window assemblies for  such  restricted use. 5.2.1 The  fire window assembly  shall  be  installed  in the 
          wall or partition construction in the manner in which it is to be used. 5.2.2 The fire window assembly shall 
          be  mounted  so  that  the  latches  and  fasteners,  other  than  hinges,  are  on  the  unexposed  side,  and  the 
          mounting  shall  not  prevent  the  free,  unrestricted  operation  of  all  operable  components  such  as 
          ventilators and sashes. 
           
                                                                                                                      Page 23 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                     Building and Structural Safety Standards 
             
             
      27.   Ducts.  
            Ducts penetrating fire‐resistance rated assemblies shall be protected with listed fire dampers. 
            27.1. Dampers shall be 1 ó hr. rated dampers when located in a 2 hr or less fire‐resistance rated assembly. 
            27.2. Dampers  shall  be  3  hr  rated  dampers  when  located  in  a  3  hr  or  greater  fire‐resistance  rated 
                  assembly. 
      28.    Shafts. 
            28.1. Fire‐resistance  rating.  A  shaft  enclosure  shall  be  have  a  minimum  fire‐resistance  rating      of  2  hr 
                  when connecting four stories or more and a minimum fire‐resistance rating of 1 hr when connecting 
                  three stories or less. 
            28.2. A shaft enclosure shall be constructed as a fire barrier and shall meet the continuity requirements of 
                  30. 
      29.   Openings.  
            Openings in shafts shall be limited to those necessary for the purpose of the shaft. These openings shall be 
            protected as required in 28. 
      30.   Opening Protective.  
            Openings in fire resistance rated walls shall be protected in accordance with BNBC Part 4 Section 2.5 and 
            the following. 
                            a. 3 hr fire barriers protected with 3 hr fire protective opening assemblies 
                            b. 2 hr fire barriers protected with 1.5 hr fire protective opening assemblies 
                            c. 1 hr fire barriers protected with . hr fire protective opening assemblies 
                            d. 1 hr exit enclosures and vertical shafts protected with 1 hr fire protective opening 
                                 assemblies. 
      31.   Penetrations.  
            Penetrations  of  fire  resistive  rated  assemblies  shall  be  protected  with  a  listed  through  penetration  fire 
            stop system tested in accordance with ASTM E814. 
             
                                                                                 
                                                      Penetration on Wall 
                                                                    
                                                                    
                                                                    
                                                                    
                                                                    
                                                                    
                                                                    
                                                                    
                                                                    
                                                                                                                        Page 24 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                    Building and Structural Safety Standards 
                                                                       
                                                                       
      32. Building Materials 
          32.1. The  requirements  of  Part  5  of  the  2006  BNBC  are  adopted  in  their  entirety,  with  the  following 
                 additional paragraphs. 
          32.2. Masonry‐chip aggregate concrete (MCAC) 
                 32.2.1. Masonry‐chip  aggregate  concrete  is  allowed  in  existing  factories  with  the  following 
                          additional requirements. 
                 32.2.2. If  the  structural  building  assessment  or  other  indication  suggests  that  that  the  factory 
                          includes  structural  use  of  MCAC,  then  special  confirmation  of  adequacy  will  be  required, 
                          including the following: 
                          32.2.2.1. The  compressive  strength  of  columns,  floor  framing  and  shear  walls  using  MCAC 
                                    shall  be  investigated  by  an  appropriate  program  of  in‐situ  testing  and 
                                    representative destructive testing of core samples. 
                          32.2.2.2. If  MCAC  is  used  in  any  horizontal  framing  element  exposed  to  rainfall  or  other 
                                    source  of  water  (such  as  roof  level  framing),  then  the  top  surface  of  the  framing 
                                    must  be  completely  sealed  from  water  intrusion  by  a  well  maintained  protective 
                                    coating.  Alternatively, if the structure has a positive drainage slope of at least 2% 
                                    and  drains  with  downspouts  at  low  spots  to  prevent  ponding,  then  the 
                                    requirement for complete sealing of the top surface may be waived. 
          32.3. If  columns  or  other  structural  elements  using  masonry‐chip  aggregate  concrete  are  exposed  to 
                 weather, they must be protected from exposure to water and dampness. 
          32.4. The structural design shall consider the effects of MCAC on reduction in elastic modulus of concrete, 
                 coefficient of creep and compressive strength compared to concrete with stone aggregates. 
                                
      33. Minimum  Construction  Material  Properties  In  evaluating  the  structural  capacity  of  existing  structural 
          elements. 
          33.1. Actual measured or tested properties of materials may be used for elements tested in accordance 
                 with ASTM Standards. 
          33.2. Where  testing  has  not  been  used  to  confirm  actual  properties  and  there  is  no  sign  of  structural 
                 distress or deficiency  in  the  subject  member,  the  following  minimum  properties  may  generally be 
                 used, unless good engineering judgment indicates lesser properties should be assumed: 
                 33.2.1. Reinforced concrete (stone chip)– 15.0 MPa (2200 psi) 
                 33.2.2. Reinforced concrete (masonry chip)– 10.4 MPa (1500 psi) 
                 33.2.3. Reinforcing steel installed prior to 2004: – 275 MPa (40 ksi) 
                 33.2.4. Reinforcing steel installed from 2004 to present: – 415 MPa (60 ksi) 
                 33.2.5. A36 Structural steel – 248 MPa (36 ksi) yield strength 
                 33.2.6. Minimum assumed density of reinforced concrete – 23.6 kN/m3 (150 pcf) 
      34. Phased  Construction.  When  a  building  or  structure  is  planned  or  anticipated  to  undergo  phased 
          construction,  structural  members  therein  shall  be  investigated  and  designed  for  any  additional  stresses 
          arising  due  to  such  effect.  Temporary  or  permanent  loads  due  to  construction  phasing  must  be 
          anticipated and analytically confirmed by a qualified structural engineer prior to any expansion. 
                                                                                                                       Page 25 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                    Building and Structural Safety Standards 
              
       35.   Restrictions on Loading. The Factory Owner shall ensure that the live load for which a floor or roof is or 
             has been designed, will not be exceeded during its use. 
       36.   Factory  Load  Manager:  The  Factory  Owner  shall  ensure  that  at  least  one  individual,  the  Factory  Load 
             Manager who is located onsite full time at the factory, is trained in the structural capacity and operational 
             load characteristics of the specific factory. The Factory Load Manager shall serve as an ongoing resource 
             to  RMG  vendors  and  be  responsible  to  ensure  that  the  factory  operational  loads  do  not  at  any  time 
             exceed the factory floor loading limits as described on the Floor Loading Plans. 
       37.   Floor Loading Plans (Load  Plans). In  every  factory  building, Load Plans shall be prepared for each floor. 
             These  Load  Plans  shall  document  the  actual  maximum  operational  loading  that  is  intended  and/or 
             allowable on each floor. The Load Plan for each floor shall be permanently and conspicuously posted on 
             that floor. Load Plans are subject to review and approval by Assessors.  
              
             37.1. Floor  Load  Markings  In  areas  of  factory  buildings  used  for  storage  of  work  materials  and  work 
                    products, walls, columns, and floors shall be clearly marked to indicate the acceptable loading limits 
                    as described in the Load Plan for that floor. 
             37.2. For existing factories with properly prepared and posted Factory Loading Plans, the requirements of 
                    BNBC Part 6 Section 1.4.5 for posting of live loads are waived. 
                   
       38.   Load Factors and Load Combinations for Structural Analysis 
             38.1. In  analyzing  the  structural  adequacy  of  existing  factories,  the  load  factors  and  load  combinations 
                    described in Table 8.1 may be used only if the dead and live loads are confirmed by measurement as 
                    stated in Section 8.13 and 8.14.  
 
                                      Standard Load Factors and Load Combinations 
                              Reinforced Concrete Structures    Structural Steel Structures
                                        1.2D + 1.6L                 1.2D + 1.6Lf + 0.5Lr
                                   1.05D + 1.25L + 1.0W         1.2D + 1.3W + 0.5Lf + 0.5Lr
                                                                    1.2D + 1.5E + 0.5Lf
                             D = Dead Load 
                             L = Live Load 
                             W = Wind Load from any direction  
                             E = Seismic Load from any direction 
                             Lr = Roof Live Load 
                             Lf = Floor Live Load
 
       NOTE: This Standard considers day‐to‐day loading conditions for assessment of existing RMG factory buildings 
considering life safety against building collapse. In this consideration, only service level wind loadings are considered 
for reinforced concrete buildings. However, assessments should note any key seismic characteristics of buildings in 
the report including irregularities, soft stories, and the like. For steel structures the BNBC‐ specified load factors are 
applicable. 
 
 
                                                                                                                      Page 26 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                    Building and Structural Safety Standards 
 
      39. Confirmation  of  Actual  Dead  Loads.  As  a  requirement  to  use  the  load  factors  and  load  combinations 
          stated in Table 8.1, dead loads shall be confirmed by measurement as follows: 
          39.1. Slab thicknesses shall be measured at mid‐span of representative slab spans on each floor. 
          39.2. Dimensions of representative sampling of beams shall be field measured. 
          39.3. Dimensions of representative sampling of columns shall be field measured. 
          39.4. Construction materials of walls shall be confirmed by representative exploration. 
          39.5. Fixed  service  equipment  and  other  permanent  machinery,  such  as  generators,  water  tanks, 
                production  equipment,  electrical  feeders  and  other  machinery,  heating,  ventilating  and  air‐
                conditioning systems, lifts and escalators, plumbing stacks and risers etc. may be considered as dead 
                load whenever such equipment is supported by structural members and weights are confirmed by 
                manufacturer’s data sheets provided by Factory Owner for each piece of equipment. 
      40. Confirmation  of  Actual  Operational  Live  Loads.  As  a  requirement  to  use  the  load  factors  and  load 
          combinations stated in above Table operational live loads shall be confirmed by measurement as follows: 
          40.1. For stored work materials, each type of material shall be weighed and measured. 
          40.2. For stored work products, each size of boxed or packaged material shall be weighed and measured. 
          40.3. For other types of live load, confirmation shall be accomplished in the most appropriate means in 
                the judgment of the Assessor. 
          40.4. The live loads used for the structural design of floors, roof and the supporting members shall be the 
                greatest  applied  loads  arising  from  the  intended  use  or  occupancy  of  the  building,  or  from  the 
                stacking of materials and the use of equipment and propping during construction, but shall not be 
                less than the minimum design live loads set out by the provisions of this section. For the design of 
                new  structural  members  for  forces  including  live  loads,  requirements  of  the  relevant  sections  of 
                Chapter 1 of the BNBC shall also be fulfilled. 
      41. Minimum Floor Design Loads 
          41.1. Minimum floor design live loads for the review of factory sewing floors shall be 2.0 kN/m2 (42 psf). 
          41.2. Where density of operations, storage of materials, or equipment weights require live load capacity 
                in excess  of 2.0 kN/m2 (42  psf), the  Factory Owner shall  engage a qualified  structural engineer to 
                analytically confirm that the structure achieves the needed load capacity. 
          41.3. If  the  approved  design  documents  for  the  factory  construction  do  not  explicitly  confirm  that  the 
                required load capacity exists, then the floor load capacity in the affected areas shall be analytically 
                confirmed and certified by a qualified structural engineer. 
          41.4. A certification letter with accompanying plans and calculations shall be prepared in accordance with 
                BNBC 1.9 or Section 40 and made available at the factory site for review by third parties. 
          41.5. For floors with design live  load capacity  of less  than  2.0  kN/m2 (42 psf)  (such as residential floors 
                converted  to  factory  use)  the  floor  live  load  capacity  shall  be  clearly  indicated  on  the  Floor  Load 
                Plans required by Section 40. 
          41.6. For areas of factory floors with actual operational live loads in excess of 2.0 kN/SM, a certification 
                letter with accompanying plans and  calculations shall be prepared in accordance with BNBC 1.9 or 
                Section 35 and shall be made available at the factory site for review by third parties. 
                                
                                
                                
                                                                                                                       Page 27 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                        Building and Structural Safety Standards 
                                  
      42. Confirmation of Actual Construction Material Properties 
          42.1. Where practical, all preliminary and detailed structural assessments will preferably consider actual 
                 in‐situ  material  strengths  as  measured  by  non‐destructive  and  destructive  testing  in  conformance 
                 with applicable ASTM testing protocols. 
          42.2. Where  field  conditions  allow  and  are  acceptable  in  the  judgment  of  the  Assessor,  presumed 
                 minimum material strengths and characteristics may be used as stated in Section 7.3. 
                
      43. Design for Lateral Loads 
          43.1. Every building, structure or portions thereof shall be designed to resist lateral loads due to wind in 
                 compliance  with  the  forces,  Load  Factors  and  Load  Combinations  as  stated  in  BNBC  2006  Section 
                 1.5.3. 
          43.2. When dead loads, live loads, and  material  properties are  confirmed as described in  Sections 8.13, 
                 8.14, and 8.16, and there are no signs of distress due to loading, the alternative Load Factors and 
                 Load Combinations stated in Table 8.1 may be used. 
          43.3. A redundant structural system with clear load path to foundations to resist lateral loads is required 
                 in  all  existing  factories.  If  such  a  load  path  does  not  exist,  or  if  the  factory  has  been  vertically 
                 expanded,  the  lateral‐resisting  capacity  of  the  factory  shall  be  analytically  confirmed  and 
                 strengthened as required to resist lateral loads. 
          43.4. Any  of  the  lateral  loads  prescribed  in  Chapter  2  of  the  2006  BNBC,  considered  either  alone  or  in 
                 combination with other forces, whichever produces the most critical effect, shall govern the design. 
          43.5. Confirmation  of  capacity  of  reinforced  concrete  structures  and  components  thereof  to  resist  the 
                 effects of earthquake forces is not considered by this Standard. 
          43.6. Importance  Factor  Importance  factor  for  all  factory  buildings  and  ancillary  buildings  shall  be  1.0, 
                 unless hazardous materials  are  stored  in the  building.  In  that  case,  the  importance  factor  shall be 
                 1.5. 
                
      44. Seismic Bracing of Key Non‐Structural Elements 
          44.1. The  following  non‐structural  elements suspended  from,  attached  to,  or  resting  atop  the  structure 
                 shall be adequately anchored and braced to resist earthquake forces: 
                  44.1.1. Steam pipes 
                  44.1.2. Gas pipes 
                  44.1.3. Chemical or process pipes 
                  44.1.4. Storage racks 
                  44.1.5. Water tanks 
                  44.1.6. Other suspended equipment weighing more than 1.8 kN that in the opinion of the Assessor 
                            presents a danger to workers in an earthquake. 
          44.2. Seismic  bracing  for  non‐structural  elements  shall  be  designed  using  the  requirements  of  BNBC 
                 2.5.8.1. 
          44.3. Interpretive Guideline: This requirement applies to both new and existing factories. It is intended to 
                 ensure  that  falling  non‐structural  elements  in  a  seismic  event  do  not  create  life  safety  hazards  or 
                 hindrances to building egress. 
                                  
                                                                                                                           Page 28 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                 Building and Structural Safety Standards 
                                
      45. Required Structural Documentation for New and Existing Factories 
          45.1. Every factory requires structural documentation that accurately describes the factory structure. 
          45.2. Structural documentation shall be maintained at the factory site and made available to third parties 
                assessing the structural safety of the factory. 
          45.3. All structural documentation shall be prepared and signed by the structural engineer responsible for 
                the preparation of the documents. 
          45.4. New  factories  and  any  additions  or  expansions  shall  have  complete  structural  documentation 
                including Design Report and Structural Documents as described in BNBC Section 1.9. 
          45.5. Existing factories shall have one of the following types of documentation: 
                 45.5.1. Complete and credible structural documentation prepared in general accordance with BNBC 
                         Section 1.9 and used as a basis for the original construction of the factory building. 
                 45.5.2. As‐built structural documents that accurately describe the structural elements as described 
                         in Section 18. 
                                
      46. Requirements for As‐Built Documents 
          46.1. For  existing  factories  that  lack  complete  and  credible  documentation,  credible  as‐built 
                documentation shall suffice.  
          46.2. The  Factory  Owner shall  engage  the  Assessor  or  a  qualified  structural  engineer  (QSEC)  to prepare 
                accurate  as‐built  documents  from  firsthand  knowledge  and  personal  investigation  of  the  actual  in 
                situ factory construction and operational conditions. 
          46.3. The  credibility  of  structural  documentation  shall  be  determined  by  the  Assessor  on  the  basis  of 
                observations and tests at the factory. 
          46.4. As‐built documents shall serve as the basis for any detailed structural analysis performed to confirm 
                the capacity of structural elements and load plans. 
          46.5. As‐built documents shall include, at a minimum, the following: 
                 46.5.1. Scaled and dimensioned Architectural Documents, including: 
                         46.5.1.1. Scaled site plan showing: 
                                                  (1) general layout of all buildings in the complex with labels 
                                                  (2) location and names of adjacent streets 
                                                  (3) location and size of utilities, if known 
                         46.5.1.2. Scaled architectural floor plan for each level of each building showing: 
                                                  (1) location and size of stairs 
                                                  (2) location and size of elevators 
                                                  (3) location of fixed walls 
                                                  (4) location of corridors 
                                                  (5) labeled usage areas on each floor, e.g. sewing, storage, dining, rooftop, 
                                                      office, etc. 
                                                  (6) location of major machinery and equipment 
                                                  (7) general layout of factory activities 
                         46.5.1.3. Scaled elevations of each façade of the building showing: 
                                                  (1) general configuration of the building 
                                                  (2) location and type of façade materials 
                                                  (3) accurate  number  of  levels  and  any  intended  future  vertical  or 
                                                      horizontal expansion areas 
 
                                                                                                                    Page 29 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                Building and Structural Safety Standards 
 
                 46.5.2. Scaled and dimensioned Structural Documents as follows: 
                         46.5.2.1. Floor Plan for each level showing: 
                                                 (1) measured locations of columns and walls 
                                                 (2) reinforcement details (rebar size and layout) for any columns 
                                                     determined using any scanning device 
                                                 (3) or physical investigations. Columns at lowest tiers and rooftop are most 
                                                     useful to explore. 
                                                 (4) confirmed construction type of walls, e.g. masonry or cast concrete 
                                                 (5) general size and layout of beams 
                                                 (6) thickness of slabs 
                                                 (7) general size and location of major floor openings 
                        46.5.2.2. Foundation Plan showing general layout and type of foundations, if known 
                        46.5.2.3. Roof Plan showing any construction, equipment, water tanks, or tower added atop 
                                  roof level. 
                        46.5.2.4. Building section(s) showing all constructed floors, dimensions between floors, and 
                                  intended  future  vertical  or  horizontal  expansion,  if  any  Building  sections  shall 
                                  indicate location and extent of any mezzanines, suspended storage areas, or partial 
                                  floors. 
                        46.5.2.5. Factory Layout and Load Documents for every floor showing: 
                                                 (1) scaled layout of work stations 
                                                 (2) operating equipment 
                                                 (3) dedicated aisle locations 
                                                 (4) type and extent of storage areas 
                                                 (5) type and weights of stored work materials and/or stored work products 
                                                     at maximum density 
                                                 (6) Factory layout and loading documents may use the structural plan 
                                                     documents as background. 
                                                 (7) Factory Layout and Load Plans shall be coordinated with the structural 
                                                     plans. 
      47. Factory Equipment Schedule, including: 
          47.1. Type of each piece of factory equipment including generators, washing machines, driers, etc. 
          47.2. Include plan dimensions and weight of each piece of equipment. 
              
      48. Required Statement of Design Responsibility 
          48.1. The  Factory  Owner’s  engaged  consultant  (QSEC)  shall  provide  written  evidence  of  design 
                responsibility, including calculations, design report, and documents as appropriate, for each of the 
                following situations: 
                 48.1.1. Structural expansions or modifications to existing factories 
                 48.1.2. Structural  investigations  or  design  confirmations  of  structural  distress  or  suspected 
                         deficiencies 
                 48.1.3. Structural strengthening or improvements to comply with Code requirements 
                 48.1.4. Structural repairs of existing structural elements 
                               
                               
                               
                               
                                                                                                                 Page 30 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                 Building and Structural Safety Standards 
                                  
      49. Construction Observation 
          49.1. Construction  observation  of  all  new  construction,  including  new  factory  buildings,  expansions  of 
                  existing factory buildings, and repairs of existing factory buildings, shall be performed by the QSEC. 
          49.2. Construction observation shall include, but not be limited to, the following: 
                  49.2.1. Specification  of  an  appropriate  testing  and  inspection  schedule  prepared  and  signed  with 
                           date by the responsible person 
                  49.2.2. Review of testing and inspection reports 
                  49.2.3. Regular  site  visits  to  verify  the  general  compliance  of  the  construction  work  with  the 
                           structural drawings and specifications 
                  49.2.4. Preparation  of  reports  to  document  the  results  of  observations  and  testing,  including 
                           resolution of non‐conforming construction. 
                  49.2.5. The  quality  and  completeness  of  new  construction,  expansions,  alterations,  and  repairs 
                           must be confirmed by independent observation and testing during construction. 
                                  
      50. Temporary  Construction  Loads  on  Existing  Factories.  All  loads  required  to  be  sustained  by  an  existing 
          factory structure or any portion thereof due to placing or storage of construction materials and erection 
          equipment including those due to operation of such equipment shall be considered as erection loads. 
          50.1. Provisions shall be made in design to account for all stresses due to such loads. 
          50.2. When an existing factory will be expanded, all erection loads and other construction loads shall be 
                  analytically confirmed and documented by an approved structural engineer. 
                 
      51. Site Investigation 
          51.1. Application  for  construction  of  a  new  building  or  structure,  and  for  the  alteration  of  permanent 
                  structures which require changes in foundation loads and their distribution shall be accompanied by 
                  a statement describing the soil in the ultimate bearing strata, including sufficient records and data 
                  to establish its character, nature and load bearing capacity.  
          51.2. Prior  to  vertical  expansion  of  an  existing  factory,  an  approved  structural  engineer  (QSEC)  shall 
                  provide  analytical  confirmation  and  documentation  that  the  foundations  supporting  the  factory 
                  have adequate capacity to safety support the additional loads due to the expansion. 
                 
      52. Durability and Maintenance 
          52.1. Factory Owner shall attend to all areas of needed maintenance, including areas with efflorescence, 
                  dampness, and corrosion. 
          52.2. Standing water on rooftop or other locations shall not be permitted. 
          52.3. Roofs shall be sloped to drain with minimum drainage of 1%. 
          52.4. Drains shall be provided at low points. 
                                  
                                  
                                  
                                  
                                  
                                  
                                  
                                                                                                                  Page 31 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                  Building and Structural Safety Standards 
                                 
      53. Qualifications of Testing Laboratory 
          53.1. Where  testing  of  in  situ  structural  elements  or  materials  or  construction  materials  is  required  to 
                 confirm  strength  or  other  characteristics,  this  testing  shall  be  performed  in  accordance  with 
                 applicable  ASTM  specifications  by  a  qualified  testing  laboratory  that  meets  the  requirements  of 
                 Section 53.1.1 through 53.1.2. 
                  53.1.1. The Testing Laboratory shall meet the basic requirements of ASTM E 329 and shall provide 
                          to  the  evidence  of  current  accreditation  from  the  American  Association  for  Laboratory 
                          Accreditation,  the  AASHTO  Accreditation  Program,  the  “NIST”  National  Voluntary 
                          Laboratory Accreditation Program, or an equivalent Bangladesh certification program. 
                  53.1.2. The  Testing  Laboratory  shall  be  approved  by  the  Building  Official  to  perform  Special 
                          Inspections and other tests and inspections as outlined in the applicable building code. 
          53.2. Tests  and  inspections  shall  be  conducted  in  accordance  with  specified  requirements,  and  if  not 
                 specified,  in  accordance  with  the  applicable  standards  of  the  American  Society  for  Testing  and 
                 Materials or other recognized and accepted authorities in the field. 
                
      54. Qualifications of Welding Inspectors 
          54.1. Inspectors  performing  visual  weld  inspection  shall  meet  the  requirements  of  AWS  D1.1  Section 
                 6.1.4. Inspectors shall have current certification as required by Bangladeshi law and BNBC 2006. 
          54.2. Inspectors performing nondestructive examinations of welds other than visual inspection (MT, PT, 
                 UT, and RT) shall meet the requirements of AWS D1.1, Section 6.14.6. 
                
      55. Retrofitting of Deficient Structural Elements 
          55.1. When  a  structural  member  is  identified  to  have  inadequate  structural  capacity  and  the  applied 
                 loadings  cannot  or  will  not  be  reduced  to  allow  the  structural  member  to  be  acceptable,  then 
                 structural retrofitting may be accomplished in accordance with this section. 
          55.2. Structural retrofitting shall be properly design using industry‐standard methods. 
          55.3. Retrofitted elements must be strengthened to provide adequacy under all imposed and anticipated 
                 loads using the load factors specified in Table 8.1. 
          55.4. Beam and slab cracks may be repaired by epoxy injection using techniques prescribed in ASTM. 
          55.5. Beam  and  slab  strengths  may  be  supplemented  by  using  properly  designed  and  installed  Ferro 
                 cement, micro‐concrete, or FRP solutions. 
          55.6. Standard retrofit techniques such as concrete jacketing, micro‐concrete encasement, FRP‐wrapping, 
                 etc. may be used for strengthening of columns. 
          55.7. Where  columns  are  strengthened  the  load  path  through  floors  and  joints  must  be  carefully 
                 accommodated. 
          55.8. Column slenderness may be reduced by installing properly‐designed lateral bracing systems. 
          55.9. All retrofitting shall be overseen by the responsible design engineer. 
                
      56. Qualifications of Retrofitting Installation Firms 
          56.1. All firms used for installation of structural retrofitting elements shall be specialty construction firms 
                 with a minimum of five (5) years of experience in this area. 
                
                                                                                                                    Page 32 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                  Building and Structural Safety Standards 
                
      57. Construction Practices and Safety 
          57.1. Fire safe Construction practices. Fire safe construction practices as outlined in NFPA 241, should be 
                 followed during all construction projects. 
                  57.1.1. Escape  Facilities.  In  buildings  under  construction,  adequate  escape  facilities  shall  be 
                          maintained at all times for the use of construction workers. Escape facilities shall consist of 
                          doors,  walkways,  stairs,  ramps,  fire  escapes,  ladders,  or  other  approved  means  or devices 
                          arranged in accordance with the general principles of Part 6 of this Standard. 
                  57.1.2. Waste.  Accumulations  of  combustible  waste  material,  dust,  and  debris  shall  be  removed 
                          from  the  structure  and  its  immediate  vicinity  at  the  end  of  each  work  shift  or  more 
                          frequently as necessary for safe operations. 
                  57.1.3. Construction Materials. 
                          57.1.3.1. Storage of construction materials shall not be placed in any means of egress from 
                                     an occupied building. 
                          57.1.3.2. Transportation of construction materials shall not use any required exits, including 
                                     stairways, needed for safe egress of an occupied building. 
                  57.1.4. Fire Protection During Construction. 
                          57.1.4.1. The  requirements  of  NFPA  241  Section  8.7  shall  be  followed  for  all  construction 
                                     work. 
                  57.1.5. Automatic sprinklers. Where automatic sprinkler protection is to be provided, the building 
                          shall not be occupied until the sprinkler installation has been completed and tested. 
                  57.1.6. Standpipes.  Where  standpipes  are  required,  temporary  or  permanent  standpipe 
                          connections shall be installed during construction. 
                          57.1.6.1. The standpipes shall be securely supported. 
                          57.1.6.2. At  least one hose  valve  shall  be provided to  allow  connection  of  fire  department 
                                     hoses. 
                          57.1.6.3. The  standpipes  shall  be  extended  up  with  each  successive  floor  and  securely 
                                     capped at the top. 
                          57.1.6.4. Top hose outlets shall not be more than one level below the highest forms, staging, 
                                     and similar combustible materials at all times. 
                  57.1.7. Hot Work. A hot‐work permit system in accordance with NFPA 51B shall be provided for any 
                          construction in an occupied facility. 
                                   13.1.1.1 Fire watch personnel shall not be assigned other duties. 
                  57.1.8. Inspections. Inspections of construction activities in occupied facilities shall be performed by 
                          the  Fire  Safety  Director  or  designee.  These  inspections  shall  insure  compliance  with  this 
                          Chapter.  The  Fire  Safety  Director  shall  be  given  the  contractual  authority  with  the 
                          construction team to stop any construction or construction activity that creates an unsafe 
                          fire condition. 
                           
                           
                           
                           
                                                                                                                   Page 33 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                      Building and Structural Safety Standards 
                            
            57.2. General. All construction including extension, alteration and demolition shall require a permit from 
                  the  Authority.  Permits  shall  also  be  obtained  from  relevant  organizations  for  service  connections 
                  and other facilities. The construction work shall conform to the plan approved by the Authority. The 
                  owner  shall  make  arrangements  for  obtaining  the  required  approvals.  All  new  work  or  alteration 
                  shall  be  planned,  designed,  supervised  and  executed  by  competent  professionals  of  relevant 
                  discipline. 
            57.3. When  existing  Compliant  factories  are  planned  for  expansion,  the  Assessor  shall  be  so  notified  in 
                  advance of the start of construction. 
     
        58. Professional  Services  and  Responsibilities.  The  responsibility  of  professionals  with  regard  to  planning 
            designing and supervision of building construction work, etc. and that of the owner shall be in accordance 
            with  the  relevant  part  of  the  Code  and  professional  practice.  All  structural  engineers  employed  as 
            responsible  structural  engineers  for  new  design  and  for  design  confirmations  shall  be  qualified  in 
            accordance  with  Section  8.4.  Employment  of  trained  workers  shall  be  encouraged  for  building 
            construction activity. 
             
        59. Construction of all Elements. Construction of all elements of a building shall be in accordance with good 
            practice.  It  shall  also  be  ensured  that  the  elements  of  structure  satisfy  the  appropriate  fire  resistance 
            requirements  as  specified in Part 4 ‘Fire  Protection’,  and  quality of building materials/components used 
            shall be in accordance with ‘Building Materials’. 
          
        60. Safe Load. No structure, temporary support, scaffolding, sidewalk, footpath and drain covers, shed, other 
            devices and construction equipment shall be loaded in excess of its safe working capacity. Whenever the 
            structural quality or strength of scaffolding plank or other construction equipment is in doubt, these shall 
            be replaced or be subject to a strength test to two and half times the superimposed live load; the member 
            may be used if it sustains the test load without failure. Requirements of 9.12 shall be observed regarding 
            design loads in scaffolds. 
        61. General Requirements and Restrictions on Storage and Handling.  
            61.1. Materials required in construction operations shall be stored, and handled in a manner to prevent 
                   deterioration and  damage  to  the  materials,  ensure safety  of  workmen  in  handling  operations  and 
                   noninterference with public life including safety of public, prevention of damage to public property 
                   and natural environment.  
            61.2. Materials shall be stored and placed so as not to endanger the public, the workers or the adjoining 
                   property. Materials shall be stacked on well‐drained, flat and unyielding surface.  
            61.3. Material stacks shall not impose any undue stresses on walls or other structures.  
            61.4. Materials shall be separated according to kind, size and length and placed in neat, orderly piles. High 
                   piles shall be staggered back at suitable intervals in height. Piles of materials shall be arranged so as 
                   to allow a minimum 800 mm wide passageway in between for inspection and removal.  
            61.5. All passageways shall be kept clear of dry vegetation, greasy substance and debris.  
            61.6. For  any  site,  there  should  be  proper  planning  of  the  layout  for  stacking  and  storage  of  different 
                   materials,  components  and  equipment  with  proper  access  and  proper  maneuverability  of  the 
                   vehicles carrying the material.  
                  
                                                                                                                        Page 34 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                                   Building and Structural Safety Standards 
                
                
          61.7. While  planning  the  layout,  the  requirements  of  various  materials,  components  and  equipment  at 
                 different stages of construction shall be considered.  
          61.8. Stairways, passageways and gangways shall not become obstructed by storage of building materials, 
                 tools or accumulated rubbish.  
          61.9. Materials  stored  at  site,  depending  upon  the  individual  characteristics,  shall  be  protected  from 
                 atmospheric  actions,  such  as  rain,  sun,  winds  and  moisture,  to  avoid  deterioration.  Special  and 
                 specified  care  should  be  taken  for  inflammable  and  destructive  chemicals  and  explosive  during 
                 storage. 
 
      62. Protection against Fire.  
          Timber, Bamboo, coal, paints and similar combustible materials shall be kept separated from each other. 
          A minimum of two dry chemical powder (DCP) type fire extinguishers shall be provided at both open and 
          covered locations where combustible and flammable materials are stored. Flammable liquids like petrol, 
          thinner  etc.,  shall  be  stored  in  conformity  with  relevant  regulations.  Explosives  like  detonators,  gun 
          powder etc. shall be stored in conformity with the fire protection provisions set forth in this Code so as to 
          ensure desire safety during storage. Stacks shall not be piled so high as to make them unstable under fire 
          fighting conditions and in general they shall not be more than 4.5 m (14.8 ft.) in height. Materials which 
          are likely to be affected by subsidence of soil like precast beams, slabs and timber of sizes shall be stored 
          by adopting suitable measures to ensure unyielding supports. 
           
      63. Inflammable and/or Fire‐Sensitive Materials.  
          Materials  under  this  classification  shall  be  stored  within  fire‐preventive  confines,  furnished  with 
          firefighting  provisions.  Buckets  containing  sand  shall  be  kept  ready  for  use.  A  5  kg  dry  powder  fire 
          extinguisher conforming to accepted standards shall be kept at an easily accessible position. Besides the 
          areas shall be close to fire hydrants. 
           
      64. Flat Roof Construction.  
          Formwork  provided  for  flat  concrete  roof  shall  be  designed  and  constructed  for  the  anticipated  loads. 
          During  the  construction  of  the  roof,  the  formwork  shall  be  frequently  inspected  for  defects.  Enough 
          walking platforms shall be provided in the reinforcement area to facilitate safe walking to the concreting 
          area.  Loose  wires  and  unprotected  rod  ends  shall  be  avoided.  Formwork  supporting  cast‐in‐place 
          reinforced  and  pre  stressed  concrete  floors  and  roofs  shall  be  adequately  tied  or  braced  together  to 
          withstand all loads until the new construction has attained the required strengths. 
           
      65. Load Capacity.  
          Scaffolds, formwork and components thereof shall be capable of supporting without failure, at least two 
          times the maximum intended load. The following loads shall be used in designing the formwork: 
          65.1. weight of wet concrete : 20 kN/m3 (127 PCF) 
          65.2. live load due to workmen and impact of ramming or vibrating: 1.5‐4.0 kPa (light duty for carpenter 
                 and stone setters, medium duty for bricklayers and plasterers, heavy duty for stone masons) 
                  
                                                                                                                   Page 35 of 188 
 
Safety Issues in Readymade Garments Factories 
                                                                               Building and Structural Safety Standards 
                   
          65.3.   allowable bending stress (flexural tensile stress) in soft timbers: 8,000 kPa. 
          65.4.   The sizes for formwork elements specified in Table 7.3.1 are applicable for spans of up to 5 m (16.4 
                  ft.) and height of up to 4 m (13 ft.). In case of longer span and height, formwork and support sizes 
                  shall be determined by calculating the load and approved by the engineer before use. 
          65.5.   All formworks and scaffolds shall be strong, substantial and stable. All centering and props shall be 
                  adequately braced to ensure lateral stability against all construction and incidental loads, especially 
                  in the case of floor height more than 3.3 m (10.8 ft.). 
          65.6.   The space under the scaffold or formwork shall not be used as a working or living space. The space 
                  shall not be used as a shelter or refuge during inclement weather or at any other time. 
                                                                                                              Page 36 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                       Fire Safety Standards 
                                                                     
B. Fire Protection Systems:   
   This section describes the requirements as to where fire protection systems are required and the requirements 
   for design, installation and operation of these fire protection systems. 
      1. Automatic Sprinkler Systems. 
          1.1 Where  required.  Automatic  sprinkler  systems  shall  be  installed  in  new  and  existing  buildings  and 
               structures as described in the following subsections. 
                
                                                                                     
                                                Automatic Sprinkler Head 
                                                                
          1.2 High‐Rise Buildings. Automatic sprinkler protection shall be installed throughout all portions of new 
               and existing high‐rise buildings with an occupiable floor greater than 23 m (75 ft) above the finished 
               grade in accordance with 2. Required automatic sprinkler protection shall be installed in accordance 
               with 2. 
       2. Installation requirements.  
          As  per  new  guideline  from  the  buyers  associations,  all  installation  and  design  requirements  outlined  in 
          BNBC Part 4 Chapter 4 shall be replaced by the requirements of NFPA 13. Pipe schedules shall not be used 
          to  size  pipe.  All  systems  shall  be  hydraulically  calculated  to  meet  the  required  NFPA  13  design 
          requirements. 
          2.1 Documentation.  Installation  of  new  automatic  sprinkler  systems  shall  be  required  to  provide  shop 
               drawings and hydraulic calculations as outlined in NFPA 13. These drawings shall include all details as 
               outlined in NFPA 13. 
          2.2 Documentation  Review.  All  sprinkler  system  installations  shall  be  submitted  for  review  to  the 
               authorized and certified experts. 
          2.3 Acceptance  testing.  Testing  of  the  installation  shall  be  conducted  in  accordance  with  NFPA  13 
               acceptance testing  requirements.  Documentation of  all  testing shall  be  submitted  for  review  to the 
               authorized and certified experts. 
          2.4 Final  inspection  and  testing  of  the  installation  shall  be  witnessed  by  the  authorized  and  certified 
               experts. 
          2.5 Supervision and alarms. 
                      2.5.1 Valves. All valves controlling automatic sprinkler systems, fire pumps, and water supply 
                                systems shall be electrically supervised by a listed fire alarm system control unit. 
                                 
                                 
                                 
                                                                                                                   Page 37 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                        Fire Safety Standards 
                              
                     2.5.2 Alarms.  An  approved  audible  device  shall  be  connected  to  every  automatic  sprinkler 
                             system and shall be activated by water flow equal to the flow of one sprinkler. Where a 
                             fire alarm system is installed, activation of the water flow shall activate the fire alarm 
                             system. 
         2.6 Testing and maintenance. Automatic sprinkler systems shall be tested and maintained in accordance 
             with NFPA 25. 
                     2.6.1 Storage  clearance.  All  storage  shall  be  maintained  with  a  460  mm  (18  in.)  minimum 
                             clearance from the top of storage to the sprinkler deflector. 
                     2.6.2 Solid‐shelves. 
                                 2.6.2.1 Racks.  Unless  in‐rack  automatic  sprinklers  have  been  designed  and 
                                         installed, solid shelf racking shall not be used. A minimum of 50% openings 
                                         in  shelving  material  shall  be  considered  open  shelves.  See  NFPA  13  for 
                                         further clarification. 
                                 2.6.2.2 Shelves. Shelving units not greater than 760 mm (30 in.) deep can have solid 
                                         shelves. Back to back solid shelf units not greater than 760 mm (30 in.) deep 
                                         each  with  a  solid  vertical  barrier  can  have  solid  shelves.  See  NFPA  13  for 
                                         further clarification. 
                                 2.6.2.3 5.3.6.3  Aisles.  Minimum  aisles  shall  be  maintained  free  of  storage  in 
                                         accordance with NFPA 13 based on the design criteria used for the sprinkler 
                                         system. 
      3. Standpipe Systems. 
         3.1 Where  required. Standpipe  systems shall  be  installed throughout  all new  and existing buildings and 
             structures where the highest occupied floor is more than 10 m (33 ft) above grade or more than 10 m 
             (33 ft) below grade. 
                                                                             
                                                  Standpipe System 
          3.2 Installation requirements. All installation and design requirements outlined in BNBC Part 4 Chapter 4 
              for  combined  standpipe  and  automatic  sprinkler  systems  shall  be  replaced  by  the  requirements  of 
              NFPA  14  with  a  minimum  pressure  of  450  kPa  (65  psi)  at  the  hydraulically  most  remote  hose 
              connection. Standalone standpipe systems shall meet the local BNBC requirements with a minimum 
              450 kPa (65 psi) pressure at the hydraulically most remote hose connection or NFPA 14. 
                                 3.2.1.1 Documentation.  Installation  of  new  combined  standpipe  and  sprinkler 
                                         systems  shall  be  required  to  provide  shop  drawings  and  hydraulic 
                                         calculations as outlined in NFPA 14. These drawings shall include all details 
                                         as outlined in NFPA 14. 
                                          
                                                                                                                    Page 38 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                       Fire Safety Standards 
                                          
                                3.2.1.2 5.4.3.2  Documentation  Review.  All  standpipe  system  installations  shall  be 
                                         submitted  for  review  by  the  authorized  and  certified  experts  for  review 
                                         prior to commencement of installation. 
                                3.2.1.3 5.4.3.3 Acceptance testing. Testing of the installation shall be conducted in 
                                         accordance with NFPA 14 acceptance testing requirements. Documentation 
                                         of all testing shall be submitted for review by the Assessor. Final inspection 
                                         and  testing  of  the  installation  shall  be  witnessed  by  the  authorized  and 
                                         certified experts. 
          3.3 Location of hose connections. 
                     3.3.1 Class I standpipe hose connections (65 mm) shall be located in all required stairwells at 
                             each floor level including occupiable roofs. 
                     3.3.2 Class  II  standpipe  hose  connections  (40  mm)  shall  not  be  required  if  the  building  is 
                             protected with automatic sprinklers. 
                              
                                                                              
                                                 Class II Hose Connection 
 
      4. Water supply. 
         4.1 Installation  requirements.  All  new  installations  and  design  requirements  outlined  in  BNBC  Part  4 
             Chapter 4 for water supplies shall be replaced by the requirements of NFPA 20 (fire pumps), NFPA 22 
             (water tanks), and NFPA 24 (underground water mains). 
                     4.1.1 Documentation.  Installation  of  new  fire  protection  water  supply  systems  shall  be 
                              required to provide shop drawings and hydraulic calculations as outlined in NFPA 13, 
                              20, 22, and 24. These drawings shall include all details as outlined in NFPA 13, 20, 22, 
                             and 24. 
                     4.1.2 Documentation  Review.  All  fire  protection  water  supply  system  installations  shall  be 
                             submitted  for  review  by  the  authorized  and  certified  experts  for  review  prior  to 
                             commencement of installation. 
                     4.1.3 Acceptance  testing.  Testing  of  the  installation  shall  be  conducted  in  accordance  with 
                             NFPA  13  acceptance  testing  requirements.  Documentation  of  all  testing  shall  be 
                             submitted for review by the Assessor. A final inspection and testing of the installation 
                              shall be witnessed by the authorized and certified experts. 
         4.2 Roof‐mounted  tanks.  No  new  roof‐mounted  tanks  to  supply  water  to  new  standpipe  or  sprinkler 
             protection installations shall be allowed without complying with the requirements of Part 8. 
         4.3 Size of tanks. Tanks shall be sized for the minimum duration for fire protection supply as outlined in 
             4.2. 
              
                                                                                                                 Page 39 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                         Fire Safety Standards 
               
          4.4 Fire department connections. Fire department (Siamese) inlet connections shall be provided to allow 
              fire  department  pumper  equipment  to  supplement  the  fire  protection  systems.  Fire  department 
              outlet  connections  shall  be  provided  to  allow  fire department pumper  vehicles  to draw  water  from 
              ground‐level or underground water storage tanks. Connections shall match the Fire Service and Civil 
              Defense hose thread standard. 
               
