PB Cons Sop 004 Sop Penimbunan Tanah

This standard operating procedure document provides guidelines for column formwork construction work. It outlines responsibilities, personal protective equipment, tools, and the work procedures. The procedures include preparing materials and tools, cutting and bending reinforcing bars according to schedules and drawings, assembling the column reinforcement cage, placing it at stages, measuring, checking, and cleaning the cage before concrete pouring. Flow charts and checklists are used to guide the safe and proper installation of column formwork.

Uploaded by

mahandhie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
133 views5 pages

PB Cons Sop 004 Sop Penimbunan Tanah

This standard operating procedure document provides guidelines for column formwork construction work. It outlines responsibilities, personal protective equipment, tools, and the work procedures. The procedures include preparing materials and tools, cutting and bending reinforcing bars according to schedules and drawings, assembling the column reinforcement cage, placing it at stages, measuring, checking, and cleaning the cage before concrete pouring. Flow charts and checklists are used to guide the safe and proper installation of column formwork.

Uploaded by

mahandhie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

STANDARD OPERATING PROCEDURE

PEMBESIAN KOLOM

DOCUMENT TYPE SOP


DOCUMENT TITLE PEMBESIAN KOLOM
DOCUMENT NUMBER PB-CONS-SOP-008

A IFR 07/03/2015 First Issue for Review GIL MHD

Rev Status Issue Date Description Prepared Checked


Approvals

Remarks
A,B,C,… Revision for all preliminary version
0 First official version
1,2,3,… Revision for official version
Revisi :A
PEMBESIAN KOLOM Date : 07/03/2015
Document No PB-CONS-SOP-008 Page 2 of 5
Department: Construction

Revision Sheet

REVISION DATE DESCRIPTION OF CHANGE


A 07/03/2015 First Issue for Review

Print Format Section 2


Revisi :A
PEMBESIAN KOLOM Date : 07/03/2015
Document No PB-CONS-SOP-008 Page 3 of 5
Department: Construction

Contents
1 TUJUAN ........................................................................................................................................................ 4
2 TANGGUNG JAWAB ..................................................................................................................................... 4
3 ALAT PELINDUNG DIRI ................................................................................................................................. 4
4 PERALATAN KERJA........................................................................................................................................ 4
5 PROSEDUR KERJA ......................................................................................................................................... 4
6 FLOW CHART ................................................................................................................................................ 5

Print Format Section 2


Revisi :A
PEMBESIAN KOLOM Date : 07/03/2015
Document No PB-CONS-SOP-008 Page 4 of 5
Department: Construction

1 TUJUAN

Prosedur ini bertujuan menyediakan panduan untuk pekerjaan pembesian agar bekerja dengan
efisien dan aman.

2 TANGGUNG JAWAB

- Project Manager
- Site Manager
- Supervisor
- Tukang Besi

3 ALAT PELINDUNG DIRI

- Safety Shoes
- Helm
- Sarung tangan
- Kacamata Safety
- Coveralls
- Rambu-rambu keselamatan

4 PERALATAN KERJA

- Bar Cutter
- Bar Bender
- Tang
- Meteran
- Penanda (kapur/ pensil)

5 PROSEDUR KERJA

1) Melakukan pekerjaan persiapan sebagai berikut :


a. Menyiapkan material yang digunakan untuk untuk pekerjaan pembesian kolom
b. Menyiapkan peralatan yang akan digunakan
c. Menggunakan APD

2) Potong dan bengkokkan besi tulangan sesuai dengan bar banding schedule dan gambar kerja.

3) Perakitan Tulangan Kolom :


a. Pemasangan tulangan utama pada kolom harus sesuai dengan ukuran dan spesifikasi yang
telah ditentukan berdasarkan acuan gambar kerja dan Rencana Kerja dan Syarat (RKS)
b. Pemasangan tulangan begel disesuaikan dengan gambar kerja, dengan melihat ukuran
tulangan dan jarak sengkang tiap begel.
c. Kawat bendrat digunakan untuk mengaitkan antara tulangan utama kolom dengan begel/
sengkang. Pengaitan kawat bendrat harus kencang agar begel tidak bergeser.

Print Format Section 2


Revisi :A
PEMBESIAN KOLOM Date : 07/03/2015
Document No PB-CONS-SOP-008 Page 5 of 5
Department: Construction

4) Pemasangan tulangan kolom pada stage :


a. Tulangan kolom ditempatkan sesuai dengan gambar rencana
b. Penyambungan tulangan kolom lantai 1 pada sloof sebaiknya dihak (ditekuk) pada ujung
bawah tulangan kolom.
c. Penyambungan tulangan kolom pada lantai 2 ke lantai 1 sebaiknya ditempatkan pada ½ dari
tinggi antar lantai, dikarenakan momen = 0.

5) Pekerjaan Pengukuran dan Pengecekan, baik dari sisi penulangan, penempatan beton decking,
dimensi kolom dan tingkat vertikalisasi kolom.

6) Marking penentuan sepatu kolom untuk mengetahui jarak antara tulangan kolom dengan
bekisting kolom sebelum dilakukan pekerjaan bekisting.

7) Membersihkan tulangan dengan kompresor udara agar saat pengecoran tidak terdapat material
atau bahan-bahan yang dapat mengurangi kekuatan beton.

6 FLOW CHART