                                                                                
                                                      Siamese Connection 
                                                                 
          4.5 Acceptance.  Acceptance  testing  of  the  installation  shall  be  in  accordance  with  NFPA  20,  22,  and  24 
              testing requirements. Documentation of all testing shall be submitted to the Assessor for review prior 
              to final acceptance by the Assessor. The Owner shall contact the Assessor prior to conducting the final 
              acceptance  testing  of  the  fire  pump  installation  to  allow  the  Assessor  to  witness  this  test.  A  final 
              inspection  of  the  installation  shall  be  conducted  by  the  Assessor  prior  to  final  acceptance  of  the 
              installation by the authorized and certified experts. 
          4.6 Portable  Fire  Extinguishers.  Portable  fire  extinguishers  shall  be  installed  throughout  all  new  and 
              existing facilities in accordance with BNBC Part 4 Section 4.10 and NFPA 10. 
                      4.6.1 Spacing. Extinguishers shall be placed so that maximum travel distance to the nearest 
                                unit shall not exceed 30 m (100 ft). 
                      4.6.2 Mounting height. 
                                   4.6.2.1 Fire extinguishers having a gross weight not exceeding 18.14 kg (40 lb) shall 
                                             be installed so that the top of the fire extinguisher is not more than 1.53 m 
                                             (5 ft) above the floor (NFPA 10 6.1.3.8). 
                      4.6.3 Fire extinguishers having a gross weight greater than 18.14 kg (40 lb) (except wheeled 
                                types) shall be installed so that the top of the fire extinguisher is not more than 1.07 m 
                                (3½ ft) above the floor (NFPA 10 6.1.3.8). 
          4.7 Fire Alarm and Detection. 
                      4.7.1 Manual  alarm.  A  fire  alarm  system  that  activates  the  system  alarm(s)  and  occupant 
                                notification devices by manual initiation. 
                      4.7.2 Automatic alarm. A fire alarm system that activates the system alarm(s) and occupant 
                                notification devices by automatic initiating devices (e.g. smoke detector, heat detector, 
                                sprinkler water flow). 
                      4.7.3 Where  required.  Automatic  or  manual  fire  alarm  and  detection  systems  shall  be 
                                installed  throughout  all  new  and  existing  buildings  and  structures  where  required  in 
                                4.7.3.2 through 4.7.3.9. 
                                 
                                                                                                                      Page 40 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                    Fire Safety Standards 
                             
                                4.7.3.1 Where automatic detection is required in 4.7.3.2 through 4.7.3.9, initiating 
                                        devices  shall  include  either  smoke  or  fire  detection  devices  spaced  in 
                                        accordance with NFPA 72. When complete sprinkler protection is provided 
                                        throughout  a  floor  with  water  flow  devices  designed  to  initiate  the  alarm 
                                        notification, smoke and fire detection devices can be eliminated throughout 
                                        that floor. 
                                4.7.3.2 Occupancy B. A manual fire alarm system shall be provided in all new and 
                                        existing  day  care  facilities  that  are  located  in  other  occupancies  or  in 
                                        buildings  greater  than  2  stories.  When  located  in  buildings  with  other 
                                        occupancies  requiring  an  automatic  fire  alarm  system,  an  automatic  fire 
                                        alarm system shall be provided. 
                                4.7.3.3 Occupancy E. An automatic fire alarm system shall be provided throughout 
                                        all new and existing assembly occupancies. 
                                4.7.3.4 Occupancy F. A manual fire alarm system shall be provided throughout all 
                                        new and existing 3 or more story buildings. When located in buildings with 
                                        other  occupancies  requiring  an  automatic  fire  alarm  system,  an automatic 
                                        fire alarm system shall be provided. An automatic fire alarm and detection 
                                        system shall be provided throughout all new and existing high‐rise buildings 
                                        as outlined before. 
                                4.7.3.5 Occupancy G1. A manual fire alarm system shall be installed throughout all 
                                        new  and  existing  low‐hazard  industrial  occupancies.  When  located  in 
                                        buildings with other occupancies requiring an automatic fire alarm system, 
                                        an automatic fire alarm system shall be provided. 
                                4.7.3.6 Occupancy  G2.  An  automatic  fire  alarm  and  detection  system  shall  be 
                                        provided  throughout  all  new  and  existing  moderate  hazard  industrial 
                                        occupancies. 
                                4.7.3.7 Occupancy H. A manual fire alarm system shall be provided throughout all 
                                        new and existing storage occupancies. When located in buildings with other 
                                        occupancies  requiring  an  automatic  fire  alarm  system,  an  automatic  fire 
                                        alarm system shall be provided. 
                                4.7.3.8 Occupancy  J.  An  automatic  fire  alarm  and  detection  system  shall  be 
                                        provided throughout all new and existing hazardous occupancies. 
                                4.7.3.9 Occupancy K. A manual fire alarm system shall be provided throughout all 
                                        miscellaneous  occupancies.  When  located  in  buildings  with  other 
                                        occupancies  requiring  an  automatic  fire  alarm  system,  an  automatic  fire 
                                        alarm system shall be provided. 
                             
                             
                             
                             
                             
                                                                                                                Page 41 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                     Fire Safety Standards 
                              
                    4.7.4    Installation  requirements.  All  installation  and  design  requirements  outlined  in  BNBC 
                             Part 4 Section 4.4 shall be supplemented by the requirements of NFPA 72. 
                                4.7.4.1 Documentation.  Installation  of  new  fire  alarm  and  detection  systems  shall 
                                         be required to provide shop drawings and as outlined in NFPA 72. 
                                4.7.4.2 Documentation  Review.  All  fire  alarm  installations  shall  be  submitted  for 
                                         review  by  the  authorized  and  certified  experts  for  review  prior  to 
                                         commencement of installation. 
                                4.7.4.3 Acceptance  testing.  Testing  of  the  installation  shall  be  conducted  in 
                                         accordance with NFPA 72 acceptance testing requirements. Documentation 
                                         of  all  testing  shall  be  submitted  for  review  by  the  Assessor.  A  final 
                                         inspection  and  testing  of  the  installation  shall  be  witnessed  by  the 
                                         authorized and certified experts. 
                                4.7.4.4 Evacuation. Automatic alarm evacuation shall be provided upon initiation of 
                                         any of the following: manual alarm box, water flow alarm, or two or more 
                                         automatic  smoke  or  fire  detection  devices.  Notification  shall  be  provided 
                                         throughout  the  building  for  total  evacuation.  Existing  partial  evacuation 
                                         systems shall be replaced. 
                     4.7.5   Monitoring.  Until  that  time  that  a  central  station  monitoring  service  or  direct 
                             connection  to  the  Fire  Service  and  Civil  Defense  can  be  set  up,  a  person  shall  be 
                             assigned  to  contact  the  fire  department  in  the  event  of  fire  alarm  activation.  An 
                             annunciator shall be located in a constantly attended location to alert this person. 
                     4.7.6   Air handling equipment. 
                                4.7.6.1 Smoke detectors listed for use in air distribution systems shall be located as 
                                         required in NFPA 90A. 
                                          
                                                                                   
                                              Smoke Detectors  
                                                      
          4.8 Automatic and manual heat and smoke ventilation. 
                   4.8.1 New Construction. Smoke and heat vents shall be installed in buildings as required by 
                           BNBC Part 4 Section B 2. 
                   4.8.2 Smoke  and  heat  vents  shall  not  be  interconnected  with  the  automatic  fire  alarm 
                           system. 
                            
                            
                                                                                                                 Page 42 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                          Fire Safety Standards 
                              
                    4.8.3 In  existing  buildings,  automatic  heat  and  smoke  vents  shall  be  converted  to  manual‐
                             only operation if the building is provided with automatic sprinklers. 
         4.9 Fire Department Elevators (Lifts). 
                    4.9.1 New  construction.  Fire  lifts  shall  be  installed  in  all  high‐rise  buildings  in  accordance 
                             with BNBC Part 4 Section 2.11. 
                    4.9.2 Existing construction. Fire lifts shall be installed where required by the Fire Service and 
                             Civil Defense in accordance with BNBC Part 4 Section 2.11. 
                    4.9.3 Recall. Phase 1  and  Phase  2  Elevator  recall shall  be  provided  for  new  construction  in 
                             accordance with ASME A17.1. 
                    4.9.4 Shafts. All fire department lifts shall be installed in shafts in accordance with 4.5.7 of 
                             this Standard. 
      5. Means of Egress. 
         5.1 Separation of Means of Egress. 
                    5.1.1 Corridors.  Exit  access  corridors  serving  an  occupant  load  exceeding  30  shall  be 
                             separated by walls having a fire resistance rating of 1 hr in accordance with 4.5 unless 
                             provided with automatic sprinkler protection throughout the story or building. 
                    5.1.2 Exits.  Exits  shall  be  enclosed  with  fire‐resistance  rated  construction  as  outlined  in 
                             5.1.2.1 through 5.1.2.3. 
                                 5.1.2.1 Exits connecting three or fewer stories shall be enclosed with a minimum 1‐
                                          hr fire‐resistance rating. 
                                 5.1.2.2 Exits connecting four or more stories shall be enclosed with a minimum 2‐hr 
                                          fire‐resistance rating. 
                                 5.1.2.3 Exits  shall  be  enclosed  with  the  same  fire‐resistance  rating  as  the  floor 
                                          penetrated but will not need to exceed 2 hr. 
                    5.1.3 Exterior  exit  stairs.  Exterior  exit  stairs  shall  be  separated  from  the  building  with  the 
                             rating requirements of 5.1.2. The rating of the exterior wall shall extend 3.05 m (10 ft) 
                             beyond the ends of the stair structure. 
         5.2 Interior Finish. All interior finishes for exits shall be limited to a flame spread index of 75 and smoke 
             developed of 450 as tested in accordance with ASTM E 84. 
         5.3 Headroom.  All  means  of  egress  shall  have  a  minimum  ceiling  height  of  2.3  m  (7  ft  6  in.)  with 
             projections  from  the  ceiling  not  less  than  2.03  m  (6  ft  8  in.).  The  minimum  ceiling  height  shall  be 
             maintained for at least 2/3 of the space or room as long as the remaining area shall be not less than 
             2.03 m (6 ft 8 in.). Headroom on stairs shall not be less than 2.03 m (6 ft 8 in.). 
         5.4 Walking surfaces. 
                    5.4.1 Changes in elevation. Abrupt changes in elevation of walking surfaces shall not exceed 
                             ¼ in. unless provided with a beveled slope of 1 in 2 that do not exceed ½ in. Changes 
                             greater than ½ in. shall meet the requirements for 5.5. 
                    5.4.2 Walking surfaces shall be mostly level; however, shall not exceed a slope of 1 in 20 in 
                             the direction of travel unless meeting the requirements for ramps in 10. 
                              
                              
                                                                                                                      Page 43 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                      Fire Safety Standards 
                               
         5.5 Changes in Level. Changes in level exceeding 535 mm (21 in.) in elevation shall meet the requirements 
             for stairs in 9 or ramps in 10. 
                      5.5.1 The change in level shall be readily apparent and if not, marked with additional signage 
                              or floor markings. 
         5.6 Slip Resistance. Walking surfaces, including stairway treads shall be uniformly slip resistant. 
         5.7 Guards.  Guards  shall  be  provided  in  accordance  with  6.12  on  the  open  sides  of  means  of  egress 
             components where the elevation exceeds 760 mm (30 in.) above the ground or floor below. 
         5.8 Impediments  to  means of  egress.  No  locks  or  other  devices  shall  be  installed  on  a  means of  egress 
             component that would prevent any occupant from having safe egress from the building or structure. 
         5.9 Reliability.  Means  of  egress  shall  be  maintained  continuously  free  and  clear  of  all  obstructions  or 
             impediments to full instant use in the case of fire or other emergency. 
         5.10 Furnishings, decorations. No furnishings, decorations, or other objects shall obstruct exits and access 
               to exits. Nothing shall obstruct or impede visibility to exits. 
                
      6. Occupant Load 
         6.1 The occupant load, in number of persons for whom means of egress are required, shall be determined 
             on the basis of the occupant load factors in BNBC Part 4 Section 3.5.1 that are characteristic for the 
             use of the space or the maximum probable population of the space, whichever is greater. 
              
                                                                           
                                                  Occupancy Load 
                                                           
          6.2 The occupant load factors from the BNBC are as follows: 
              (1) Assembly with tables and chairs: 1.5 m2 per occupant (16 ft2 per occupant) net 
              (2) Assembly without fixed seats: 0.7 m2 per occupant (7 ft2 per occupant) net 
              (3) Offices: 10 m2 per occupant (100 ft2 per occupant) gross 
              (4) Industrial: 10 m2 per occupant (100 ft2 per occupant) gross 
              (5) Storage: 30 m2 per occupant (300 ft2 per occupant) gross 
              (6) Hazardous: 10 m2 per occupant (100 ft2 per occupant) gross 
                     6.2.1 RMG factories shall have a calculated occupant load of 2.3 m2 per occupant (25 ft2 per 
                             occupant). This occupant load factor is permitted to be increased or decreased based 
                             on the actual number of occupants. 
          6.3 Increased  occupant  load.  The  occupant  load  is  permitted  to  be  increased  above  the  calculated 
              occupant load provided that all other means of egress requirements for that higher occupant load are 
              met. 
          6.4 Posting of occupant load. The occupant load shall be posted for every assembly and production floor 
                                                                                                                  Page 44 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                            Fire Safety Standards 
in a facility in a conspicuous space near the main exit or exit access doorway for the space.
      7. Egress Width 
         7.1 Aisles shall be provided with a minimum unobstructed clear‐width of 0.9 m (36 in.). 
              
                                                                               
                                                           Aisles 
          7.2 Means of egress continuity. The path of egress travel along a means of egress shall not be interrupted 
              by any obstruction. The capacity of the means of egress shall not be reduced along the path of travel. 
          7.3 Capacity. The total capacity of the means of egress shall for any story, floor, or other occupied space 
              shall be sufficient for the occupant load as calculated in 6.1. 
          7.4 Capacity  Factors.  The  capacity  factors  for  calculating  the  available  egress  for  each  means  of  egress 
              component shall be in accordance with BNBC Part 4 Table 4.3.2 (repeated below). 
                                                    BNBC Table 4.3.2
                                             Required Exit Width per Occupant
                                           Buildings without Sprinkler            Buildings thoroughly Sprinkled  
                                              System (mm per person)                     (mm per person) 
                    Occupancy 
                                                        Ramps &                            Ramps & 
                                         Stairways                   Doors   Stairways                       Doors 
                                                       Corridors                           Corridors 
           A            Residential 
           B            Educational 
           F1,F2, Business &                                                                                   
           F4           Mercantile          8             5          4          5            4               4 
           G            Industrial 
           H            Storage 
           C1,C2, Institutional 
           C3                              10             5          4          5            5               4 
           C4           Institutional       8            5            4        8              5               4 
           D            Health Care        25            18          10        15            12              10 
           E            Assembly 
           F3           Business and       10             7          5          7            5               5 
                         Mercantile 
           J            Hazardous           8             5          4          8            5               4 
          7.5 Sufficient  Capacity.  For  new  construction,  where  more  than  one  means  of  egress  is  required,  the 
              means of egress shall be of such width and capacity that the loss of any one means of egress leaves 
              available not less than 50 percent of the required capacity. 
               
               
                                                                                                                Page 45 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                                          Fire Safety Standards 
               
          7.6 Minimum widths. 
                   7.6.1 Doors. Doors in an existing means of egress shall have a minimum width of 0.8 m (32 
                          in.). 
                   7.6.2 Stairs. 
                              7.6.2.1 In  new  construction  and  for  newly  constructed  stairs,  stairs  shall  have  a 
                                      minimum width of  1.25 m (50 in.) for all industrial occupancies and 2.0 m 
                                      (79 in.) for all assembly occupancies. 
                              7.6.2.2 In existing construction, stairs shall have a minimum width of 0.9 m (35 in.). 
          7.7 Number of Means of Egress 
                   7.7.1 General. The number of means of egress from any floor or story shall not be less than 2 
                          except where a single exit is permitted by 7.7.2 or where a greater number is required 
                          by 7.7.3. 
                   7.7.2 Single  exits.  Only  one  exit  shall  be  required  in  existing  buildings  where  the  occupant 
                          load and travel distance listed in Table 6.6.2 are not exceeded. 
                                                             TABLE 6.6.2
                                                 STORIES WITH ONE EXIT
                              Story           Occupancy          Maximum Occupants per Floor and Travel Distance
                          Ground or              B                       50 occupants and 23 m (75 ft) travel distance 
                           Basement             E, F, G, K               50 occupants and 23 m (75 ft) travel distance
                                                 H                   30 occupants and 30 m (100 ft) travel distance
                                                 J                        5 occupants and 8 m (25 ft) travel distance
                         Second story           F, G                     30 occupants and 23 m (75 ft) travel distance
                                                 H              30        occupants and 23 m (75 ft) travel distance
                                                                      
                      7.7.3   High occupant load. The number of means of egress from any floor or story shall not 
                              be less than 3 when the occupant load exceeds 500 per story and not less than 4 when 
                              the occupant load exceeds 1000 per story. 
                      7.7.4 Occupied roofs. Occupied roofs  shall  be provided  with the  minimum number of exits 
                              required as a story. 
          7.8 Egress  Illumination.  All  paths  of  egress  shall  be  provided  with  illumination  in  accordance  with 
              Electrical Safety Part. 
          7.9 Doors and Gates 
                      7.9.1 Door swing. All doors in a means of egress shall be of the side‐hinged swinging type. 
                              Roll‐down and sliding gates and shutters shall not be allowed. 
                      7.9.2 Locking. 
                                 7.9.2.1 General.  Doors  shall  not  be  locked  in  the  direction  of  egress  under  any 
                                           conditions.  All  existing  hasps,  locks,  slide  bolts,  and  other  locking  devices 
                                           shall be removed unless provided for in 7.9.2.2 and 7.9.2.3. 
                                            
                                            
                                            
                                                                                                                       Page 46 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                     Fire Safety Standards 
                                          
                               7.9.2.2 Doors  may  be  locked  where  the  latch  and  lock  are  disengaged  with  one 
                                         motion  where  the  occupant  load  does  not  exceed  49  persons.  Turning  a 
                                         door handle and disengaging a lock is considered two motions. 
                               7.9.2.3 Doors  may  be  provided  with  locking  hardware  from  the  ingress  side 
                                         provided  that  a  panic  bar  is  installed  on  any  door  with  an  occupant  load 
                                         exceeding 49 persons. The re‐entry provisions of 7.9.3 must be met. 
                    7.9.3   Re‐entry. Every door in a stair enclosure serving more than 5 stories shall be provided 
                            with re‐entry unless it meets the requirements of 7.9.4. 
                    7.9.4   Stair doors may be permitted to be locked from the stair (ingress) side that prevents 
                            re‐entry to the  floor  provided  at  least two  floors  allowing  re‐entry  to  access  another 
                            exit  are  provided,  there  are  not  more  than  4  stories  intervening  between  re‐entry 
                            floors, re‐entry is allowed on the top or next to top level, reentry doors are identified 
                            as such on the stair side, and locked doors shall be identified as to the nearest re‐entry 
                            floors. When the discharge floor is determined to be a required re‐entry floor using the 
                            above requirements, re‐entry does not have to be provided back into the building on 
                            this level. 
 
                    Figure 7.9.4 (a). Required re-entry floors when starting at the top level.
 
                                                                                                                  Page 47 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                            Fire Safety Standards 
                 Figure 7.9.4 (b). Required re-entry floors when starting at the next to top level.
 
         7.10 Warehouse. Doors to storage buildings shall be in compliance with BNBC Part 4 Section 3.24.2. 
         7.11 Landings. A landing shall be provided on both sides of doors used in the means of egress. Door shall 
              not swing out over stairs. 
      8. Stairs. 
         8.1 New Construction. Newly constructed stairs shall be in compliance with BNBC Part 3 Section 1.12.5. 
         8.2 Existing. Existing stairs shall meet the requirements of this subsection. 
 
                                                                               
                                                             Stairs 
          8.3 Stairs shall be of noncombustible construction. 
                     8.3.1 Landings. Landings shall be provided with same width in the direction of egress travel 
                              as  the  stair  clear  width  shall  be  provided  at  each  level  and  at  intermediate  landings. 
                              Existing  landings  that  are  less  than  the  stair  width,  shall  reduce  the  overall  available 
                              capacity of the stair as per calculation. 
                               
                               
                               
                                                                                                                       Page 48 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                       Fire Safety Standards 
                                
                                 8.3.1.1 Treads. Stair treads shall be of nominal uniformity. 
                                              8.3.1.1.1 The maximum riser height for any stair shall be 215 mm (8.5 
                                                           in.). 
                                              8.3.1.1.2 Any  riser  height  at  the  top  or  bottom  step  in  a  stair  run 
                                                           exceeding  more  than  51  mm  (2  in.)  difference  from  the 
                                                           adjacent  riser  height  shall  be  modified  to  be  within  this 
                                                           tolerance. 
                                              8.3.1.1.3 Any riser height or tread depth not at the top or bottom step 
                                                           in a stair run exceeding more than 25 mm (1 in.) difference 
                                                           from  the  adjacent  step  shall  be  modified  to  be  within  this 
                                                           tolerance. 
                                              8.3.1.1.4 For  existing stairs that do not meet these tread dimensions 
                                                           and  will  require  extensive  rework  of  the  stairway,  a  full 
                                                           detailed  analysis  of  the  tread  dimensions  can  be  submitted 
                                                           to  the  Authority  for  review  and  approval  of  an  alternate 
                                                           corrective action plan. 
                      8.3.2    Handrails.  Handrails  shall  be  provided  on  both  sides  of  each  stairway.  Intermediate 
                               handrails shall be provided when the stair width exceeds 2.2 m (87 in.). 
                      8.3.3    Guards. Guards shall be provided in stairs in accordance with 12.2. 
                                
      9. Signs. 
          Stair designation signs shall be provided at each floor entrance from the stair to the floor in English and 
          Bengali. Signs shall indicate the name of the stair and the floor level. Signs shall be posted adjacent to the 
          door. 
           
      10. Ramps. 
          10.1 Width.  Ramps  used  in  a  means  of  egress  shall  not  reduce  the  overall  means  of  egress  width.  The 
                minimum width shall be 1.1 m (44 in.). 
          10.2 Slope. New ramps shall not have a running slope greater than 1 in 12 (8 percent). Existing ramps shall 
                not have a running slope greater than 1 in 8 (12.5 percent). 
          10.3 Handrails. Ramps shall be provided with handrails on both sides of the ramp. 
 
      11. Exit Signs. 
          11.1 Location. Lighted exit signs shall be placed at entrance to an exit. Additional exit signs shall be placed 
                throughout the facility anywhere the continuation of the egress is not obvious. 
          11.2 Power. Lighted exit signs shall be provided with either battery backup or emergency power and shall 
                be continuously illuminated. 
          11.3 Directional signs. Directional signs shall be provided where there is a change in the direction for the 
                path of travel and the direction to an exit is not obvious. 
 
                                                               
                                                                                                                   Page 49 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                         Fire Safety Standards 
                                                                               
                                                           Exit Sign 
                                                                 
      12. Handrails and Guards. 
          12.1 Handrails. 
                       12.1.1 New handrails shall have a minimum height of 865 mm (34 in.) and a maximum height 
                               of 965 mm (38 in.) as measured from the leading edge of the tread. 
                       12.1.2 Existing handrails that are less than 760 mm (30 in.) or greater than 1100 mm (44 in.) 
                               as  measured  from  the  leading  edge  of  the  tread,  shall  be  replaced  with  handrails 
                               meeting the requirements of 12.1.1. 
          12.2 Guards. Guards shall be provided at all open sides of means of egress that exceed 760 mm (30 in.) 
                above the floor or finished ground below. 
                       12.2.1 New guards shall have a minimum height of 1067 mm (42 in.). 
                       12.2.2 Existing guards shall have a minimum height of 760 mm (30 in.). 
                       12.2.3 Open guards shall have intermediate rails or pattern such that a sphere 200 mm (8 in.) 
                               in diameter cannot pass through any opening up to a height of 865 mm (34 in.). 
                       12.2.4 Roofs. All occupiable roofs shall be provided with parapets or guards with a minimum 
                               height of 1067 mm (42 in.). 
      13. Travel Distance. 
          13.1 General.  Travel  distance to  reach  an  exit  for  new  and  existing  shall  not exceed the  values  listed  in 
                BNBC Part 4 Section 3.15.1 unless the requirements of 6.13.1.1 or 6.13.1.2 can be met. 
                       13.1.1 Travel distance limitations for G2 (RMG  factories) shall  be  increased to 60  m (200 ft) 
                               where  a  complete  automatic  fire  detection  system,  portable  fire  extinguishers,  and 
                               standpipe system are provided in accordance with this Standard. 
                       13.1.2 Travel distance limitations for G2 (RMG factories) shall be increased to 122 m (400 ft) 
                               where  a  complete  automatic  sprinkler  system,  automatic  fire  alarm  system,  and 
                               portable fire extinguishers are provided in accordance with this Standard. 
      14. Exit Enclosures. 
          14.1 Ratings.  Interior  exit  stairways  and  ramps  shall  be  enclosed  with  fire  barriers  constructed  in 
                accordance with 33. 
          14.2 Termination.  Interior  exit  stairways  and  ramps  shall  terminate  at  an  exit  discharge  except  where 
                terminating at an exit passageway constructed in accordance with 15. 
          14.3 Openings. Openings into an exit enclosure other than unprotected exterior walls shall be limited to 
                those necessary for exit access to the enclosure. In new construction, elevators shall not open into an 
                exit  enclosure.  Openings  from  exit  enclosures  to  storage  areas,  basements,  transformer  rooms, 
                generator  rooms,  boiler  rooms,  and  similar  normally  unoccupied  spaces  shall  be  provided  with 
                vestibules. 
                                                                                                                     Page 50 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                          Fire Safety Standards 
                 
           14.4 Penetrations. Penetrations into and through an exit enclosure shall be prohibited with the exception 
                of required exit doors, sprinkler piping, standpipes, electrical raceway for fire alarm equipment, and 
                electrical conduit serving the exit enclosure. 
        
                 
                                                                                   
                                                    Penetration on Walls 
          14.5 Exterior walls. Exterior walls of exit enclosures shall comply with 3.9. 
          14.6 Smoke  proof  enclosures.  Smoke  proof  enclosures  shall  be  provided  for  new  stairs  as  required  in 
                BNBC Part 4 Section 3.13. 
          14.7 Exposures. Where nonrated walls or unprotected openings enclose the exterior of the stairway and 
                the walls or openings are exposed by other parts of the building at an angle of less than 180 degrees 
                (3.14  rad),  the  building  exterior  walls  within  3050  mm  (10  ft)  horizontally  of  a  nonrated  wall  or 
                unprotected opening shall have a fire‐resistance rating  of  not less than  1  hr. Openings within such 
                exterior walls shall be protected by opening protective having a fire protection rating of not less than 
                ¾ hr. This construction shall extend vertically from the ground to a point 3050 mm (10 ft) above the 
                topmost landing of the stairway or to the roof line, whichever is lower. [IBC 1022.7] 
                 
      15. Exit Passageways. 
          15.1 Definition. An exit passageway is an exit component that is separated from other interior spaces of a 
                building or structure by fire resistance‐rated construction and opening protective, and provides for a 
                protected path of egress in a horizontal direction to the exit discharge or the public way. 
          15.2 General. Exit passageways shall be considered an extension of the stairs and shall not be used for any 
                other purpose. 
          15.3 Construction.  Exit  passageways  shall  have  walls,  ceilings,  and  floors  that  meet  the  same  rating 
                requirement  as  the  exit  that  is  being  served  and  shall  not  be  less  than  1  hr  fire‐resistance  rated 
                construction. 
          15.4 Termination. Exit passageways shall terminate at an exit discharge. 
                 
      16. Horizontal Exits. Horizontal exits shall comply with the requirements of BNBC Part 4 Section 3.12. 
           
           
           
           
           
                                                                                                                       Page 51 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                          Fire Safety Standards 
           
      17. Exit Discharge 
          17.1 General. Exits shall discharge directly to the exterior of the building unless meeting the requirements 
               of  6.17.3  and  6.17.3.  The  exit  discharge  shall  be  at  grade  or  provide  direct  access  to  grade.  Exit 
               discharge shall not reenter a building. 
          17.2 Egress Court. An egress court serving as a portion of the exit discharge shall be open to the sky or 
               provided with a fire resistance rated enclosure the same as the exit enclosure. Egress courts less than 
               3050  mm  (10  ft)  in  width  (as  measured  from  the  building  and  the  adjacent  property  line)  shall  be 
               provided with walls having a 1‐hr fire resistance rated construction for a distance of 3050 mm (10 ft) 
               above the floor of the court. 
 
                                                                                   
                                                         Egress Court 
          17.3 Interior  building  exit  discharge.  A  maximum  of  50  percent  of  the  number  and  capacity  of  the  exit 
               enclosures can discharge through areas on the level of exit discharge where all of the following are 
               met: 
                      17.3.1 Automatic  sprinkler  protection  is  provided  throughout  the  level  of  exit  discharge  or 
                               portion of the level of discharge where separated from nonsprinklered portions of the 
                               floor by fire barriers with the same fire resistance rating as the exit enclosure. 
                      17.3.2 The interior discharge is not through a storage or hazardous occupancy. 
                      17.3.3 The  entire  area  of  the  level  of  exit  discharge  is  separated  from  areas  below  by 
                               construction  having  a  fire  resistance  rating  not  less  than  that  required  for  the  exit 
                               enclosure. 
                      17.3.4 The way to the exterior shall be free and unobstructed and shall be readily visible and 
                               identifiable from the point of discharge of the interior exit. 
 
                                                                                             
 
                                                                                                                      Page 52 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                         Fire Safety Standards 
Human Element Programs 
 
      1   Fire Safety Director 
          1.1 Duties. The duties of the Fire Safety Director shall include the following: 
                   (1) Establish internal and external rally points and communicate to all employees in the building. 
                   (2) Fire department pre‐planning. 
                   (3) Conduct safety inspections as outlined in 13.9. 
                   (4) Ensure all testing of fire protection equipment is conducted in accordance with 13.10. 
                         
      2   Fire Drills 
          2.1 Fire  drills  shall  be  conducted  on  a  quarterly  basis  as  outlined  in  BNBC  Part  4  Appendix  A  for  all 
               garment facilities. 
          2.2 Fire drills shall be conducted under the direction of a Fire Safety Director. 
          2.3 All other requirements for fire drills shall be conducted in accordance with BNBC Part 4 Appendix A. 
                
      3   Evacuation Plan. 
          3.1 The Fire Service Director shall develop a fire evacuation plan for each building. 
          3.2 Fire evacuation maps shall be posted at the entrance to each exit stair. 
          3.3 The  evacuation  plan  shall  include  provisions  to  assist  physically  disabled  persons.  A  list  of  all 
               employees with physical disabilities shall be kept by the Fire Service Director. 
                                  
      4   Hot work permit. 
          4.1 A  hot  work  permit  system  program  shall  be  enacted  for  all  RMG  facilities  in  accordance  with  NFPA 
               51B. 
                                  
      5   Smoking. 
          5.1 Smoking shall be prohibited in any garment factory building, separate storage building, or any building 
               or  area  where  the  Inspector  of  the  Factories  Rules  (1.6.3.7)  Part  53  requires  that  smoking  is 
               prohibited. 
          5.2 Signs shall be posted in Bengali and English at all building entrances. 
          5.3 If an Owner creates a designated smoking area outside the buildings, information on the location of 
               these designated areas shall be posted on the signs required in 13.5.2. 
                
      6   Housekeeping. 
          6.1 Policy. Establish written corporate and plant policies on housekeeping to ensure scheduled cleaning 
               for  floor,  wall,  ceiling,  supply  and  return  air  ventilation  systems.  Promptly  reschedule  skipped 
               cleanings. Provide a documented line of authority for authorizing a cleaning delay and rescheduling. 
               As a general rule the maximum tolerable deposit thickness for loose fluffy lint is 13 mm (½ in.) over a 
               maximum of 46.5 m2 (500 ft2). Limit dense deposits to 6 mm (¼ in.) and oil saturated deposits to 3.2 
               mm (⅛ in.). 
                
                
                                                                                                                    Page 53 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                        Fire Safety Standards 
              
         6.2 Maintain  electrical  systems  in  good  working  order  and  keep  free  of  lint  buildup  to  reduce  the 
             potential for ignition. This includes cleaning inside junction boxes, buses, trays, tunnels, etc. 
               
      7 Storage practices. 
         7.1 Management of Operating Loads. Factory Owners shall ensure that at least one trained professional 
              individual is assigned to each factory facility as Factory Load Manager in accordance with 8.9 of this 
             Standard. 
         7.2 Cutting tables. Storage underneath the cutting tables shall be kept clear of combustibles at all time. 
              
      8 Egress. All means of egress shall be kept free and clear at all times. 
          
      9 Safety Inspections. A safety inspection program shall be initiated and conducted on a quarterly basis. This 
         program shall be conducted under the direction of the Fire Safety Director. These inspections shall look 
         for egress maintenance, condition of fire doors, storage in aisle ways, excess storage, smoking, hot work 
         and  other  fire‐safety  related  items.  Records  of  these  inspections  shall  be  kept  for  Assessor  inspection 
         review. 
         9.1 Construction  inspections.  An  additional  safety  inspection  program  shall  be  initiated  under  the 
              direction  of  the  Fire  Safety  Director  for  any  construction  that  occurs  in  an  occupied  facility  (see 
              Section 9.2). 
         9.2 Doors tested. Fire doors shall be tested on a quarterly basis to ensure that they are properly closing 
             and  latching.  They  shall  also  be  checked  for  the  proper  label  and  verification  that  the  door  has not 
              been damaged in any way. 
               
      10 Maintenance of fire protection equipment. 
         10.1 Automatic  suppression  systems.  Inspection,  testing  and  maintenance  in  accordance  with  NFPA  25  
                shall be conducted on all water‐based fire protection systems. 
         10.2 Fire alarm and detections systems. Inspection, testing and maintenance in accordance with NFPA 72 
                shall be conducted on all fire alarm systems. 
         10.3 Fire extinguishers. Fire extinguishers shall be inspected, tested,  and  maintained  in accordance with 
                NFPA 10. 
                 
      11 Equipment. 
         11.1 Establish a maintenance, cleaning and lubrication schedule for all equipment. The maintenance and 
                cleaning  schedule  will  vary  with  type  of  fiber  processed  and  the  equipment  used.  Lubricate 
                equipment  in  accordance  with  manufacturer’s  recommendations.  Review  plant  fire  loss  records  to 
                determine  whether  cleaning  or  equipment  maintenance  was  a  factor,  and  increase  frequency  as 
                needed. 
                 
                 
                 
                 
                                                                                                                     Page 54 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                     Fire Safety Standards 
               
      12 Electrical maintenance. 
         12.1 Testing  of  emergency  lighting.  Emergency  lighting  provided  by battery  backup  shall  be  tested  on  a 
              monthly basis. 
         12.2 Generators.  Generators  used  for  emergency  or  standby  requirements  of  this  Standard  shall  be 
              inspected, tested, and maintained in accordance with NFPA 110. 
                                                                                                                 Page 55 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                        Electrical Safety Standards 
 
    C. Electrical Safety 
      1 Definition 
          1.1 Instant  power  supply  (IPS).  An  electrical  device  that  provides  power  when  the  main  supply  fails  to 
                operate. 
          1.2 Uninterruptible  power  supply  (UPS).  A  system  consisting  of  a  stored  energy  source,  designed  to 
                continuously provide a clean, conditioned sinusoidal wave of power under normal conditions and for 
                a finite period of time upon loss of the primary power source. 
                 
      2 Electrical Wiring and Cabling. 
          2.1 Electrical Connections. 
                       2.2.1 Separate  branch  circuits  shall  be  provided  for  the  installation,  which  need  to  be 
                               separately controlled. These branches should not be affected by failure of other branch 
                               circuits.  The  number  of  final  circuits  required  and  the  points  supplied  by  any  final 
                               circuits shall comply with: 
                               (a) the requirement of over current protection 
                               (b) the requirement for isolation and switching 
                               (c) the selection of cables and conductors. 
                       2.2.2 Separate branch circuits shall be provided from miniature circuit breaker (MCB) or fuse 
                               distribution  boards  (FDB)  for  general  lighting  automatic  and  fixed  appliances  with  a 
                               load of 500 watt or more and plug receptacles. Each automatic or fixed appliance shall 
                               be served by an individual circuit. 
 
                                                                                       
                                               Separate Branch for Each Loads 
                                                                    
                       2.2.3    Size  of  wire  to  be  used  in  a  branch  circuit  shall  be  at  least  one  size  larger  than  that 
                                computed from the loading if the distance from the over current protective device to 
                                the first outlet is over 15 m. 
                       2.2.4    When the distance from the over current protective device to the first socket outlet on 
                                a receptacle circuit is over 30 m the minimum size of wire used for a 15A branch circuit 
                                shall be 4mm2 (7/0.036). 
                       2.2.5    The use of common neutral for more than one circuit shall not be permitted. 
                       2.2.6    Circuits with more than one outlet shall not be loaded in excess of 50% of their current 
                                carrying capacity. 
                                 
                                                                                                                            Page 56 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                   Electrical Safety Standards 
                                
                      2.2.7    Connections between conductors and between conductors and other equipment shall 
                               provide  durable  electrical  continuity  and  adequate  mechanical  strength  and 
                               protection. 
                                
      3   Wiring. 
          4.1 For new construction, surface/exposed wiring shall be run‐either horizontally or vertically, and never 
               at an angle. Battens on ceiling shall be run parallel to the edges in either orthogonal direction, and 
               not at an angle. 
          4.2 For  new  construction,  in  case  of  concealed  wiring,  the  wires  shall  be  encased  in  metallic  (GI)  or 
               nonmetallic (PVC) conduits that are buried in roof or floor concrete and in brick/concrete wall. The 
               conduits in the walls shall be run horizontally or vertically, and not at an angle. Conduits in concrete 
               slabs  shall  be  placed  at  the  centre  of  thickness  and  supported  during  casting  by  mortar  blocks  or 
               'chairs' made of steel bare or any other approved means. All conduits shall be continuous throughout 
               their lengths. 
          4.3 Underground cables for electrical distribution in the premises/garden/compound of the building shall 
               be encased in GI or PVC pipes and laid in earth trenches of 600 mm (24 in,). Armored cables need not 
               be encased in conduit except for crossings under road, footpath, walkway or floors. 
          4.4 Wiring for connections to machines shall be carried in steel pipes or cable tray hung from the ceiling 
               or in concrete or steel cable tray running over the floor. 
                
      4   Wiring for Lighting. 
          4.1 Lighting  fittings  shall  be  supported  by  suitable  pipe/conduits,  brackets  fabricated  from  structural 
               steel, steel chains or similar materials depending upon the type: and weight of the fittings. 
          4.2 The use of fittings wire shall normally be restricted to the internal wiring of the lighting. When the 
               fittings wire is used as wiring for the fittings the sub circuit load shall terminate in a ceiling rose or 
               box with connectors, from which they shall be carried into the fittings. 
          4.3 Lighting systems shall not be installed in a manner where the light fixture is supported by the False / 
               Lay‐in  Ceiling  Grid  system.  Light  Fixtures  shall  be  independently  supported  from  the  structure  and 
               seismic bracing shall be installed as required. 
                
                                                                                                
                                                        Light Fixing 
      5   External Influences. 
          5.1 Ambient  temperature.  Wiring  system  components  including  cables  and  wiring  accessories  shall  be 
              installed or handled only at temperatures within the limits stated in the relevant product specification 
              or as given by the manufacturers. 
                                                                                                                    Page 57 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                      Electrical Safety Standards 
               
          5.2 External heat sources. In order to avoid the effects of heat from external sources one of the following 
              methods shall be used to protect wiring systems: 
              (a)   shielding; 
              (b)   placing 900 mm (36 in.) from the source of heat; 
              (c)   selecting a system with due regard for the additional temperature rise which may occur; 
              (d)   local reinforcement or substitution of insulating material. 
          5.3 Presence of water. Wiring systems shall be selected and erected so that no damage is caused by the 
              ingress of water. The completed wiring system shall comply with the IP degree of protection relevant 
              to the particular location. 
               
      6   Selection and Erection to Minimize the Spread of Fire. 
          6.1 The risk of spread of fire shall be minimized by the selection of appropriate materials and erection. 
          6.2 Wiring systems shall be installed so that the general building structural performance and fire safety 
              are not reduced. 
          6.3 Cables not complying, as a minimum, with the flame propagation requirements, if used, be limited to 
              short  lengths  for  connection  of  appliances  to  permanent  wiring  systems  and  shall  in  any  event  not 
              pass from one fire‐segregated compartment to another. 
          6.4 Parts  of  wiring  systems  other  than  cables  which  do  not  comply,  as  a  minimum,  with  the  flame 
              propagation requirements but  which comply in all  other  respects with standards for  wiring systems 
              shall, if used, be completely enclosed in suitable non‐combustible building materials. 
          6.5 Non‐metallic conduits and conduit fillings shall be of heavy wall water grade type. All bends shall be 
              large radius bends. The cross‐section of the conduit shall remain circular at the bend and the internal 
              diameter shall not be reduced. PVC pipe fittings shall be sealed with PVC solvent cement or by using 
              glue or gum paste of approved quality. Conduits installed in floors shall have a slope of at least 1:1000 
              towards floor mounted pool box or cable duct. 
          6.6 Socket and Plug. 
                       6.6.1 Each 15/20A socket outlet for air‐conditioner, water cooler, etc. shall be provided with 
                                its  own  individual  fuse  with  suitable  discrimination  with  backup  fuse  or  miniature 
                                circuit  breaker  (MCB)  in  the  distribution/  sub‐distribution  board.  The  socket  outlet 
                                need not necessarily embody the fuse as an integral part of it. 
                       6.6.2 Each  socket  outlet  shall  also  be  controlled  by  a  switch  which  should  normally  be 
                                located immediately adjacent thereto or combined therewith. 
                       6.6.3 The copper earth wire for 5A socket outlets shall not be smaller in size than 14 SWG 
                                and the phase wire to the socket outlet shall be through the switch. 
                                 
      7   Lighting Fittings. 
          7.1 In  industrial  premises  lighting  fittings  shall  be  supported  by  suitable  pipe/conduits,  brackets 
              fabricated from structural steel, steel chains or similar materials depending upon the type and weight 
              of the fittings. 
          7.2 No  flammable  shade  shall  form  part  of  lighting  fitting  unless  such  shade  in  such  shade  is  well 
              protected  against  all  risks  of  fire.  Celluloid  shade  or  lighting  fitting  shall  not  be  used  under  any 
              circumstances. 
                                                                                                                        Page 58 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                     Electrical Safety Standards 
               
      8   Layout and Installation Drawings. 
          8.1 For  new  construction,  an  electrical  layout  drawing  shall  be  prepared  after  proper  locations  of  all 
              outlets for lamps, fans, fixed and transportable appliances, motors etc. have been selected. 
          8.2 For new construction, power and heating sub‐circuits shall be kept separate and distinct from lighting 
              and  fan  sub‐circuit.  All  types  of  wiring  whether  concealed  or  surface  shall  be  as  near  the  ceiling  as 
              possible. 
          8.3 Circuits in 3‐phase installations shall be balanced. 
          8.4 Conductors shall be so enclosed in earthed metal or incombustible insulating materials so that it is not 
              possible  to  have  ready  accesses  to  them  unless  the  points  between  which  a  voltage  exceeding  240 
              volts may be present are 2m or more apart. In case such points are kept apart the means of access 
              shall be marked to indicate the voltage present. 
          8.5 Where terminals or other fixed live parts between which a voltage exceeding 240V exists are housed 
              in separate enclosures or items of apparatus which although separated are within reach of each other 
              a  notice shall be placed in  such  a  position  that anyone  gaining access  to  live  parts  is warned of the 
              magnitude of the voltage that exists between them. 
          8.6 For new construction, layout drawings shall indicate the relevant civil and mechanical details. 
 
      9   Conductor and Cables. 
          9.1 Conductors. 
                      9.1.1 Conductors shall be of copper or aluminum. 
                      9.1.2 Conductors  for  power  and  lighting  circuits  shall  be  of  adequate  size  to  carry  the 
                               designed  circuit  load  without  exceeding  the  permissible  thermal  limits  for  the 
                               insulation. 
                      9.1.3 Phase and neutral wires shall be of the same size. 
                                
          9.2 Flexible Cables and Flexible Cords.  
              Flexible  cable  or  cords  shall  not  be  used  as  fixed  wiring  unless  contained  in  an  enclosure  affording 
              mechanical protection. Flexible cords may be used for connections to portable equipment. 
          9.3 Cable Ends.  
              All stranded conductors having nominal cross‐sectional area 6mm2 and above shall be provided with 
              cable sockets. For stranded conductors of cross‐sectional area  below 6 mm2 and not provided with 
              cable sockets, all strands at the exposed ends of the cable shall be soldered together or crimped using 
              suitable sleeve or ferrules. 
          9.4 Cable Joints.  
              Cable joints are to be realized through porcelain/PVC connectors with PIB tape wound around before 
              placing the cable in the box. 
          9.5 Expansion Joints.  
              Conduits shall not normally be allowed to cross expansion joints in a building. Where such crossing is 
              found to be unavoidable special care must be taken to ensure that conduit runs and wring are not in 
              any way put to strain or are not damaged due to expansion/ contraction of the building structure. 
               
                                                                                                                        Page 59 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                 Electrical Safety Standards 
              
      10 Sub‐distribution Boards. 
         10.1 Enclosures. 
                    10.1.1 Sub‐distribution  boards  shall  be  located  as  close  as  possible  to  the  electrical  load 
                            centers. 
                    10.1.2 Enclosures  for  sub‐distribution  boards  located  inside  the  building  shall  be  dust‐proof 
                            and vermin proof using sheet steel fabrication of a minimum thickness of 20 SWG. The 
                            boards shall be safe in operation and safe against spread of fire due to short circuit. 
                    10.1.3 BNBC  Table  8.2.7  provides  recommended  sizes  of  enclosures  for  sub‐distribution 
                            boards containing miniature circuit breakers or fuses. 
                             
Sub‐Distribution Boards
                                      Dimensions (mm)
                                                                                 No. of MCB's or Fuses
                         Height             Width             Depth
          10.2 Wiring of Sub‐distribution Boards. 
                     10.2.1 For new construction, in wiring a sub‐distribution board, total load of the consuming 
                             devices shall be distributed as far as possible evenly between the numbers of ways of 
                             the board leaving the spare way(s) for future extension. 
                     10.2.2 Cables  shall  be  connected  to  terminals  only  by  soldered  or  welded  lugs,  unless  the 
                             terminal  are  of  such  form  that  it  is  possible  to  securely  clamp  them  without  cutting 
                             away the cable strands. 
                              
                                                                                                                   Page 60 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                  Electrical Safety Standards 
                               
         10.3 Service Entry. 
                     10.3.1 Overhead service connection to  a  building  shall  be achieved with covered conductor. 
                              The  overhead  service  connection  shall  be  led  into  buildings  via  roof  poles  or  service 
                              masts made of GI pipe having a goose neck bend at the top and installed on the outer 
                              wall. 
                     10.3.2 Underground service cables shall be laid in conformity with the requirements of wiring 
                              of concealed wiring. 
                     10.3.3 Power and telecommunication or antenna cables shall be led in separately. 
                               
      11 Electrical Service Shaft and Bus Duct. 
         11.1 Service Shaft. 
                     11.1.1 Buildings  over  six‐story  or  20  m  (65  ft)  high  shall  have  a  minimum  of  one  vertices 
                              vertical shaft of 200 mm x 400 mm size for every 1500 m2 floor areas. 
                     11.1.2 Free  and  easy  access  to  the  electrical  shaft  room  in  each  floor  must  be  available  for 
                              operation, maintenance and emergency shut downs. 
                     11.1.3 For  new  construction,  vertical  cables  other  than  electrical  cables  shall  be  placed  at  a 
                              sufficient  distance  from  the  nearest  electrical  cable.  A  vertical  separating  brick  wall 
                              between electrical and non‐electrical wall is preferable. 
                     11.1.4 For  new  construction,  vertical  service  shaft  for  electrical  risers  must  not  be  placed 
                              adjacent to the sanitary shafts. They should be placed at significant separation in order 
                              to ensure that the vertical service shaft for electrical risers remains absolutely dry. 
                               
      12 Bus Duct. 
         12.1 Bus ducts should be used for exposed work or where concealing is not of a permanent nature. The 
              bus  duct  shall  be  laid  with  minimum  numbers  of  bends  for  distribution  system.  Typical  rating  of 
              feeder  bus  ducts  for  3‐phase,  3‐wire  or  4‐wire  system  shall  range  from  200  amperes  to  3000 
              amperes. Concrete horizontal ducts of suitable size shall be provided along the roads for a group of 
              buildings to be fed by a single substation. 
         12.2 Floors of the duct area shall be constructed in such a way so that the empty space after putting the 
              cables/bus‐bar  trunking/pipes/conduits  in  position  the  remaining  open  space  is  filled  up  with  RCC 
              slab(s) or any other non‐inflammable material so that fire or molten PVC cannot fall from one floor to 
              the  next  lower  floor(s).  For  this  purpose  arrangements  need  to  be  made  during  the  main  floor 
              casting. 
         12.3 Sealing of Shaft and Duct. 
                     12.3.1 Where  a  wiring  system  passes  through  elements  of  building  construction  such  as 
                              floors, walls, roofs, ceilings, partitions or cavity barriers, the openings remaining after 
                              passage of the wiring system shall be sealed according to the degree of fire resistance 
                              prescribed for the respective element of building construction before penetration. 
                     12.3.2 Wiring systems which penetrate elements of building construction having specified fire 
                              resistance shall  be  internally  sealed  to  the degree of  fire  resistance  of  the respective 
                              element before penetration as well as being externally sealed. 
                                                                                                                    Page 61 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                   Electrical Safety Standards 
                              
      13 Electrical Substation. 
         13.1 Necessity and capacity of the electrical substation shall be set by regulations in the Electricity Act or 
              by the relevant electrical utilities. 
         13.2 For new construction, to arrive at the capacity of the substation required, a load factor of 70% shall 
              be applied to the estimated load of the building, unless future expansion requirements dictate that a 
              higher figure be considered. 
         13.3 Substation Location. 
                     13.3.1 For  new  construction,  the  substation  shall  be  installed  on  the  lowest  floor  level. 
                             Location of substation in the basement floor should be avoided. Direct access from the 
                             street for installation or removal of the equipment shall be provided. 
                     13.3.2 The floor level of the substation or switch room shall be above the highest flood level 
                             of the locality. Suitable arrangements should exist to prevent the entrance of storm or 
                             flood water into the substation area. 
                     13.3.3 For new construction, in case of building complex, or a group of buildings belonging to 
                             the  same  organization,  the  substation  should  preferably  be  located  in  a  separate 
                             building and should be adjacent to the generator room, if any. 
                              
                     13.3.4 For new construction, in case the electric substation has to be located within the main 
                             building for unavoidable reasons, it should be located on ground floor. 
                     13.3.5 For transformers having  large oil  content (more than 2000 liters), soak  pits are to be 
                             provided. 
                     13.3.6 For new construction, the minimum height of the substation room shall be 3.6 m (12 
                             ft).  The  minimum  area  required  for  substation  and  transformer  rooms  for  different 
                             capacities are given in BNBC Table 8.2.8. 
                                               BNBC Table 8.2.8 
                   Area Required for Transformer Room and Substation for Different Capacities 
 
                                                                                                                    Page 62 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                   Electrical Safety Standards 
          13.4 Layout of Substation. 
                    13.4.1 For new construction, the layout of the substation shall be in accordance of the power 
                             flow, i.e. from utility network to HT room, then to transformer and finally to the low 
                             voltage  switchgear  room.  In  general,  the  substation  HT  to  LT  Transformer  shall  be 
                             placed in one corner of the room so that the HT side remains away from the passage of 
                             the persons. 
                    13.4.2 For new construction, the HT metering panel shall be located near the exterior of the 
                             substation room near the exit gate and also shall be convenient for the HT cable entry. 
                    13.4.3 For  new  construction,  the  HT  Panel  shall  be  located  near  the  exterior,  just  after  or 
                             adjacent to the HT panel. 
                    13.4.4 For  new  construction,  LT  Panel  shall  remain  at  a  sufficient  distance  from  the 
                             transformer but not too  far  away from the transformer. The location of the LT panel 
                             should  such  that  the  riser  main  cable  can  have  their  way  upward  or  outward  within 
                             very short distance. 
                    13.4.5 All the rooms shall be provided with partitions up to the ceiling and shall have proper 
                             ventilation.  Transformer  rooms  shall  have  proper  ventilation  and  where  necessary 
                             louvers  at  lower  level  and  exhaust  fans  at  higher  level  shall  be  provided  at  suitable 
                             locations in such a way that cross ventilation is maintained. 
                    13.4.6 Arrangement  shall  be  made  to  prevent  storm  water  entering  the  transformer  and 
                             switch rooms through the soak pits, if floor level of the substation is low. 
                              
          13.5 Equipment and Accessories. 
                    13.5.1 High‐voltage Switchgear. 
                                13.5.1.1 For  new  construction,  banks  of  switchgears  shall  be  segregated  from 
                                             each other by means of fire resistant barriers in order to prevent the risk 
                                             of damage by fire or explosion arising from switch failure. Where 3 bus‐
                                             section switches are installed, it shall also be segregated from adjoining 
                                             banks in the same way. 
                                13.5.1.2 For  new  construction,  in  the  case  of  duplicate  or  ring  main  supply, 
                                             switches  with  interlocking  arrangement  shall  be  provided  to  prevent 
                                             simultaneous switching of two different supply sources. 
                    13.5.2 Low‐voltage Switchgear. 
                                13.5.2.1 Switchgear  and  fuse  gear  must  have  adequate  breaking  capacity  in 
                                             relation to the capacity of the transformers. 
                                13.5.2.2 For  new  construction,  isolation  and  protection  of  outgoing  circuits 
                                             forming  the  main  distribution  system  may  be  effected  by  means  of 
                                             circuit  breakers,  or  fuses  or  switch  fuse  units,  mounted  on  the  main 
                                             switchboard,  the  choice  between  alternative  types  of  equipment  will 
                                             take the following points into consideration: 
                                              
                                              
                                                                                                                    Page 63 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                 Electrical Safety Standards 
                                              
                                             (1) In  certain  installations  supplied  with  electric  power  from  remote 
                                                 transformer substations, it may be necessary to protect main circuits 
                                                 with  circuit  breakers  operated  by  earth  leakage  trips  in  order  to 
                                                 ensure effective earth fault protection. 
                                             (2) Where  large  electric  motors,  furnaces  or  other  heavy  electrical 
                                                 equipment  are  installed,  the  main  circuits  shall  be  protected  by 
                                                 metal  clad  circuit  breakers  or  conductors  fitted  with  suitable 
                                                 instantaneous  and  time  delay  over  current  devices  together  with 
                                                 earth leakage and backup protection where necessary. 
                                             (3) In  installations  other  than  those  mentioned  above  or  where 
                                                 overloading  of  circuits  may  be  considered  unlikely,  HRC  type  fuses 
                                                 will normally afford adequate protection for main circuits separately 
                                                 as  required;  the  fuses  shall  be  mounted  in  switch  fuse  unit  or  with 
                                                 switches forming part of the main switch boards. 
                                             (4) Where it is necessary to provide suitable connection for power factor 
                                                 improvement  capacitors  at  the  substation  bus,  suitable  capacitors 
                                                 shall  be  selected  in  consultation  with  the  capacitor  and  switchgear 
                                                 manufacturer  and  necessary  switchgear/feeder  circuit  breaker  shall 
                                                 be provided for controlling the capacitor bank(s). 
          13.6 Transformers. 
                     13.6.1 For new construction, in most cases oil type natural cooled transformer may be used 
                            for substations if adequate space is available to accommodate the transformer. 
                     13.6.2 For new construction, dry type transformer should be installed where risk of spreading 
                            of fire is high and where flammable materials are to be kept around the substation. 
                     13.6.3 For  new  construction,  where  two  or  more  transformers  are  to  be  installed  in  a 
                            substation  to  supply  a  medium  voltage  distribution  system,  the  distribution  system 
                            shall  be divided  into  separate  sections  each  of  which  shall  normally  be  fed  from  one 
                            transformer only unless the medium voltage switchgear has the requisite short circuit 
                            capacity,  provision  may  be  made  to  interconnect  separate  sections  through  bus 
                            couplers to cater for the failure or disconnection of one transformer. 
                     13.6.4 For new construction, the transformers that at any time operate in parallel shall be so 
                            selected as to share the load in proportion to their respective ratings. 
                     13.6.5 For  new  construction,  when  a  step‐up  transformer  is  used,  a  linked  switch  shall  be 
                            provided for disconnecting the transformer from all poles of the supply, including the 
                            neutral conductor. 
                             
                             
                             
                             
                             
                             
                                                                                                                    Page 64 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                     Electrical Safety Standards 
                              
         13.7 Rotating Machines. 
                     13.7.1 All  equipment  including  cables  of  every  circuit  carrying  the  starting,  accelerating  and 
                             load  currents  of  motors  shall  be  suitable  for  a  current  at  least  equal  to  the  full  load 
                             current  rating  of  the  motor.  When  the  motor  is  intended  for  intermittent  duty  and 
                             frequent stopping and starting, account shall be taken of any cumulative effects of the 
                             starting periods upon the temperature rise of the equipment of the circuit. 
                     13.7.2 The rating of circuit supplying the rotors through slip ring or commentator of induction 
                             motors  shall  be  suitable  for  both  the  starting  and  loaded  conditions.  Every  electric 
                             motor having  a  rating  exceeding  0.376  kW  shall  be  provided  with  control  equipment 
                             incorporating means of protection against overcurrent. 
                     13.7.3 Every  motor  shall  be  provided  with  means  to  prevent  automatic  restarting  after  a 
                             stoppage  due  to  drop  in  voltage  or  failure.  This  requirement  does  not  apply  to  any 
                             special  cases  where  the  failure  of  the  motor  to  start  after  a  brief  interruption  of the 
                             supply would be likely to cause greater danger. It also does not preclude arrangements 
                             for starting a motor at intervals by an automatic control device where other adequate 
                             precautions are taken against danger from unexpected restarting. 
                     13.7.4 The frame of every stationary motor shall be connected with earth. 
                              
      14 Cables. 
         14.1 For new construction, the advice of the cable manufacturer with regard to installation, jointing and 
              sealing shall be followed. 
         14.2 The HT cables shall either be laid on cable racks or in built‐up concrete trenches/tunnel/ basement or 
              directly buried in the ground. Standard cable laying techniques shall be used. 
         14.3 Methods of installation of cables and conductors in common use as specified in BNBC Table 8.2.10 
              shall be followed. 
               
      15 Main Switch, Switchboards and Metal Clad Switchgear. 
         15.1 Main Switch, Switchboards. 
                     15.1.1 All  main  switches  shall  be  either  of  metal  clad  enclosed  patterns  or  of  any  insulated 
                             enclosed pattern and the switches shall be fixed at close proximity to the point of entry 
                             of supply. 
                     15.1.2 The  wiring  throughout  the  installation  shall  be  such  that  there  is  no  break  in  the 
                             neutral wire in the form a switch or fuse unit or otherwise. 
                     15.1.3 The location of the main board shall be such that it is easily accessible for firemen and 
                             other personnel to quickly disconnect the supply in case of emergencies. 
                     15.1.4 Open type switchboards are not allowed. 
                     15.1.5 In damp situation or where inflammable or explosive dust, vapor or gas is likely to be 
                             present,  the  switchboard  shall  be  totally  enclosed  or  made  flame  proof  as  may  be 
                             necessitated by the particular circumstances. 
                              
                              
                                                                                                                        Page 65 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                Electrical Safety Standards 
                              
                     15.1.6 Switchboards  shall  not  be erected  above  gas  stoves or  sinks  or  within  2.5  m (8  ft) of 
                             any washing unit in the washing rooms or laundries. 
                     15.1.7 In case of switchboards being unavoidable in places likely to be exposed to weather, to 
                             drip or in abnormally moist atmosphere, the outer casing shall be weather proof and 
                             shall be provided with glands or bushings or adapted to receive screwed conduit. 
                     15.1.8 Adequate illumination shall be provided for all working spaces about the switchboards 
                             when installed indoors. 
                     15.1.9 All  metal  casings  or  metallic  coverings  containing  or  protecting  any  electrical  supply‐
                             line or apparatus shall be connected with earth. 
                     15.1.10 There  shall  be  a  distance  of  1  m  (39  in.)  clear  in  front  of  the  switchboards  and 
                             switchgear. 
          15.2 Metal Clad Switchgear. 
                     15.2.1 Metal  clad  switchgear  shall  be  mounted  on  hinged  type  metal  boards  or  fixed  type 
                             metal boards. 
                     15.2.2 Hinged  type metal  boards  shall  consist  of  a  box  made  of  sheet metal not  less  than 2 
                             mm thick and shall be provided with a hinged cover to enable the board to swing open 
                             for examination of the wiring at the back. The joints shall be welded. The board shall 
                             be securely fixed to the wall by means of rag bolt plugs or wooden plugs and shall be 
                             provided  with  locking  arrangement  and  earthing  stud.  All  wires  passing  though  the 
                             metal  board  shall  be  protected  by  a  rubber  or  wooden  bush  at  the  entry  hole.  The 
                             earth stud should be commensurate with the size of the earth lead(s). 
                     15.2.3 Fixed type  metal boards  shall  consist  of an angle  or  channel  steel frame fixed on the 
                             wall at the top, if necessary. 
                     15.2.4 There  shall  be  a  distance  of  1  m  (39  in.)  clear  in  front  of  the  switchboards  and 
                             switchgear. 
          15.3 Location of Distribution Boards. 
                     15.3.1 For new construction, the distribution fuse boards shall be located as near as possible 
                             to the center of the load they are intended to control. 
                     15.3.2 They  shall  be  fixed  on  suitable  stanchion  or  wall  and  shall  be  accessible  ‐  for 
                             replacement of fuses, and shall not be more than 2 m (6.5 ft) from floor level. 
                     15.3.3 They shall be either metal clad type, or all insulated type. But if exposed to weather or 
                             damp  situations,  they  shall  be  of  the  weather  proof  type  and  if  installed  where 
                             exposed to explosive dust, vapor or gas, they shall be of flame proof type. In corrosive 
                             atmospheres  they  shall  be  treated  with  anticorrosive  preservative  or  covered  with 
                             suitable plastic compounds. 
                     15.3.4 Where two of more distribution fuse‐boards feeding low voltage circuits are fed from a 
                             supply of medium voltage, these distribution boards shall be: 
                             (1) fixed not less than 2m apart 
                             (2) arranged  so  that  it  is  not  possible  to  open  two  at  a  time,  namely  they,  are 
                                  interlocked, and the metal case is marked "Danger 400 Volts" and identified with 
                                  proper phase marking and danger marks  
                                                                                                                 Page 66 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                  Electrical Safety Standards 
                                  
                             (3) installed in rooms or enclosures accessible to authorized persons only. 
                    15.3.5 All distribution boards shall be marked "Lighting" or "Power", as the case may be, and 
                             also  be  marked  with  the  voltage  and  number  of  phases  of  the  supply.  Each  shall  be 
                             provided  with  a  circuit  list  giving  diagram  of  each  circuit  which  it  controls  and  the 
                             current rating for the circuit and size of fuse element. 
                    15.3.6 There shall be a distance of 1 m (39 in.) clear in front of the distribution panels. 
                              
      16 Standby Power. 
         16.1 Provision  should  be  made  for  standby  power  supply  to  avert  panic,  hazard  to  life  and  property  or 
              major production loss in case of interruption of electrical power supply. The standby power supply 
              may be a petrol engine or diesel engine or gas engine generator or an IPS or a UPS. 
         16.2 Capacity of a Standby Generating Set. 
                    16.2.1 The  capacity  of  standby  generating  set  shall  be  chosen  on  the  basis  of  essential light 
                             load,  essential  air‐conditioning  load,  essential  equipment  load  and  essential  services 
                             load, such as one lift out of a bank of lifts, one or all water pumps, etc. The generator 
                             shall  be  capable  of  taking  starting  currents  of  all  the  machines  and  circuits  stated 
                             above simultaneously. 
                    16.2.2 The  generator  frame  shall  be  earthed  by  two  separate  and  distinct  connections  to 
                             earth. 
                    16.2.3 Standby Power for Lifts. 
                                16.2.3.1 In a building, where a lift is installed, stand by power shall be provided by 
                                           a self‐contained generator set to operate automatically whenever there is 
                                           a disruption of electrical power supply to the building. 
                                16.2.3.2 Where  only  one  lift  is  installed,  the  lift  shall  transfer  to  standby  power 
                                           within 60 seconds after failure of normal power. 
                                16.2.3.3 Where two or more lifts are controlled by a common operating system, all 
                                           lifts may be transferred to standby power within 60 seconds after failure 
                                           of normal power, or if the standby power source is of insufficient capacity 
                                           to operate all lifts at the same time, all lifts shall be transferred to standby 
                                           power in sequence, shall return to designated landing and discharge their 
                                           load. 
                    16.2.4 Generator Room. 
                                16.2.4.1 For new construction, the generating set should preferably be housed in 
                                           the  substation  building  or  should  be  placed  adjacent  to  the  substation 
                                           room to enable transfer of electrical load with negligible voltage drop as 
                                           well as to avoid transfer of vibration and noise to the main building. 
                                16.2.4.2 For new construction, the generator room should have significant amount 
                                           of  ventilation  and  fitted  with  a  number  of  ceiling  fans.  Appropriate  type 
                                           and  number  of  firefighting  equipment  must  be  installed  inside  the 
                                           generator room. 
                                            
                                                                                                                    Page 67 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                 Electrical Safety Standards 
                                            
                                  16.2.4.3 For  new  construction,  the  generator  engine  exhaust  should  be 
                                           appropriately  taken  out  of  the  building  and  should  preferably  be  taken 
                                           out through any other side except South. The generator oil tank should be 
                                           place  away  from  the  control  panel  side.  In  case  of  gas  engine  generator 
                                           extra precaution must be taken regarding ventilation, leakage to prevent 
                                           explosion. 
                                  16.2.4.4 For new construction, BNBC Table 8.2.9 shows minimum generator room 
                                           area requirement for different sizes of generators. 
                                                            
BNBC Table 8.2.9
Area Requirements for Standby Generator Room
                                     Capacity (kW)                         Area (m2)
                                          1x25                                 20
1x48 24
1x100 30
1x150 36
1x300 48
                                         1x500                                 56
 
          16.3 Changeover Switch of a Standby Generator. 
                     16.3.1 A  standby  generator  is  to  be  connected  at  the  supply  input  point  after  the  energy 
                             meter  and  after  the  main  incoming  switch  or  the  main  incoming  circuit  breaker,  but 
                             through a changeover switch of appropriate rating. The rating of such a switch shall be 
                             at  least  1.25  times  the  rating  of  the  main  incoming  circuit  breaker.  The  changeover 
                             switch shall be of such a type so that when moved to the mains position, there is no 
                             chance that the generator will be connected and vice versa. 
                     16.3.2 The changeover switch may be manual type or automatic type. In both the cases the 
                             changeover  switch  shall  be  properly  made  so  that  there  is  no  chance  of  loose 
                             connection or spark. 
          16.4 Protection of Circuits. 
                     16.4.1 Appropriate protection  shall  be  provided  at  switchboards  and  distribution  boards  for 
                             all  circuits  and  sub  circuits  against  short  circuit  and  overcurrent  and  the  protective 
                             apparatus  shall  be  capable  of  interrupting  any  short  circuit  current  that  may  occur 
                             without danger. 
                              
                              
                                                                                                                   Page 68 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                   Electrical Safety Standards 
                              
                     16.4.2 Where  circuit  breakers  are  used  for  protection  of  main  circuit  and  the  sub‐circuits 
                             derived  therefrom,  discrimination  in  operation  shall  be  achieved  by  adjusting  the 
                             protective devices of the sub‐circuit breakers to operate at lower current settings and 
                             shorter time‐lag than the main circuit breaker. 
                     16.4.3 A  fuse  carrier  shall  not  be  fitted  with  a  fuse  element  larger  than  that  for  which  the 
                             carrier  is  designed.  The  current  rating  of  fuses  shall  not  exceed  the  current  rating  of 
                             the smallest cable in the circuit protected by the fuse. 
         16.5 Protection against Overload Current. 
                     16.5.1 Protective devices shall be provided to break any overload current flowing in the circuit 
                             conductors  before  such  a  current  could  cause  a  temperature  rise  detrimental  to 
                             insulation, joints, terminations or surroundings of the conductors. 
                     16.5.2 The  omission  of  devices  for  protection  against  overload  is  recommended  for  circuits 
                             supplying  current  using  equipment  where  unexpected  opening  of  the  circuit  could 
                             cause danger, for example fire pump circuit. 
                     16.5.3 Protection against Short‐Circuit Currents. Protective devices shall be provided to break 
                             any short‐circuit current flowing in the circuit conductors before such a current could 
                             cause danger due to thermal and 
                             mechanical effects produced in conductors and connections. 
                     16.5.4 Protection against under voltage. 
                                16.5.4.1 Where a drop in voltage, or a loss and subsequent restoration of voltage 
                                             could  imply  dangerous  situations  for  persons  and  property,  suitable 
                                             precautions shall be taken. 
                                16.5.4.2 An  under  voltage  protective  device  is  not  required  if  damage  to  the 
                                             installation  is  considered  to  be  an  acceptable  risk,  provided  that  no 
                                             danger is caused to persons. 
      17 Earthing. 
         17.1 In general all parts of equipment and installation other than live parts shall be earth potential, thus 
              ensuring that persons coming in contact with these parts shall also be at earth potential at all times. 
         17.2 Circuit and System Earthing. 
                     17.2.1 Circuit  and  system  earthing  shall  limit  excessive  voltage  from  line  surges  from  cross‐
                             overs  with  higher  voltage  lines  or  turn  lighting  and  keep  non‐current  carrying 
                             enclosures and equipment at zero potential with respect to earth. 
                     17.2.2 The  value  of  the  earthing  resistance  shall  be  in  accordance  with  the  protective  and 
                             functional requirements of the installation and be continuously effective. 
                     17.2.3 Where  a  number  of  installations  have  separate  earthing  arrangements,  protective 
                             conductors  running  between  any  two  of  the  separate  installations  shall  either  be 
                             capable  of  carrying  the  maximum  fault  current  likely  to  flow  through  them  or  be 
                             earthed within one installation only and insulated from the earthing arrangements of 
                             any  other  installation.  In  the  latter  circumstances,  if  the  protective  conductor  forms 
                             part  of  cables  the  protective  conductor  shall  be  earthed  only  in  the  installation 
                             containing the associated protective device. 
                                                                                                                      Page 69 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                        Electrical Safety Standards 
                             
          17.3 Methods of Earthing. 
                    17.3.1 General.  The  three  main  elements  required  for  an  earthing  system  are  earth 
                            conductors, earthing lead and earth electrodes. 
                    17.3.2 Earth Conductors. 
                                17.3.2.1 Earth  conductors  are  the  part  of  the  earthing  system  which  joins  all  the 
                                          metal parts of an installation. 
                                17.3.2.2 In  all  eases  the  grounding  conductor  shall  be  made  of  copper  or 
                                          galvanized steel or other metals or combination of metals which will not 
                                          corrode  excessively  and,  if  practical,  shall  be  without  joints  or  splice.  If 
                                          joints  are  unavoidable,  they  shall  be  made  and  maintained  so  as  not  to 
                                          materially  increase  the  resistance  of  the  earthing  conductor  and  shall 
                                          have appropriate mechanical and corrosion resistant characteristics. 
                                17.3.2.3 Aluminum or copper clad aluminum conductors shall not be used for final 
                                          connections to earth electrodes. 
                                17.3.2.4 The  earth  conductor  shall  have  a  short  time  capacity  adequate  for  the 
                                          fault current which can flow in the grounding conductor or conductors for 
                                          the operating time of the system protective device. In case of copper wire 
                                          being used as earth conductors, the size of the wire shall not be less than 
                                          half  the  area  of  the  largest  current  carrying  conductor  supplying  the 
                                          circuit. 
                                17.3.2.5 BNBC  Table  8.2.11  gives  the  minimum  sizes  of  copper  earth  conductors 
                                          corresponding  to  the  sizes  of  associated  copper  circuit  conductors.  No 
                                          size smaller titan 14 SWG shall be used anywhere as earth conductor. 
                                                            
                                                 BNBC Table 8.2.11 
                          Minimum Cross‐sectional Area of Copper Earth Conductors 
                             in Relation to the Area of Associated Phase Conductors 
                   Cross‐sectional Area of Phase Conductor(s) 
                                                                       Minimum Cross‐sectional Area of the 
                                                                         Corresponding Earth Conductor 
                                                                                      (mm2)
                                     (mm2)
                  Less than 16                                   Same as cross‐sectional area of phase conductor 
                                                                 but not less than 14 SWG 
16 or greater but less than 35 16
35 or greater Half the cross‐sectional area of phase conductor
                                                                                                                        Page 70 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                     Electrical Safety Standards 
          17.4 Earth Lead. 
                     17.4.1 The earth conductor shall be brought to  one or more  connecting points according to 
                              size  of  installation;  the  copper  wire  earthing  leads  shall  run  from  there  to  the 
                              electrodes. 
                     17.4.2 Earthing lead can either be of copper wire or of copper strands. 
                     17.4.3 Earthing leads shall be run in duplicate down to the earth electrode so as to increase 
                              the  safety  factor  of  the  installation.  Copper  wire  used  as  earthing  lead  must  not  be 
                              smaller than 8 SWG (12 mm2). 
          17.5 Earth Electrodes. 
                     17.5.1 The  earth  electrode  shall  as  far  as  practicable  penetrate  into  permanently  moist  soil 
                              preferably  below  ground  water  table.  The  resistance  of  the  electrodes  shall  not  be 
                              more than one ohm. 
                     17.5.2 The  following  types  earth  electrodes  are  recognized:  Copper  rods,  copper  plates, 
                              galvanized iron pipes. 
                     17.5.3 The  following  is  a  guideline  for  electrode  size:  Copper  rods  shall  have  a  minimum 
                              diameter  of  12.7  mm,  GI  pipes  shall  have  a  minimum  diameter  of  50  mm,  copper 
                              plates shall not be less than 600 mm x 600 mm in size, with 6mm thickness. 
          17.6 Lightning Protection. 
                     17.6.1 A  building  shall  have  protection  against  lightning  depending  on  the  probability  of  a 
                              stroke and acceptable risk levels. Steps shall be taken for  an objective  assessment of 
                              the risk and of the magnitude of the consequences of lightning strikes following BNBC 
                              Part  8,  section  2.9.  The  marginal  Risk  Index  shall  be  40.  Structures  higher  than  53  m 
                              (174 ft) require protection in all cases. 
                     17.6.2 A complete lightning protection system shall consist of air termination network, down 
                              conductors and earth termination. 
          17.7 Air Termination Network.  
               The  air  termination  network  is  that  part  which  is  intended  to  intercept  lightning  discharges.  It 
               consists of vertical and horizontal conductors arranged to protect the required area. No part of the 
               roof should be more than 9 m (30 ft) from the nearest horizontal conductor except that an additional 
               0.3 m (1 ft) may be added for each 0.3 m (1 ft) or part thereof by which the part to be protected is 
               below the nearest conductor. 
          17.8 Down Conductor. 
                     17.8.1 The down conductor is the conductor which runs from the air termination to the earth 
                              termination.  A  building  with  a  base  area  not  exceeding  100  m2  (1,076  ft2)  shall  be 
                              provided  with  one  down  conductor.  For  a  large  building  there  shall  be  one  down 
                              conductor for the first 100 m2 (1,076 ft2) plus a further one for every 300 m2 or part 
                              thereof in excess of the first 100 m2 (1,076 ft2). Alternatively, for a larger building one 
                              down  conductor  may  be  provided  for  every  30  m  (100  ft)  of  perimeter.  The  number 
                              chosen  can  be  the  smaller  of  the  numbers  given  by  these  alternative  methods  of 
                              calculation. 
                               
                                                                                                                       Page 71 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                Electrical Safety Standards 
                             
                             
                     17.8.2 The material used for lightning conductors must be aluminum or copper. The criterion 
                            for design is to keep the resistance from air termination to earth to a minimum. 
          17.9 Earth Termination. 
                     17.9.1 The earth termination is that part which discharges the current into the general mass 
                            of the earth. The total resistance of an electrode for a lightning protection system must 
                            not exceed 10 ohms. 
                     17.9.2 The  lightning  protection  system  ground  terminals  shall  be  bonded  to  the  building  or 
                            structure grounding electrode system. 
                     17.9.3 Recommended  dimensions  for  various  components  of  lightning  arrester  are  given  in 
                            Table  4.6.  Larger  conductors  should  however  be  used  if  the  system  is  unlikely  to 
                            receive regular inspection and maintenance. 
                                                            
                                                 BNBC Table 8.2.14 
                            Sizes of the Components of Lightning Protection Systems 
                                          Components                                Minimum Dimensions
               Air Terminations 
Aluminium and copper strip 20 mm x 3 mm
Aluminium, aluminium alloy, copper and phosphor bronze rods
Standard copper conductors 19 strands of 2.5 mm
                                                                                 19 strands of 1.8 mm 
               Down Conductors 
                                                                                    20 mm x 3 mm 
               Aluminium and copper strip 
                                                                                      10 mm dia 
               Aluminium, aluminium alloy and copper rods 
               Earth Terminations 
                                                                                      12 mm dia 
               Hard drawn copper rods for driving into soft ground 
                                                                                           
               Hard  drawn or  annealed  copper  rods for indirect driving or         10 mm dia 
               laying in ground 
                                                                                      12 mm dia 
               Phosphor bronze for  hard ground 
                                                                                      10 mm dia
               Copper clad steel for hard ground
                                                                                                                Page 72 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                   Electrical Safety Standards 
                     17.9.4 External metal on a building should be bonded to the lightning conductor with bonds 
                             at least as large as the conductor. 
      18 Illumination of Exit Signs and Means Of Escape. 
         18.1 Exit Signs. 
                     18.1.1 All required exit signs shall be illuminated continuously at all times. 
                     18.1.2 Exit  signs  may  be  illuminated  either  by  lamps  external  to  the  sign  or  by  lamps 
                             contained within the sign. The source of illumination shall provide not less than 50 lux 
                             at the illuminated surface with a contrast of not less than 0.5. Approved self‐luminous 
                             signs  which  provide  evenly  illuminated  letters  having  a  minimum  luminance  of 
                             0.2cd/m2 may also be used. 
                     18.1.3 Emergency  power.  Lighting  for  exit  signs  shall  either  be  provided  with  emergency 
                             power or battery backup. 
                     18.1.4 Inspection and  testing.  Emergency power  for exit  signs shall be verified at least once 
                             per year. If battery‐operated signs are used, these lights shall be tested on a monthly 
                             basis. Functional testing of battery powered signs shall be provided for a minimum 90 
                             min once per year. 
         18.2 Means of egress. 
                     18.2.1 Illumination. The means of egress paths shall be illuminated at all times the building is 
                             occupied.  Illumination  shall  be  a  minimum  of  10  lux  for  all  corridors,  exit  doors,  and 
                             stairways. Aisles shall be provided with a minimum 2.5 lux. 
                     18.2.2 Emergency  power.  Means  of  egress  illumination  shall  be  provided  with  emergency 
                             power or supplemented with battery powered lights that provide minimum 10 lux for 
                             no less than 30 min in the event of failure of normal lighting. 
                     18.2.3 Inspection  and  testing.  Emergency  power  for  means  of  egress  illumination  shall  be 
                             verified at least once per year. If battery operated lights are used, these lights shall be 
                             tested  on  a  monthly  basis.  Functional  testing  of  battery  powered  lights  shall  be 
                             provided for a minimum 30 min once per year. 
         18.3 Battery  Systems.  Battery  systems  used  to  provide  standby  or  emergency  power  shall  be  installed, 
              tested and maintained in accordance with NFPA 111. 
         18.4 Generators. Generators used to provide standby or emergency power shall be installed, tested, and 
              maintained in accordance with NFPA 110. 
               
      19 Inspection and Testing. 
         19.1 General. Every installation shall, on completion and before being energized, be inspected and tested. 
              The  methods of test  shall be such  that no danger to persons or property  or damage to equipment 
              occurs even if the circuit tested is defective. 
         19.2 Periodic  Inspection  and  Testing.  Periodic  inspection  and  testing  shall  be  carried  out  in  order  to 
              maintain the installation in a sound condition after putting it into service. Where an addition is to be 
              made to the fixed wiring of an existing installation, the latter shall be examined for compliance with 
              the recommendations of this Standard. 
                                                                                                                     Page 73 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                      Electrical Safety Standards 
                
          19.3 Checking  the  conformity  with  the  Bangladesh  Standard.  The  individual  equipment  and  materials 
               which form part of the installation shall generally conform to the relevant Bangladesh Standard (BDS) 
               wherever  applicable.  If  there  is  no  relevant  Bangladesh  standard  specification  for  any  item,  these 
               shall be approved by the appropriate authority. 
          19.4 Insulation Tests. 
                      19.4.1 For  new  installations,  insulation  resistance  test  shall  be  made  on  all  electrical 
                             equipment, using a self‐ contained instrument such as the direct indicating ohm‐meter 
                             of the generator type. DC potential shall be used in these tests and shall be as follows 
                             or an appropriate Meggar: 
                             (1) Circuits below 230 volts 500 volts Meggar 
                             (2) Circuits between 230 volts to 400 volts 1000 volts Meggar
                      19.4.2 The  minimum  acceptable  insulation  resistance  value  is  5  mega  ohms  for  LT  lines. 
                               Before  making  connections  at  the  ends  of  each  cable  run,  the  insulation  resistance 
                               measurement test of each cable shall be made. Each conductor of a multi‐core cable 
                               shall  be  tested  individually  to  all  other  conductors  of  the  group  and  also  to  earth.  If 
                               insulation resistance test readings are found to be less than the specified minimum in 
                               any conductor, the entire cable shall be replaced. 
                      19.4.3 All  transformers,  switchgears  etc.  shall  be  subject  to  an  insulation  resistance 
                               measurement  test  to  ground  after  installation  but  before  any  wiring  is  connected. 
                               Insulation tests shall be made between open contacts of circuit breakers, switches etc. 
                               and between each phase and earth. 
          19.5 Earth Resistance Test. 
                      19.5.1 Earth resistance tests shall be made on the system, separating and reconnecting each 
                               earth connection using earth resistance meter. 
                      19.5.2 The electrical resistance of the earth continuity conductor together with the resistance 
                               of  the  earthing  lead  measured  from  the  connection  with  the  earth  electrode  to  any 
                               other position in the completed installation shall not exceed 1 ohm. 
                      19.5.3 Where  more  than  one  earthing  sets  are  installed,  the  earth  resistance  between  two 
                               sets shall be measured by means of resistance bridge instrument. The earth resistance 
                               between two sets shall not exceed 1 ohm. 
          19.6 Operation  Tests.  Current  load  measurement  shall  be  made  on  equipment  and  on  all  power  and 
               lighting feeders. The current reading shall be taken in each phase wire and in each neutral wire while 
               the circuit or equipment is operating under actual load conditions. Clamp on ammeters may be used 
               to take current readings without interrupting a circuit. All light fittings shall be tested electrically and 
               mechanically  to  check  whether  they  comply  with  the  standard  specifications.  Fluorescent  light 
               fittings shall be tested so that when functioning no flickering or choke singing is felt. 
          19.7 Inspection  of  the  Installation.  On  completion  of  wiring  a  general  inspection  shall  be  carried  out  by 
               competent personnel in order to verify that the provisions of this Standard and that of the Electricity 
               Act of Bangladesh have been complied with. 
                
                                                                                                                         Page 74 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                               Electrical Safety Standards 
                
                    19.7.1 Inspection  of  Substation  Installations.  In  substation  installations,  it  shall  be  checked 
                           whether: 
                           (1) Phase to phase and phase to earth clearances are provided as required; 
                           (2) All equipment are efficiently earthed and properly connected to the required 
                                number of earth electrodes; 
                           (3) The required ground clearance to live terminals is provided 
                           (4) Suitable fencing is provided with gate with lockable arrangements; 
                           (5) The required number of caution boards, fire‐fighting equipment, operating rods, 
                                rubber mats, etc., are kept in the substation; 
                           (6) In case of indoor substation sufficient ventilation and draining arrangements are 
                                made; 
                           (7) All cable trenches have covers of noninflammable material; 
                           (8) Free accessibility is provided for all equipment for normal operation; 
                           (9) All name plates are fixed and the equipment are fully painted; 
                           (10) All construction materials and temporary connections are removed; 
                           (11) Oil level , bus bar tightness, transformer tap position, etc. are in order; 
                           (12) Earth pipe troughs and cover slabs are provided for earth electrodes/earth pits and 
                                the neutral and LA earth pits are marked for easy identification; 
                           (13) Earth electrodes are of GI pipes or CI pipes or copper plates. For earth connections, 
                                brass bolts and nuts with lead washers are provided in the pipes/plates; 
                           (14) Earth pipe troughs and oil sumps/pits are free from rubbish, dirt and stone jelly 
                                and the earth connections are visible and easily accessible; 
                           (15) HT and LT panels and switchgears are all vermin and damp‐ proof and all unused 
                                openings or holes are blocked properly; 
                           (16) The earth bus bars have tight connections and corrosion free joint surfaces; 
                           (17) Control switch fuses are provided at an accessible height from ground; 
                           (18) Adequate headroom is available in the transformer room for easy topping‐ up of 
                                oil, maintenance, etc.; 
                           (19) Safety devices, horizontal and vertical barriers, bus bar covers/shrouds, automatic 
                                safety shutters/door interlock, handle interlock etc. are safe and in reliable 
                                operation in all panels and cubicles; 
                           (20) Clearances in the front, rear and sides of the main HT and LT and sub‐switch 
                                boards are adequate; 
                           (21) (21) The switches operate freely; the 3 blades make contact at the same time, the 
                                arcing horns contact in advance; and the handles are provided with locking 
                                arrangements, 
                           (22) Insulators are free from cracks, and are clean; 
                           (23) In transformers, there is no oil leak; 
                           (24)  Connections to bushing in transformers are light and maintain good contact; 
                           (25) Bushings are free from cracks and are clean; 
                                 
                                                                                                                 Page 75 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                           Electrical Safety Standards 
                                 
                           (26) Accessories of transformers like breathers, vent pipe, buchholz relay, etc. are in 
                                order; 
                           (27) Connections to gas relay in transformers are in order; 
                           (28) In transformers, oil and winding temperature are set for specific requirements to 
                                pump out; 
                           (29) In case of cable cellars, adequate arrangements exist to pump off water that has 
                                entered due to seepage or other reasons; and 
                           (30) All incoming and outgoing circuits of HT and LT panels are clearly and indelibly 
                                labeled for identifications. 
                    19.7.2 Inspection  of  Medium  Voltage  Installation.  In  Medium  Voltage  (MV)  Installations,  it 
                           shall be checked whether: 
                           (1) All blocking materials that are used for safe transportation in switchgears, 
                                contactors, relays, etc. are removed; 
                           (2) All connections to the earthing system have provisions for periodical inspection; 
                           (3) Sharp cable bends are avoided and cables are taken in a smooth manner in the 
                                trenches or alongside the walls and ceilings using suitable support clamps at 
                                regular intervals; 
                           (4) Suitable linked switch or circuit breaker or lockable push button is provided near 
                                the motors/apparatus for controlling supply to the motor/apparatus in an easily 
                                accessible location; 
                           (5) Two separate and distinct earth connections are provided for the motor apparatus; 
                           (6) Control switch fuse is provided at an accessible height from ground for controlling 
                                supply to overhead traveling crane, hoists, overhead bus bar trunking; 
                           (7) The metal rails on which the crane travels are electrically continuous and earthed 
                                and bonding of rails and earthing at both ends are done; 
                           (8) Four‐core cables are used for overhead travelling crane and portable equipment, 
                                the fourth core being used for earthing, and separate supply for lighting circuit is 
                                taken; 
                           (9) If flexible metallic hose is used for wiring to motors and other equipment, the 
                                wiring is enclosed to the full lengths, and the hose secured properly by approved 
                                means; 
                           (10) The cables are not taken through areas where they are likely to be damaged or 
                                chemically affected; 
                           (11) The screens and armors of the cables are earthed properly; 
                           (12) The belts of belt driven equipment are properly guarded; 
                           (13) Adequate precautions are taken to ensure that no live parts are so exposed as to 
                                cause danger; 
                           (14) Installed Ammeters and voltmeters work properly and are tested; and 
                           (15) The relays are inspected visually by moving covers for deposits of dusts or other 
                                foreign matter. 
                                 
                                                                                                             Page 76 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                           Electrical Safety Standards 
                                 
                    19.7.3 Inspection of Overhead Lines. For overhead lines, every care must be taken so that: 
                           (1) All conductors and apparatus including live parts thereof are inaccessible; 
                           (2) The types and size of supports are suitable for the overhead lines/conductors used 
                                and are in accordance with approved drawing and standards; 
                           (3) Clearances from ground level to the lowest conductor of overhead lines, sag 
                                conditions, etc. are in accordance with the relevant standard; 
                           (4) Where overhead lines cross the roads suitable grounded guarding shall be 
                                provided at road crossings,  
                           (5) Where overhead lines cross each other or are in proximity with one another, 
                                suitable guarding shall be provided at crossings to protect against possibility of the 
                                lines coming in contact with one another; 
                           (6) Every guard wire shall be properly grounded / earthed; 
                           (7) The type, size and suitability of the guarding arrangement provided shall be 
                                adequate; 
                           (8) Stays cables must be provided suitably with the overhead line carrying poles as 
                                required and shall be efficiently earthed at the bottom and shall be provided with 
                                suitable stay insulators of appropriate voltages; 
                           (9) Anti‐climbing devices and Danger Board/Caution Board Notices are provided on all 
                                HT supports; 
                           (10) Clearances along the route are checked and all obstructions such as trees/branches 
                                and shrubs are cleared on the route to the required distance on either side; 
                           (11) Clearance between the live conductor and the earthed metal parts are adequate; 
                                and 
                           (12) For the service connections tapped off from the overhead lines, cutouts of 
                                adequate capacity are provided. 
                    19.7.4 Inspection of Lighting Circuits. The lighting circuits shall be checked to see whether: 
                           (1) Wooden boxes and panels are avoided in factories for mounting the lighting 
                                boards, switch controls, etc.; 
                           (2) Neutral links are provided in double pole switch fuses which are used for lighting 
                                control, and no fuse is provided in the neutral; 
                           (3) The plug points in the lighting circuit are all 3‐ pin type, the third pin being suitably 
                                earthed; 
                           (4) Tamper proof interlocked switch socket and plug are used for locations easily 
                                accessible; 
                           (5) Lighting wiring in factory area is enclosed in conduit and the conduit is properly 
                                earthed, or alternatively, armored cable wiring is used; 
                           (6) A separate earth wire is run in the lighting installation to provide earthing for plug 
                                points, fixtures and equipment; 
                           (7) Proper connectors and junction boxes are used wherever joints are in conductors 
                                or cross‐over of conductors takes place; 
                           (8) Cartridge fuse units are fitted with cartridge fuses only. 
                                                                                                             Page 77 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                                Electrical Safety Standards 
                                       
                           19.7.5 Electrical Inspections. 
                                  (1) Records of initial testing as well as subsequent testing shall be maintained onsite. 
        20 Elevators 
                     20.1.1 General. Elevators shall be installed in accordance with BNBC Part 8 Chapter 5 and 5.9 
                            of this Standard. 
        21 Naked lights. 
                     21.1.1 Light fixtures without protective covers (otherwise known as naked lights) shall not be 
                            allowed  in  storage  areas  or  in  any  area  where  the  Inspector  of  the  Factories  Rules 
                            (1.6.3.7) Part 53 disallows these fixtures. 
                     21.1.2 Signs shall be posted in Bengali and English, indicating this prohibition at all entrances 
                            to these areas. 
                             
Sources
http://www.guardian.co.uk/world/2013/apr/29/inside‐bangladesh‐garment‐factories 
http://www.guardian.co.uk/world/2013/may/01/bangladesh‐workers‐protest‐may‐day‐building‐collapse 
http://www.bbc.co.uk/news/business‐22296645 
http://online.wsj.com/article/SB10001424127887324766604578458802423873488.html 
http://www.bbc.co.uk/news/business‐22382329 
http://www.labourbehindthelabel.org/urgent‐actions/item/1134‐bangladeshi‐factory‐fire‐families‐of‐victims‐continue‐to‐wait 
http://www.huffingtonpost.com/2013/05/02/bangladesh‐garment‐blame‐retailers_n_3204245.html 
http://in.reuters.com/article/2013/05/02/bangladesh‐garments‐idINDEE9410IZ20130502 
http://m.guardiannews.com/commentisfree/2012/dec/13/apparel‐industry‐outsourcing‐garment‐workers‐bangladesh 
http://www.business‐standard.com/article/pti‐stories/building‐collapse‐2‐infants‐born‐under‐debris‐rescued‐113042600593_1.html 
http://www.supplychaindigital.com/global_logistics/eti‐announces‐its‐bangladesh‐fire‐and‐building‐safety‐plan 
http://m.irinnews.org/Report/97945/Lessons‐from‐Bangladesh‐garment‐factory‐collapse 
http://qz.com/77717/political‐unrest‐is‐killing‐bangladeshs‐low‐cost‐manufacturing‐appeal/ 
http://www.theatlanticcities.com/commute/2012/08/meet‐dhaka‐worlds‐densest‐city/2923/ 
http://www.bangladeshworkersafety.org/files/Alliance_Assessment_Protocols.pdf 
http://www.bangladeshworkersafety.org/files/Alliance%20Fire%20Safety%20and%20Structural%20Integrity%20Standard.pdf  
 
Tags:  Bangladesh, building codes, fire safety, garment factory, garment factory collapse, informality, lack of safety regulations, sub 
contracting, western retailers 
                                                                                                                                     Page 78 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                 Report on Safety Assessments 
Report on Safety Assessments 
         
        The  writer  of  this  document  is  the  founder  CEO  of  Uttaron  Technologies.  Uttaron  Technologies  from  its 
inception in 1995 is doing all sorts of Engineering Works including consultancy for various types of clients. With the 
recent  development  in  concept  and  meaning  of  safety,  UT  has  started  factory  inspections  since  last  three  years. 
Which is a new concept but fundamentally it is an implementation of the expertise in a systematic way only. 
 
        Following  the  rules,  codes  and  guidelines  is  must  to  avoid  any  sorts  of  disaster  causes  from  fire  due  to 
unplanned  installation,  maintenance  and  follow‐up.  UT  does  the  assessments  in  compliance  with  the  regulations, 
prepare  the  report  with  the  list  of  areas  to  improve  and  provide  guidelines  to  build  the  capacity  to  mitigate  the 
disasters within the limitations.   
 
UT finds the weak areas, where to concentrate for an installation. Weakness, itself is a vast in meaning. We defined 
the  weakness  for  the  factories  in  a  systematic  way.    Generally  the  incident  for  garments  manufacturing  factories 
indicates the following issues to concentrate, still prevalent in many units. 
 
             1.    Congested, non‐ventilated, ill‐lit, hot and humid 
             2.    Escape route are crammed with work‐tops and combustible materials 
             3.     Improper wiring and electrical design, illegal connections 
             4.    Absence of Fire Marshals 
             5.    Careless smoking and heating habits 
 
Consideration during Assessment 
UT has developed the way in line with the guidelines and codes from different institutes and bodies to approach the 
shortfalls of this RMG industry in Bangladesh. In the assessment phase the following things are addressed 
 
             1.    Effective implementation of inadequate legislation 
             2.    Building plan 
             3.    Unauthorized change in building use 
             4.    Provision of single operational staircase 
             5.    Presence of escape routes and hindrance of escape by congestion and sealed exits 
             6.    Presence of security measures driven to extremes, causing safety hazards 
             7.    Presence of waste disposal and maintenance pattern 
             8.    Use of combustible materials for finish and interior works 
             9.    Smoking habits 
             10.   Use of heat appliances 
             11.   Installation and operation of electrical connections and equipment 
             12.   Maintenance pattern of electrical installations 
             13.   Presence of emergency training and drill involving employees 
             14.   Presence of adequate detection and alarm systems 
             15.   Presence of appropriate notices, signs and symbols 
             16.   Accessibility into the buildings to fight the fire 
             17.   General awareness regarding the dangers of fire 
 
 
 
                                                                                                                        Page 79 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                               Report on Safety Assessments 
 
Methodology 
A fire hazard is anything that may cause a fire to start. List the fire hazards including building facilities, electrical short 
circuits, ignition, fuel, and oxygen sources. In a garments factory it may include boiler room, stores, raw materials, 
heater, laundry, gas cylinder, and oven, etc. Mitigating the hazards, the following steps are done 
 
             a. Electrical System 
                This cluster  is  for Electrical Network  starting from the substation/power plant to the nodes, where 
                the equipment, accessories, machines and appliances are connected. 
                  
                     i.   Electrical  Drawing‐  Checking  the  electrical  drawing  and  to  give  unique  identity  of each  and 
                          every  individual component  in  the  network.  Where  there  is  absence  of electrical drawings, 
                          our Engineer prepares a single line diagram to ease the whole process 
                     ii. Thermography‐ Thermal Imaging of the control points and main cables 
                     iii.     Actual condition of the network‐ 
                           Measuring of Loads, Voltages in different nodes and control switches 
                           Measuring of OFF Load and ON Load Currents 
                           Measuring of leakage current 
                           Insulation resistance checking 
                           Earth resistance checking 
                           Selection of cables, wires and breakers are compared with charts 
                           Physical checking of the electrical joints and connection on the basis of thermal images 
                           Power  analyzing  may  require  to  understand  the  overall  power  quality  from  the 
                             commercial  source.  This  will  facilitate  the  understanding  on  various  component  of  the 
                             power that using by the factory 
                     iv. Checking  the  competence  of  the  Engineers  and  Electricians‐  Educational  background  and 
                          experiences are checked to find the eligibility to carry out the assigned responsibilities. Also 
                          the habit of using PPE and awareness of the personnel on following the safety measures are 
                          evaluated. 
                           
             b. Fire Safety  
                This cluster is for the finding the risks to fire, availability of fighting equipment, creating awareness, 
                building and training a team to act in emergency 
                  
                     i. Identify and listing the following issues 
                     ii. Checking  the  log,  data  sheet  or  information  to  understand  the  pattern  of  using  of  boiler, 
                           heater,  gas  cylinder,  oven  any  other  hazarders  accessories  or  appliances  for  developing  a 
                           guideline complying to the codes and regulations 
                     iii. General cleanliness‐ Whether accumulation of rubbish can cause fire by being ignited 
                     iv.       Functional hazard‐ Whether process and use of any machinery can cause fire 
                     v. Smoking  behavior‐  Whether  'No  Smoking'  sign  is  strictly  observed,  and  whether  smoking 
                           habits are increasing the possibility of a fire 
                     vi. New  Materials‐  Whether  new  materials  have  been  included  which  might  have  an  adverse 
                           effect on Fire Load 
                     vii. Training  of  staff‐  Whether  staff  has  been  trained  to  take  charge  during  any  emergency,  to 
                           operate fire‐fighting equipment, etc.  
                     viii. Fire Drill‐ Whether drills are held at least twice a year in which all the workers and staff takes 
                           part. 
                            
                                                                                                                     Page 80 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                Report on Safety Assessments 
                          
                   ix. Warning and alarm system‐ Whether installed, operational and understood 
                   x. Firefighting equipment‐ Whether the condition of extinguisher, sprinkler system, hose reels, 
                         etc. meet safety requirements 
                   xi. Means of Escape‐ Whether requisite number of doors and outlets are in operation for timely 
                         escape by all workers and staff; whether aisles, corridors, lounge, lobby and foyer are clear of 
                         any furniture, material, rubbish, etc.  
                   xii. Assembly Point‐ Whether a safe assembly point, sufficient to accommodate all the workers 
                         and staff, has been earmarked and displayed as such within safe distance from the factory 
                   xiii. Fire Services: Whether the telephone number of the Fire Services is known and whether the 
                         telephone system is reliable and accessible to the staff during any emergency 
                   xiv. Listing  the  people  who  are  at  risk  from  fire  or  smoke.  Identifying  where  people  would  be 
                         stationed in case of fire and who specifically at risk. 
                   xv. Design for fire safety: 
                         A good and safe factory building should meet the following (list is not exhaustive) 
                          Capacity: number of workers will determine number of doors, size of entry/exits 
                          Layout:  volume  per  person,  aisle  width,  floor  finish  and  distance  to  exit  should  meet 
                            standards; congestion should not impede escape 
                          Building and finish materials: determines Fire Load 
                          Emergency Lighting: to make escape possible when power is cut off in a fire 
                          Means  of  Escape:  each  person  should  be  able  to  escape  to  a  place  of  safety  unaided 
                            within 2.5 minutes of starting a fire 
                          Number and location of fire extinguishers: based on size and proper utilization of spaces 
                          Sprinkler system: depending on height, space should have an overhead sprinkler system 
                          Early detection and warning systems: Smoke detectors, prerequisite for maximum safety 
                          City  Traffic:  location  of  the  factory,  its  surroundings,  neighboring  land‐use,  traffic 
                            congestion, pattern and behavior, width and turning radii of roads, over‐bridge clearance, 
                            etc. 
                          Water requirement: availability of water, size of reservoir, type of riser (dry/wet) 
                          Assembly Point:  place  for escapees  to assemble  so  that  every  person  supposed  to be  in 
                            the factory building can be accounted for, drill 
 
           c. Building Envelope (Factory Building) 
              This cluster is for inspecting existing buildings, emphasis is laid on the following: 
                
                   i. Visit the site / building physically 
                   ii. Collect  the  layout  &  structural  drawings  if  any  or  take  interview  of  Engineer  /  Mason  who 
                         have done the job during construction or physically take the structural members dimension 
                   iii. Knowing the production of concrete and its strength if sample test done. 
                   iv. Reinforcement/ Ms bar tensile strength. 
                   v. Collect the soil report or execute sub soil investigation. 
                   vi. Past use of the different floor (s) 
                   vii. Age‐ how many years it is constructed 
                   viii. Building  design,  addition  and/or  alteration‐  Whether  any  change  has  been  made  to  the 
                         building  since  it  received  planning  permission,  either  structurally  or  with  regards  to  finish 
                         materials, number of exits, size of exits, etc. 
                   ix. Number of workers‐ Whether number has increased 
                   x. Then execute the calculation of different structural members with its stability 
                          
                                                                                                                      Page 81 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                                  Report on Safety Assessments 
                           
            d. Tools,  Codes  and  Regulations‐  Using  of  calibrated  certified  world  class  equipment  is  one  of  the 
               factors, which makes us different from the others. We follow the BNBC (Bangladesh National Building 
               Code),  BER  (Bangladesh  Electricity  Rules  1937),  IEC  (  International  Electrotechnical  Commission), 
               NEMA standards (National Electrical Manufacturer Association), IEEE (The Institute of Electronics and 
               Electrical Engineers), NFPA Codes (National Fire Protection Association, USA), BS (British Standards), 
               Alliance  Standards,  Accord  Standards,  Different  guidelines  from  Local  Fire  and  Civil  Defense 
               Authority, Best Engineering Practice and CoC (Client’s Code of Conduct) 
            e. Record findings to implement them.  
                           
Improvement on findings 
Depending on the findings at assessment level, improvement as per codes and regulations may required at following 
levels to mitigate any fire incidents 
 
            1. Detection/Notification: System building on finding out that there is a fire, as early as possible, letting 
               all building occupants know about it, and notifying fire service to respond. 
            2. Emergency  Egress  (escape):  Ensuring  on  having  ways  to  exit  the  building  safely  and  to  make  sure 
               everyone is out. 
            3. Incipient  Suppression:  Ensuring  the  presence  of  automatic  sprinkler  systems,  fire  hoses  (provided 
               water  is  available)  and  portable  fire  extinguishers  that  can  put  the  fire  out  in  its  early  stage  (i.e. 
               within 3 minutes). 
            4. Electrical  System:  Starting  from  the  substation  (electricity  entrance  or  generating  point)  to  user 
               points may need some up‐gradation, rewiring, redesigning, etc. and 
            5. Changing, rectification or replacement of any process, system, layout, and etc. as per requirement. 
            6. Evaluate the risk and decide on precautions. The risk is the chance (high, medium, or low) of starting 
               a fire at any place without notice. Decide what is being done or can be done to reduce or remove the 
               risk. 
            7. Review on implementation 
 
Capacity Building 
Findings from the assessment and improvement phases, there might be numerous recommendations to improve the 
overall safety of the factories. The management will need to focus on the following issues to ensure the overall safety 
of the factory as well as the workers and financial loses. 
 
            0. Factory Building‐ Base on the findings, recommendation(s) will be incorporated in the report. Some 
               of them might be a major capital expenditure and some them might be a minor renovation. Giving 
               the priority on the urgency and risk, execution plan should be followed as per recommendation from 
               assessment and improvement phases. 
            1. Electrical  Safety‐  There  might  be  a  need  of  replacing  controls,  gears,  modification,  renovation,  re‐
               wiring,  etc.,  which  need  to  be  executed  as  per  following  the  recommendations  prepared  on  codes 
               and regulations. Moreover, proper training sought to the existing staff for a better response. 
            2. Fire Safety‐ Base on the findings, recommendation(s) will be incorporated in the report. A complete 
               list of existing equipment, new requirement basis on building envelope and numbers of workers and 
               nature of uses will ease the management on further investment. Report will includes the following  
                     i. Guideline on Train all workers on such procedures to take charge during any emergency, to 
                         operate fire‐fighting equipment, etc. 
                    ii. Capacitate management to run such training in the future at least twice a year in which all 
                         the workers and staff takes part. 
                   iii. Identify and train a corps of “fire safety marshals” to assist in case of fire 
                          
                                                                                                                          Page 82 of 188 
 
Safety Issues in Readymade Garments Factories in Bangladesh 
                                                                                           Report on Safety Assessments 
                        
                    iv.Preparing  a  comprehensive  guideline  to  capacitate  management  and  marshals  in  regular 
                       record keeping (safety check list, drills, etc.) in line with international standards 
         3. Core  Team‐  Identifying  a  team  consisting  members  from  Engineering  and  Management  group  to 
              keep continuous monitoring on implementation the recommendations and rectification. This group 
              will  ensure  the  overall  safety  issues  by  following  the  recommended  codes  and  regulations  with  a 
              close  coordination  to  the  consultant.  This  group  may  define  as  “Safety  Committee”.  Size  of  the 
              committee depends on the numbers of the workers and volume of the factory. 
Deliverable  
After proper assessment and consequent survey on the total installation the following documents, information will 
be  prepared  and  presented  to  the  management  for  further  review  and  ease  the  modification,  rectification  and 
renovation works for each area.  
 
            1. Building Health 
               Compiling all data and information gathered from calculation and physical verification a SUMMARY 
               OF THE FINDING will be included in the report submission focusing on the following issues. 
                        Structural Strength 
                        Building is sound or not for further modification or extension 
                        Recommendation on any further improvements, modification and extension 
                 
            2. Electrical Safety 
               Grouping the risks in the category of High, Medium and Low Hazards and physical existing condition 
               of  the  Electrical  Network  a  SUMMARY  OF  THE  FINDING  will  be  included  in  the  report  submission 
               focusing on the following issues to ease the further initiatives for the corrective measures. 
                          Single Line Drawing, if previously not present at site 
                          Thermography Report for easy locating the faults 
                          Classification of Hazards supported by captured pictures 
                          Measurement Data sheet 
                          Recommendation  on  strengthening  the  capability  of  the  existing  staff  and  new 
                            recruitment if required 
 
            3. Fire Safety 
               Grouping the risks in the category  of High,  Medium  and Low and physical existing  condition of the 
               fire safety issue a SUMMARY OF THE FINDING will be included in the report submission focusing on 
               the following issues to ease the further initiatives for the corrective measures. 
                         Data on existing physical condition of the systems and equipment 
                         Recommendation(s) on aligning the existing system with the conformity to the codes and 
                           regulations 
                         List of the system(s) or equipment to meet the conformity to the codes and regulations to 
                           ensure the full proof safety 
                         List of the potential staff to be trained 
                         Guideline and schedule on training the selected staffs 
                         Guidelines and plan for the staff and workers to follow in emergency 
                         Providing the format for the record keeping 
 
                                                                                                                Page 83 of 188 
 
 
Sample Report
                                      Report on Assessment of the 
                            Structural, Electrical and Fire Safety 
                            ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ Bangladesh 
                             Inspection Dates: 26 February and 1 March 2014 
                                                               
 
                                                                           
 
Report Prepared By:                                                                       Checked and Validated By: 
Shajibul Ali                                                                              Sayem U Ahammed 
Industrial Surveyor                                                                       C EO 
 
                                                                       
                                                                                       
                                   Apartment 402, Configure Shadhona, 3E South Kallyanpur
                              Dhaka‐ 1207, Bangladesh. Hotline‐ 0167 8631 636, 8802 809 1611 
                             Email: info@uttaron‐technologies.com Web: www.uttaron.webs.com 
                                          Structural, Electrical and Fire Safety Assessment of XYZ Garments Ltd. Project Summary 
                                                                                                                                Page 85 of 188 
                                                                                                                                               
                                                                                                                                               
Introduction 
 
We visited the factory buildings of XYZ Garments Ltd. on 26 February and 1 March 2014 and conducted an opening 
meeting  to  introduce  ourselves  with  the  owner’s  administration  and  their  engineering  team  of  the  factory.  We 
explained our mission and process for the Structural, Electrical and Fire Safety Assessments of the factory building. 
This  report  is  a  snapshot  of  time  when  the  factory  was  visited.  We  also  met  eight  members  from  WPC  (Worker 
Participation  Committee)  to  know  the  history  of  the  building,  mishaps  or  any  incidents  to  make  our  visit  more 
effective towards the safety of the workers.  
 
Three  teams  were  engaged  to  conduct  the  whole  building  assessment  from  different  aspects  as  directed  in  the 
Alliance Assessment Protocol. 
 
Summary on Findings 
 
In  our  observation,  Engineering  Calculation  and  Evaluation  the  building  is  being  used  as  per  design  load  criteria. 
There  is  no  notable  distress  or  non‐conformity  in  the  structure.  No  extra  load  on  floor  which  are  beyond  of 
recommended  in  design  load.  Generator  or  any  weighty  equipment  not  found  in  the  building  floor.  No  corrective 
action relates to Structural issues is required. 
 
Multiple Cables found in MCCB/MCB terminals also cables was connected without Lugs. Burning Sign found in the PFI 
unit. Hotspot was also found in some of MDBs. Earth system needs to be improved. Insulation Resistance needs to be 
measured to know actual condition of the feeders. 
 
All the penetration on fire barrier walls needs to be redone in accordance with ASTM E814. Stair cases need to be 
kept in positive pressure. Additional hose cabinet is required. 
 
From the meeting with the WPC, no major information was gathered to disseminate or evaluate for the safety of the 
building. 
 
Below  is  the  list  of  required  drawings  and  documents  which  were  asked  from  the  building  owner  for  structural 
evaluation: 
 
                Sl. No.                       Documents                               Comments (if any) 
                  1               Geo technical (soil) investigation report                          Found 
                  2                  Previous assessment report (if any)                           Not Found 
                  3                         Architectural Drawing                                    Found 
                  4                          Structural Drawing                                      Found 
                  5                     As‐built drawing (authentic)                                 Found 
                  6         Construction History (timing of construction phases)                  2003 to 2007 
                  7                      Approval letter + Drawing                           Absent / under process 
                  8                     Factory Inspector's Approval                                 Found 
                  9                 Environmental Clearance Certificate                          Not Applicable 
                  10                    Fire Department's Clearance                                  Found 
                  11       Name and contact information of the Design Engineer          Engr. Sanakar Joti Dev FIBE (India)
                           Construction Contractor's Information (if construction 
                  12                                                                  Self‐procedure by labor contract basis 
                                    was made through formal contract) 
                              Test Results on materials during construction, if 
                  13                                                                   Done but ruined (presently absent) 
                                                  available 
                  14                          Electrical drawing                       Found but incomplete information 
                           Manufacturer's catalogue for the electrical sub‐station 
                  15                                                                                  Found 
                                         equipment and generator.
                                                          
 
                                       Structural, Electrical and Fire Safety Assessment of XYZ Garments Ltd. Project Summary 
                                                                                                                 Page 86 of 188 
                                                                                                                                
                                                                                                                                
General Data as per Documents & Present Status  
 
Factory Location:        Bangladesh 
Occupancy Type:          G (G2) because of moderate hazardous   
The  building:           Factory building is 10 storied , ground floor is 16’‐0” other floor is 10’‐6” floor to top to floor 
                         top, (111 +_ft high,) Classed as High Rise building. 
Floor in use now: 
                        1.    Ground Floor         : Bonded ware house & storage 
                        2.    1st  Floor           : Finishing section & finished goods storage 
                        3.    2nd Floor            : Sewing floor and office 
                        4.    3rd Floor            : Sewing floor 
                        5.    4th Floor            : Cutting & Fusing machine  
                        6.    5th Floor            : Cutting floor 
                        7.    6th floor            : Sewing area & Carton storage  
                        8.    7th Floor            : Sewing floor  
                        9.    8th floor            : Finishing floor and finishing goods storage  
                        10.   9th Floor            : Sample preparation & temporary idle machine storage & partial  
                                                   under re‐construction on going. 
 
Following criteria were used for this assessment: 
    1. Alliance Standard V 1.0 
    2. Bangladesh National Building Code (BNBC) 2006 
    3. Bangladesh Electricity Rules 1937 – Appropriate Sections. 
    4. Appropriate parts of the NFPA 70 (NEC‐2011) Edition 2011. 
 
The methodologies of the inspection are: 
    1. Checking of all drawings and documents: Back calculation were done to check the design integrity 
    2. Scanning  of  the  Columns:  Ferro  Scanning  enables  easy  location  of  steel  reinforcement  in  concrete  of  the 
        column. 
    3. Computer Analysis: ETABS (Extended Three Dimensional Analysis of Building Systems) was used to analyze 
        the building design. 
    4. ON Load Measurement of Voltage, Current in different Distribution Boxes: These values were evaluated in 
        order  to  ascertain  any  possible  adverse  condition  that  may  lead  to  further  deterioration  and 
        incident/accident. 
    5. Thermography: Abnormalities of temperature variation was captured from the live distribution boxes, buses 
        and protective devices by thermal imager to analyze the causes of problems 
    6. OFF  Load  Measurement:  Earth  and  Insulation  Resistance  data  were  checked  from  the  periodical 
        maintenance record. 
    7. Inspection of the whole Electrical System Network: The Electrical System Network was checked section by 
        section, floor by floor, from the Electric source to the final electric outlet and/or load points. Any differences 
        or deviations against the criteria were noted. Components/areas having lapses were photographed. 
    8. A  thorough  analysis  of  all  the  findings  was  made  and  report  prepared  in  following  manner:  A  set  of 
        descriptive Non‐Conformity Reports (NCRs) were made, where the deficiencies are described and associated 
        references are cited in next pages. 
    9. Measurement of different stair, corridor, etc.: Values were evaluated and compared with the standards. 
    10. Inspection  of  the  whole  firefighting  system:  The  complete  firefighting  system  was  inspected,  section  by 
        section, floor by floor, from the source to the final points for users. Any differences or deviations against the 
        criteria were noted. Components/areas having lapses were photographed. 
         
                                                     
 
                                        Structural, Electrical and Fire Safety Assessment of XYZ Garments Ltd. Project Summary 
                                                                                                                      Page 87 of 188 
                                                                                                                                     
                                                                                                                                     
          
    11. A thorough analysis of all the findings was made and report prepared in following manner: 
         A  set  of  descriptive  Non‐Conformity  Reports  (NCRs)  were  made,  where  the  deficiencies  are  described  and 
         associated references are cited in next pages. 
Interpretation of the Report 
In order to use the reports effectively, following points need to be noted: 
 
    1. The summary documents at the beginning of the report and the findings shall be noted 
    2. At the facility level, management shall assign appropriate persons to study the reports, and make a detailed 
         action plan immediately, based on the report and recommendations at various points, share this with us, and 
         execute the improvements. For your safety and liability purposes, we recommend that licensed contractors 
         evaluate and repair any deficiencies. 
    3. For  any  clarification  of  the  report,  a  meeting  can  be  arranged,  where  any  item  which  is  not  readily 
         understood can be explained. 
 
This  report  sets  forth  our  findings  solely  with  respect  to  the  installation  samples  presented,  and  based  upon  the 
information  that  was  provided,  to  us.  This  report does  not  constitute  a  guarantee  of  continued  or  absolute  safety 
against fire or any incidents. The sole purpose of this report is to help factories improve the level of safety in terms of 
infrastructure and management. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                       
 
                        Structural, Electrical and Fire Safety Assessment of XYZ Garments Ltd. Project Summary 
                                                                                                  Page 88 of 188 
                                                                                                                 
                                                                                                                 
 
 
 
 
 
 
 
    Contents: Safety Assessments 
                                                                                          
    Cover Page                                                                 84 
    Project Summary                                                            85 
    Structural Safety Assessment                                               89 
    Electrical Safety Assessment                                               102 
    Fire Safety Assessment                                                     145 
     
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                      
 
                                                          Structural Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                                      Page 89 of 188 
                                                                                                                                     
                                                                                                                                     
Structural Safety Assessment 
 
Roof:                     Clear and open to sky. 
Structure type:           RC Intermediate Moment Resisting Frame (IMRF) 
Foundation type:          Deep  foundation  /  Cast  in  Situ  Pile  Foundation/  column  &  beam  RC  construction  but  floor 
                          slab is pre‐stressed flat slab with edge beam 
Standard follows:         Bangladesh  National  building  Code  (BNBC).  Previous  design  criteria  &  standard  is  attached 
                          herewith the report. 
 
Materials used in Building 
All structural members are built in reinforcement concrete. 
Stone chips and coarse sand were used as coarse and fine aggregates respectively and a mix ratio of 1:1½:3 was used 
with concrete admixture in all concrete in foundations, grade beams and columns. According to General notes in the 
drawings and from the briefing of Owner’s engineer, 60 ksi (Yield strength) steel was used in the reinforced concrete 
which meets the required strength as per analysis and calculations. 
 
Load Manager 
The  Factory  Owner  has  two  civil  engineer  they  are  onsite  full  time  at  the  factory  and  trained  on  the  structural 
capacity conforming to operational load characteristics of the specific factory.  
                        Their contract details: 
                        ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐, General Manager, Engineering,  
                        Cell‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  
                        ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐, Manager, Engineering 
                        Cell ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
Load Plans 
The average live load for 9 floors is equal or below 2 kn / m ² and the design live load  is 3 kn / m², which is suitable 
for the building user. 
 
Analysis and Calculations 
 
Loadings of the buildings 
    1. Seismic Load: As per BNBC 2.5.6, Base Shear V= ZIC/R where Seismic Zone co‐efficient Z = 0.15 for zone 2 for 
        Gazipur,  Importance  factor  I=1.0,  C=1.25S/T^(2/3).  S=1.5  T=Ct(hn)^(3/4)  where  Ct.=0.  073  in  SI  unit  for  RC 
        moment resisting frame. R=8  for intermediate moment resisting RC frame. 
    2. Wind Load: As per BNBC 2.44.1 exposure category for this building is Exposure A.  
        Sustain wind pressure,(Kn/m2) qz=CcCiCzVb2 where qz= Ci= importance factor=1.0. Cc= velocity to pressure 
        conversion =47.2x10^(‐6). Cz= height and exposure co‐efficient. Vb= Basic wind speed= 215 km/hr .  
        Design  wind pressure  Pz=  CgCpqz  where  Cg=  Gust  co‐efficient  taken  from  table  6.2.11  ,  Cp=1.5 from  table 
        6.2.15 of BNBC 2006. 
    3. Live load: 40 to 50 psf  (+ 2 Kn / m ²)  in maximum areas was found in the building. But average 3 kn/m² has 
        been considered for foundation and columns for calculation  
 
Model analysis for story drift is provided with this report. 
 
Factor of safety of Column 
Factor of safety of column = 0.8 0.85 ’ ∗               	 ∗       / Pac 
Pac= 1.2*D.L+1.6 *L.L.             (Calculated actual) 
 
                                                       
 
                                                      Structural Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                             Page 90 of 188 
                                                                                                                            
                                                                                                                            
For Mid Column  
Pac=2074*1.2+477*1.6=3187 kip 
Column size 32”x32”  
No of bar used 24‐32mm Ѳ  of 60 ksi 
From scanning report   24 nos 32 mmѲ ensured  
Concrete f’c =35 mpa =5 ksi from, design parameter  
Factor of safety (F.S) of column = 0.8 0.85 ’ ∗             	 ∗         / Pac 
F.S =4944/3252= 1.55 ≥1.5  so acceptable 
 
Observation & Comments 
In our observation we found that the building is used as per design load criteria. There have no notable distress or 
non‐conformity in the structure. No extra load on floor which are beyond of recommended in design load. Generator 
or any weighty equipment are not found in the building floor. Ongoing partial Re construction of 10th floor is properly 
protected by safety bracing (attached photo) construction goods/debris is carried by hoist which is placed at outer 
side of south bay.  Only we found that 2nd floor west edge beam slightly deflected on due to first floor window grill is 
bulked slightly (at inner face). But factory engineers informed us it results during construction period. On observation 
they found that the incident does not propagate later up this time. On observation we take this note and found no 
distressed on wall in outer face or inner face. We materialize that their observation is rationale because such incident 
not found at above floors. Required action= None. 
 
Attachment 
             Previous design calculation 
             Scanning report  
             ETAB model analysis  
             Field visit data sheet   
             Reference Pictures 
	
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                   
 
                                                       Structural Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                                Page 91 of 188 
                                                                                                                               
                                                                                                                               
Previous Data Calculation 
 
    LOAD CASE :A     LOAD DATA  FOR TISWL                                                                   
                                                                                           UNIT LOAD / 
                     D.L                                                    THICKNESS      IN             TOTAL LOAD 
TOTAL W 193.25
Load Case :B LOAD DATA FOR ROOF
                                                                                           UNITLOAD / 
                     D.L                                                    THICKNESS      IN             TOTAL LOAD 
SUB TOTAL 136.25
AGGREGATE : STONE CHIPS
 
 
 
 
 
 
 
 
 
                                                    
 
                                                               Structural Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                                                     Page 92 of 188 
                                                                                                                                                    
                                                                                                                                                    
 
    Column legend                      Middle  Column                                      all equal grid 
                                       Total Load D.L& LL                                                                   2497.34 
    Actual  
    Factored load=                     (1.2D+1.6L)                                                                               3,187.85  Kip 
    Or in kn                                                                                            KN                    14,185.92  KN 
                                       Total Load D.L& LL                                                                     1638.05    
    Actual                                                                                                                                
    Factored load= kip                 (1.2D+1.6L)                                                                            2,061.18  Kip 
    Or in kn                                                                                            KN                    9,172.25  KN 
 
                                                            
 
                                                               Structural Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                                               Page 93 of 188 
                                                                                                                                              
                                                                                                                                              
 
                                       Total Load D.L& LL                                                             1164.83 
    Actual 
    Factored load=                     (1.2D+1.6L)                                                                        1,451.28  Kip 
    Or in kn                                                                                        KN                    6,458.22  KN 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                            
 
                                                 Structural Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                        Page 94 of 188 
                                                                                                                       
                                                                                                                       
Ferro Scanning Report 
 
                                    Nature of 
      Sl. No    Grid no/Location                            Reinforcement details         Remark (if any) 
                                    Structure 
                 Ground Floor       Column            Main Reinforcement: (24‐Ø32mm) 
       01                                                                                         
                     G‐8                                 Ring: Ø10mm @ 11.5” c/c 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                             
 
             Structural Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                   Page 95 of 188 
                                                                                  
                                                                                  
ETABS 
 
 
 
 
                                                                            
 
 
 
 
 
 
 
 
 
 
 
 
 
          
 
        Structural Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                              Page 96 of 188 
                                                                             
                                                                             
 
 
                                                                           
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
                   
     
 
        Structural Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                              Page 97 of 188 
                                                                             
                                                                             
                    
                    
                                                                     
                    
                    
                    
                    
                    
                    
                    
                    
                    
                    
                    
                    
                    
                    
                    
                    
                    
     
 
        Structural Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                              Page 98 of 188 
                                                                             
                                                                             
                
                
                                                                        
                
 
     
 
                                           Structural Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                 Page 99 of 188 
                                                                                                                
                                                                                                                
Picture References on Structural Safety Issues 
 
                                                                           
                                           Front Elevation 
                                                    
                                                    
                                                    
                                                                       
                                           Side Elevation 
 
 
                                                                           
                                Re‐construction work at Level 10 
                                                 
                                                 
                                                 
                                                 
                                                 
                                        
 
             Structural Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                   Page 100 of 188 
                                                                                   
                                                                                   
                     
                                         
    Supporting of Slab at Level 9 
                   
                   
                                          
      Cutting Section Level 5 
                  
                  
                                          
        Sewing Floor Level 7 
                   
                   
                   
                   
                   
                   
                   
                   
                   
          
 
         Structural Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                               Page 101 of 188 
                                                                               
                                                                               
                 
                                     
    Finishing at Level 8 
               
               
                                     
     Carton at Level 6 
 
                                     
             
    Emergency Exit Stair 
 
                 
 
 
 
      
 
                                                      Electrical Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                             Page 102 of 188 
                                                                                                                             
                                                                                                                             
Electrical Safety Assessment 
 
Administration and Enforcement 
The report is as detailed as possible, made illustrated so that this can be used as a checklist. The criteria used can be 
found  in  Nonconformities and  Code  Descriptions  in Electrical  Measurement  part.  A  summary  sheet of the  findings 
and measurement are attached with this report. 
 
Project Description 
 
       Name of the Facility                       XYZ Garments Ltd. 
       Location of the Facility                   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐, Bangladesh
       Nature of Facility                         Embroidery  
       Area of Floor                              As mentioned at the beginning of the report 
       Electrical Safety Rating (Overall)         D 
       Time to Complete the Deficiencies          D=30, C =90, B=180 Days 
 
                        Electrical Safety Assessment: Overall Rating for XYZ Garments Ltd. is: 
 
 
 
                                      D                     C                    B 
 
                                              Total NC Findings= 85 
                                                                    D 
                                                    B              22% 
                                                   30% 
                                                             C 
                                                            48% 
                                                                                              
          The details of the score are shown in different chapters of this report and brief with the summary 
                                                             
                                                             
           Classification of Findings        Symbol        Negative Points of each Findings  No. of Findings 
                       Red                       D                         10                          19 
                     Orange                      C                          8                          41 
                     Yellow                      B                          3                          25 
                                                  Total Number of NCs (Non Compliances)=               85 
 
 
                                                   
 
                                                              Electrical Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                                   Page 103 of 188 
                                                                                                                                   
                                                                                                                                   
 
Following criteria were used for this assessment: 
    5. Alliance Standard‐ Final 
    6. Bangladesh National Building Code (BNBC) 2006 – Electrical Part. 
    7. Bangladesh Electricity Rules 1937 – Appropriate Sections. 
    8. Appropriate parts of the NFPA 70 (NEC‐2011) Edition 2011. 
 
For this, the following chapters of NFPA 70 were taken into consideration: 
             a. Chapter 1 – General (Appropriate Sections) 
             b. Chapter 2 – Wiring and protection (Appropriate Sections) 
             c. Chapter 4 – Equipment for general use (Appropriate Sections) 
             d. Chapter 6 – Special Equipment (section 605, 670 and 695 only) 
             e. Chapter 7 – Special Conditions (section 705 and 760) 
The methodologies of the inspection are: 
    12. ON Load Measurement of Voltage, Current in different Distribution Boxes: These values were evaluated in 
         order  to  ascertain  any  possible  adverse  condition  that  may  lead  to  further  deterioration  and 
         incident/accident. 
    13. Thermography: Abnormalities of temperature variation was captured from the live distribution boxes, buses 
         and protective devices by thermal imager to analyze the causes of problems 
    14. OFF Load Measurement: Earth and Insulation Resistance were measured and evaluated with the standards 
         and recommendations.  
    15. Inspection of the whole Electrical System Network: The Electrical System Network was checked section by 
         section, floor by floor, from the Electric source to the final electric outlet and/or load points. Any differences 
         or deviations against the criteria were noted. Components/areas having lapses were photographed. 
    16. A  thorough  analysis  of  all  the  findings  was  made  and  report  prepared  in  following  manner:  A  set  of 
         descriptive Non‐Conformity Reports (NCRs) were made, where the deficiencies are described and associated 
         references are cited in next pages. 
 
Interpretation of the Report 
In order to use the reports effectively, following points need to be noted: 
 
    4. The summary documents at the beginning of the report and the overall rating of the facility shall be noted 
    5. At the facility level, management shall assign appropriate persons to study the reports, and make a detailed 
         action plan immediately, based on the report and recommendations at various points, share this with us, and 
         execute the improvements. For your safety and liability purposes, we recommend that licensed contractors 
         evaluate and repair any deficiencies. 
    6. For  any  clarification  of  the  report,  a  meeting  can  be  arranged,  where  any  item  which  is  not  readily 
         understood can be explained. 
 
Facility Description 
 
Name of the Facility:      XYZ Garments Ltd. 
                           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐, Bangladesh 
Nature of the Facility:    Embroidery 
Contact Person:            ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ Contact no.:‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
No of Building:            1 Building 
 
 
                                                           
 
                                                               Electrical Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                                       Page 104 of 188 
                                                                                                                                       
                                                                                                                                       
Summary of Electrical System 
                                        Description                                           Quantity 
                                         
                                          Generator                                               01 
                                          Transformer                                             01 
                                          LT Panel                                                01 
                                          DB                                                      02 
                                          SDB                                                     02 
                                          Technician                                              01 
 
Numbers of Findings on Non Compliances (NCs) 
                                         Descriptive NC  Photographic NC   Thermal NC      Visual & Measure   Time to Rectify 
 
    Deficiency‐ Red                            0                   10                  1                  08           30 Days 
    Deficiency‐ Orange                         0                    0                  1                  40           90 Days
    Deficiency‐ Yellow                        11                   0                   2                  12          180 Days 
 
Calculation of Deficiency Rating 
 
     Color of Findings           Symbol     Negative Points of each Findings       No. of Findings     Total Negative Point 
           Red                     D                      10                              19                   190 
         Orange                    C                       8                              41                   328 
          Yellow                   B                       3                              25                   75 
                                                               Total Negative Points in the premises=          593 
                                                                        Negative Point per 1,000 Sft=         26.35 
 
Final Result: Rating of the Factory 
 
                                                    According to Negative Points             According to Negative Points and 
               Name of the Facility 
                                                          Scored (Rating)                   Consideration Factors (Final Rating) 
               XYZ Garments Ltd.                                 D                                          D 
 
Factory/Premises Rating Table Based on NC and other Consideration Factors 
 
            Status                    A: Compliant               B: Yellow                  C: Orange               D: Red 
     Rating Consideration                  0                     0.1 to 15                  15.1 to 25          25.1 and above 
 
Rating Criteria at a Glance 
      1. If ordinary wooden Enclosure used in Electrical System then the factory may be rated as D. 
      2. If any single floor or part of a building is rated D, then the entire building will be rated as D. 
      3. If a lot of looping connections, connection without lug and no space and no spare MCB/MCCB is available in 
         LT/MDB/DB/SDB then the factory/installation/facility will be rated as C. 
          
          
                                                            
 
                                                     Electrical Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                          Page 105 of 188 
                                                                                                                          
                                                                                                                          
    4. If numbers of Circuits having no protection with MCCB/MCB/Fuse then the factory/installation/facility will be 
       rated as C. 
    5. If numbers of Circuits having unknown load then the factory/installation/facility will be rated as C. 
    6. If the Sub‐Station/Boiler room is or in the factory building but layout of these are not as per BNBC code, then 
       the factory will be rated as C. 
                                                  
 
                                                                                                                                  Electrical Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                                                                                                                            Page 106 of 188 
                                                                                                                                                                                                                            
                                                                                                                                                                                                                            
                                                                            XYZ Garments Ltd.  ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐, Bangladesh 
                                                Electrical Safety Assessment Summary from Descriptive NC, Visual Inspection and Enclosure Data Sheets 
                                                                                                                                                                                          Time to 
                                                                                                                           Total 
    SL.          Observation            NC             Picture Reference                     Identification                                           Consequences                       Complete     Source of Findings 
                                                                                                                         Finding(s) 
                                                                                                                                                                                           (Days) 
               Absence of Planned 
                     Periodical         NC‐
                                                                                                                                                                                                           Collected 
    1        inspection/testing and     1.1,                                                      N/A                        0                 Major Shutdown may occur                     0 
                                                                                                                                                                                                         Information 
                maintenance of all      1.4 
              electrical equipment  
              Absence of Periodical 
                                        NC‐                                                                                             Failing of adequate resistivity of the cables                      Collected 
    2         insulation resistance                                                               N/A                        0                                                              0 
                                        1.2                                                                                                        may leads short circuit                               Information 
                    test (IR test)  
                 Absence of Load 
            measurement (Voltage        NC‐                                                                                                                                                                Collected 
    3                                                                                             N/A                        1            Causes the failure/loss of equipment’s           180 
                and Current) on all     1.3                                                                                                                                                              Information 
                      feeders  
                    Higher rated 
                                                                                   LT‐01/S.S/GF, DB‐1/GF, SDB‐1/1st 
              MCCB/MCB is used to       NC‐                                                                                                                                                          From Measurement 
    4                                                                              Floor, DB‐1/2nd  Floor, SDB‐1/2nd         5                  Circuit Protection is in Risk               30 
            protect the lower rated     1.5                                                                                                                                                              Data Sheet 
                                                                                                 Floor 
                        cable  
                 Unknown Load is        NC‐                                                                                                                                                          From Measurement 
    5                                                                                          DB‐1/GF                       1                  Circuit Protection is in Risk               30 
                     connected          1.6                                                                                                                                                              Data Sheet 
            List and diagram of the 
                  circuits that the 
                                        NC‐                                                                                            Emergency Response and Maintenance will 
    6          distribution boards                                                                N/A                        1                                                             180         Visual Inspection 
                                        1.7                                                                                                         be hampered 
            (SDB/DB/MDB) control, 
                 are not available. 
                        Clear 
           identification/marking is    NC‐                                                                                            Emergency Response and Maintenance will 
    7                                                                                             N/A                        1                                                             180         Visual Inspection 
           not available at LT, MDB     1.8                                                                                                         be hampered 
               and DB MCB/MCCB 
              There is no means to 
               know for how many 
           over current devices the     NC‐
    8                                                                                             N/A                        1                  Circuit Protection is in Risk               30          From Checklist 
           panel board (MDB, SDB,       1.9 
              LT etc.) was designed 
                   and rated for.                               
             Cables connected 
                                        NC‐                                                                                            Cause of loose connection may lead heat and 
    9       without lugs/Splicing                                                           A‐3,A‐2,5,6,7,8                  5                                                              30       From Hazard Pictures 
                                        1.10                                                                                                               fire.   
               joints/Looping 
 
                                                                                                    Electrical Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                                                                                             Page 107 of 188 
                                                                                                                                                                                             
                                                                                                                                                                                             
 
                                                                                                                                                           Time to 
                                                                                             Total 
    SL.         Observation            NC           Picture Reference    Identification                                 Consequences                      Complete     Source of Findings 
                                                                                           Finding(s) 
                                                                                                                                                            (Days) 
            Sockets & Lights are in    NC‐                                                               May cause of frequent tripping of the Circuit 
    10                                                                        N/A              0                                                             0        From Hazard Pictures 
                  same circuit         1.11                                                                               breakers 
           MCB/MCCBs installing in     NC‐                                                               May cause of Electrical Shock and loosing of 
    11                                                                        N/A              0                                                             0        From Hazard Pictures 
              exposed condition        1.12                                                                         lives of the workers 
           Means for identification 
             not available for the     NC‐
    12                                                                   LT Panel /GF          1                  Circuit Protection is in Risk              30          From Checklist 
              final circuits in the    1.13 
                 following DBs.  
            Wooden board is used 
               as enclosure and        NC‐
    13                                                                        N/A              0         Maximum probability of communicating fire           0        From Hazard Pictures 
              supporting base of       1.14 
                  MCB/MCCB.  
           Interlocks not provided 
                                       NC‐                                                                May cause of short circuit and destroy the 
    14        for multiple power                                              N/A              0                                                             0           From Checklist 
                                       1.15                                                                             equipment’s 
             sources (LT & MDB).  
             Main incomer of the 
                                       NC‐                                                                Important to disconnecting the power for 
    15          panel should be                                               N/A              0                                                             0           From Checklist 
                                       1.16                                                                         equipment’s in need 
                    operable                                 
           Cable Overloaded, Cable 
           Lugs not fixed properly.    NC‐
    16                                                                   IR007161.IS2          1              Will burn the cable and contactor              30       From Thermography 
            Probable Deficiency ‐      1.17 
                 Immediately 
                                       NC‐                                                                Electrical shocking hazard and may be the 
    17          Safety guard                                              A‐1,2,4,7,8          5                                                             30       From Hazard Pictures 
                                       1.18                                                                     cause of losing lives of workers 
            Combustible materials 
                                       NC‐                                                                 May be the cause of fire by ensuring the 
    18        kept near to the                                                N/A              0                                                             0        From Hazard Pictures 
                                       1.19                                                                  probability of communicating fire 
              Electrical system 
 
 
                                                                                                                         Electrical Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                                                                                                                    Page 108 of 188 
                                                                                                                                                                                                                    
                                                                                                                                                                                                                    
 
                                                                                                                                                                                  Time to 
                                                                                                                  Total 
    SL.          Observation            NC           Picture Reference              Identification                                            Consequences                       Complete     Source of Findings 
                                                                                                                Finding(s) 
                                                                                                                                                                                   (Days) 
               In damp or wet                                                                                                 May cause of short circuit and destroy the 
                                        NC‐
    19     locations, surface‐type                                                       N/A                        0         equipment’s and electrical shock to human             0        From Hazard Pictures 
                                        1.20 
                  enclosures                                                                                                  bodies 
           Neutral and Grounding 
            should not be shorted                                                                                               Over Current may flow through grounding 
                                        NC‐
    20     but both are shorted in 
                                        1.21                                             N/A                        0            and could be the cause of failure of the           0           From Checklist 
               the mentioned                                                                                                                    system 
                MDB/DB/SDBs                                   
             Cable Lug not Fixed 
               Properly, Cable 
            Overloaded. Probable 
                                        NC‐
    21      Deficiency ‐ Monitor                                                    IR007160.IS2                    1               May burn the cable and breakers                 90       From Thermography 
                                        1.22 
               until Corrective 
              Measures can be 
                accomplished 
            No. of outgoing circuit 
              Neutral and Earth 
                                        NC‐                                DB‐1/GF, SDB‐1/1st Floor, DB‐                      May cause of Electrical shocking hazard and 
    22     conductors is not equal                                                                                  3                                                               90          From Checklist 
                                        1.23                                       1/2nd  Floor                                                overload 
            to the no. of outgoing 
                    circuits 
           Means for identification 
           not available for Circuit‐                                     LT Panel /GF, DB‐1/GF, SDB‐1/1st 
                                        NC‐
    23        Neutral and Earth                                           Floor, DB‐1/2nd  Floor, SDB‐1/2nd         5            May cause of Electrical shocking hazard            90          From Checklist 
                                        1.24 
               conductors in the                                                        Floor 
             following MDB/DBs 
              Phase, Neutral and 
           earth bus‐bars not used                                        LT Panel /GF, DB‐1/GF, SDB‐1/1st 
                                        NC‐                                                                                     Difficult to expand add or reduce specific 
    24     and connected properly                                         Floor, DB‐1/2nd  Floor, SDB‐1/2nd         5                                                               90          From Checklist 
                                        1.25                                                                                                    load circuit 
            in the following panel                                                      Floor 
                    boxes. 
                Identification of 
                                                                          LT Panel /GF, DB‐1/GF, SDB‐1/1st 
                 Neutral/Earth          NC‐                                                                                   Risk of electrical shocks during working in the 
    25                                                                    Floor, DB‐1/2nd  Floor, SDB‐1/2nd         5                                                               90          From Checklist 
               Conductor is not         1.26                                                                                                        boxes 
                                                                                        Floor 
                  permanent 
              Protective devices 
            (MCCB, MCB) without         NC‐                                                                                                                                                  From Measurement 
    26                                                                                DB‐1/GF                       1                     Protection hampered                       90 
            identification of their     1.27                                                                                                                                                     Data Sheet 
                    ratings  
 
                                                                                                                          Electrical Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                                                                                                                     Page 109 of 188 
                                                                                                                                                                                                                     
                                                                                                                                                                                                                     
 
                                                                                                                                                                                   Time to 
                                                                                                                   Total 
    SL.          Observation             NC           Picture Reference              Identification                                            Consequences                       Complete     Source of Findings 
                                                                                                                 Finding(s) 
                                                                                                                                                                                    (Days) 
           Some of the distribution 
                                         NC‐                                DB‐1/GF, SDB‐1/1st Floor, DB‐                        Hampering the safety of the equipment’s                      From Measurement 
    27        boards (MDB/DB/SB)                                                                                     4                                                               90 
                                         1.28                               1/2nd  Floor, SDB‐1/2nd  Floor                                      and lives                                         Data Sheet 
              have inadequate ECC  
              Panel board cabinets                                         LT Panel /GF, DB‐1/GF, SDB‐1/1st 
                                         NC‐                                                                                   Risk of electrical shocks during working in the 
    28      and panel board frames                                         Floor, DB‐1/2nd  Floor, SDB‐1/2nd         5                                                               90          From Checklist 
                                         1.29                                                                                                        boxes 
                 are not grounded                                                        Floor 
             Load current must be 
           measurable in all circuits                                                                                          Cause of loose connection may lead heat and 
                                         NC‐
    29      but cables are not well                                                       N/A                        0           fire.  Measuring Volt/Amps is difficult to          0        From Hazard Pictures 
                                         1.30 
            dressed in the following                                                                                                 understand the circuit conditions 
                      MDB/DBs 
                  Periodical Earth 
               Resistance Test not       NC‐                                                                                    Higher earth resistance may be the cause                            Collected 
    30                                                                                    N/A                        0                                                               0 
                 carried out for all     1.31                                                                                  destroying or malfunctioning of equipment’s                        Information 
                 earthing systems  
           Adequate illumination is                                        LT Panel /GF, DB‐1/GF, SDB‐1/1st 
                                         NC‐                                                                                   Risk of electrical shocks during working in the 
    31           absent in front of                                        Floor, DB‐1/2nd  Floor, SDB‐1/2nd         5                                                               90          From Checklist 
                                         1.32                                                                                                        boxes 
                     Enclosures                                                          Floor 
            Multiple cables entered 
                                         NC‐                                                                                   Cause of loose connection may lead heat and                    From Measurement 
    32       in one point either on                                            DB‐1/GF, SDB‐1/1st Floor              2                                                               90 
                                         1.33                                                                                                      fire.                                          Data Sheet 
            busbar or MCB, MCCBs 
             Proper Working or “as 
                  built” electrical 
                 drawings of main 
            distribution circuit and 
                floor levels circuits    NC‐                                                                                       As built drawing is the main tools to                            Collected 
    33                                                                                    N/A                        1                                                              180 
              connecting electrical      1.34                                                                                             understand the system                                   Information 
                        loads 
           (machines/lights/cooling 
                system etc.) not be 
                  available at site 
             DBs (BBT Control) not 
             installed at reachable      NC‐                                                                                   Risk of electrical shocks during working in the 
    34                                                                                    N/A                        0                                                               0           From Checklist 
                 height, should be       1.35                                                                                                        boxes 
            maximum 6 feet height.  
            Room is not Rain proof       NC‐                                                                                   Entering rain water can be the cause of short 
    35                                                                                    N/A                        0                                                               0        From Hazard Pictures 
                   or water proof        1.36                                                                                      circuit and damaging of equipment 
             Cable, raceway, or box 
               installed in exposed      NC‐                                                                                   Entering rain water can be the cause of short 
    36                                                                                    N/A                        0                                                               0        From Hazard Pictures 
                 locations and not       1.37                                                                                      circuit and damaging of equipment 
                     supported 
 
                                                                                                                           Electrical Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                                                                                                                      Page 110 of 188 
                                                                                                                                                                                                                      
                                                                                                                                                                                                                      
 
                                                                                                                                                                                    Time to 
                                                                                                                    Total 
    SL.          Observation              NC           Picture Reference              Identification                                            Consequences                       Complete     Source of Findings 
                                                                                                                  Finding(s) 
                                                                                                                                                                                     (Days) 
           Proper bushings (gland) 
             are not used at cable 
                                                                            LT Panel /GF, DB‐1/GF, SDB‐1/1st                    Vermin, dust and moistures may enter in to 
           entering point of Boards       NC‐
    37                                                                      Floor, DB‐1/2nd  Floor, SDB‐1/2nd         5          the boxes and could be cause of electrical           90          From Checklist 
             and panels. Moisture,        1.38 
                                                                                          Floor                                                short circuit 
             dust and vermin may 
                enter in to boxes 
                 Conductors not 
            separately enclosed in        NC‐                                                                                    May damaged the insulation and cause of 
    38                                                                                     N/A                        0                                                               0        From Hazard Pictures 
              flexible nonmetallic        1.39                                                                                             electrical faults 
                       tubing 
            V/A meters' calibration 
                                          NC‐                                                                                   Error in reading of meter could be the cause                         Collected 
    39       was never done after                                                          N/A                        1                                                              180 
                                          1.40                                                                                           of loss of lives and machines                             Information 
                    installation 
              Indicator lamps for 
             some of the MDB/DB                                                                                                    Absence of indicators will mislead the 
                                          NC‐
    40         are not present or                                               DB‐1/GF, DB‐1/2nd  Floor              2           persons and could be the cause of loss of          180          From Checklist 
                                          1.41 
            connected without any                                                                                                           lives and machines 
                protective device 
             Many Ampere meter 
                                          NC‐                                                                                    Understanding of system health instantly is 
    41      and Volt meter are out                                                    LT Panel /GF                    1                                                              180          From Checklist 
                                          1.42                                                                                         not possible without meters.  
                      of order 
                  In front of few 
            MDB/DB/SDBs there is 
              no electrical graded 
           rubber mat and in front        NC‐                                                                                   Risk of electrical shocks during working in the 
    42                                                                      SDB‐1/1st Floor, DB‐1/2nd  Floor          2                                                              180          From Checklist 
                   of few other           1.43                                                                                                        boxes 
              MDB/DB/SDBs non‐
            graded and inadequate 
           sized rubber mats used.  
            There is no instruction 
                 board found for 
            restoration of persons        NC‐                                                                                     Presence of such instruction will help the 
    43                                                                                     N/A                        1                                                              180         Visual Inspection 
           suffering from electrical      1.44                                                                                                 victim in need 
           shock at any place in the 
                      factory. 
                   There was no 
           instruction board found 
                                          NC‐                                                                                     Presence of such instruction will help the 
    44          in the factory for                                                         N/A                        1                                                              180         Visual Inspection 
                                          1.45                                                                                                 victim in need 
           “artificial respiration” in 
             case of electric shock. 
 
                                                                                                                         Electrical Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                                                                                                                Page 111 of 188 
                                                                                                                                                                                                                
                                                                                                                                                                                                                
 
                                                                                                                                                                               Time to 
                                                                                                                  Total 
    SL.          Observation            NC           Picture Reference              Identification                                          Consequences                      Complete    Source of Findings 
                                                                                                                Finding(s) 
                                                                                                                                                                                (Days) 
               Electrical Layout 
                                        NC‐                                                                                   In such a case any addition or deduction can                     Collected 
    45         drawings are not                                                          N/A                        1                                                           180 
                                        1.46                                                                                          not be done easily and safely                          Information 
               available at site. 
            All Phase conductors, 
                                                                          LT Panel /GF, DB‐1/GF, SDB‐1/1st 
              Neutral and Earth         NC‐                                                                                     May cause of burning of equipment’s or 
    46                                                                    Floor, DB‐1/2nd  Floor, SDB‐1/2nd         5                                                           180         From Checklist 
           should follow the colour     1.47                                                                                                  machines 
                                                                                        Floor 
                     code.  
                                                              
           Cable Lug not Adequate, 
            Contact Loose, Breaker 
              Overloaded, Dry &         NC‐
    47                                                                       IR007163.IS2, IR007164.IS2             2              May burn the cable and breakers              180       From Thermography 
                Loose contacts.         1.48 
             Probable Deficiency ‐ 
            Repair as Time Permits 
           Hand held tools used by 
                                        NC‐                                                                                     Can be the cause of electrical shock and 
    48      the electricians are not                                                     N/A                        1                                                           180        Visual Inspection 
                                        1.49                                                                                              losing workers lives 
                double insulated 
             There is no adequate 
                                                                                                                              Proper arrangement should be in place for 
              lightning protection      NC‐
    49                                                                                   N/A                        1         the safety of workers and the machines as         180        Visual Inspection 
              arrangement of the        1.50 
                                                                                                                                                 well 
                     building.  
               Phase and Neutral 
            should be same size but 
                                        NC‐                                                                                   Could be the cause of unbalancing loads and                 From Measurement 
    50           in the following                                                        N/A                        0                                                            0 
                                        1.51                                                                                          destroying the equipment’s                              Data Sheet 
                 MDB/DBs have 
                   deficiencies 
           Indicator lamps for most 
                     of the LT‐
             PANEL/MDB/DB/SDB           NC‐                                                                                   Error in reading of meter could be the cause 
    51                                                                        DB‐1/GF, DB‐1/2nd  Floor              2                                                           180         From Checklist 
            connected without any       1.52                                                                                          of lose of lives and machines 
                protective device 
                   (Fuse/MCB) 
 
 
                                                                                                             Electrical Safety Assessment of XYZ Garments Ltd. Finding Summary 
                                                                                                                                                                                      Page 112 of 188 
                                                                                                                                                                                                      
                                                                                                                                                                                                      
 
                                                                                                                                                                     Time to 
                                                                                                      Total 
    SL.         Observation            NC      Picture Reference               Identification                                   Consequences                        Complete    Source of Findings 
                                                                                                    Finding(s) 
                                                                                                                                                                      (Days) 
           Permanent legible signs 
              shall be installed at 
             isolating equipment 
                warning against 
           operation while carrying    NC‐                                                                        Mis‐operation may be the cause of accident 
    52                                                                              N/A                 1                                                             180       Visual Inspection 
              current, unless the      1.53                                                                               and loosing workers lives 
                 equipment is 
            interlocked so that it 
             cannot be operated 
                  under load. 
 
Corrective Actions on Deficiencies 
 
                                               D (Red)=      Need to check immediately the following and correcting accordingly 
                                                             a. Breaker Sizes 
                                                             b. Multiple cables in one points 
                                                             c. Proper size of cable lugs and crimping with proper tools 
                                                             d. Loose connections 
                                               C (Orange)=   Monitor the followings until corrective measures can be accomplished and correct after completing the above issues 
                                                             a. Dressing of cable in correct order 
                                                             b. Closing of cable entrance 
                                                             c. Illumination in front distribution boxes 
                                                             d. ECC for distribution boxes 
                                               B (Yellow)=  Check the following and correct in next schedule of maintenance 
                                                             a. Instruction Boards 
                                                             b. Rubber mat in front t of distribution boxes 
                                                             c. Periodical Earth and Insulation Resistance program 
                                                             d. Indicator lamps for the distribution boxes 
                                                             e. Volt and Ammeters for the distribution boxes   
                                               A (Blue)=     Compliant, no correction required. 
 
                                                                                                                                                                 
                                                              Electrical Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                              Page 113 of 188 
                                                                                                                                              
                                                                                                                                              
Nonconformities (NCs) by Description 
 
     XYZ  Garments  Ltd.  has  some  deficiencies  in  the  electrical  system  network,  which  is  listed  below  for 
appropriate  correction  and  corrective  actions.  All  the  deficiencies  will  be  presented  later  in  this  document 
through pictures, data sheets on enclosures, overall visual inspection reports. All the pictures, data are the part 
of this report. 
 
     1. General Requirements: 
 
     NC  1.1:  (B):  Planned  Periodical  inspection/testing  and  maintenance  of  all  electrical  equipment  shall  be  carried 
out in order to ensure proper operability of the installation and record of the same should be maintained. No such 
program  schedule  or  record  is  evident  here  for  inspection  and  maintenance  of  the  electrical  equipment.  This  is  a 
violation of Section 2.11.1 of BNBC‐2006. 
      
     NC 1.2: (B): Periodical insulation resistance test (IR test) shall have to be carried out for all electrical equipment 
with Meggar 0.5 KV or 1 KV (according to the voltage rating of equipment). No such program schedule or record of 
Periodical insulation resistance test is evident here. This is a violation of Section 2.11.2.1 of BNBC‐2006. 
 
     NC  1.3:  (B):  Load  measurement  (Voltage  and  Current)  is  needed  on  all  feeders  in  every  year  to  monitor  the 
condition and tendency of the equipment. No such program schedule or record of load measurement is evident. This 
is a violation section 2.11.4 of BNBC‐ 2006. 
 
     NC 1.4: (B): Notice for periodical inspection and testing at least once in every 2‐year should be displayed at the 
factory – LT room. No such notice was found. This is a violation of Bangladesh Electricity Rules 1937, Clause 49 (5). 
 
     NC  1.5:  (D):  Higher  rated  MCCB/MCB  is  used  to  protect  the  lower  rated  cable  in  MDB/SDBs  is  a  violation  of 
section: 2.7.6.3 and 2.7.6.4 of BNBC‐2006. 
      
     NC  1.6:  (D):  Unknown  load  is  connected  to  DBs  is  a  violation  of  section:  2.7.5.6(d)  of  BNBC‐2006.  Data  on 
Connecting Load was not provided during inspection. 
      
     NC 1.7: (B):List and diagram of the circuits that the distribution boards (SDB/DB/MDB) control, are not available. 
This is a violation of section: 2.7.5.6(d) of BNBC‐2006 which requires “Each (Distribution Board) shall be provided with 
a  circuit  list  giving  diagram  of  each  circuit  which  it  controls  and  the  current  rating  for  the  circuit  and  size  of  fuse 
element.” 
     NC 1.8: (B): Clear identification/marking was not available at LT, MDB and DB MCB/MCCB. This is a violation of 
section: 2.11.5.4 (point‐9) of BNBC‐2006. As per BNBC‐2006, clear and permanent identification marks are required 
to be painted in all distribution boards, switchboards, sub main boards and switches as necessary. 
 
     NC 1.9: (D): There is no means to know for how many over current devices the panel board (MDB, SDB, LT etc.) 
was designed and rated for. Also, means of prevention of installing exceeding the designed number of devices is not 
available. This is a violation of section 408.54, NFPA70‐2011. As per NFPA70‐2011, a panel board shall be provided 
with physical means to prevent the installation of more over current devices than that number for which the panel 
board was designed, rated, and listed. For the purposes of this section, a 2‐pole circuit breaker or fusible switch shall 
be considered for two over current devices; a 3‐pole circuit breaker or fusible switch shall be considered for three 
over current devices. 
     NC  1.10:  (D):  In  MDB/DB/SDBs  attaching  cables  using  splicing  joint  at  bus‐bar  without  using  cable  lugs  is  a 
violation of Section 2.5.4.4 and 2.5.5.4 (c) of BNBC‐2006. 
                                                           
                                                          Electrical Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                    Page 114 of 188 
                                                                                                                                    
                                                                                                                                    
      
     NC 1.11: (D): Sockets & Lights are in same circuit in DBs is a violation of Section: 2.7.5.6(d) of BNBC‐2006. As per 
BNBC‐2006. 
      
     NC  1.12:  (D):  MCB/MCCBs  installing  in  exposed  condition  is  a  violation  of  Bangladesh  electricity  rules  1937, 
clause‐49(3). 
      
     NC 1.13: (D): Means for identification not available for the final circuits in DBs is a violation of the rule refers to 
section 200.10 NFPA70‐2011. 
      
     NC 1.14: (D): Using of wooden board as enclosure and supporting base of MCB/MCCB is a violation of section: 
2.11.5.4 (point‐1) of BNBC‐2006. 
      
     NC 1.15: (D): Interlocks should be provided for multiple power sources (LT & MDB). Violation of this rule refers to 
section 225.17 NFPA70‐2011. 
      
     NC  1.16:  (D): Main incomer of the panel should be operable.  Violation  of  this  rule refers to section  520.53 (C) 
NFPA70‐2011.  
      
     NC 1.17: (D): As per Electrical Testing Association ANSI/MTS‐07 “Thermographic Survey Suggested Action Based 
on Temperature Rise”. “Major Deficiency ‐ Immediate Correction Required "‐ If difference is more than 40.0°C and 
above from measured ‘Ambient Temperature’. Below is list of reference of D deficiencies base on temperatures. 
      
     NC 1.18: (D): Arcing Parts. Parts of electrical equipment that in ordinary operation produce arcs, sparks, flames, 
or  molten metal  shall  be  enclosed or  separated  and isolated from  all  combustible material  as directed  in NFPA70‐
2011 section 110.18. Phase separator should be used at the terminals of the main disconnections (MCCB, MCB). Air 
gap should be minimum 25mm. 
      
     NC  1.19:  (D):  As  per  NFPA  section408.17  Location  Relative  to  Easily  Ignitable  Material.  Switchboards  shall  be 
placed so as to reduce to a minimum the probability of communicating fire to adjacent combustible materials. Where 
installed over a combustible Floor, suitable protection thereto shall be provided. 
      
     NC 1.20: (D): Damp and Wet Locations. In damp or wet locations, surface‐type enclosures within the scope of 
this article shall be placed or equipped so as to prevent moisture or water from entering and accumulating within the 
cabinet or cutout box, and shall be mounted so there is at least 6‐mm (1⁄4‐in.) airspace between the enclosure and 
the wall or other supporting surface. Enclosures installed in wet locations shall be weatherproof. For enclosures in 
wet locations, raceways or cables entering above the level of un insulated live parts shall use fittings listed for wet 
locations. Exception: Nonmetallic enclosures shall be permitted to be installed without the airspace on a concrete, 
masonry, tile, or similar surface, as directed in NFPA70‐2011 section 312.2. 
      
     NC 1.21: (B): As per NFPA70‐2011 clause 250.186‐C, Neutral and Grounding should not be shorted. 
      
     NC 1.22: (C): As per Electrical Testing Association ANSI/MTS‐07 “Thermographic Survey Suggested Action Based 
on Temperature Rise”. "Certain Deficiency ‐ Monitor until Corrective Measures can be accomplished"‐ If difference 
is more than 20.0°C and up to 40.0°C from measured ‘Ambient Temperature’. 
      
     NC 1.23: (C): The no. of outgoing circuit Neutral and Earth conductors need to be equal to the no. of outgoing 
circuits to avoid unbalancing of loads. Violation of the rule refers to section 200.6, 210.11 and 210.19 NFPA70‐2011. 
      
                                                       
                                                             Electrical Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                           Page 115 of 188 
                                                                                                                                           
                                                                                                                                           
     NC  1.24:  (C):  Means  for  identification  not  available  for  Circuit‐Neutral  and  Earth  conductors  in  the  DBs  is  a 
violation of the rule refers to section 200.6, 310.120 NFPA70‐2011..  
      
     NC 1.25: (C): Phase, Neutral and earth bus‐bars not used and connected properly in the panel boxes is violation 
of the rule refers to section 408.3(E) and 408.41 NFPA70‐2011. 
      
     NC 1.26: (C): Identification of earthed conductors and earthed neutral conductors shall be of permanent nature. 
It is not followed in most of the boards. Most of the boxes there is no identifications. It is a violation of Bangladesh 
Electricity rules 1937, clause 51 and section 408.41 of NFPA70‐2011. 
      
     NC 1.27: (C): No protective devices (MCCB, MCB) or without identification of their ratings which are listed below. 
Proper rating is required to select the wire size as well as selection and coordination of the circuits. This is a violation 
of section: 2.7.6.1 of BNBC‐2006, 110.22(A) NFPA70. 
      
     NC 1.28: (C): Having inadequate ECC (earth continuity conductor) for the distribution boards (DB/MDB/SB) is a 
violation of section: 2.8.3.3(c) & Table‐8.2.11of BNBC‐2006. As per BNBC‐2006, ECC size shall not be less than half the 
area of the largest current carrying conductor supplying the line. If the phase conductor is less than 16 mm2 then ECC 
will be same size but not less than 14SWG (3.243mm2) and if the size is 16 to 35 mm2 then ECC will be 16mm2. 
      
     NC 1.29: (C): As per clause 408.40 NFPA70‐2011, Panel board cabinets and panel board frames, if of metal, shall 
be  in  physical  contact  with  each  other  and  shall  be  grounded.  Where  the  panel  board  is  used  with  nonmetallic 
raceway or cable or where separate grounding conductors are provided, a terminal bar for the grounding conductors 
shall  be  secured  inside  the  cabinet.  The  terminal  bar  shall  be  bonded  to  the  cabinet  and  panel  board  frame,  if  of 
metal; otherwise it shall be connected to the grounding conductor that is run with the conductors feeding the panel 
board. 
      
     NC 1.30: (C): Load current must be measurable in all circuits. This is a violation of section 2.11.4 of BNBC‐2006. 
      
     NC 1.31: (B): Periodical Earth Resistance Test shall have to be carried out for all earthing systems and the result 
thereof  shall  be  kept  for  a  period  of  not  less  than  two  years  after  the  test  so  made  and  shall  be  available  to  the 
Inspector  when  required.  No  such  programmed  schedule  or  record  of  Periodical  Earth  Resistance  Test  is  evident 
here. This is a violation of Bangladesh Electricity Rules 1937, Clause 57(5) and Section 2.11.1.2 and 2.11.3 of BNBC‐
2006.  Grounding  is  very  vital  for  the  operation  of  the  system  and  protection  of  man/machine.  If  phase  conductor 
fails,  it  will  stop  operation/production  but  in  case  of  grounding  failure,  it  could  cause  stop  production/damage 
equipment and electric sock hazard to the workers. 
      
     NC  1.32:  (C):  Adequate  illumination  should  be  in  front  of  Enclosures,  which  is  violation  of  section  110.26(D) 
NFPA70‐2011.  
      
     NC 1.33: (C): Multiple cables entered in one point either on Bus Bar or MCB, MCCBs. This is violation of section 
312.5 (C) of NFPA70‐2011. 
                                                                      
    NC 1.34: (B): Proper Working or “as built” electrical drawings of main distribution circuit and Floor levels circuits 
connecting  electrical  loads  (machines/lights/cooling  system  etc.)  should  be  available  at  site.  Unavailability  is  a 
violation  of  Section  2.5.3.1  &  2.5.3.2  of  BNBC‐2006.  With  the  help  of  proper  electrical  drawings,  any 
addition/deduction/isolation  of  loads  can  be  done  easily  and  any  table‐top  decision  can  be  made  centrally  taking 
consideration  of  safety,  integrity  and  good  productivity.  Proper  drawing  is  an engineering  tool,  and every  system 
must have it. 
 
                                                          
                                                             Electrical Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                          Page 116 of 188 
                                                                                                                                          
                                                                                                                                          
    NC  1.35:  (B):  DBs  (BBT  Control)  should  install  at  reachable  height,  and  should  be  maximum  6  feet  height. 
Violation of this rule refer to section: 2.7.5.6(a) of BNBC‐2006 and NEC‐ 110.26(A)(3). 
     
    NC 1.36: (C): As per article 100 NFPA70‐2011, Rainproof: Constructed, protected, or treated so as to prevent rain 
from  interfering  with  the  successful  operation  of  the  apparatus  under  specified  test  conditions.  Rain‐tight: 
Constructed or protected so that exposure to a beating rain will not result in the entrance of water under specified 
test conditions. 
     
    NC 1.37: (C): A cable, raceway, or box, installed in exposed or concealed locations under metal‐corrugated sheet 
roof decking, shall be installed and supported so there is not less than 38 mm (11⁄2 in.) measured from the lowest 
surface of the roof decking to the top of the cable, raceway, or box. A cable, raceway, or box shall not be installed in 
concealed locations in metal‐corrugated, sheet decking– type roof. This has been described more precisely in clause 
300.4(E) NFPA70‐2011. 
     
    NC 1.38: (C): Proper bushings (gland) are not used at cable entering point of Boards and panels. Moisture, dust 
and vermin may enter in to boxes. This is a violation of section: 2.7.5.4(a) of BNBC‐2006 and 110.12(A), 230, 312.5 
NFPA70‐2011. 
     
    NC  1.39:  (C):  Exposed  Work‐In  dry  locations,  where  not  exposed  to  physical  damage,  conductors  shall  be 
permitted  to  be  separately  enclosed  in  flexible  nonmetallic  tubing.  The  tubing  shall  be  in  continuous  lengths  not 
exceeding 4.5 m (15 ft) and secured to the surface by straps at intervals not exceeding 1.4 m (41⁄2  ) as directed in 
NFPA70 section 398.15. 
     
    NC 1.40: (B): Calibration/validation of all type of meters at Floor levels and LT room should be done periodically. 
Calibration was never done after installation. Metering error of more than 3% not allowed in Bangladesh Electricity 
rules 1937, Clause 32(b).  
     
    NC  1.41:  (B):  Indicator  lamps  for  some  of  the  MDB/DB  are  not  present  or  connected  without  any  protective 
device (Fuse/MCB). This is a violation of Section: 2.7.6.1 of BNBC‐2006, 408.52 NFPA70‐2011. 
     
    NC  1.42:  (B):  Many  Ampere  meter  and  Volt  meter  are  out  of  order  (such  as  at  MDB,  LT  Panel  etc.).  This  is  a 
violation of Bangladesh Electricity Rules 1937, Clause 33. Ampere meters and voltmeters are the system monitor of 
the  running  system.  Abnormal  high  amps  indicates  fault  in  the  system  and  abnormal  voltage  (low/high)  indicates 
abnormality in the system. If the meters are not correct then it could not reflect the actual situation of the system. As 
a result proper measures could not be taken in right time. All meters must be maintained correctly. 
 
    NC  1.43:  (B):In  front  of  few  MDB/DB/SDBs  there  is  no  electrical  graded  rubber  mat  and  in  front  of  few  other 
MDB/DB/SDBs non‐graded and inadequate sized rubber mats used. This is a violation of Section 2.11.5.1 of BNBC‐
2006. 
 
    NC 1.44: (B): There is no instruction board found for restoration of persons suffering from electrical shock at any 
place in the factory. This is a violation of Bangladesh Electricity rules 1937, Clause 46. It is very essential that safety 
and first‐aid instructions should be adequately displayed and promulgated. 
     
    NC  1.45:  (B):  There  was  no  instruction  board  found  in  the  factory  for  “artificial  respiration”  in  case  of  electric 
shock. This is the violation of Bangladesh Electricity rules 1937, Clause 47. It is a very essential safety instruction and 
in many cases such awareness can save lives with simple actions. 
     
                                                          
                                                         Electrical Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                   Page 117 of 188 
                                                                                                                                   
                                                                                                                                   
    NC 1.46: (B): Absent of Electrical Layout drawings at site are a violation of Section 2.5.3.5 of BNBC‐2006. Proper 
layout  drawing  is  very  important  for  the  production  oriented  factory.  A  layout  drawing  should  be  prepared 
considering possible maximum loading/production capacity of a Floor area. Accordingly electrical infrastructure will 
have to be built. In such a case any addition or deduction can be done easily and safely. Proper layout drawing is an 
engineering tool, and every system must have it. 
     
    NC 1.47: (B): All Phase conductors, Neutral and Earth should follow the colour code. Violation of the rule refer to 
section 310.120, 250.119 NFPA70‐2011.  
     
    NC 1.48: (B): AS per Electrical Testing Association ANSI/MTS‐07 “Thermographic Survey Suggested Action Based 
on Temperature Rise”. “Probable Deficiency ‐ Repair as Time Permits"‐  If difference is more than 10.0°C (degrees 
centigrade) and up to 20.0°C from measured ‘Ambient Temperature’. 
     
    NC 1.49: (B): Hand held tools used by the electricians are not double insulated. Hand gloves should be kept in 
each Floor. Generator/Substation operator should use PPE. For safety, double insulated hand tools, PPE, hand gloves 
and earthling lids are required as per NFPA70 (E). 
     
    NC  1.50:  (B):  Lightening  protection  arrangement  of  a  building  is  essential  as  per  Section  2.9  of  BNBC‐2006. 
Lightning protection is an important arrangement. Absent of proper LA may cause health hazards for the workers and 
destruction of machines and materials. Lightning protection is an important arrangement .Every Industrial installation 
must have it. 
     
    NC 1.51: (B): Phase, Neutral and Grounding are not same size in the DB is a violation of section 2.5.4.1 of BNBC‐
2006. 
     
    NC 1.52: (B): Indicator lamps for most of the LT‐PANEL/MDB/DB/SDB connected without any protective device 
(Fuse/MCB). This is a violation of Section: 2.7.6.1 of BNBC‐2006. 
     
    NC 1.53: (B): As per NFPA 70 clause 110.34, the entrance to all buildings, vaults, rooms, or enclosures containing 
exposed  live  parts  or  exposed  conductors  operating  at  over  600  volts,  nominal,  shall  be  kept  locked  unless  such 
entrances are under the observation of a qualified person at all times. Where the voltage exceeds 600 volts, nominal, 
permanent and conspicuous warning signs shall be provided, reading as follows: 
DANGER — HIGH VOLTAGE — KEEP OUT 
As  per  NFPA  70  clause  225.70  A  permanent,  legible  warning  notice  carrying  the  wording  “DANGER  —  HIGH 
VOLTAGE” shall be placed in a conspicuous position in the following areas: (a) At all entrances to electrical equipment 
vaults and electrical equipment rooms, areas, or enclosures (b) At points of access to conductors on all high voltage 
conduit  systems  and  cable  systems  (c)  On  all  cable  trays  containing  high‐voltage  conductors  with  the  maximum 
spacing  of  warning  notices  not  to  exceed  3  m  (10  ft.).  Permanent  legible  signs  shall  be  installed  at  isolating 
equipment warning against operation while carrying current, unless the equipment is interlocked so that it cannot be 
operated under load. 
     
     
     
     
     
     
     
     
     
                                                      
                                                         Electrical Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                   Page 118 of 188 
                                                                                                                                   
                                                                                                                                   
     
    2. Generator: 
     
    NC 2.1: (C): Periodical testing of grounding resistance has not been done for the generators. This is a violation of 
Bangladesh  Electricity  rules  1937,  clause  49  and  57.  System  grounding/Transformer  grounding  is  very  vital  for  the 
operation of the system and protection of man/machine.  If phase conductor fails, it will stop operation/production 
but in case of grounding failure, it could cause stop production/damage equipment and electric sock hazard to the 
workers. Such a vital element needs periodical inspection and testing. 
     
    NC 2.2: (C): Generator frame earthing shall be two points separately. This is a violation of Bangladesh Electricity 
rules 1937, Clause 57 (2). 
 
    3. Substation: 
         
    NC 3.1: (D): Combustible materials stored in the Substation. 
     
    NC 3.2: (D): No safety Guard. 
     
    NC 3.3: (C): Neutral and Earthing Cables not marked properly 
     
    NC 3.4: (C): Transformer Locations.(i) Accessible. Transformers shall be accessible after installation. (ii) Secondary 
Conductors. Transformers shall be installed as near to the loads as practicable to keep the secondary conductors as 
short as possible. (iii) Adjacent to Combustible Materials. Transformers shall be located so that adjacent combustible 
materials are not subjected to temperatures in excess of 90°C (194°F). 
     
 
 
 
 
 
                                                                  
                                                                  
                                                                  
                                                      
                                             Electrical Safety Assessment of XYZ Garments Ltd. Photographic Findings 
                                                                                                                       Page 119 of 188 
                                                                                                                                       
                                                                                                                                       
 
A. D– Need Immediate Correction 
                                        Summary: D‐ XYZ Garments Ltd. 
         SL                       Observation                              References               No. of Findings 
         1     Splicing  cable joint                                           A‐3                         1 
         2     No phase separator                                          A‐1,2,4,7,8                     5 
         3     Multiple cable/Cable connected without lugs                 A‐2,5,6,7,8                     4 
 
 
 
 
                                                                                D 
                                                                    Category 
                                                                                A‐01 
                                                                                 nd
                                                                     Location  2  FL 
Equipment Name SDB‐1
Observation No phase separator in MCCB.
Required Action Need phase separator in MCCB.
 
 
 
                                                                                D 
                                                                    Category 
                                                                                A‐02 
                                                                                 nd
                                                                     Location  2  FL 
Equipment Name DB‐1
                                                                               No phase separator in MCCB. 
                                                                 Observation  Multiple cables connect without 
                                                                               lug.   
                                                                               Need phase separator in MCCB. 
                                                      
                                                              Required Action  Need to connect them single 
                                                                               with lugs. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                  
    Electrical Safety Assessment of XYZ Garments Ltd. Photographic Findings 
                                                                          Page 120 of 188 
                                                                                          
                                                                                          
 
 
 
                                       D 
                           Category 
                                       A‐03 
                                        nd
                           Location  2  FL 
Equipment Name DB‐1
Observation Splicing cable joint.
                
                    Required Action  Need to joint properly.  
 
 
 
                                       D 
                           Category 
                                       A‐04 
                                        st
                           Location  1  FL 
Equipment Name SDB‐1
Observation No phase separator in MCCB.
            
                    Required Action  Need phase separator in MCCB. 
 
 
 
                                       D 
                           Category 
                                       A‐05 
                                        st
                           Location  1  FL 
Equipment Name SDB‐1
                                       Multiple cables connect without 
                       Observation 
                                       lugs. 
                                       Need to connect them single 
                    Required Action 
                                       with lugs. 
 
 
 
 
 
 
 
 
 
 
 
        
    Electrical Safety Assessment of XYZ Garments Ltd. Photographic Findings 
                                                                       Page 121 of 188 
                                                                                       
                                                                                       
 
 
 
                                    D 
                       Category 
                                    A‐06 
Location GF
Equipment Name DB‐1
                                    Multiple cables connect without 
                    Observation 
                                    lugs. 
                                    Need to connect them single 
                 Required Action 
                                    with lugs. 
 
 
 
                                    D 
                       Category 
                                    A‐07 
Location GF
Equipment Name DB‐1
                                  No phase separator in MCCB. 
                    Observation  Multiple cables connect without 
                                  lugs.   
                                  Need phase separator in MCCB. 
                 Required Action  Need to connect them single 
                                  with lugs. 
 
 
 
                                    D 
                       Category 
                                    A‐08 
Location GF
Equipment Name LT‐Panel
                                  No phase separator in MCCB. 
                    Observation  Multiple cables connect without 
                                  lugs.  
                                  Need phase separator in MCCB. 
                 Required Action  Need to connect them single 
                                  with lugs. 
 
 
 
 
 
 
         
                                              Electrical Safety Assessment of XYZ Garments Ltd. Photographic Findings 
                                                                                                                         Page 122 of 188 
                                                                                                                                         
                                                                                                                                         
 
B. C– Correct As Early As Possible 
 
                                         Summary: C‐ XYZ Garments Ltd. 
             SL                      Observation                                References            No. of Findings 
             1     Multiple cables connected                                       B‐2,3                     2 
             2     Panel door/Body  not ECC                                        B‐1,4                     2 
 
 
 
 
                                                                                 C 
                                                                   Category 
                                                                                 B‐01 
                                                                                  nd
                                                                    Location  2  FL 
Equipment Name SDB‐1
                                                                                 Panel door is not connected with 
                                                                Observation 
                                                                                 ECC.  
                                                                                 Need to connect with ECC 
                                                             Required Action 
                                                                                 properly. 
 
 
 
                                                                                 C 
                                                                   Category 
                                                                                 B‐02 
                                                                                  nd
                                                                    Location  2  FL 
Equipment Name SDB‐1
                                                                             Multiple cables connected. May 
                                                                Observation  cause of loose connection heat 
                                                                             and fire. 
                                                         
                                                             Required Action  Need to connect them single. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                     
    Electrical Safety Assessment of XYZ Garments Ltd. Photographic Findings 
                                                                        Page 123 of 188 
                                                                                        
                                                                                        
 
 
 
                                    C 
                       Category 
                                    B‐03 
                                     st
                        Location  1  FL 
Equipment Name SDB‐1
                                 Multiple cables connected. May 
                    Observation  cause of loose connection heat 
                                 and fire.  
             
                 Required Action  Need to connect them single. 
 
 
 
                                    C 
                       Category 
                                    B‐04 
Location GF
Equipment Name LT‐Panel
                                    Panel door is not connected with 
                    Observation 
                                    ECC.  
                                    Need to connect with ECC 
                 Required Action 
                                    properly 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
         
                                         Electrical Safety Assessment of XYZ Garments Ltd. Photographic Findings 
                                                                                                            Page 124 of 188 
                                                                                                                            
                                                                                                                            
 
C. B– Correct at Next Maintenance 
 
                                     Summary: B‐ XYZ Garments Ltd. 
                SL             Observation                       References              No. of Findings 
                1     Improper cable latching                      C‐1,2,4                      3 
                2     No rubber mat                                  C‐3                        1 
 
 
 
                                                                        B 
                                                            Category 
                                                                        C‐01 
Location GF
Equipment Name DB‐1
Observation Improper cable latching.
                                                  
                                                      Required Action  Need to latch properly. 
 
 
 
                                                                        B 
                                                            Category 
                                                                        C‐02 
Location GF
Equipment Name DB‐1
Observation Improper cable latching.
                                                  
                                                      Required Action  Need to latch properly. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                              
    Electrical Safety Assessment of XYZ Garments Ltd. Photographic Findings 
                                                                   Page 125 of 188 
                                                                                   
                                                                                   
 
 
 
                                      B 
                          Category 
                                      C‐03 
                                       st
                           Location  1  FL 
Equipment Name SDB‐1
Observation No rubber mat.
            
                    Required Action  Need to proper rubber mat. 
 
 
 
                                      B 
                          Category 
                                      C‐04 
Location GF
Equipment Name DB‐1
Observation Improper cable latching.
Required Action Need to latch properly.
        
                                                           Electrical Safety Assessment of XYZ Garments Ltd. Thermography 
                                                                                                                    Page 126 of 188 
                                                                                                                                    
                                                                                                                                    
 
Interpretation of IR Thermal Images 
 
Probable Cases and comments: Red= D, Orange= C, Yellow= B 
 
    Case‐1:  Rating  B  "Probable  Deficiency  ‐  Repair  as  Time  Permits"  ‐  If  difference  is  more  than  10.0°C  (degrees 
centigrade) and up to 20.0°C from measured ‘Ambient Temperature’. 
 
    Case‐2: Rating C "Certain Deficiency ‐ Monitor until Corrective Measures can be accomplished" ‐ If difference is 
more than 20.0°C and up to 40.0°C from measured ‘Ambient Temperature’. 
 
    Case‐3: Rating D “Major Deficiency ‐ Immediate Correction Required " ‐ if difference is more than 40.0°C and 
above from measured ‘Ambient Temperature’. 
     
                                                      Thermography 
                                                                      D 
                                                                     25% 
                                                     B 
                                                    50% 
                                                                      C 
                                                                     25% 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                       
                                                    Electrical Safety Assessment of XYZ Garments Ltd. Thermography 
                                                                                                         Page 127 of 188 
                                                                                                                         
                                                                                                                         
Thermal Picture Reference 
 
Inspection Date:          26‐02‐14 4:38:58 PM       Location                  3rd FL – Sewing Section 
Equipment:                MDB                       Equipment Name:           3rd FL 
Ambient Air Temp:         30.0°C                    Description:              Upper 
Exception Temperature:    53.2°C                    Repair Priority:          Repair as Time Permits 
Emissivity:               0.95                      Reflected Temperature:    30.0 °C 
Procedure:                Thermography              Thermal Imager:           Ti32‐10050408 
 
 
                                                           Visible Light Image 
IR007342.IS2 
 
 
Image Info 
Average Temperature                                                    40.1°C
Image Range                                                       33.4°C to 56.0°C
Image Time                                                      26‐02‐14 4:38:58 PM 
 
Main Image Markers 
                     Name                                          Temperature
                   Centerpoint                                       46.7°C
                      Cold                                           33.4°C
                       P0                                            53.2°C
                                                 
                                                    Electrical Safety Assessment of XYZ Garments Ltd. Thermography 
                                                                                                         Page 128 of 188 
                                                                                                                         
                                                                                                                         
  
 
Inspection Date:          26‐02‐14 4:39:17 PM       Location                  3rd FL – Sewing Section 
Equipment:                MDB                       Equipment Name:           3rd FL 
Ambient Air Temp:         30.0°C                    Description:              Lower 
Exception Temperature:    76.4°C                    Repair Priority:          Immediate Correction 
                                                                              Required 
Emissivity:               0.95                      Reflected Temperature:    30.0 °C 
Procedure:                Thermography              Thermal Imager:           Ti32‐10050408 
 
 
                                                           Visible Light Image 
IR007343.IS2 
 
 
Image Info 
Average Temperature                                                    39.7°C
Image Range                                                       32.7°C to 76.4°C
Image Time                                                      26‐02‐14 4:39:17 PM 
 
Main Image Markers 
                     Name                                          Temperature
                   Centerpoint                                       37.4°C
                      Hot                                            76.4°C
                      Cold                                           32.7°C
                                                 
                                                    Electrical Safety Assessment of XYZ Garments Ltd. Thermography 
                                                                                                         Page 129 of 188 
                                                                                                                         
                                                                                                                         
  
 
Inspection Date:          26‐02‐14 4:41:43 PM       Location                  3rd FL – Sewing Section 
Equipment:                SDB                       Equipment Name:           3rd FL 
Ambient Air Temp:         30.0°C                    Description:
Exception Temperature:    45.3°C                    Repair Priority:          Repair as Time Permits 
Emissivity:               0.95                      Reflected Temperature:    30.0 °C 
Procedure:                Thermography              Thermal Imager:           Ti32‐10050408 
 
 
                                                           Visible Light Image 
IR007344.IS2 
 
 
Image Info 
Average Temperature                                                    33.7°C
Image Range                                                       30.8°C to 45.3°C
Image Time                                                      26‐02‐14 4:41:43 PM 
 
Main Image Markers 
                     Name                                          Temperature
                   Centerpoint                                       33.6°C
                      Hot                                            45.3°C
                      Cold                                           30.8°C
                                                 
                                                    Electrical Safety Assessment of XYZ Garments Ltd. Thermography 
                                                                                                         Page 130 of 188 
                                                                                                                         
                                                                                                                         
  
 
Inspection Date:          26‐02‐14 4:42:43 PM       Location                  3rd FL – Sewing Section 
Equipment:                SDB                       Equipment Name:           07
Ambient Air Temp:         30.0°C                    Description:
Exception Temperature:    41.3°C                    Repair Priority:          Repair as Time Permits 
Emissivity:               0.95                      Reflected Temperature:    30.0 °C 
Procedure:                Thermography              Thermal Imager:           Ti32‐10050408 
 
 
                                                           Visible Light Image 
IR007345.IS2 
 
 
Image Info 
Average Temperature                                                    35.2°C
Image Range                                                       32.5°C to 42.9°C
Image Time                                                      26‐02‐14 4:42:43 PM 
 
Main Image Markers 
                     Name                                          Temperature
                   Centerpoint                                       34.9°C
                      Cold                                           32.5°C
                       P0                                            41.3°C
                                                 
                                                     Electrical Safety Assessment of XYZ Garments Ltd. Thermography 
                                                                                                         Page 131 of 188 
                                                                                                                         
                                                                                                                         
  
 
Inspection Date:           26‐02‐14 4:55:41 PM       Location                  3rd FL – Left Side of 
                                                                               Conference Room 
Equipment:                 SDB                       Equipment Name:
Ambient Air Temp:          30.0°C                    Description:
Exception Temperature:     46.1°C                    Repair Priority:          Repair as Time Permits 
Emissivity:                0.95                      Reflected Temperature:    30.0 °C 
Procedure:                 Thermography              Thermal Imager:           Ti32‐10050408 
 
 
                                                            Visible Light Image 
IR007346.IS2 
 
 
Image Info 
Average Temperature                                                     36.8°C
Image Range                                                        33.1°C to 63.7°C
Image Time                                                       26‐02‐14 4:55:41 PM 
 
Main Image Markers 
                      Name                                          Temperature
                    Centerpoint                                       38.2°C
                       Cold                                           33.1°C
                        P0                                            46.1°C
                                                  
                                                     Electrical Safety Assessment of XYZ Garments Ltd. Thermography 
                                                                                                         Page 132 of 188 
                                                                                                                         
                                                                                                                         
  
 
Inspection Date:           26‐02‐14 4:56:05 PM       Location                  3rd FL – Left Side of 
                                                                               Conference Room 
Equipment:                 SDB                       Equipment Name:
Ambient Air Temp:          30.0°C                    Description:
Exception Temperature:     45.8°C                    Repair Priority:          Repair as Time Permits 
Emissivity:                0.95                      Reflected Temperature:    30.0 °C 
Procedure:                 Thermography              Thermal Imager:           Ti32‐10050408 
 
 
                                                            Visible Light Image 
IR007347.IS2 
 
 
Image Info 
Average Temperature                                                     35.8°C
Image Range                                                        32.6°C to 61.4°C
Image Time                                                       26‐02‐14 4:56:05 PM 
 
Main Image Markers 
                      Name                                          Temperature
                    Centerpoint                                       36.3°C
                       Cold                                           32.6°C
                        P0                                            45.8°C
 
 
                                                  
                                                                           Electrical Safety Assessment of XYZ Garments Ltd. Enclosures (DB) 
                                                                                                                                       Page 133 of 188 
                                                                                                                                                       
                                                                                                                                                       
Enclosures (Distribution Boxes) 
 
                                 Probable Cases and NCs on Field Measurement and Visual Inspection 
                                                                   
                                                                                      
                                                                                                                             
    SL                                 Description                                        NC No.         Findings           Source of Findings 
          Absence of Planned Periodical inspection/testing and maintenance of 
    1                                                                                    NC‐1.1, 1.4        0             Collected Information 
                               all electrical equipment  
    2           Absence of Periodical insulation resistance test (IR test)                 NC‐1.2           0              Collected Information 
    3      Absence of Load measurement (Voltage and Current) on all feeders                NC‐1.3           1              Collected Information 
                                                                                                                         From Measurement Data 
    4       Higher rated MCCB/MCB is used to protect the lower rated cable                 NC‐1.5           5 
                                                                                                                                   Sheet 
                                                                                                                         From Measurement Data 
    5                          Unknown Load is connected                                   NC‐1.6           1 
                                                                                                                                   Sheet 
                List and diagram of the circuits that the distribution boards 
    6                                                                                      NC‐1.7           1               Visual Inspection 
                         (SDB/DB/MDB) control, are not available. 
              Clear identification/marking is not available at LT, MDB and DB 
    7                                                                                      NC‐1.8           1               Visual Inspection 
                                          MCB/MCCB 
            There is no means to know for how many over current devices the 
    8                                                                                      NC‐1.9           1                   From Checklist 
               panel board (MDB, SDB, LT etc.) was designed and rated for.  
    9              Cables connected without lugs/Splicing joints/Looping                  NC‐1.10           5             From Hazard Pictures 
    10                       Sockets & Lights are in same circuit                         NC‐1.11           0             From Hazard Pictures 
    11                  MCB/MCCBs installing in exposed condition                         NC‐1.12           0             From Hazard Pictures
             Means for identification not available for the final circuits in the 
    12                                                                                    NC‐1.13           1                   From Checklist 
                                        following DBs.  
                Wooden board is used as enclosure and supporting base of 
    13                                                                                    NC‐1.14           0             From Hazard Pictures 
                                         MCB/MCCB.  
    14       Interlocks not provided for multiple power sources (LT & MDB).               NC‐1.15           0                   From Checklist
    15                 Main incomer of the panel should be operable                       NC‐1.16           0                   From Checklist 
          Cable Overloaded, Cable Lugs not fixed properly. Probable Deficiency ‐ 
    16                                                                                    NC‐1.17           1              From Thermography 
                                         Immediately 
    17                                   Safety guard                                     NC‐1.18           5             From Hazard Pictures 
    18           Combustible materials kept near to the Electrical system                 NC‐1.19           0             From Hazard Pictures 
    19               In damp or wet locations, surface‐type enclosures                    NC‐1.20           0             From Hazard Pictures
          Neutral and Grounding should not be shorted but both are shorted in 
    20                                                                                    NC‐1.21           0                   From Checklist 
                                the mentioned MDB/DB/SDBs 
          Cable Lug not Fixed Properly, Cable Overloaded. Probable Deficiency ‐
    21                                                                                    NC‐1.22           1              From Thermography 
                  Monitor until Corrective Measures can be accomplished 
           No. of outgoing circuit Neutral and Earth conductors is not equal to 
    22                                                                                    NC‐1.23           3                   From Checklist 
                                  the no. of outgoing circuits 
 
                                                                      
                                                                           Electrical Safety Assessment of XYZ Garments Ltd. Enclosures (DB) 
                                                                                                                                      Page 134 of 188 
                                                                                                                                                      
                                                                                                                                                      
 
                                                                                      
                                                                                      
                                                                                      
                                                                                      
                                                                                      
                                                                                      
                                                                      
                                                                         Electrical Safety Assessment of XYZ Garments Ltd. Enclosures (DB) 
                                                                                                                                               Page 135 of 188 
                                                                                                                                                               
                                                                                                                                                                 
                                                                                
                                                                                                                                                                 
    DB reference/Name                                 SDB‐1/1st Floor
               Location                                Laser Cutting
             Feed From                                   DB‐1/GF                                                 Field Measurement Data 
    Incoming Cable Size                              3*1C*10rm(BYA) 
      Incoming Breaker                                100A TP MCCB 
                                       R‐Y                    397                                     Ir                Amps         15.7        Acceptable 
                                       Y‐B                    394                                     Iy                Amps         7.5           In Max. 
     Voltage 3Phase                                                         Load Current 
                                       B‐R                    395                                     Ib                Amps         5.1            Amp= 
                                       N‐E                    0.5                                     In                Amps         14.4           12.03
                                       R‐N                   2231          Earth Wire Size       2.5rm(BYA)                                        NC‐1.28
    Voltage 1 Phase                    Y‐N                    230         Neutral Wire Size       10rm(BYA)                                             
                                       B‐N                    229         Incoming Breaker      100A TP MCCB                                        NC‐1.5 
                                                                                                                                                     Non 
       Breaker No                Connected Load        Breaker Rating     Measured Current       Wire Size OG          Phase    Description 
                                                                                                                                                 Compliance 
                                2nos Hit Gun Tube 
           1                                             32A SP MCB                 3.8           2.5rm(IYAL)            Y           1core          NC‐1.5 
                                       Light 
           2                       TL(21X40W)            20A SP MCB                 0.2        2.5rm+2.5rm(IYAL)         Y           1core       NC‐1.33,1.5 
           3                        TL(1X40W)            20A SP MCB                 3.5            2.5rm(IYAL)           Y           1core         NC‐1.5
           4                       TL(15X40W)            20A SP MCB                 0.1            2.5rm(IYAL)           Y           1core         NC‐1.5 
           5                       CF(5X80W)             20A SP MCB                 0.1            2.5rm(IYAL)           R           1core         NC‐1.5 
                                2nos Hit Gun Tube 
           6                                             20A SP MCB                  0            2.5rm(IYAL)            R           1core          NC‐1.5 
                                       Light 
           7                       TL(10X40W)            63A SP MCB                  0            2.5rm(IYAL)            R           1core          NC‐1.5
           8                     1nos AC(1.5ton)         20A SP MCB                  0            2.5rm(IYAL)            R           1core          NC‐1.5
           9                       CF(1X80W)             20A SP MCB                 2.8           2.5rm(IYAL)            R           1core          NC‐1.5 
                                                                                    0.5                                  B 
           10                     TL(15X40W)             20A TP MCB                 0.1           2.5rm(IYAL)            Y           1core          NC‐1.5 
                                                                                    2.6                                  R 
                                                                                   Spare             Spare               R 
           11                     TL(10X40W)             20A TP MCB                 0.1           2.5rm(IYAL)            Y           1core          NC‐1.5 
                                  TL(10X40W)                                         0            2.5rm(IYAL)            B 
                                                                                     0                                   R 
           12                   1nos Cooling Fan         32A TP MCB                  0             2rm(BYA)              Y           1core          NC‐1.5 
                                                                                     0                                   B 
                                                                                     0                                   R 
           13                   1nos Cooling Fan         32A TP MCB                  0             2rm(BYA)              Y           1core          NC‐1.5 
                                                                                     0                                   B 
                                                                                    0.1                                  R 
           14                   1nos Cooling Fan         20A TP MCB                 0.1           1.5rm(BYA)             Y           1core          NC‐1.5 
                                                                                    0.1                                  B 
           15                     TL(10X40W)             20A SP MCB                 0.1           2.5rm(IYAL)            Y           1core          NC‐1.5 
                                CF(2X80W)+1nos 
           16                                            20A SP MCB                 3.7           2.5rm(IYAL)            B           1core          NC‐1.5 
                                  Power Point 
           17                   1nos Power Point         20A SP MCB                 0.2            2.5rm(IYAL)           B           1core         NC‐1.5 
           18                   1nos Power Point         20A SP MCB                 8.4            2.5rm(IYAL)           B           1core         NC‐1.5
           19                   1nos Power Point         32A SP MCB                 5.3        2.5rm+2.5rm(IYAL)         B           1core       NC‐1.33,1.5
                                                                                                                 Cell Color Red= D, Orange= C, Yellow= B 
    DB/Reference Name           SDB‐1/1st Floor 
              Location          Laser Cutting 
      Observation                                                       Description                                                  Yes/No       NC Nos. 
           1                    Adequate illumination available in front of DB?                                                        No           1.32 
           2                    Is panel board at accessible height?                                                                   Yes          1.35 
           3                    Are Instruction Board (both) displayed on the DB?                                                      No        1.44, 1.45 
           4                    Electric Danger/Caution sign available on the panel?                                                   No           1.53 
           5                    Are indicator lamps available and functional?                                                         N/A           1.41 
           6                    Indicator Lamps Connected with protective device?                                                     N/A           1.52 
           7                    Are Ammeters (for LT & MDB) available?                                                                N/A           1.42 
 
                                                                   
                                                                   Electrical Safety Assessment of XYZ Garments Ltd. Enclosures (DB) 
                                                                                                                                           Page 136 of 188 
                                                                                                                                                           
                                                                                                                                                           
 
                 ***Huge Data on 25 Distribution Boxes were not included with this report and may be obtained in need as Appendix. 
              Example of finding process and understanding the meanings of non‐conformities with the boxes, few sheets are added above. 
                    Identification and numbers of findings may find in the Summary Sheet with the Project Summary of this report. 
                                                               
                                         Electrical Safety Assessment of XYZ Garments Ltd. Earth and Insulation Resistance 
                                                                                                                         Page 137 of 188 
                                                                                                                                         
                                                                                                                                         
 
Measurement of Earth Resistance 
 
     SL No.           Location                Measured Point              Measured Value                   Remarks 
        1       Transformer Left Side            PIT‐01                       2.8 Ω                             
        2       Transformer Left Side            PIT‐02                       1.7 Ω                             
        ** Note: Earth Resistance should be less than equals 1 Ω(Ohm), shall not exceed 1 Ω. AS per Alliance Standards and 
                               Bangladesh Electricity Rules‐1937, Earth Resistance is not Satisfactory 
       Recommendation to improve the situation‐ Increasing the depth of the earth rod or increasing the numbers of pits with 
             appropriate length of earth rod to reach the underground layer of water as per standard described in BNBC. 
                                               Cell Color Red= D, Orange= C, Yellow= B 
Measurement of Insulation Resistance 
                                                                     
                                                                     
                      LT‐01 
                         Off Loading Measurement                            Resistance 
                                                                Phases                        Remarks 
                                   Points                                      MΩ 
                                                                  R‐Y         420  MΩ  
                                                                  Y‐B         450  MΩ  
                                                                 B‐R          400  MΩ  
                          400A TP MCCB (Main Breaker)                                                
                                                                 R‐N           300 MΩ  
                                                                 Y‐N          280  MΩ  
                                                                 B‐N          300  MΩ  
                                                                  R‐Y         380  MΩ  
                                                                  Y‐B         400  MΩ  
                                                                 B‐R          370  MΩ  
                                 200A TP MCCB                                                        
                                                                 R‐N           250 MΩ  
                                                                 Y‐N          280  MΩ  
                                                                 B‐N          250  MΩ  
                                               Cell Color Red= D, Orange= C, Yellow= B 
                                    Note: Insulation Resistance of the Feeders is good. 
     As per Alliance clause 10.13.4.2 minimum acceptable insulation resistance value is 5 mega ohms (MΩ ) for LT lines. 
 
                                                          
                                                                 Electrical Safety Assessment of XYZ Garments Ltd. Overall Findings 
                                                                                                                               Page 138 of 188 
                                                                                                                                               
                                                                                                                                               
Substation, Generator and Overall Visual Inspection 
 
Probable Cases and comments on entire premises: 
 
                                                         Overall Findings 
                                                                           D 
                                                                B         16% 
                                                               27% 
                                                                       C 
                                                                      57% 
                                                                                                      
         1  GENERATOR ROOM/SUBSTATION‐CHECKLIST                                                                      NC Rating and 
       1.1  General                                                                                                    Findings 
     1.1.1    No/Insufficient /Unsafe stair at the entrance of the Generator room/Substation                    C                     No 
     1.1.2    Combustible material in the Generator room/Substation                                             D                     No
     1.1.3    Combustible material near the HT                                                                  D                     N/A 
     1.1.4    Rains water enters into the substation /generator room                                            D        Yes             
     1.1.5    No/insufficient lighting inside the S/S or generator room                                         C                     No 
     1.1.6    Lint/dirt present in the S/S or Generator room                                                    C                     No
     1.1.7    Combustible Material in cable trench                                                              D                     No 
     1.1.8    No Cover on cable trench                                                                          B                     N/A 
     1.1.9    Improper Installation of LT meter                                                                 B                     No 
       1.2    Generator  
     1.2.1    Generator frame earthing not done                                                                 D        Yes             
     1.2.2    Generator frame earthing done partially (One instead two)                                         D                     N/A 
     1.2.3    Battery terminal is open                                                                          C        Yes             
     1.2.4    Top and bottom of the generator supply terminal box open                                          C        Yes             
     1.2.5    Generator supply terminal box not staled                                                          C                     No 
       1.3    Transformer  
     1.3.1    X‐former installed on combustible wooden stick                                                    D                      No 
     1.3.2    Neutral & earthing of transformer are connected at the same point                                 C        Yes              
     1.3.3    Horn gape Upper/lower part missing                                                                D                      No 
     1.3.4    Horn gape not aligned                                                                             B                      No 
     1.3.5    Silica gel of x‐former breather becomes brown                                                     C                      No 
     1.3.6    Transformer Breather oil pot empty                                                                B                      No 
     1.3.7    Equipment ‐earthing and system earthing shorted                                                   C                      No 
     1.3.8    Huge dirt present on the top and at the bottom of the transformer                                 C                      No 
     1.3.9    Huge dirt present in the transformer area                                                         C                      No 
    1.3.10    Earthing connected with x‐former body w/o lug                                                     B                      No 
       1.4    PFI: 
     1.4.1    The outer side of the board at a glance for the purpose of identification                                  Yes              
     1.4.2    PFI auto controller disordered (not working)                                                      B        Yes
     1.4.3    Panel door cannot be opened fully                                                                 C        Yes              
 
                                                            
                                                                Electrical Safety Assessment of XYZ Garments Ltd. Overall Findings 
                                                                                                                                    Page 139 of 188 
                                                                                                                                                    
                                                                                                                                                    
 
                                                             
                                                             Electrical Safety Assessment of XYZ Garments Ltd. Overall Findings 
                                                                                                                             Page 140 of 188 
                                                                                                                                             
                                                                                                                                             
 
                                                          
                                                               Electrical Safety Assessment of XYZ Garments Ltd. Overall Findings 
                                                                                                                        Page 141 of 188 
                                                                                                                                        
                                                                                                                                        
 
                                                           
                                                                 Electrical Safety Assessment of XYZ Garments Ltd. Overall Findings 
                                                                                                                          Page 142 of 188 
                                                                                                                                          
                                                                                                                                          
 
                                                             
                                                                 Electrical Safety Assessment of XYZ Garments Ltd. Overall Findings 
                                                                                                                          Page 143 of 188 
                                                                                                                                          
                                                                                                                                          
 
                                                              
                                                              Electrical Safety Assessment of XYZ Garments Ltd. Overall Findings 
                                                                                                                       Page 144 of 188 
                                                                                                                                       
                                                                                                                                       
      3.20    Main cut‐out box: 
    3.20.1    Fuse bypassed                                                                               D                    No 
      3.21    C.O.S.: 
    3.21.1    Extra line from common terminal                                                             D                   No 
    3.21.2    Lines taken for indicators w/o fuse                                                         B                   N/A 
    3.21.3    Bunch of cable/multiple cable/looping wire connected at output (common) terminal            C                   No 
    3.21.4    Extra wire connected at input terminal (s) or output (common) terminal(s)                   C                   No 
    3.21.5    The changeover switch enclosure not sealed                                                  C                   No 
      3.22    RAW MATERIAL & FINISHED GOODS STORE –CHECKLIST 
    3.22.1    Normal light (uncovered) above combustible mat                                              D                    No 
    3.22.2    Aerials                                                                                     C                    No 
    3.22.3    Bracket light cover missing                                                                 C                    No 
    3.22.4    Bracket light inside holder loose                                                           C                    No 
      3.23    CHEMICAL ROOM/STORE‐CHECKLIST 
    3.23.1    Normal light above combustible materials or chemical in store                               C      Yes              
    3.23.2    Normal Switch Board installed in the chemical room/chemical store                           C                    No
    3.23.3    Normal Socket installed in the chemical room/chemical store                                 C                    No 
    3.23.4    MCCB/MCB‐box installed in the chemical room/chemical store                                  C                    No 
      3.24    LIFT ROOM – CHECKLIST 
    3.24.1    No/insufficient/unsafe stair to the entrance of lift room                                   C                   N/A 
    3.24.2    Motor ECC not done                                                                          D                   N/A 
    3.24.3    Motor connection terminal cover not sealed / glanded                                        C                   N/A 
    3.24.4    No mechanical guard on rotating part                                                        B                   N/A 
      3.25    MAINTENANCE ROOM‐ CHECKLIST                                                                                        
    3.25.1    Chemical stored inside the maintenance room                                                 C                   No 
    3.25.2    Maintenance personnel don’t have PPE                                                        C      Yes             
    3.25.3    Maintenance personnel not using PPE while working                                           C      Yes             
    3.25.4    No/insufficient light on working platform in the maintenance room                           C      Yes             
    3.25.5    No earthing connection at the welding M/C (or other M/C)                                    C                   No 
    3.25.6    Grinding M/C (or other M/Cs) installed on wooden platform/table/combustible material        D      Yes             
    3.25.7    Drill M/C (or other M/Cs) connection terminal not sealed properly                           C      Yes             
 
 
 
 
 
 
 
                                                                      
                                                                      
                                                          
                                                                         Fire Safety Assessment of XYZ Garments Ltd. Project Summary 
                                                                                                                                                Page 145 of 188 
                                                                                                                                                                
                                                                                                                                                                
Fire Safety Assessment 
 
Administration and Enforcement 
The report is as detailed as possible, made illustrated so that this can be used as a checklist. The criteria used can be 
found  in  Nonconformities  and  Code  Descriptions  in  Observation  Summary  part.  A  summary  sheet  is  attached  at 
beginning of the report. 
 
Project Description 
       Name of the Facility                                    XYZ Garments Ltd. 
       Location of the Facility                                ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐, Bangladesh
       Nature of Facility                                      Embroidery 
       Area of Floor                                           As mentioned at the beginning of the report 
       Fire Safety Rating (Final)                              C 
       Time to Complete the Deficiencies                       As described in the Finding Summary 
 
                               Fire Safety Assessment: Overall Rating for XYZ Garments Ltd. is: 
                                                                
 
 
                                             D                              C                              B 
                                                                             
                                                         Total Observations= 115 
                                                            D 
                                                           0%          N/A  C 
                                                                       13%  10% B 
                                                                              19% 
                                                                           A 
                                                                          58% 
                                                                                             
          The details of the score are shown in different chapters of this report and brief with the summary 
                                                             
                                                             
           Classification of Findings        Symbol        Negative Points of each Findings  No. of Findings 
                       Red                       D                         10                            0 
                     Orange                      C                          5                           11 
                     Yellow                      B                          1                           22 
                  Fit for work                   A                          0                           67 
                Not Applicable                 N/A                                                      15
                                                             Total Number of Observations=             115 
             N. B. No issues were rated under rating D since there exists a minimum system for the fire safety and fighting at the premises. 
 
 
 
                                                                  
                                                             Fire Safety Assessment of XYZ Garments Ltd. Project Summary 
                                                                                                                Page 146 of 188 
                                                                                                                                
                                                                                                                                
Following criteria were used for this assessment: 
    1. Alliance Standard‐ Final 
    2. Bangladesh National Building Code (BNBC) 2006. 
    3. Appropriate parts of the NFPA 10, 13, 14, 20, 22, 24, 25, 30, 51B, 72, 80, 252 and 257 
 
For this, the following chapters of BNBC 2006 were taken into consideration: 
              a. Chapter 3 – General Building requirements (Appropriate Sections) 
              b. Chapter 4– Fire Protection (Appropriate Sections) 
              c. Chapter 8 – Building Services (Appropriate Sections) 
              d. Chapter 9 – Use of Existing Building (Appropriate Sections) 
 
The methodologies of the inspection are: 
 
    1. Measurement of different stair, corridor, etc.: Values were evaluated and compared with the standards. 
          
    2. Inspection  of  the  whole  firefighting  system:  The  complete  firefighting  system  was  inspected,  section  by 
         section, floor by floor, from the source to the final points for users. Any differences or deviations against the 
         criteria were noted. Components/areas having lapses were photographed. 
          
    3. A thorough analysis of all the findings was made and report prepared in following manner: 
         A  set  of  descriptive  Non‐Conformity  Reports  (NCRs)  were  made,  where  the  deficiencies  are  described  and 
         associated references are cited in next pages. 
 
Interpretation of the Report 
In order to use the reports effectively, following points need to be noted: 
 
    7. The summary documents at the beginning of the report and the overall rating of the facility shall be noted 
    8. At the facility level, management shall assign appropriate persons to study the reports, and make a detailed 
         action plan immediately, based on the report and recommendations at various points, share this with us, and 
         execute the improvements. For your safety and liability purposes, we recommend that licensed contractors 
         evaluate and repair any deficiencies. 
    9. For  any  clarification  of  the  report,  a  meeting  can  be  arranged,  where  any  item  which  is  not  readily 
         understood can be explained. 
 
Facility Description 
Name of the Facility:      XYZ Garments Ltd. 
                           ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐, Bangladesh 
Nature of the Facility:    Embroidery 
Contact Person:            Md. Bangir Ahamed (Factory Manager). Contact no.:+88‐0726086567 
No of Building:            1 Building 
 
Summary of the Premises 
                                  Description                                               Area (Sft) 
                                   
                                                                 As mentioned at the beginning of the 
                                         Building ‐ 01 
                                                                               report  
                                   
 
                                                          
                                                                       Fire Safety Assessment of XYZ Garments Ltd. Project Summary 
                                                                                                                                   Page 147 of 188 
                                                                                                                                                   
                                                                                                                                                   
 
Numbers of Findings on Non Compliances (NCs) 
                                                                                     Visual & Measure       Time to Rectify 
 
              Deficiency‐ Red                                                                    10                   30 Days 
              Deficiency‐ Orange                                                                 5                    90 Days 
              Deficiency‐ Yellow                                                                 1                    180 Days 
                                    **Time mentioned above is for normal cases unless described other values. 
 
Calculation of Deficiency Rating 
                                                               Negative Points        No. of                           Total Negative 
            Classification of Findings              Symbol 
                                                               of each Findings      Findings                              Point 
                       Red                           D                10                 0                                    0 
                     Orange                          C                5                 11                                   55 
                     Yellow                          B                1                 22                                   22 
                      Blue                           A                0                 67                                    0 
                   Light Black                      N/A                                 15                                      
                                                         Total Negative Points in the premises=                              77 
                                                Average Negative Points on Each Observations =                              0.67 
 
Rating of the Factory Considering the Firefighting System 
                                           According to Negative Points Scored                          According to Negative Points and 
        Name of the Facility 
                                                         (Rating)                                      Consideration Factors (Final Rating) 
         XYZ Garments Ltd.                                Yellow                                                       C 
                                   There is no Fire rated Door at the factory which leads to rate the factory at C 
 
Factory/Premises Rating Table Based on NC and Other Consideration Factors 
           Status                 A: Fit for Work                     B: Yellow                      C: Orange                  D: Red 
    Rating Consideration                  0                           0.1 to 3.5                      3.6  to 7             7.1 and above 
 
Rating Criteria at a Glance 
 
      1. If no provision for Fire Exit is provided then the factory may be rated as D. 
      2. If any single floor or part of a building is rated D, then the entire building may be rated as D. 
      3. If generator/substation room is not separated from the main structure then the factory/installation/facility 
         may be rated as B. 
      4. If manual call point is not present in the facilities then the factory/installation/facility may be rated as C. 
      5. If Fire resistive door is not provided as per requirement then the factory may be rated as C.  
      6. If the Sub‐Station/Boiler room is or in the factory building but layout of these are not as per BNBC code, then 
         the factory may be rated as C. 
                                                                
                                                                                                                         Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                                    Page 148 of 188 
                                                                                                                                                                                                    
                                                                                                                                                                                                    
                                                               XYZ Garments Ltd.  ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐, Bangladesh 
                                    Fire Safety Assessment Finding Details from Descriptive NC, Visual Inspection and Available Information 
                                                                                                                                                                                      Time to 
              Alliance/BNBC 
    NC No.                          Description                Picture Reference                     Observations                    Recommended Corrective Measures                 Complete 
                  Section 
                                                                                                                                                                                       (Days) 
                                                                                        i. 01 no Generator(100 KVA) has been 
                                                                                             installed at a separated tin shed 
                                                                                         having 5 inch thick brick wall on one 
                                                                                          side which is 25 inch high and has 2  
                                                                                         hr fire  resistance considering plaster 
                                                                                         & painting. Other side is enclosed by 
                                                                                            the building wall which is 10 inch 
                               Generator Room, Fuel 
    NC‐1.1       3.4.2.1.3                                                                  thick and has 5  hr fire  resistance     No Corrective Measures Needed (None)                N/A 
                               Tank & Exhaust System 
                                                                                              considering plaster & painting. 
                                                                                          ii. 01 no fuel tank found outside the 
                                                                                         tin shed. Fuel tank capacity 225 liter.
                                                                                       
                                                                                               iii. Exhaust system exists and 
                                                                                           discharge to the exterior of the tin 
                                                                                             shed in the open space in a safe 
                                                                                                          location. 
                                                                                                                                      Rooms used for the housing of oil‐filled 
                                                                                                                                     transformers shall be in compliance with 
                                                                                          i.  Oil‐filled transformer (200KVA) has      BNBC Part 4 Section D 15 for high‐rise 
                               Room for Oil or Dry type 
    NC‐1.2       3.4.2.1.4                                                                      been installed in open space.        buildings. Oil filled transformers for non‐         180 
                                   Transformer 
                                                                                               ii.  Fire extinguisher not found.     high‐rise buildings shall be separated by a 
                                                                                                                                        minimum 2 hour fire resistive rated 
                                                                                                                                                     construction 
                                                                                       
                                                                                             i. All RC floor slabs having 19 mm 
                                                                                           clear cover has minimum 2.5 hr fire 
                                                                                                             ratings.  
                                                                                          ii. All floor beam having 35 mm clear 
                                  Fire resistance of                                      cover has more than 4 hr fire ratings.  
    NC‐1.3          4.4                                                                                                                                (None)                            N/A 
                                 structural members                                          iii. All floor columns 35  mm clear 
                                                                                          cover has more than 4 hr fire ratings.  
                                                                                           Over all the structural members are 
                                                                                           in the type ‐1 i.e. highest degree of 
                                                                                                    fire resistance element.  
 
 
                                                                                                                 Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                 Page 149 of 188 
                                                                                                                                                                                 
                                                                                                                                                                                 
 
                                                                                                                                                                   Time to 
              Alliance/BNBC 
    NC No.                          Description            Picture Reference                Observations                      Recommended Corrective Measures     Complete 
                  Section 
                                                                                                                                                                    (Days) 
                                                                                   i. All exterior and interior non load 
                                                                                bearing walls (10 inch thick) have 5 hr 
                                                                                     fire resistance rating considering 
                                                                                       plaster and painting which are 
                                                                                  Moderate degree of fire resistance 
                                                                                                     element.  
                                                                                   ii. All  non‐load bearing fire wall (5 
                                                                                inch thick )  have 2  hr fire  resistance 
                               Fire Resistance Ratings                               highest degree of fire resistance 
    NC‐1.4        4.4.1                                                                                                                    (None)                     N/A 
                                of Common Elements                                                   element. 
                                                                                   iii. Fire barriers walls (5 inch thick) 
                                                                                have 2  hr fire  resistance considering 
                                                                                       plaster and painting which are 
                                                                                  Moderate degree of fire resistance 
                                                                                       element. Over all the common 
                                                                                       elements are in the type ‐2 i.e. 
                                                                                  moderate degree of fire resistance 
                                                                                                     element.  
                                                                                    Parapet in the roof is 34 inch high 
                               Parapets wall thickness                          which is constructed with 5 inch thick 
    NC‐1.5        4.4.2                                                                                                                    (None)                     N/A 
                               & height of the parapets                              brick wall. The parapet walls are 
                                                                                            plastered on both sides. 
                                                                                    i. Floors are separated by RC floor 
                                 Separation of floors,                          slab having 19 mm clear cover have 3 
                                occupancies, hazards,                                             hr fire ratings.  
    NC‐1.6        4.5.1                                                                                                                    (None)                     N/A 
                                   exit enclosures                                Ii. Other occupancies, hazards, exit 
                                construction thickness                               enclosures are separated by fire 
                                                                                 barrier walls (10 inch & 5 inch thick).
                                                                                  I. At outside 10 inch thick brick wall 
                                                                                     have 5  hr fire  resistance rating. 
                                                                                        Ii. Fire barriers wall of 5 inch 
                                    Fire barriers 
    NC‐1.7        4.5.2                                                            thickness have more than 2 hr fire                      (None)                     N/A 
                                    construction 
                                                                                                resistance rating. 
                                                                                Iii. RC slabs for separating floors have 
                                                                                 more than 3 hr fire resistance rating. 
 
                                                                                                                       Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                                   Page 150 of 188 
                                                                                                                                                                                                   
                                                                                                                                                                                                   
 
                                                                                                                                                                                     Time to 
               Alliance/BNBC 
    NC No.                            Description                 Picture Reference               Observations                     Recommended Corrective Measures                  Complete 
                   Section 
                                                                                                                                                                                      (Days) 
                                                                                         Fire barriers are not continuous in 
                                                                                       one stair. In other places fire barriers 
                                Fire barrier construction 
    NC‐1.8        4.5.2.1                                                               are continuous from outside wall to                          (None)                             N/A 
                                      continuation 
                                                                                       outside wall, from one fire barrier to 
                                                                                          another or combination thereof. 
                                                                                          Fire barriers are constructed that 
                                                                                        have fire resistance rating shown in 
                                Fire barrier construction 
    NC‐1.9        4.5.2.2                                                                 BNBC part 4 table 4.1.1  which is                          (None)                             N/A 
                                    materials testing 
                                                                                           prepared based on the testing 
                                                                                            requirements of ASTM E 119.
                                   All openings in fire 
                                                                                         Openings in fire barriers are not            All openings in fire barriers shall be 
                                    barriers shall be 
                                                                                          protected with fire protective             protected with the same fire‐resistant 
    NC‐1.10       4.5.2.3         protected with fire‐                                                                                                                                  180 
                                                                                          assemblies. External wall have            protective of fire barriers as per alliance 
                                  resistant protective 
                                                                                         exhaust fan and glass windows.                              standard. 
                                         opening 
                                                                                                                                    Fire doors assemblies should conform to 
                                                                                                                                    NFPA 252, BS 476 Part 22, EN 1364‐1, GB 
                                                                                                                                      12955‐2008, or IS 3614 Part II and at 
    NC‐1.11       4.5.4.1              Fire Doors                                            Fire doors are not found                                                                    90 
                                                                                                                                      passages that connected with lobby, 
                                                                                                                                      workshops, storerooms, plant rooms, 
                                                                                                                                                should be installed.  
                                                                                                                                   Fire windows should conform to NFPA 257 
                                                                                                                                     or British, European, Chinese, or Indian 
    NC‐1.12       4.5.5.1            Fire windows                                           Fire windows are not found                                                                  180 
                                                                                                                                    standard for fire window tests should be 
                                                                                                                                               installed at staircase. 
                                 Ducts penetrating fire‐
    NC‐1.13        4.5.6             resistance rated                                   Ducts penetrations are not found.                            (None)                             N/A 
                                                                           
                                        assemblies 
                                  A shaft enclosure shall 
    NC‐1.14       4.5.7.1       be have a minimum fire‐                                        Shafts are not found.                                 (None)                             N/A 
                                resistance rating of 2 hr 
                                  A shaft enclosure shall 
    NC‐1.15       4.5.7.2       be constructed as a fire                                       Shafts are not found.                                 (None)                             N/A 
                                          barrier 
 
 
                                                                                                                         Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                                    Page 151 of 188 
                                                                                                                                                                                                    
                                                                                                                                                                                                    
 
                                                                                                                                                                                      Time to 
               Alliance/BNBC 
    NC No.                           Description                Picture Reference                    Observations                     Recommended Corrective Measures                Complete 
                   Section 
                                                                                                                                                                                       (Days) 
                                  Openings in shafts 
    NC‐1.16        4.5.7.3      satisfies the purpose of                                         Shafts are not found.                                 (None)                            N/A 
                                        the shaft 
                                                                                         Door Openings in fire barriers are not 
                                                                                             protected with fire protective 
                                                                                                                                        Openings in fire resistance rated walls 
                                   Openings in fire                                         assemblies. External walls have 
    NC‐1.17          4.6                                                                                                               should be protected with fire protective          180 
                                resistance rated walls                                   exhaust fan and glass windows which 
                                                                                                                                                opening assemblies.  
                                                                                             are also not protected by fire 
                                                                                                protective assemblies. 
                                                                                           Found numbers of Penetrations on 
                                  Penetrations of fire                                       the barrier walls at all floors like 
                                                                                                                                         Need to be redone as per standards 
    NC‐1.18          4.7           barriers shall be                                              compressed air pipes, air                                                              180 
                                                                                                                                              according to ASTM E814 
                                  protected firestop                                       conditioning channels at all floors, 
                                                                                              which are not properly sealed. 
                                                                                              Automatic sprinkler protection 
                                 Automatic sprinkler 
                                                                                         system is not required as the building 
    NC‐1.19       5.3.2.1.1      protection for above                                                                                                  (None)                            N/A 
                                                                                           height above the finished grade is 
                                     height 75 ft. 
                                                                                                       less then 75ft. 
                                                                                                 Roof top tank= 792 Gallon 
                                                                                         (02 Nos. tank  of capacity  264 Gallon 
                                                                                                      and 528 Gallon) 
                                                                                                                                       Roof top Water Tank and Underground 
                                                                                              Underground water tank= 792 
                                                                                                                                     Water Tank. No new roof‐mounted tanks to 
                                                                                                           Gallon. 
                                                                                                                                     supply water to new standpipe or sprinkler 
                                    Roof top and                                          (Calculation: Total Riser 1 no. having 
                                                                                                                                       protection installations shall be allowed 
    NC‐1.20         5.5.2        Underground Water                                             total 6 nos hose connection.                                                               90 
                                                                                                                                     without complying with the requirements of 
                                       Tank                                                 Considering 4 nos. operating at a 
                                                                                                                                       Alliance Standard Part 8. Tanks shall be 
                                                                                                time. Total 4x30=120 GPM. 
                                                                                                                                       sized for the minimum duration for fire 
                                                                                            Additional 30 GPM is required for 
                                                                                                                                      protection supply as outlined in NFPA 24. 
                                                                                          other's use). For 75 minutes fighting 
                                                                                             underground reservoir capacity 
                                                                                               required 150x75=11,250 gal) 
 
 
                                                                                                                  Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                 Page 152 of 188 
                                                                                                                                                                                 
                                                                                                                                                                                 
 
                                                                                                                                                                   Time to 
               Alliance/BNBC 
    NC No.                            Description              Picture Reference               Observations                   Recommended Corrective Measures     Complete 
                   Section 
                                                                                                                                                                    (Days) 
                                The automatic sprinkler 
                                                                                       Automatic sprinkler protection 
                                system design criteria in 
                                                                                    system is not required as the building 
    NC‐1.21         5.5.1           general production                                                                                     (None)                     N/A 
                                                                                      height above the finished grade is 
                                     areas of factories, 
                                                                                               less then 75ft.. 
                                 including storage areas  
                                     Pipe schedule for                                 Automatic Sprinkler protection 
    NC‐1.22         5.3.3                                                                                                                  (None)                     N/A 
                                      Sprinkler system                              System is not required at this factory 
                                All valves for firefighting                            Automatic Sprinkler protection  
    NC‐1.23        5.3.5.1                                                                                                                 (None)                     N/A 
                                           system                                   System is not required at this factory 
                                The automatic sprinkler 
                                 system waterflow shall                                Automatic Sprinkler protection 
    NC‐1.24        5.3.5.2                                                                                                                 (None)                     N/A 
                                  activate the fire alarm                           System is not required at this factory 
                                           system 
                                    Automatic sprinkler                                Automatic Sprinkler protection 
    NC‐1.25         5.3.6                                                                                                                  (None)                     N/A 
                                 systems shall be tested                            System is not required at this factory 
                                     Minimum storage 
                                  clearance with 18 inch                             Automatic Sprinkler System is not 
    NC‐1.26        5.3.6.1                                                                                                                 (None)                     N/A 
                                     with the sprinkler                                  required at this factory 
                                      system installed 
                                                                                       Automatic Sprinkler protection 
                                                                                    System is not required at this factory
                                   Solid Racks & Shelves                               Found racks are open type. All 
                  5.3.6.2.1  
    NC‐1.27                       with sprinkler system                               shelves have layer of rack whose                     (None)                     N/A 
                  5.3.6.2.1 
                                         installed                                       height is 40 inch. Minimum 
                                                                                    clearances between the roof and the 
                                                                                          racks are found 11 inch.   
                                Minimum aisles shall be                                Automatic Sprinkler protection 
                                  maintained free of                                System is not required at this factory 
    NC‐1.28        5.3.6.3                                                                                                                 (None)                     N/A 
                                  storage if sprinkler                                Found minimum aisles of 40 inch 
                                  system is installed                               wide are maintained free of storage.  
 
 
                                                                                                                Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                         Page 153 of 188 
                                                                                                                                                                                         
                                                                                                                                                                                         
 
                                                                                                                                                                           Time to 
               Alliance/BNBC 
    NC No.                           Description            Picture Reference               Observations                   Recommended Corrective Measures                Complete 
                   Section 
                                                                                                                                                                            (Days) 
                                                                                                                              Standpipe systems shall be installed 
                                                                                                                           throughout all new and existing buildings 
                                                                                                                          and structures where the highest occupied 
                                                                                                                          floor is more than 10 m (33 ft) above grade 
                                                                                                                           or more than 10 m (33 ft) below grade. As 
    NC‐1.29        5.4.2          Standpipe systems                               01 No. 2 inch dia. GI pipe is found.                                                         90 
                                                                                                                            per 5.4.3 Standalone standpipe systems 
                                                                                                                            shall meet the local BNBC requirements 
                                                                                                                          with a minimum 450 kPa (65 psi) pressure at 
                                                                                                                              the hydraulically most remote hose 
                                                                                                                                    connection or NFPA 14. 
                                 Class I standpipe hose                           03 hose connections are found with 
                                connections (65 mm) at                             standpipe of 2 inch dia and hose       Class I standpipe hose connections (65 mm) 
    NC‐1.30       5.4.4.1                                                                                                                                                      90 
                                    each stairways &                                length is 30 meter . Roof is not          at each stairways & occupied roofs 
                                     occupied roofs                                            occupied. 
                                                                                                                          Fire department (Siamese) inlet connections 
                                    Fire department                                                                        shall be provided to allow fire department 
    NC‐1.31        5.5.4                                                           Siamese connection is not found.                                                            90 
                                        (Siamese)                                                                          pumper equipment to supplement the fire 
                                                                                                                                       protection systems. 
                                                                                   Found 42 nos. ( 29 nos. , 5 kg ABC 
                                       Portable fire                             type, 13 Nos. , 5 kg CO2 type ) whose 
                                   extinguishers travel                            top level height 33 inch from floor 
    NC‐1.32         5.6                                                                                                                     (None)                            N/A 
                                distance, gross weight &                             level. The maximum distance 
                                    height of the top                             between two fire extinguishers are 
                                                                                               found 30 ft. 
                                  For Occupancy B.  A 
    NC‐1.33       5.7.3.2          manual fire alarm                                              N/A                                       (None)                            N/A 
                                        system 
                                 For Occupancy E.  An 
    NC‐1.34       5.7.3.3        automatic fire alarm                                             N/A                                       (None)                            N/A 
                                        system 
                                  For Occupancy F.  A 
    NC‐1.35       5.7.3.4          manual fire alarm                                              N/A                                       (None)                            N/A 
                                        system 
 
                                                                                                                 Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                           Page 154 of 188 
                                                                                                                                                                                           
                                                                                                                                                                                           
 
                                                                                                                                                                             Time to 
               Alliance/BNBC 
    NC No.                            Description              Picture Reference              Observations                   Recommended Corrective Measures                Complete 
                   Section 
                                                                                                                                                                              (Days) 
                                 For Occupancy G1.  A 
    NC‐1.36       5.7.3.5         manual fire alarm                                                 N/A                                       (None)                            N/A 
                                        system 
                                                                                      Found  Manual type Fire Alarm            An automatic fire alarm and detection 
                                 For Occupancy G2.  An                               system ( 04 nos. sound device) in      system shall be provided throughout all new 
    NC‐1.37       5.7.3.6                                                                                                                                                       180 
                                  automatic fire alarm                              front of every stair with emergency       and existing moderate hazard industrial 
                                                                                               power supply.                                occupancies. 
                                   For Occupancy H.  A 
    NC‐1.38       5.7.3.7           manual fire alarm                                               N/A                                       (None)                            N/A 
                                         system
                                  For Occupancy J.  An 
    NC‐1.39       5.7.3.8        automatic fire alarm &                                             N/A                                       (None)                            N/A 
                                    detection system 
                                   For Occupancy K.  A 
    NC‐1.40       5.7.3.9           manual fire alarm                                               N/A                                       (None)                            N/A 
                                         system 
                                                                                    An automatic heat and smoke vents 
                                                                                       are not required to convert to 
                                 An automatic heat and 
    NC‐1.42        5.8.3                                                             manual operation since automatic                         (None)                            N/A 
                                  smoke vents system 
                                                                                     sprinkler protection system is not 
                                                                                       recommended for this factory. 
                                                                                     Fire lift is not required because 3‐
                   5.9.1 
    NC‐1.43                              Fire lifts                                 storied building of height not more                       (None)                            N/A 
                   5.9.2 
                                                                                                   than 20 m. 
 
                                                                                                                          Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                                          Page 155 of 188 
                                                                                                                                                                                                          
                                                                                                                                                                                                          
 
                                                                                                                                                                                            Time to 
               Alliance/BNBC 
    NC No.                            Description              Picture Reference                     Observations                       Recommended Corrective Measures                    Complete 
                   Section 
                                                                                                                                                                                             (Days) 
                                  Exit access corridors 
                                  serving an occupant 
                                load exceeding 30 shall 
    NC‐1.44       6.3.1.1                                                                   One exit access corridor found.                                (None)                              N/A 
                                 be separated by walls 
                                having a fire resistance 
                                          rating 
                                                                                                                                                                   
                                                                                         Found  01 (one) no. common stair in 
                                                                                                                                          i. Exits connecting three or fewer stories 
                                                                                          the building with 10 inch brick wall 
                                                                                                                                        shall be enclosed with a minimum 1‐hr fire‐
                                                                                         having fire resistance rating 5 hours  
                                                                                                                                                         resistance rating. 
                                  Exits shall be enclosed                                considering plaster and painting. 01 
                                                                                                                                       ii. Exits connecting four or more stories shall 
    NC‐1.45       6.3.1.2          with fire‐resistance                                     no steel stiar of width 45 inch is                                                                 180 
                                                                                                                                            be enclosed with a minimum 2‐hr fire‐
                                   rated construction                                     found which connects 1st floor and 
                                                                                                                                                         resistance rating. 
                                                                                         2nd floor and which is not enclosed 
                                                                                                                                          iii.  Exits shall be enclosed with the same 
                                                                                          by fire resistance rated wall on one 
                                                                                                                                       fire‐resistance rating as the floor penetrated 
                                                                                                           side. 
                                                                                                                                                but will not need to exceed 2 hr. 
                                                                                                                                        Exterior exit stairs shall be separated from 
                                                                                           1 no.  Exterior exit stair of width 36 
                                Exterior exit stairs shall                                                                             the building with the rating requirements of 
                                                                                         inch is found which connects ground 
    NC‐1.46       6.3.1.3       be separated from the                                                                                  6.3.1.2.  The rating of the exterior wall shall         180 
                                                                                         floor and first floor. Exterior exit stair 
                                        building                                                                                         extend 3.05 m (10 ft) beyond the ends of 
                                                                                                  fabricated by MS steel.  
                                                                                                                                                     the stair structure. 
                                                                                      
                                      Interior Finish                                       Interior walls are painted with 
                                                                                                                                         Need to paint with noncombustible, fire 
    NC‐1.47        6.3.2        maintaining class A, B &                                   distemper paints at the means of                                                                    180 
                                                                                                                                                    resistance color 
                                             C                                                          egress. 
                                Headroom: All means of 
                                    egress shall have a                                   Ceiling height at all means of egress 
                                 minimum ceiling height                                    is more than 10 ft and minimum 
    NC‐1.48        6.3.3         of 2.3 m (7 ft 6 in.) with                                height of doors (thai aluminium,                                (None)                              N/A 
                                  projections from the                                   swinging and collapsible) are 80 inch . 
                                ceiling not less than 2.03                                    Height of head room is 10 ft. 
                                       m (6 ft 8 in.) 
                                    Abrupt changes in                                        Not found. There is no abrupt 
    NC‐1.49       6.3.4.1          elevation of walking                                     changes in elevation of walking                                (None)                              N/A 
                                         surfaces                                                      surfaces. 
                                                                                                                    Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                   Page 156 of 188 
                                                                                                                                                                                   
                                                                                                                                                                                   
 
                                                                                                                                                                     Time to 
               Alliance/BNBC 
    NC No.                            Description             Picture Reference               Observations                    Recommended Corrective Measures       Complete 
                   Section 
                                                                                                                                                                      (Days) 
                                 Walking surfaces shall 
                                     be mostly level; 
                                    however, shall not 
                                                                                      No changes in level on walking 
    NC‐1.50       6.3.4.2       exceed a slope of 1 in 20                                                                                   (None)                      N/A 
                                                                                                surfaces 
                                in the direction of travel 
                                   unless meeting the 
                                requirements for ramps 
                                   The change in level 
                                 marked with additional 
    NC‐1.51       6.3.5.1                                                                   No changes in level.                            (None)                      N/A 
                                     signage or floor 
                                        markings. 
                                                                                    Stairways found to be uniform and 
                                    Walking surfaces, 
                                                                                    have tiles and cement finish which 
                                   including stairway 
    NC‐1.52        6.3.6                                                           are not slippery. Walking surfaces are                   (None)                      N/A 
                                treads shall be uniformly 
                                                                                    found to be uniform and have non‐
                                      slip resistant 
                                                                                    slippery tiles and cement finishing. 
                                      No locks or other 
                                devices shall be installed 
                                   on a means of egress                             Both way of egress paths are open 
                                  component that would                              for all time. Locks, alarms, or other 
    NC‐1.53        6.3.8                                                                                                                    (None)                      N/A 
                                   prevent any occupant                            devices are not installed in the egress 
                                 from having safe egress                                           pathway. 
                                    from the building or 
                                          structure 
                                Means of egress shall be 
                                maintained continuously 
                                     free and clear of all                            Means of egress are found to 
    NC‐1.54        6.3.9               obstructions or                               continuously free and clear of all                     (None)                      N/A 
                                    impediments to full                               obstructions or impediments. 
                                instant use in the case of 
                                 fire or other emergency 
 
 
                                                                                                                           Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                          Page 157 of 188 
                                                                                                                                                                                          
                                                                                                                                                                                          
                                                                                                                                                                            Time to 
               Alliance/BNBC 
    NC No.                            Description                 Picture Reference                   Observations                     Recommended Corrective Measures     Complete 
                   Section 
                                                                                                                                                                             (Days) 
                                     No furnishings, 
                                 decorations, or other                                     No furnishings, decorations, or other 
                                 objects shall obstruct                                    objects are found that obstruct exits 
    NC‐1.55       6.3.9.1                                                                                                                           (None)                     N/A 
                                exits and access to exits.                                 and access to exits. Visibility to exits 
                                Nothing shall obstruct or                                      found to be obstruction free. 
                                impede visibility to exits 
                                                                                              192 persons in whole factory. 65 
                                                                                            persons are working in the 1st floor 
                                                                                           of the building which is the maximum 
                                                                                                number of workers per floor. 
                                                                                                The calculated occupant load 
    NC‐1.56         6.4             Occupancy Load                                                                                                  (None)                     N/A 
                                                                                           considering the maximum number of 
                                                                                                         workers is: 
                                                                                           (7500*0.8)/65 = 92.30 ft2 per person.
                                                                                           Considering 80% floor area is used for 
                                                                                                    production purpose. 
                                Aisles shall be provided 
                                    with a minimum                                         Minimum aisles are 40 inch wide. The 
    NC‐1.57        6.5.1                                                                                                                            (None)                     N/A 
                                  unobstructed clear‐                                           aisles have no obstacles. 
                                width of 0.9 m (36 in.) 
                                                                                        
                                                                                             The path of egress travel along a 
                                The path of egress travel 
                                                                                           means of egress are found free of any 
                                  free from obstacle & 
    NC‐1.58        6.5.2                                                                     obstruction.  The capacity of the                      (None)                     N/A 
                                   shall not be reduced 
                                                                                              means of egress are not being 
                                 along the path of travel 
                                                                                            reduced along the path of travel. 
 
 
                                                                                                                        Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                       Page 158 of 188 
                                                                                                                                                                                       
                                                                                                                                                                                       
 
                                                                                                                                                                         Time to 
               Alliance/BNBC 
    NC No.                            Description             Picture Reference                     Observations                    Recommended Corrective Measures     Complete 
                   Section 
                                                                                                                                                                          (Days) 
                                                                                         Found  01 (one) no. common stair of 
                                                                                              width 52 inch in the building.  
                                                                                            01(one) no internal steel stiar of 
                                                                                            width 45 inch which connects 1st 
                                The total capacity of the                                    floor and 2nd floor and 01 no.  
                                means of egress shall for                                  exterior exit steel stair of width 36 
                                any story, floor, or other                              inch which connects ground floor and 
    NC‐1.59        6.5.3        occupied space shall be                                           first floor are found.                          (None)                    N/A 
                                    sufficient for the                                       The calculated capacity of   the 
                                   occupant load as                                         means of egress considering the 
                                       calculated                                           maximum number of workers is: 
                                                                                          8 mm per person * 65 =  520 mm = 
                                                                                         21 inch. As per Alliance section 6.5.4
                                                                                         Total width of stairs are (52+36)= 88 
                                                                                                           inch.
                                                                                        03 nos swinging thai door of width 60 
                                                                                          inch, 64 inch and 48 inch, 01 no ply 
                                 Doors in an existing                                    wood door of  width 36 inch and 01 
                                 means of egress shall                                     no swinging steel door of width 42 
    NC‐1.60       6.5.6.1                                                                                                                        (None)                     N/A 
                                have a minimum width                                     inch, and one Collapsible door of 60 
                                   of 0.8 m (32 in.)                                    inch are found in the means of egress 
                                                                                            which are kept open for working 
                                                                                                           time. 
                                                                                         Found  01 (one) no. common stair of 
                                                                                              width 52 inch in the building.  
                                 In existing construction,                                  01(one) no internal steel stiar of 
                                    stairs shall have a                                     width 45 inch which connects 1st 
    NC‐1.61      6.5.6.2.2.                                                                                                                      (None)                     N/A 
                                minimum width of 0.9 m                                       floor and 2nd floor and 01 no.  
                                          (35 in.)                                         exterior exit stair of width 36 inch 
                                                                                        which connects ground floor and first 
                                                                                                     floor are found. 
 
 
                                                                                                                    Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                             Page 159 of 188 
                                                                                                                                                                                             
                                                                                                                                                                                             
 
                                                                                                                                                                               Time to 
               Alliance/BNBC 
    NC No.                            Description            Picture Reference                   Observations                   Recommended Corrective Measures               Complete 
                   Section 
                                                                                                                                                                                (Days) 
                                  Only one exit shall be 
                                   required in existing 
                                   buildings where the 
    NC‐1.62        6.6.2                                                               Such  type of building is not found                       (None)                           N/A 
                                occupant load and travel 
                                 distance listed in Table 
                                 6.6.2 are not exceeded 
                                The number of means of 
                                egress from any floor or 
                                  story shall not be less                               65 persons are working on the 1st 
                                     than 3 when the                                    floor of the building  which is the 
    NC‐1.63        6.6.3         occupant load exceeds                                  maximum number of workers per                            (None)                           N/A 
                                  500 per story and not                               floor. 02 (two) Nos stair are found in 
                                  less than 4 when the                                         the means of egress. 
                                 occupant load exceeds 
                                      1000 per story 
                                                                                      03 nos swinging thai door of width 60 
                                                                                        inch, 64 inch and 48 inch, 01 no ply 
                                                                                       wood door of  width 36 inch and 01 
                                  Doors in a means of                                   no swinging steel door of width 42      Side‐hinged swinging type doors should be 
    NC‐1.65        6.8.1                                                                                                                                                          180 
                                        egress                                         inch, and one Collapsible door of 60          installed in the  means of egress.  
                                                                                      inch are found in the means of egress 
                                                                                          which are kept open for working 
                                                                                   
                                                                                                       time.
                                    Doors shall not be 
                  6.8.2.1  
                                 locked in the direction                               Locked doors are not found in the 
    NC‐1.66       6.8.2.2                                                                                                                        (None)                           N/A 
                                   of egress under any                                         means of egress. 
                  6.8.2.3 
                                        conditions 
 
                                                                                                                        Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                                Page 160 of 188 
                                                                                                                                                                                                
                                                                                                                                                                                                
 
                                                                                                                                                                                  Time to 
               Alliance/BNBC 
    NC No.                            Description            Picture Reference                     Observations                      Recommended Corrective Measures             Complete 
                   Section 
                                                                                                                                                                                   (Days) 
                                   Every door in a stair 
                                                                                        Locked doors are not found in the 
                   6.8.3         enclosure serving more 
    NC‐1.67                                                                            means of egress. Every stair gate has                         (None)                          N/A 
                  6.8.3.1         than 5 stories shall be 
                                                                                               re‐entry provision. 
                                 provided with re‐entry 
                                     landing shall be 
                                 provided on both sides                                 Landing is provided on both sides of 
    NC‐1.68        6.8.5                                                                                                                             (None)                          N/A 
                                of doors & not swing out                                   doors in the means of egress. 
                                        over stairs 
                                                                                       Side wall of common staircase is built 
                                    Stairs shall be of 
                                                                                        with 10 inch thick brick wall which is          Stairs shall be of noncombustible 
    NC‐1.69       6.9.2.1           noncombustible                                                                                                                                   180 
                                                                                         noncombustible. The internal steel                        construction. 
                                      construction 
                                                                                             stair has no wall on one side. 
                                   Landings shall be                                         Landing widths of 55 inch for 
                                  provided with same                                         common stair is found in the 
    NC‐1.70       6.9.2.2                                                                                                                            (None)                          N/A 
                                width in the direction of                                 direction of egress travel which is 
                                     egress travel                                        greater than the stair clear width. 
                                                                                        Stair treads are uniform which are 12 
                                                                                       inch. Stair riser height is 6 inch for the 
                                                                                            common stair. The maximum 
                                 Stair treads shall be of                                difference of riser heights found to 
    NC‐1.71       6.9.2.3                                                                                                                            (None)                          N/A 
                                  nominal uniformity.                                             be 1/2 inch (12 mm).  
                                                                                         Maximum Riser height for internal 
                                                                                        stair is 9 inch and for exterior stair it 
                                                                                                       is 13 inch.  
                                   Handrails shall be 
                                provided on both sides 
                                   of each stairway.                                   Handrails are provided on one side of 
                                                                                                                                     Handrail on both sides of each stairway 
    NC‐1.72       6.9.2.4       Intermediate handrails                                  the common stairway. The largest                                                             180 
                                                                                                                                               should be installed. 
                                shall be provided when                                  stair width is found to be 52 inch. 
                                the stair width exceeds 
                                      2.2 m (87 in.) 
                                                                                    
                                                                                           Stair designation signs are not 
    NC‐1.73       6.9.3.1         Stair designation signs                              provided at each floor entrance from                          (None)                          N/A 
                                                                                                      the stair.  
 
                                                                                                                           Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                                       Page 161 of 188 
                                                                                                                                                                                                       
                                                                                                                                                                                                       
 
                                                                                                                                                                                         Time to 
               Alliance/BNBC 
    NC No.                            Description                 Picture Reference                    Observations                     Recommended Corrective Measures                 Complete 
                   Section 
                                                                                                                                                                                          (Days) 
                                 The minimum width of 
                                ramp shall be 1.1 m (44 
                                   in.) with handrail. 
    NC‐1.74         6.1         Existing ramps shall not                                              No ramps found                                     (None)                             N/A 
                                  have a running slope 
                                greater than 1 in 8 (12.5 
                                        percent). 
                                                                                             Lighted exit signs (11 nos.) with 
                                 Lighted exit signs shall 
                                                                                           emergency power supply are found. 
    NC‐1.75        6.11         be placed at entrance to                                                                                                 (None)                             N/A 
                                                                                            Directional lighted exit signs also 
                                        an exit. 
                                                                                                provided where needed. 
                                Existing handrails that 
                                 are less than 760 mm 
                                (30 in.) or greater than                                    The height of existing handrails are 
    NC‐1.76       6.12.1.2        1100 mm (44 in.) as                                      34 inch from the leading edge of the                          (None)                             N/A 
                                  measured from the                                                  tread for all stairs. 
                                  leading edge of the 
                                          tread 
                                  Guards height at all 
                                                                                           There is no such spaces in the means 
    NC‐1.77        6.12.2       open sides of means of                                                                                                   (None)                             N/A 
                                                                                             of egress which require guards. 
                                         egress
                                                                                              The maximum gap between two              Open guards shall have intermediate rails or 
                                                                                           intermediate rails in the stair cases is    pattern such that a sphere 200 mm (8 in.) in 
    NC‐1.78       6.12.2.3        Open guards height                                          found to be 12 inch for common           diameter cannot pass through any opening             180 
                                                                                           stair, 32 inch for internal stair and 12         up to a height of 865 mm (34 in.). 
                                                                                                    inch for external stair. 
                                                                                        
                                All occupiable roofs shall 
                                     be provided with 
    NC‐1.79       6.12.2.4      parapets or guards with                                            Roof is not occupied.                                 (None)                             N/A 
                                    a minimum height 
                                   of1067 mm (42 in.) 
 
 
                                                                                                                 Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                Page 162 of 188 
                                                                                                                                                                                
                                                                                                                                                                                
 
                                                                                                                                                                  Time to 
               Alliance/BNBC 
    NC No.                            Description            Picture Reference               Observations                    Recommended Corrective Measures     Complete 
                   Section 
                                                                                                                                                                   (Days) 
                                Travel distance to reach 
                                                                                  The Maximum travel distance found 
                                 an exit maximum 60m 
                                                                                   to be 87 ft to reach an exit. As per 
                                    with automatic fire 
    NC‐1.80        6.13                                                              BNBC Part 4 section 3.15.1 for                       (None)                     N/A 
                                   detection system or 
                                                                                   occupancy G the Maximum travel 
                                122m with an automatic 
                                                                                    distance should be 400 ft (122m) 
                                      sprinkler system 
                                An exit passageway is an 
                                 exit component that is 
                                  separated from other 
                                    interior spaces of a 
                                 building or structure by 
                                   fire resistance‐rated 
                                                                                  Interior exit stairway terminates at an 
    NC‐1.81        6.14.2             construction and                                                                                    (None)                     N/A 
                                                                                               exit discharge. 
                                opening protective, and 
                                provides for a protected 
                                     path of egress in a 
                                 horizontal direction to 
                                the exit discharge or the 
                                         public way. 
                                 Openings from storage 
                                     areas, basements, 
                                                                                  Door of the main storage at 2nd floor 
    NC‐1.82        6.14.3          transformer rooms,                                                                                     (None)                     N/A 
                                                                                       opens at the exit passage. 
                                generator rooms, boiler 
                                rooms etc. to vestibules 
                                   A stairway in an exit 
                                    enclosure shall not 
                                continue below its level 
                                 of exit discharge unless 
                                  an approved barrier is 
                                 provided at the level of 
    NC‐1.83        6.14.7                                                               There is no such opening                          (None)                     N/A 
                                exit discharge to prevent 
                                        persons from 
                                       unintentionally 
                                  continuing into levels 
                                  below  as described in 
                                         IBC 1022.7 
 
                                                                                                                 Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                Page 163 of 188 
                                                                                                                                                                                
                                                                                                                                                                                
 
               Alliance/                                                                                                                                          Time to 
    NC No.       BNBC              Description                Picture Reference               Observations                   Recommended Corrective Measures     Complete 
                Section                                                                                                                                            (Days) 
                             Exit passageways shall be                             One no exit passage way found which 
    NC‐1.84     6.15.2      considered an extension of                               is in the 2nd floor and which is not                 (None)                     N/A 
                                     the stairs                                       being used for any other purpose 
                                                                                      The exit passage way has 10 inch 
                           Exit passageways shall have                                 thick walls which have 5  hr fire  
                            walls, ceilings, and floors                            resistance rating considering plaster 
    NC‐1.85     6.15.3                                                                                                                    (None)                     N/A 
                            have 1 hr. fire resistance                                 and painting. The ceiling of the 
                                       rating                                       passage way also has fire resistance 
                                                                                          rating of more than 1 hour.
                             Exit passageways terminate                             Exit passageways terminate to exit 
    NC‐1.86     6.15.4                                                                                                                    (None)                     N/A 
                                    to exit discharge                                               discharge 
                            Exits shall discharge directly 
                                 to the exterior of the 
                                building, not reenter a                            Exits are terminated to exit discharge 
                6.17.1 
    NC‐1.87                      building. The interior                            area directly and do not re‐enter the                  (None)                     N/A 
                6.17.3 
                              discharge is not through a                                          building 
                                 storage or hazardous 
                                       occupancy 
                            An egress court serving as a 
                           portion of the exit discharge 
                             shall be open to the sky or 
                                  provided with a fire 
                             resistance rated enclosure 
                                  the same as the exit 
                           enclosure. Egress courts less 
                                                                                     Egress court is open to the sky to 
                               than 3050 mm (10 ft) in 
    NC‐1.88     6.17.2                                                               exterior of the building and area                    (None)                     N/A 
                           width (as measured from the 
                                                                                           found 60 ft. by 30 ft. 
                              building and the adjacent 
                                property line) shall be 
                           provided with walls having a 
                              1‐hr fire resistance rated 
                           construction for a distance of 
                             3050 mm (10 ft) above the 
                                   floor of the court 
 
 
                                                                                                                  Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                                 Page 164 of 188 
                                                                                                                                                                                                 
                                                                                                                                                                                                 
               Alliance/                                                                                                                                                           Time to 
    NC No.       BNBC               Description                Picture Reference               Observations                     Recommended Corrective Measures                   Complete 
                Section                                                                                                                                                             (Days) 
                                                                                                                                    i.The means of egress paths shall be 
                                                                                                                                   illuminated at all times the building is 
                                                                                                                               occupied. Illumination shall be a minimum 
                                                                                                                                 of 10 lux for all corridors, exit doors, and 
                                                                                                                                stairways. Aisles shall be provided with a 
                                                                                    At the means of egress paths 11 Nos                       minimum 2.5 lux. 
                                                                                     emergency lights found which have            ii. Emergency power.  Means of egress 
                               The means of egress paths 
                                                                                        90 minutes backup that provides              illumination shall be provided with 
                            illumination 10 lux, aisles 2.5 
                                                                                     illumination of more than 10 lux for       emergency power or supplemented with 
                                lux, Emergency power of 
    NC‐1.89    10.12.2.1                                                            all corridors, exit doors stairways and          battery powered lights that provide              180 
                            battery powered, inspection 
                                                                                      aisles. Regular inspection is carried    minimum 10 lux for no less than 30 min in 
                                  testing & 90 minutes 
                                                                                        out but no record is maintained.           the event of failure of normal lighting. 
                                        duration  
                                                                                      Inspection and testing reports not        iii. Emergency power for means of egress 
                                                                                                     found.                    illumination shall be verified at least once 
                                                                                                                                   per year. If battery operated lights are 
                                                                                                                                   used, these lights shall be tested on a 
                                                                                                                               monthly basis. Functional testing of battery 
                                                                                                                                   powered lights shall be provided for a 
                                                                                                                                       minimum 30 min once per year. 
                                                                                      11 Nos exit lights are found with 
                            All required exit signs shall 
                                                                                    emergency power supply. Inspection 
    NC‐1.90    10.12.1.1    be illuminated continuously                                                                                           (None)                              N/A 
                                                                                     and testing are carried out on each 
                                     at all times 
                                                                                    month but no record is maintained. 
                            Buildings over six‐story or 20 
                             m (65 ft) high shall have a 
                                                                                    Not found such duct. Cable tray and 
                             minimum of one vertices 
    NC‐1.91    10.4.1.1                                                              channel has been used to run the                             (None)                              N/A 
                              vertical shaft of 200 mm 
                                                                                             cables and wire 
                              x 400 mm size for every 
                                1500 m2 floor areas. 
                                                                                      Ready records was not found but 
                            Fire Safety Director's duties,                          testing equipment, safety inspection, 
                                Fire department pre‐                                  preplanning with fire department          Records on every activities need to kept 
    NC‐1.92      13.1                                                                                                                                                                 180 
                              planning & testing of fire                             and  communicating rally points to                 strictly on regular basis 
                               protection equipment                                  all employees are being on routine 
                                                                                                   basis  
 
                                                                                                            Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                        Page 165 of 188 
                                                                                                                                                                                        
                                                                                                                                                                                        
 
                Alliance/                                                                                                                                                 Time to 
    NC No.        BNBC             Description              Picture Reference              Observations                 Recommended Corrective Measures                  Complete 
                 Section                                                                                                                                                   (Days) 
                                 Fire drills shall be 
                             conducted on a quarterly 
    NC‐1.93       13.2       basis as outlined in BNBC                             Fire drill record has been seen.                       (None)                             N/A 
                              Part 4 Appendix A for all 
                                 garment facilities. 
                             Evacuation Plan posted at 
                                                                                 Evacuation plan found at each floor 
    NC‐1.94       13.3       the entrance to each exit                                                                                    (None)                             N/A 
                                                                                          of the building.  
                                        stair 
                               Hot work permit for all 
    NC‐1.95       13.4      RMG facilities in accordance                          Not found any hot work practice                         (None)                             N/A 
                                   with NFPA 51B 
                                                                                                                            Smoking should be prohibited in any 
                                                                                 Smoking is prohibited according to 
                               Smoking be prohibited,                                                                   garment factory building, separate storage 
                                                                                  their own notice but document is 
                            Factories rule, Signs posted                                                                 building or any factory area. As cigarettes 
    NC‐1.96       13.5                                                                       not found.                                                                      180 
                            & smoking area outside the                                                                     are one of the main causes of the fire, 
                                                                                   'No Smoking' sign in the factory 
                                      building                                                                            supervisors should ensure that workers 
                                                                                          area not found. 
                                                                                                                             appreciate the need to take care.  
                                                                                                                         To reduce or minimize fire hazard, good 
                             Housekeeping policy &                                                                           housekeeping and sensible fire 
                  13.6 
    NC‐1.97                 Maintain electrical systems                           Housekeeping record not found.        precautions should be strictly maintained.           180 
                  13.7 
                             in good working order                                                                      A person should be appointed to conduct 
                                                                                                                          regular check in respect to fire safety.  
                            All means of egress shall be 
                                                                                 All means of egress found open and 
    NC‐1.98       13.8        kept free and clear at all                                                                                  (None)                             N/A 
                                                                                      obstacles free for all time 
                                       times 
                             Safety Inspection need to 
    NC‐1.99       13.9      be conducted on a quarterly                                  No Records found                                 (None)                             N/A 
                                        basis 
                                                                                                                         Fire doors shall be tested on a quarterly 
                             Fire doors testing report,                          Fire door not present, so fire door 
    NC‐1.100     13.9.2                                                                                                   basis to ensure that they are properly             180 
                                 closing & latching                                   testing report not found 
                                                                                                                                    closing and latching 
 
 
                                                                                                                           Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                                       Page 166 of 188 
                                                                                                                                                                                                       
                                                                                                                                                                                                       
 
                 Alliance/                                                                                                                                                               Time to 
    NC No.         BNBC                Description                  Picture Reference                   Observations                    Recommended Corrective Measures                 Complete 
                  Section                                                                                                                                                                 (Days) 
                                                                                                                                       Automatic suppression systems. Inspection, 
                                  Automatic suppression                                                                                testing and maintenance in accordance with 
                                systems: Inspection, testing                                                                             NFPA 25 shall be conducted on all water‐
                                and maintenance of water‐                                                                                based fire protection systems. Fire alarm 
    NC‐1.101        13.1                                                                               No records found                                                                      90 
                                   based fire protection                                                                                and detections systems. Inspection, testing 
                                  systems, Fire alarm and                                                                               and maintenance in accordance with NFPA 
                                    detections systems                                                                                    72 shall be conducted on all fire alarm 
                                                                                                                                                         systems. 
                                                                                                                                       The maintenance and cleaning schedule will 
                                 Establish a maintenance,                                                                                vary with type of fiber processed and the 
    NC‐1.102       13.11         cleaning and lubrication                                              No records found                  equipment used.  Lubricate equipment in            180 
                                 schedule for equipment                                                                                      accordance with manufacturer’s 
                                                                                                                                                    recommendations. 
    NC‐1.103       13.12          Electrical maintenance                                       Maintenance record not found.                              (None)                            N/A 
                BNBC Part ‐4 
                                                                                               Normal gravity pressure is being        Required 650 kpa (94.34 psi), line pressure 
    NC‐1.104      Chap‐4,          Pressure in Riser Pipe                                                                                                                                    90 
                                                                                                            used                       600 kpa should maintain by jockey pump. 
                  4.2.3.10  
                BNBC Part ‐4 
                                                                                                                                       Fire hose pipe should be as per BNBC Part ‐4 
    NC‐1.105      Chap‐4,             Fire Hose Pipe                                              1.5 inch dia, Length=30 m                                                                  90 
                                                                                                                                                      Chap‐4, 4.2.3.9 
                  4.2.3.9 
                BNBC Part ‐4                                                                 3 Nos fire hose cabinet  with 1.5 inch 
                                                                                                                                       The fire hose cabinet should be as per BNBC 
    NC‐1.106      Chap‐4,            Fire Hose Cabinet                                       dia hose pipe found at the building .                                                           90 
                                                                                                                                                  Part ‐4 Chap‐4, 4.2.3.9. 
                  4.2.3.9                                                                         Hose pipe Length is  30m. 
 
                                                                                                                      Fire Safety Assessment of XYZ Garments Ltd. Finding Details 
                                                                                                                                                                                 Page 167 of 188 
                                                                                                                                                                                                 
                                                                                                                                                                                                 
 
                 Alliance/                                                                                                                                                         Time to 
    NC No.         BNBC                 Description                Picture Reference                 Observations                Recommended Corrective Measures                  Complete 
                  Section                                                                                                                                                           (Days) 
                                                                                                                                    1 no Fire pump (motor driven), 1no 
                                                                                                                                   standby Fire pump (engine driven)  or 
                                                                                                                                 electric pump with own generator and 1 
                BNBC Part ‐4                                                                  1 no Fire pump (45 KW).  1 no       no Jockey Pump for maintaining system 
                                  Fire Pump, Standby pump, 
    NC‐1.107      Chap‐4,                                                                      Jockey Pump(25 KW) found.           pressure. (Pump capacity shall be 150               90 
                                         Jockey pump 
                   4.2.6.                                                                       Standby pump not found.          GPM, Pump head shall be 230 ft of WG to 
                                                                                                                                  maintain hose outlet pressure 5 bar and 
                                                                                                                                  Jockey pump shall be 15GPM & 260ft of 
                                                                                                                                                   WG) 
                BNBC Part‐4, 
                                                                                                                                    Separate Pump House for firefighting 
    NC‐1.108      Chapt‐4.              Pump House                                                     Not present                                                                    180 
                                                                                                                                            system  is required 
                   4.2.6 
                BNBC Part ‐4 
                                                                                             Found 04 nos. with emergency 
    NC‐1.109     Appendix‐           Manual Call Points                                                                                            (None)                             N/A 
                                                                                                    power supply. 
                   D17.2 
                                                                                                                                   Required at corridor, Lift lobby and Stair 
                BNBC Part ‐4   
    NC‐1.110                             PA System                                                PA System not found.           lobby as per design requirement should be            180 
                  Chap‐4 
                                                                                                                                          automatically controlled.
                BNBC Part ‐4                                                                                                       One central station at ground floor or at 
    NC‐1.111     Appendix‐          Fire Command Station                                               Not found.                    any suitable place as fire command               180 
                     D18                                                                                                                           station. 
                BNBC Part‐3 
    NC‐1.112                      Main Road near Main Gate                                                10 m                                     (None)                             N/A 
                  Chapt‐1. 
                 Fire service 
    NC‐1.113        & civil            Fire Certificate                                        Fire license has been seen                          (None)                             N/A 
                   defense
                   5.5.1.1, 
                    5.4.3.1                                                                                                      Need Fire approval drawing for Firefighting 
                    5.7.4.1       Fire approval drawing and                                 Fire approval drawing and Fire as‐   system there will provide all necessary fire 
    NC‐1.114                                                                                                                                                                          180 
                 Fire service        Fire as‐built drawing                                     built drawing are not found.      appliance such as emergency exit position, 
                    & civil                                                                                                          detector location, pull station etc.. 
                   defense 
                  Standard 
    NC‐1.115                        Storage of Chemicals                                      Chemical storage not found.                          (None)                             N/A 
                   Practice 
                                                                                                                                                                                                 
                                                                                                                                                                                               . 
                                                                  Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                                Page 168 of 188 
                                                                                                                                                
                                                                                                                                                
 
Nonconformities (NCs) by Description 
 
    XYZ Garments Ltd.  has some deficiencies in the fire safety system, which is described below for appropriate 
correction and corrective actions.  
 
1. General Requirements: 
 
NCs by Definitions:  
      NC‐1.1  Alliance  Section  3.4.2.1.3  Generator  sets  shall  be  separated  from  all  other  occupancy  areas  by  a  minimum  2  hour 
construction.  Fuel  tanks  shall  be  limited  to  a  maximum  2500  L  (660  gal)  when  located  in  a  building  with  other  occupancies. 
Exhaust shall be in accordance with NFPA 37. All exhaust systems shall discharge to the exterior of the building in a safe location 
 
      NC‐1.2 Alliance Section 3.4.2.1.4 Rooms used for the housing of oil‐filled transformers shall be in compliance with BNBC Part 
4 Section D 15 for high‐rise buildings. Oil filled transformers for non‐high‐rise buildings shall be separated by a minimum 2 hour 
fire resistive rated construction 
 
                                                                                                                                
    
   NC‐1.3  Alliance  Section  4.4  Fire  resistance  of  structural  members.    The  fire  resistance  of  structural  members  shall  be  in 
compliance with BNBC Part 3 Chapter 3 and Table 3.3.1 of the Alliance Standards.  
    
                                                            
    Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                      Page 169 of 188 
                                                                      
                                                                      
                                       
        
 
                                                             Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                      Page 170 of 188 
                                                                                                                                      
                                                                                                                                      
                                                                                                                                     
 
 
                                                                                                            
                                                                   
     NC‐1.4 Alliance Section 4.4.1 Fire Resistance Ratings of Common Elements.  Fire resistance shall be in compliance with Table 
4.1.1 from BNBC Part 4. 
 
     NC‐1.5 Alliance Section 4.4.2 Parapets.  Parapets that are constructed on rated exterior construction shall be of the same 
rating as the exterior wall rating in accordance with BNBC Part 3 Section 3.1.13. 
      
                                                                                                                       
 
    NC‐1.6 Alliance Section 4.5.1 Separation of floors, occupancies, hazards, exit enclosures shall be provided with fire‐resistive 
rated construction fire barriers in accordance with this section. 
    NC‐1.7 Alliance Section 4.5.2 Fire barriers shall be classified as 1‐, 2‐, or 3‐hr fire‐resistive rated construction. 
                                                        
                                                                   Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                                  Page 171 of 188 
                                                                                                                                                  
                                                                                                                                                  
                                                                                                           
     NC‐1.8 Alliance Section 4.5.2.1  Fire  barrier  shall  be  continuous  from  outside  wall  to  outside  wall,  from  one  fire  barrier  to 
another or combination thereof and shall be continuous through all concealed spaces. 
 
     NC‐1.9 Alliance Section 4.5.2.2 Fire barriers shall be constructed of materials meeting the testing requirements of ASTM E 
119. 
 
     NC‐1.10  Alliance  Section  4.5.2.3  All  openings  in  fire  barriers  shall  be  protected  with  fire‐resistant  protective  opening 
protection in accordance the following:  
      
     (1) 3 hr fire barriers protected with 3 hr fire protective opening assemblies 
     (2) 2 hr fire barriers protected with 1.5 hr fire protective opening assemblies 
     (3) 1 hr fire barriers protected with ¾ hr fire protective opening assemblies 
     (4) 1 hr exit enclosures and vertical shafts protected with 1 hr fire protective opening assemblies. 
      
     NC‐1.11 Alliance Section 4.5.4.1 Fire Doors 
Fire doors assemblies shall conform to NFPA 252, BS 476 Part 22, EN 1364‐1, GB 12955‐2008, or IS 3614 Part II.   
      
     NC‐1.12 Alliance Section 4.5.5.1 Fire windows shall conform to NFPA 257 or British, European, Chinese, or Indian standard 
for fire window tests.  
                NFPA 257 5.1.3  
                The area of the fire window  assembly shall be not less than 100 ft 2 (9.3 m 2 ), with  no dimension less than 9 ft 
                (2745  mm).  5.1.4  When  the  conditions  of  use  limit  the  construction  to  smaller  dimensions,  a  proportionate 
                reduction shall be permitted to be made in the dimensions of the tests used to qualify the fire window assemblies 
                for such restricted use. 5.2.1 The fire window assembly shall be installed in the wall or partition construction in the 
                manner  in  which  it  is  to  be  used.  5.2.2  The  fire  window  assembly  shall  be  mounted  so  that  the  latches  and 
                fasteners, other than hinges, are on the unexposed side, and the mounting shall not prevent the free, unrestricted 
                operation of all operable components such as ventilators and sashes. 
      
                                                             
                                                                    Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                                     Page 172 of 188 
                                                                                                                                                     
                                                                                                                                                     
     NC‐1.13 Alliance Section 4.5.6 Ducts penetrating fire‐resistance rated assemblies shall be protected with listed fire dampers.  
Dampers shall be 1 ½  hr. rated  dampers  when  located  in  a  2 hr  or less  fire‐resistance  rated assembly.   Dampers shall be  3 hr 
rated dampers when located in a 3 hr or greater fire‐resistance rated assembly. 
      
     NC‐1.14 Alliance Section 4.5.7.1 Fire‐resistance rating.  A shaft enclosure shall be have a minimum fire‐resistance rating of 2 
hr when connecting four stories or more and a minimum fire‐resistance rating of 1 hr when connecting three stories or less. 
 
     NC‐1.15 Alliance Section 4.5.7.2 A shaft enclosure shall be constructed as a fire barrier and shall be continuous from outside 
wall  to  outside  wall,  from  one  fire  barrier  to  another  or  combination  thereof  and  shall  be  continuous  through  all  concealed 
spaces. 
 
     NC‐1.16 Alliance Section 4.5.7.3 Openings in shafts shall be limited to those necessary for the purpose of the shaft.  
 
     NC‐1.17  Alliance  Section  4.6  Openings  in  fire  resistance  rated  walls  shall  be  protected  in  accordance  with  BNBC  Part  4 
section 2.5and the following  
      
     (1) 3 hr fire barriers protected with 3 hr fire protective opening assemblies 
     (2) 2 hr fire barriers protected with 1.5 hr fire protective opening assemblies 
     (3) 1 hr fire barriers protected with ¾ hr fire protective opening assemblies 
     (4) 1 hr exit enclosures and vertical shafts protected with 1 hr fire protective opening assemblies. 
 
     NC‐1.18  Alliance  Section  4.7  Penetrations  of  fire  resistive  rated  assemblies  shall  be  protected  with  a  listed  through‐
penetration fire stop system tested in accordance with ASTM E814 
 
     NC‐1.19  Alliance  Section  5.3.2.1.1  Automatic  sprinkler  protection  shall  be  installed  throughout  all  portions  of  new  and 
existing high‐rise buildings with an occupiable floor greater than 23 m (75 ft) above the finished grade. 
      
     NC‐1.20 Alliance Section 5.5.2 Roof top Water Tank and Underground Water Tank. No new roof‐mounted tanks to supply 
water  to  new  standpipe  or  sprinkler  protection  installations  shall  be  allowed  without  complying  with  the  requirements  of 
Alliance Standard Part 8. Tanks shall be sized for the minimum duration for fire protection supply as outlined in NFPA 24. 
      
     NC‐1.21 Alliance Section  5.5.1  All  new  installations and  design  requirements  outlined in BNBC Part 4 Chapter  4  for water 
supplies shall be replaced by the requirements of NFPA 20 (fire pumps), NFPA 22 (water tanks), and NFPA 24 (underground water 
mains). 
      
     NC‐1.22 Alliance Section 5.3.3 Pipe schedules shall not be used to size pipe.  All systems shall be hydraulically calculated to 
meet the required NFPA 13 design requirements. 
 
     NC‐1.23  Alliance  Section  5.3.5.1  All  valves  controlling  automatic  sprinkler  systems,  fire  pumps,  and  water  supply  systems 
shall be electrically supervised by a listed fire alarm system control unit. 
 
     NC‐1.24  Alliance  Section  5.3.5.2  An  approved  audible  device  shall  be  connected  to  every  automatic  sprinkler  system  and 
shall  be  activated  by  waterflow  equal  to  the  flow  of  one  sprinkler.    Where  a  fire  alarm  system  is  installed,  activation  of  the 
waterflow shall activate the fire alarm system. 
 
     NC‐1.25 Alliance Section 5.3.6 Automatic sprinkler systems shall be tested and maintained in accordance with NFPA 25. 
 
     NC‐1.26 Alliance Section 5.3.6.1 All storage shall be maintained with a 460 mm (18 in.) minimum clearance from the top of 
storage to the sprinkler deflector. 
 
     NC‐1.27 Alliance Section 5.3.6.2.1 Racks.  Unless in‐rack automatic sprinklers have been designed and installed, solid shelf 
racking shall not be used.  A minimum of 50% openings in shelving material shall be considered open shelves.  See NFPA 13 for 
further clarification. 
                                                              
                                                                    Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                                   Page 173 of 188 
                                                                                                                                                   
                                                                                                                                                   
     5.3.6.2.2 Shelves.  Shelving units not greater than 760 mm (30 in.) deep can have solid shelves.  Back to back solid shelf units 
not  greater  than  760  mm  (30  in.)  deep  each  with  a  solid  vertical  barrier  can  have  solid  shelves.    See  NFPA  13  for  further 
clarification. 
 
     NC‐1.28  Alliance  Section  5.3.6.3  Minimum  aisles  shall  be  maintained  free  of  storage  in  accordance  with  NFPA  13  Table 
16.2.1.3..2 based on the design criteria used for the sprinkler system. 
                                                                                                                                     
                                                                           
      NC‐1.29 Alliance Section 5.4.2 Standpipe systems shall be installed throughout all new and existing buildings and structures 
where the  highest occupied  floor  is more  than  10  m  (33  ft) above grade or  more than 10 m  (33 ft)  below  grade.  As per  5.4.3 
Standalone  standpipe  systems  shall  meet  the  local  BNBC  requirements  with  a  minimum  450  kPa  (65  psi)  pressure  at  the 
hydraulically most remote hose connection or NFPA 14. 
 
      NC‐1.30  Alliance  Section  5.4.4.1  Class  I  standpipe  hose  connections  (65  mm)  shall  be  located  in  all  required  stairwells  at 
each floor level including occupiable roofs. 
 
      NC‐1.31 Alliance Section 5.5.4 Fire  department  (Siamese)  inlet  connections  shall  be  provided  to  allow  fire  department 
pumper equipment to supplement the fire protection systems.  Fire department outlet connections shall be provided to allow 
fire department pumper vehicles to draw water from ground‐level or underground water storage tanks.  Connections shall match 
the Fire Service and Civil Defense hose thread standard. 
 
      NC‐1.32  Alliance  Section  5.6  Portable  fire  extinguishers  shall  be  installed  throughout  all  new  and  existing  facilities  in 
accordance with BNBC Part 4 Section 4.10 and  
                NFPA 10.1.1.1. 1 Extinguishers shall be placed so that maximum travel distance to the nearest unit shall not exceed 
                30 m (100 ft). 2) Fire extinguishers having a gross weight not exceeding 18.14 kg (40 lb) shall be installed so that the 
                top  of  the  fire  extinguisher  is  not  more  than  1.53  m  (5  ft)  above  the  floor  (NFPA  10  6.1.3.8).  
                1.1.1.2  3  Fire  extinguishers  having  a  gross  weight  greater  than  18.14  kg  (40  lb)  (except  wheeled  types)  shall  be 
                installed so that the top of the fire extinguisher is not more than 1.07 m (3½ ft) above the floor (NFPA 10 6.1.3.8). 
 
      NC‐1.33 Alliance Section 5.7.3.2 Occupancy B.  A manual fire alarm system shall be provided in all new and existing day care 
facilities  that  are  located  in  other  occupancies  or  in  buildings  greater  than  2  stories.    When  located  in  buildings  with  other 
occupancies requiring an automatic fire alarm system, an automatic fire alarm system shall be provided. 
 
                                                              
                                                                      Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                                        Page 174 of 188 
                                                                                                                                                        
                                                                                                                                                        
     NC‐1.34  Alliance  Section  5.7.3.3  Occupancy  E.    An  automatic  fire  alarm  system  shall  be  provided  throughout  all  new  and 
existing assembly occupancies. 
 
     NC‐1.35 Alliance Section 5.7.3.4 Occupancy F.  A manual fire alarm system shall be provided throughout all new and existing 
3  or  more  story  buildings.    When  located  in  buildings  with  other  occupancies  requiring  an  automatic  fire  alarm  system,  an 
automatic fire alarm system shall be provided.  An automatic fire alarm and detection system shall be provided throughout all 
new and existing high‐rise buildings as outlined in Section 3.6 and 3.6.3. 
 
     NC‐1.36 Alliance Section 5.7.3.5 Occupancy G1.  A manual fire alarm system shall be installed throughout all new and 
existing low‐hazard industrial occupancies.  When located in buildings with other occupancies requiring an automatic fire alarm 
system, an automatic fire alarm system shall be provided. 
 
     NC‐1.37 Alliance Section 5.7.3.6 Occupancy G2.  An automatic fire alarm and detection system shall be provided throughout 
all new and existing moderate hazard industrial occupancies. 
 
     NC‐1.38 Alliance Section 5.7.3.7 Occupancy H.  A manual fire alarm system shall be provided throughout all new and existing 
storage occupancies.  When located in buildings with other occupancies requiring an automatic fire alarm system, an automatic 
fire alarm system shall be provided. 
 
     NC‐1.39 Alliance Section 5.7.3.8 Occupancy J.  An automatic fire alarm and detection system shall be provided throughout 
all new and existing hazardous occupancies. 
 
     NC‐1.40 Alliance Section 5.7.3.9 Occupancy K.  A manual fire alarm system shall be provided throughout all miscellaneous 
occupancies.    When  located  in  buildings  with  other  occupancies  requiring  an  automatic  fire  alarm  system,  an  automatic  fire 
alarm system shall be provided. 
 
     NC‐1.41  Alliance  Section  5.7.6.1  Smoke  detectors  listed  for  use  in  air  distribution  systems  shall  be  located  as  required  in 
NFPA 90A. 
 
     NC‐1.42 Alliance Section 5.8.3 In  existing  buildings,  automatic  heat  and  smoke  vents  shall  be  converted  to  manual‐only 
operation if the building is provided with automatic sprinklers. 
      
     NC‐1.43  Alliance  Section  5.9.1  and  5.9.2  Fire  lifts  shall  be  installed  in  all  new  high‐rise  buildings  and  for  existing  building 
where required by the Fire Service and Civil Defense in accordance with BNBC Part 4 Section 2.11. 
      
                                                                                                                   
    NC‐1.44 Alliance Section 6.3.1.1 Exit access corridors serving an occupant load exceeding 30 shall be separated by walls 
having a fire resistance rating of 1 hr in accordance with 4.5 unless provided with automatic sprinkler protection throughout the 
story or building. 
 
    NC‐1.45  Alliance  Section  6.3.1.2  Exits  shall  be  enclosed  with  fire‐resistance  rated  construction  as  outlined  in  6.3.1.2.1 
through 6.3.1.2.3 
    6.3.1.2.1  Exits  connecting  three  or  fewer  stories  shall  be  enclosed  with  a  minimum  1‐hr  fire‐resistance  rating. 
    6.3.1.2.2  Exits  connecting  four  or  more  stories  shall  be  enclosed  with  a  minimum  2‐hr  fire‐resistance  rating. 
    6.3.1.2.3  Exits shall be enclosed with the same fire‐resistance rating as the floor penetrated but will not need to exceed 2 hr. 
 
                                                                
                                                                   Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                                 Page 175 of 188 
                                                                                                                                                 
                                                                                                                                                 
     NC‐1.46  Alliance  Section  6.3.1.3  Exterior  exit  stairs  shall  be  separated  from  the  building  with  the  rating  requirements  of 
6.3.1.2.  The rating of the exterior wall shall extend 3.05 m (10 ft) beyond the ends of the stair structure. 
 
     NC‐1.47 Alliance Section 6.3.2 Interior Finish.  All interior finishes for means of egress shall meet the following requirements 
of this section.  The finishes shall meet the rating requirements outlined herein as tested in accordance with ASTM E 84. 
          1.1.1.1.1 Class A.   
           Class  A  interior  finish  shall  be  those  with  a  flame  spread  index  of  0‐25  and  smoke  developed  index  of  0‐450. 
           1.1.1.1.2 Class B.   
           Class  B  interior  finish  shall  be  those  with  a  flame  spread  index  of  26‐75  and  smoke  developed  index  of  0‐450. 
           1.1.1.1.3 Class C.   
           Class  C  interior  finish  shall  be  those  with  a  flame  spread  index  of  76‐200  and  smoke  developed  index  of  0‐450. 
            
           All exits shall be limited to Class A and Class B interior finish material. 
 
     NC‐1.48 Alliance Section 6.3.3 Headroom. All means of egress shall have a minimum ceiling height of 2.3 m (7 ft 6 in.) with 
projections from the ceiling not less than 2.03 m (6 ft 8 in.).  The minimum ceiling height shall be maintained for at least 2/3 of 
the space or room as long as the remaining area shall be not less than 2.03 m (6 ft 8 in.).  Headroom on stairs shall not be less 
than 2.03 m (6 ft 8 in.). 
 
     NC‐1.49 Alliance Section 6.3.4.1 Abrupt changes in elevation of walking surfaces shall not exceed ¼ in. unless provided with 
a beveled slope of 1 in 2 that do not exceed ½ in.  Changes greater than ½ in. shall meet the requirements for 6.3.5. 
 
     NC‐1.50 Alliance Section 6.3.4.2 Walking surfaces shall be mostly level; however, shall not exceed a slope of 1 in 20 in the 
direction of travel unless meeting the requirements for ramps in 6.10. 
 
     NC‐1.51 Alliance Section 6.3.5.1 The change in level shall be readily apparent and if not, marked with additional signage or 
floor markings. 
 
     NC‐1.52 Alliance Section 6.3.6  Walking surfaces, including stairway treads shall be uniformly slip resistant. 
 
     NC‐1.53 Alliance Section 6.3.8 No  locks,  alarms,  or  other  devices  shall  be  installed  on  a  means  of  egress  component  that 
would prevent any occupant from having safe egress from the building or structure. 
           
     NC‐1.54 Alliance Section 6.3.9 Means  of  egress  shall  be  maintained  continuously  free  and  clear  of  all  obstructions  or 
impediments to full instant use in the case of fire or other emergency. 
 
     NC‐1.55  Alliance  Section  6.3.9.1  No  furnishings,  decorations,  or  other  objects  shall  obstruct  exits  and  access  to  exits.  
Nothing shall obstruct or impede visibility to exits. 
 
     NC‐1.56 Alliance Section 6.4 (Occupancy Load) 
                                                             
                                                                 Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                               Page 176 of 188 
                                                                                                                                               
                                                                                                                                               
                                                                                                            
    NC‐1.57 Alliance Section 6.5.1 Aisles shall be provided with a minimum unobstructed clear‐width of 0.9 m (36 in.). 
 
     NC‐1.58 Alliance Section 6.5.2 The path of egress travel along a means of egress shall not be interrupted by any obstruction.  
The capacity of the means of egress shall not be reduced along the path of travel. 
 
     NC‐1.59 Alliance Section 6.5.3 The total capacity of the means of egress shall for any story, floor, or other occupied space 
shall be sufficient for the occupant load as calculated in 6.4.1. 
 
     NC‐1.60 Alliance Section 6.5.6.1 Doors in an existing means of egress shall have a minimum width of 0.8 m (32 in.). 
 
     NC‐1.61 Alliance Section 6.5.6.2.2. In existing construction, stairs shall have a minimum width of 0.9 m (35 in.). 
 
     NC‐1.62 Alliance Section 6.6.2  Only  one  exit  shall  be  required  in  existing  buildings  where  the  occupant  load  and  travel 
distance listed in the table below are not exceeded.  
                                                                                                                       
     NC‐1.63 Alliance Section 6.6.3 The  number  of  means  of  egress  from  any  floor  or  story  shall  not  be  less  than  3  when  the 
occupant load exceeds 500 per story and not less than 4 when the occupant load exceeds 1000 per story. 
 
     NC‐1.64 Alliance Section 6.6.4 Occupied roofs shall be provided with the minimum number of exits required as a story. 
 
     NC‐1.65 Alliance Section 6.8.1 All  doors  in  a  means  of  egress  shall  be  of  the  side‐hinged  swinging  type.    Roll‐down  and 
sliding gates and shutters shall not be allowed. 
 
     NC‐1.66 Alliance Section (6.8.2.1 ), (6.8.2.2), (6.8.2.3)  
     General.  Doors shall not be locked in the direction of egress under any conditions.  All existing hasps, locks, slide bolts, and 
     other locking devices shall be removed unless provided for in the exceptions below: 
     Doors may be locked where the latch and lock are disengaged with one motion where the occupant load does not exceed 49 
     persons.  Turning a door handle and disengaging a lock is considered two motions. 
     Doors may be provided with locking hardware from the ingress side provided that a panic bar is installed on any door with 
     an occupant load exceeding 49 persons.  The re‐entry provisions of 6.8.3 must be met. 
     NC‐1.67 Alliance Section (6.8.3), (6.8.3.1) Every door in a stair enclosure serving more than 5 stories shall be provided with 
     re‐entry unless it meets the requirement below. 
                                                            
                                                                     Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                                      Page 177 of 188 
                                                                                                                                                      
                                                                                                                                                      
     Stair doors may be permitted to be locked from the stair (ingress) side that prevents re‐entry to the floor provided at least 
two floors allowing re‐entry to access another exit are provided, there are not more than 4 stories intervening between re‐entry 
floors, re‐entry is allowed on the top or next to top level, reentry doors are identified as such on the stair side, and locked doors 
shall be identified as to the nearest re‐entry floors. When the discharge floor is determined to be a required re‐entry floor using 
the above requirements, re‐entry does not have to be provided back into the building on this level. 
      
     NC‐1.68 Alliance Section 6.8.5 A landing shall be provided on both sides of doors used in the means of egress.  Door shall 
not swing out over stairs. 
 
     NC‐1.69 Alliance Section 6.9.2.1 Stairs shall be of noncombustible construction. 
 
     NC‐1.70 Alliance Section 6.9.2.2 Landings shall be provided with same width in the direction of egress travel as the stair 
clear width shall be provided at each level and at intermediate landings.  Existing landings that are less than the stair width, shall 
reduce the overall available capacity of the stair as calculated in 6.5.6.2.2 
 
     NC‐1.71 Alliance Section 6.9.2.3 Treads.  Stair treads shall be of nominal uniformity.   
     6.9.2.3.1 The maximum riser height for any stair shall be 215 mm (8.5 in.). 
     6.9.2.3.2 Any riser height at the top or bottom step in a stair run exceeding more than 51 mm (2 in.) difference from the 
     adjacent riser height shall be modified to be within this tolerance. 
     6.9.2.3.3  Any  riser  height  or  tread  depth  not  at  the  top  or  bottom  step  in  a  stair  run  exceeding  more  than  25  mm  (1  in.) 
     difference from the adjacent step shall be modified to be within this tolerance. 
     6.9.2.3.4 For existing stairs that do not meet these tread dimensions and will require extensive rework of the stairway, a full 
     detailed  analysis  of  the  tread  dimensions  can  be  submitted  to  the  Authority  for  review  and  approval  of  an  alternate 
     corrective action plan. 
 
     NC‐1.72 Alliance Section 6.9.2.4 Handrails shall be provided on both sides of each stairway.  Intermediate handrails shall be 
provided when the stair width exceeds 2.2 m (87 in.). 
 
     NC‐1.73 Alliance Section 6.9.3.1 Stair designation signs shall be provided at each floor entrance from the stair to the floor in 
English and Bengali.  Signs shall indicate the name of the stair and the floor level.  Signs shall be posted adjacent to the door. 
 
     NC‐1.74 Alliance Section 6.10 Ramps. 6.10.1 Width.  Ramps used in a means of egress shall not reduce the overall means of 
egress width.  The minimum width shall be 1.1 m (44 in.). 
     6.10.2 Slope.  New ramps shall not have a running slope greater than 1 in 12 (8 percent).  Existing ramps shall not have a 
     running slope greater than 1 in 8 (12.5 percent). 
     6.10.3 Handrails.  Ramps shall be provided with handrails on both sides of the ramp. 
      
     NC‐1.75 Alliance Section 6.11.1 Location.  Lighted exit signs shall be placed at entrance to an exit.  Additional exit signs shall 
     be  placed  throughout  the  facility  anywhere  the  continuation  of  the  egress  is  not  obvious. 
     6.11.2 Power.  Lighted exit signs shall be provided with either battery backup or emergency power and shall be continuously 
     illuminated.  
     6.11.3 Directional signs.  Directional signs shall be provided where there is a change in the direction for the path of travel 
     and the direction to an exit is not obvious. 
      
     NC‐1.76 Alliance Section 6.12.1.2 Existing handrails that are less than 760 mm (30 in.) or greater than 1100 mm (44 in.) as 
measured  from  the  leading  edge  of  the  tread,  shall  be  replaced  with  handrails  meeting  the  following  requirements  ‐  New 
handrails  shall  have  a  minimum  height  of  865  mm  (34  in.)  and  a  maximum  height  of  965  mm  (38  in.)  as  measured  from  the 
leading edge of the tread. 
      
     NC‐1.77 Alliance Section 6.12.2 6.12.2 Guards.  Guards shall be provided at all open sides of means of egress that exceed 
760 mm (30 in.) above the floor or finished ground below. Guards shall have a minimum height of 760 mm (30 in.). 
      
     NC‐1.78 Alliance Section 6.12.2.3 Open guards shall have intermediate rails or pattern such that a sphere 200 mm (8 in.) in 
diameter cannot pass through any opening up to a height of 865 mm (34 in.). 
                                                               
                                                                    Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                                    Page 178 of 188 
                                                                                                                                                    
                                                                                                                                                    
     
    NC‐1.79 Alliance Section 6.12.2.4 All occupiable roofs shall be provided with parapets or guards with a minimum height of 
1067 mm (42 in.). 
     
    NC‐1.80 Alliance Section 6.13  Travel  distance  to  reach  an  exit  for  new  and  existing  shall  not  exceed  the  values  listed  in 
BNBC Part 4 Section 3.15.1 Table 6.13.1  
                 Occupant Load 500 or Less                       Minimum 2 exits 
                 Occupant Load 501 to 1000                       Minimum 3 exits 
                 Occupant Load more than 1000                    Minimum 4 exits 
 
                                                                                                                                 
 
As per Final version Alliance Standard V1 Travel distance to reach an exit for new and existing shall not exceed the values listed in 
BNBC Part 4 Section 3.15.1 Table 6.13.1 unless the below requirements can be met. 
 
     6.13.1.1 travel distance limitations for G2 (RMG factories) shall be increased to 60 m (200 ft) where a complete automatic 
fire detection system, portable fire extinguishers, and standpipe system are provided in accordance with this Standard. 
 
     6.13.1.2 Travel distance limitations for G2 (RMG factories) shall be increased to 122 m (400 ft) where a complete automatic 
sprinkler system, automatic fire alarm system, and portable fire extinguishers are provided in accordance with this Standard. 
      
     NC‐1.81  Alliance  Section  6.14.2  Interior  exit  stairways  and  ramps  shall  terminate  at  an  exit  discharge  except  where 
terminating at an exit passageway constructed in accordance with 6.15. Exit passageways shall terminate at an exit discharge. 
      
     NC‐1.82 Alliance Section 6.14.3 Openings.  Openings into an exit enclosure other than unprotected exterior walls shall be 
limited to those necessary for exit access to the enclosure.  In new construction, elevators shall not open into an exit enclosure.  
Openings  from  exit  enclosures  to  storage  areas,  basements,  transformer  rooms,  generator  rooms,  boiler  rooms,  and  similar 
normally unoccupied spaces shall be provided with vestibules. 
      
     NC‐1.83 Alliance Section 6.14.7 Where nonrated walls or unprotected openings enclose the exterior of the stairway and the 
walls or openings are exposed by other parts of the building at an angle of less than 180 degrees (3.14 rad), the building exterior 
walls within 3050 mm (10 ft) horizontally of a nonrated wall or unprotected opening shall have a fire‐resistance rating of not less 
than 1 hr.  Openings within such exterior walls shall be protected by opening protective having a fire protection rating of not less 
than ¾ hr.  This construction shall extend vertically from the ground to a point 3050 mm (10 ft) above the topmost landing of the 
stairway or to the roof line, whichever is lower. [IBC 1022.7] 
      
              IBC 1022.7 Discharge identification.  
              A  stairway  in  an  exit  enclosure  shall  not  continue  below  its  level  of  exit  discharge  unless  an  approved  barrier  is 
              provided  at  the  level  of  exit  discharge  to  prevent  persons  from  unintentionally  continuing  into  levels  below. 
              Directional exit signs shall be provided as specified in Section 1011. 
      
     NC‐1.84 Alliance Section 6.15.2 Exit passageways shall be considered an extension of the stairs and shall not be used for any 
other purpose.  
      
     NC‐1.85  Alliance  Section  6.15.3  Exit  passageways  shall  have  walls,  ceilings,  and  floors  that  meet  the  same  rating 
requirement as the exit that is being served and shall not be less than 1 hr fire‐resistance rated construction. 
      
     NC‐1.86 Alliance Section 6.15.4  Exit passageways shall terminate at an exit discharge. 
      
     NC‐1.87  Alliance  Section  (6.17.1),  (6.17.3)  Exits  shall  discharge  directly  to  the  exterior  of  the  building  unless  meeting  the 
requirements below.  The exit discharge shall be at grade or provide direct access to grade.  Exit discharge shall not reenter a 
                                                              
                                                                       Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                                          Page 179 of 188 
                                                                                                                                                          
                                                                                                                                                          
building.  A maximum of 50 percent of the number and capacity of the exit enclosures can discharge through areas on the level 
of exit discharge where all of the following are met: 
      (1)  Automatic  sprinkler  protection  is  provided  throughout  the  level  of  exit  discharge  or  portion  of  the  level  of  discharge 
      where separated from nonsprinklered portions of the floor by fire barriers with the same fire resistance rating as the exit 
      enclosure.  
      (2) The interior discharge is not through a storage or hazardous occupancy. 
      (3) The entire area of the level of exit discharge is separated from areas below by construction having a fire resistance rating 
      not less than that required for the exit enclosure. 
      (4)  The  way  to  the  exterior  shall  be  free  and  unobstructed  and  shall  be  readily  visible  and  identifiable  from  the  point  of 
      discharge of the interior exit. 
 
      NC‐1.88  Alliance  Section  6.17.2  An  egress  court  serving  as  a  portion  of  the  exit  discharge  shall  be  open  to  the  sky  or 
provided with a fire resistance rated enclosure the same as the exit enclosure.  Egress courts less than 3050 mm (10 ft) in width 
(as measured from the building and the adjacent property line) shall be provided with walls having a 1‐hr fire resistance rated 
construction for a distance of 3050 mm (10 ft) above the floor of the court.   
 
      NC‐1.89  Alliance  Section  10.12.2.1 The  means  of  egress  paths  shall  be  illuminated  at  all  times  the  building  is  occupied. 
Illumination shall be a minimum of 10 lux for all corridors, exit doors, and stairways. Aisles shall be provided with a minimum 2.5 
lux. 
      10.12.2.2 Emergency power.  Means of egress illumination shall be provided with emergency power or supplemented with 
      battery  powered  lights  that  provide  minimum  10  lux  for  no  less  than  30  min  in  the  event  of  failure  of  normal  lighting. 
      10.12.2.3 Emergency  power  for  means  of  egress  illumination  shall  be  verified  at  least  once  per  year.  If  battery  operated 
      lights are used, these lights shall be tested on a monthly basis. Functional testing of battery powered lights shall be provided 
      for a minimum 30 min once per year. 
       
      NC‐1.90 Alliance Section 10.12.1.1 All required exit signs shall be illuminated continuously at all times.  
      10.12.1.2 Exit  signs  may  be  illuminated  either  by  lamps  external  to  the  sign  or  by  lamps  contained  within  the  sign.  The 
      source  of  illumination  shall  provide  not  less  than  50  lux  at  the  illuminated  surface  with  a  contrast  of  not  less  than  0.5. 
      Approved self‐luminous signs which provide evenly illuminated letters having a minimum luminance of 0.2cd/m2 may also be 
      used. Lighting for exit signs shall either be provided with emergency power or battery backup. 
      10.12.1.3 Lighting for exit signs shall either be provided with emergency power or battery backup. 
      10.12.1.4 Emergency power for exit signs shall be verified at least once per year. If battery‐operated signs are used, these 
      lights shall be tested on a monthly basis. Functional testing of battery powered signs shall be provided for a minimum 90 min 
      once per year. 
       
      NC‐1.91 Alliance Section  10.4.1.1  Buildings over  six‐story  or  20  m  (65 ft)  high shall have  a minimum  of one  vertices  vertical shaft  of 
200mm x 400mm size for every 1500 m2 floor areas. 
       
      NC‐1.92 Alliance Section 13.1.1 Fire Safety Director. The duties of the Fire Safety Director shall include the following: 
       
      (1) Establish internal and external rally points and communicate to all employees in the building. 
      (2) Fire department pre‐planning. 
      (3) Conduct safety inspections as outlined in 13.10. 
      (4) Ensure all testing of fire protection equipment is conducted in accordance with 13.11. 
 
      NC‐1.93 Alliance Section 13.2 
      13.2.1 Fire drills shall be conducted on a quarterly basis as outlined in BNBC Part 4 Appendix A for all garment facilities. 
      13.2.2 Fire drills shall be conducted under the direction of a Fire Safety Director. 
      13.2.3 All other requirements for fire drills shall be conducted in accordance with BNBC Part 4 Appendix A. 
       
                                                                                                                                       
                                                                 
                                                                  Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                                 Page 180 of 188 
                                                                                                                                                 
                                                                                                                                                 
                                                                                                                             
     
    NC‐1.94 Alliance Section 13.3 Evacuation Plan. 
    13.3.1 The Fire Service Director shall develop a fire evacuation plan for each building. 
    13.3.2 Fire evacuation maps shall be posted at the entrance to each exit stair. 
    13.3.3 The evacuation plan shall include provisions to assist physically disabled persons.  A list of all employees with physical 
    disabilities shall be kept by the Fire Service Director. 
     
    NC‐1.95 Alliance Section 13.4  Hot work permit. 
    13.4.1 A hot work permit system program shall be enacted for all RMG facilities in accordance with NFPA 51B. 
     
           NFPA 51B 5.1 Permissible Areas. 
           5.1.1 General. Hot work shall be permitted only in areas that are or have been made fire safe. 
           5.1.2 Designated or Permit Required Areas. Hot work shall be performed in either designated areas or permit required 
           areas. 
           5.1.2.1  Designated  Areas.  A  designated  area  shall  be  a  specific  area  designed  or  approved  for  hot  work,  such  as  a 
           maintenance shop or a detached outside location that is of noncombustible or fire resistive construction, essentially 
           free of combustible and flammable contents, and suitably segregated from adjacent areas. 
           5.1.2.2 Permit Required Areas. 
           5.1.2.2.1 A permit required area shall be an area that is made fire safe by removing or protecting combustibles from 
           ignition sources. 
           5.1.2.2.2 Signs shall be posted designating hot work areas as deemed necessary by the PAI. 
           5.2* No Permissible Areas. 
           Hot work shall not be permitted in the following areas: 
            (1)  In  areas  not  authorized  by  management  (2)  In  sprinklered  buildings  where  sprinklers  are  impaired,  unless  the 
           requirements  of  NFPA  25,  Standard  for  the  Inspection,  Testing,  and  Maintenance  of  Water  Based  Fire  Protection 
           Systems,  are  met  (3)  In  the  presence  of  explosive  atmospheres  (i.e.,  where  mixtures  of  flammable  gases,  vapors, 
           liquids,  or  dusts  with  air  exist)  (4)  In  the  presence  of  un‐cleaned  or  improperly  prepared  drums,  tanks,  or  other 
           containers and equipment that have previously contained materials that could develop explosive atmospheres (5) In 
           areas with an accumulation of combustible dusts that could develop explosive atmospheres 
     
    NC‐1.96 Alliance Section 13.5 Smoking. 
    13.5.1 Smoking shall be prohibited in any garment factory building, separate storage building, or any building or area where 
    the Inspector of the Factories Rules (1.6.3.7) Part 53 requires that smoking be prohibited.  
    13.5.2 Signs shall be posted in Bengali and English at all building entrances.  
    13.5.3 If an Owner creates a designated smoking area outside the buildings, information on the location of these designated 
    areas shall be posted on the signs required in 13.6.2. 
 
    NC‐1.97 Alliance Section 13.6 and 13.7 Housekeeping and Management of Operating Loads. 
    13.6.1 Policy.  Establish written corporate and plant policies on housekeeping to ensure scheduled cleaning for floor, wall, 
    ceiling,  supply  and  return  air  ventilation  systems.    Promptly  reschedule  skipped  cleanings.    Provide  a  documented  line  of 
                                                            
                                                                     Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                                      Page 181 of 188 
                                                                                                                                                      
                                                                                                                                                      
     authority for authorizing a cleaning delay and rescheduling. As a general rule the maximum tolerable deposit thickness for 
     loose fluffy lint is 13 mm (½ in.) over a maximum of 46.5 m2 (500 ft2).  Limit dense deposits to 6 mm (¼ in.) and oil saturated 
     deposits to 3.2 mm (⅛ in.). 
     13.6.2 Maintain electrical systems in good working order and keep free of lint buildup to reduce the potential for ignition. 
     This includes cleaning inside junction boxes, buses, trays, tunnels, etc. 
     13.7  Factory  Owners  shall  ensure  that  at  least  one  trained  professional  individual  is  assigned  to  each  factory  facility  as 
     Factory Load Manager in accordance with 8.9 of this Standard. 
      
     NC‐1.98 Alliance Section 13.8   All means of egress shall be kept free and clear at all times. 
 
     NC‐1.99 Alliance Section 13.9 Safety Inspections.  
     A safety inspection program shall be initiated and conducted on a quarterly basis. This program shall be conducted under 
the direction of the Fire Safety Director. These inspections shall look for egress maintenance, condition of fire doors, storage in 
aisle ways, excess storage, smoking, hot work and other fire‐safety related items. Records of these inspections shall be kept for 
Alliance inspection review. 
      
     NC‐1.100 Alliance Section 13.9.2 Doors tested.   
     Fire  doors  shall  be  tested  on  a  quarterly  basis  to  ensure  that  they  are  properly  closing  and  latching.    They  shall  also  be 
checked for the proper label and verification that the door has not been damaged in any way. 
      
     NC‐1.101 Alliance Section 13.10 Maintenance of fire protection equipment. 
     13.10.1  Automatic  suppression  systems.  Inspection,  testing  and  maintenance  in  accordance  with  NFPA  25  shall  be 
     conducted on all water‐based fire protection systems.  
     13.10.2 Fire alarm and detections systems. Inspection, testing and maintenance in accordance with NFPA 72 
     shall be conducted on all fire alarm systems. 
     13.10.3 Fire extinguishers. Fire extinguishers shall be inspected, tested, and maintained in accordance with NFPA 10. 
               As per NFPA 25 Periodic Inspections 
               Obstruction Inspections: “An investigation of piping and branch line conditions shall be conducted every 5 years by 
               opening a flushing connection at the end of one main and by removing a sprinkler toward the end of one branch 
               line for the purpose of investigating for the presence of foreign organic and inorganic material.” Chapter 13, Sec. 
               13.2.1 
               Valves  &  Valve  Components:  Alarm  Valves:  “Alarm  Valves  and  their  associated  strainers,  filters,  and  restriction 
               orifices shall be inspected internally every 5 years unless tests indicate a greater frequency is necessary.” Chapter 
               12 Sec. 12.4.1.2 
               Check Valves: “Inspection. Valves shall be inspected internally every 5 years to verify that all components operate 
               correctly, move freely, and are in good condition.” Chapter 12 Sec. 12.4.2.1 
               Pre‐action/Deluge Valves: “Internal inspection of valve that can be reset without the removal of a faceplate shall be 
               permitted to be conducted every 5 years.” Chapter 12 Sec. 12.4.3.1.7.1 
               Strainers: “Strainers, filters, restricted orifices and diaphragm chambers shall be inspected internally every 5 years 
               unless tests indicate a greater frequency is necessary.” Chapter 12 Sec. 12.4.3.1.8 
               Dry Pipe Valves: “Strainers, filters, restricted orifices and diaphragm chambers shall be inspected internally every 5 
               years unless tests indicate a greater frequency is necessary.” Chapter 12 Sec. 12.4.4.1.6 
               Water  Storage  Tanks: “The  interior  of steel  tanks without corrosion  protection  shall  be  inspected every  3 years.” 
               Chapter 9 Sec. 9.2.6.1.1 
               Interior Tanks: “The interior of all other types of tanks shall be inspected every 5 years.” Chapter 9 Sec. 9.2.6.1.2 
               Periodic Tests 
               Valves and Components 
               Dry pipe valves / Quick‐Opening devices: “Every 3 years and when the system is altered, the dry pipe valve shall be 
               trip tested with the control valve fully open and the quick opening device, if provided in service.” Chapter 12, Sec 
               12.4.4.2.2.2 
               Pressure Reducing and Relief Valves: Sprinkler pressure reducing control valves: “A full flow test shall be conducted 
               on each valve at 5‐year intervals and shall be compared to previous test results.” Chapter 12 Sec.12.5.1.2 
               Hose  Connection Pressure  Reducing  Valves: “A  full  flow  test shall be conducted  on each valve  at  5‐year intervals 
               and shall be compared to previous test results.” Chapter 12 Sec. 12.5.2.2 
                                                               
                                                    Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                  Page 182 of 188 
                                                                                                                                  
                                                                                                                                  
Hose Rack Assembly Pressure Reducing Valves: “A full flow test shall be conducted on each valve at 5‐year intervals 
and shall be compared to previous test results.”  Chapter 12 Sec. 12.5.3.2 
Sprinkler  Systems  Gauges:  “Gauges shall be replaced  every  5  years  or tested  every  5  years  by  comparison with a 
calibrated  gauge.  Gauges  not  accurate  to  within  3  percent  of  the  full  scale  shall  be  recalibrated  or  replaced.” 
Chapter 5, Sec. 5.3.2 
Sprinklers‐Extra  High  Temperature:  “Representative  samples  of  solder‐type  sprinklers  with  a  temperature 
classification of extra high 163°C (325°F) or greater that are exposed to semi continuous to continuous maximum 
allowable ambient temperature conditions shall be tested a 5‐year intervals.” Chapter 5 Sec. 5.3.1.1.1.3 
 
Sprinklers–Fast Response: “Sprinklers manufactured using fast‐response elements that have been in service for 20 
years shall be tested. They shall be retested at 10‐year intervals.” Chapter 5 Sec. 5.3.1.1.1.2 
Sprinklers:  “Where  sprinklers have  been  in  service for  50 years,  they  shall  be  replaced or representative  samples 
from one or more sample areas shall be tested. Test procedures shall be repeated at 10‐year intervals.” Chapter 5 
Sec. 5.3.1.1.1 
Sprinklers‐Corrosive  Environment:  “Where  sprinklers  are  subjected  to  harsh  environments,  including  corrosive 
atmospheres and corrosive water supplies, on a 5‐year basis, sprinklers shall either be replaced or representative 
sprinkler samples shall be tested.” Chapter 5 Sec. 5.3.1.1.2 
Standpipe and Hose Systems Hose: Fire hoses shall be tested every 5 years per NFPA 1962. 
Hydrostatic Test: “Hydrostatic tests at not less than 13.8‐bar (200 psi) pressure for 2 hours, or at 3.4 bar (50 psi) in 
excess of the maximum pressure, where maximum pressure is in excess of 10.3‐bar (150 psi), shall be conducted 
every 5 years on dry standpipe systems and dry portions of wet standpipe systems.” Chapter 6 Sec. 6.3.2.1 
Flow Test: “A flow test shall be conducted every 5 years at the hydraulically most remote hose connection of each 
zone of an automatic standpipe system to verify the water supply still provides the design pressure at the required 
flow.” Chapter 6 Sec. 6.3.1.1 
Private Fire Service Mains Underground and Exposed Piping Flow Tests: “Underground and exposed piping shall be 
flow tested to determine the internal condition of the piping at minimum 5‐year intervals.” Chapter 7 Sec. 7.3.1 
Water Storage Tanks Level Indicators: “Level indicators shall be tested every 5 years for accuracy and freedom of 
movement.” Chapter 9 Sec. 9.3.1 
As per NFPA72 10.2.1 Performance. 
10.2.1.1 Performance Verification. To ensure operational integrity, the fire alarm system shall have an inspection, 
testing, and maintenance program. Inspection, testing, and maintenance programs shall satisfy the requirements of 
this Code, shall conform to the equipment manufacturer’s published instructions, and shall verify correct operation 
of the fire alarm system.  
10.2.1.2 Impairments. 
10.2.1.2.1 The requirements of Section 4.6 shall be applicable when a system is impaired. 
10.2.1.2.2 System defects and malfunctions shall be corrected.10.2.1.2.3 If a defect or malfunction is not corrected 
at the conclusion of system inspection, testing, or maintenance, the system owner or the owner’s designated 
representative shall be informed of the impairment in writing within 24 hours. 
                                              
            Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                              Page 183 of 188 
                                                                              
                                                                              
                                                     
 
     
     
         
                                                                  Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                                       Page 184 of 188 
                                                                                                                                                       
                                                                                                                                                       
             As per NFPA 10 Periodic Inspections. 
             6.2.1  Inspections  should  be  performed  when  the  fire  extinguisher  is  initially  placed  in  service  and  thereafter  at 
             approximately 30‐day intervals. Inspections should be performed in accordance with the owner's manual supplied 
             with the fire extinguisher. 
             6.2.2 Inspection procedures should include a check of at least the following: 
             (1)  The  equipment  is  in  its  designated  place,  and  its  operating  instructions  face  outward.  (2)  Access  to  the  fire 
             extinguisher  is  not  obstructed.  (3)  Operating  instructions  are  legible.  (4)  Any  seals  or  tamper  indicators  are  not 
             broken, missing, or in need of replacement. (5) Pressure gauge or indicating devices, if provided, are in the operable 
             range or position. (6) There is no evidence of corrosion or physical damage. 
             6.2.3  If  the  inspection  of  the  fire  extinguisher  reveals  any  deficiency  under  6.2.2(l)  and  (2).  immediate  corrective 
             action  should  be  taken  by  the  homeowner  or  occupant.  Deficiencies  related  to  6.2.2(3)  through  (6)  indicate  the 
             need for immediate maintenance and servicing. 
             6.3 Maintenance and Servicing. 
             6.3.1 Maintenance and servicing of fire extinguishers should be performed by fire extinguisher servicing companies 
             that have the proper tools, recharge materials, lubricants, manufacturer's servicing instructions, and replacement 
             pans. 
             6.3.2 Manufacturer’s instructions specify servicing of rechargeable fire extinguishers after any use. The frequency of 
             internal maintenance and hydrostatic testing is specified in the owner's manual and in Table F6.3.2. 
              
                                                                                                
      
     NC‐1.102 Alliance Section 13.11 Equipment 
     13.11.1  Establish  a  maintenance,  cleaning  and  lubrication  schedule  for  all  equipment.    The  maintenance  and  cleaning 
schedule will vary with type of fiber processed and the equipment used.  Lubricate equipment in accordance with manufacturer’s 
recommendations.  Review plant fire loss records to determine whether cleaning or equipment maintenance was a factor, and 
increase frequency as needed. 
      
     NC‐1.103 Alliance Section  13.12 Electrical maintenance. 
     13.12.1 Testing of emergency lighting.  Emergency lighting provided by battery backup shall be tested on a monthly basis. 
     13.12.2 Generators.  Generators used for emergency or standby requirements of this Standard shall be inspected, tested, 
     and maintained in accordance with NFPA 110. 
 
     NC‐1.104 BNBC Part ‐4 Chap‐4, 4.2.3.10 Pressure in Riser Pipe 
                                                                                                                               
    NC‐1.105 BNBC Part ‐4 Chap‐4, 4.2.3.9 Fire Hose Pipe 
                                                                                                                                
                                                                        
    NC‐1.106 BNBC Part ‐4 Chap‐4, 4.2.3.9 Fire Hose Cabinet  
                                                                                                                                    
     
    NC‐1.107 BNBC Part ‐4 Chap‐4, 4.2.6. Fire Pump, Standby pump, Jockey pump 
                                                            
                                                                 Fire Safety Assessment of XYZ Garments Ltd. NCs by Description 
                                                                                                                                  Page 185 of 188 
                                                                                                                                                  
                                                                                                                                                  
                                                                                                                       
     
    NC‐1.108 BNBC Part‐4, Chapt‐4. 4.2.6 Pump House 
 
    NC‐1.109 BNBC Part ‐4 Appendix‐D17.2 Manual Call Points 
                                                                                                                                   
 
    NC‐1.110 BNBC Part ‐4 Chap‐4 PA system 
     
    NC‐1.111 BNBC Part ‐4 Appendix‐D18 Fire Command Station 
     
                                                                                                                           
     
    NC‐1.112 BNBC Part‐3 Chapt‐1. Main Road near Main Gate 
                                                                                                                               
 
    NC‐1.113 Fire service & Civil Defense Fire Certificate 
 
    NC‐1.114 Alliance 5.5.1.1, 5.4.3.1 5.7.4.1 and Fire service & civil Defense Fire approval drawing and Fire as‐built drawing 
 
     NC‐1.115 Standard Practice Chemical Store: All stored chemicals must be labeled with their correct name and any specific 
hazards and requirement to wear personal protective equipment clearly identified. Flammable chemicals (e.g. solvents) must be 
segregated and stored separately, preferably in a locked, secure area. An authentic Material Safety Data Sheet (MSDS) for each 
chemical must be available in the local language and kept in close proximity to the chemical for ease of access. Bulk quantities of 
hazardous chemicals must be stored appropriately to avoid the risk of a spillage.  
      
     The recommended approach is to enclose containers of chemicals with bunds or bund trays that are capable of holding the 
entire amount of chemicals in the container. All chemicals must be stored to minimize the risk of dangerous reaction with other 
chemicals.  For  example  acids  and  alkalis  must  be  segregated  and  oxidizing  and  reducing  agents  should  be  separated.  Storage 
advice on the MSDS must be followed at all times.   
 
    As per Alliance Section 3.4.2.1.9 Chemical storage. Chemical storage shall be in compliance with BNBC Part 3 Section 2.1.13.  
                                                           
              Fire Safety Assessment of XYZ Garments Ltd. Documents 
                                                        Page 186 of 188 
                                                                        
                                                                        
           
                                        
            
    Fire License 
            
            
            
 
             Fire Safety Assessment of XYZ Garments Ltd. Documents 
                                                       Page 187 of 188 
                                                                       
                                                                       
          
          
          
                                               
    Fire Drill 
          
          
          
          
          
          
          
          
 
              Fire Safety Assessment of XYZ Garments Ltd. Documents 
                                                        Page 188 of 188 
                                                                        
                                                                        
           
           
           
                                              
Fire Safety Training