Nuclear Plant Decommissioning Guide
Nuclear Plant Decommissioning Guide
Maurizio Cumo1
LNS0520006
1
[email protected]
Experiences & Techniques in the Decommissioning of Old Nuclear Power Plants 255
1. Introduction
The main goal for the decommissioning activities is to place the facility in a condition
that eliminate any risk for the health and safety of the general public and the
environment, removing, in particular, from systems and structures any radioactivity
that may have been accumulated during plant operations. Of course, all the
decommissioning activities shall be carried out with great attention to assure the
minimization of the risks to both the public and the workers involved in the process.
All power plants, coal, gas and nuclear, have a finite life beyond which it is no longer
economical to operate them. Generally speaking, Nuclear Power Plants (NPP's) were
designed for a life of about 30 years, though some have proved capable of continuing
well beyond this term. Newer plants are designed for a 40 to 60 years operating life.
To date, 70 commercial power reactors, over 250 research reactors and a number of
fuel cycle facilities, have been retired from operation. Some of these have been fully
dismantled. Assuming an average of about 25-years lifespan, almost 300 nuclear
power plants would have to be decommissioned by the year 2010. By appropriate
refurbishment, replacement or upgrading of some equipment, operations at many of
these plants can probably be extended well beyond this conservative estimate.
256 M. Cumo
Commercial Plant
Plant Type Designer Mwe
operations shutdown
Latina Magnox TNPG 200 1963 1986
Stage 1
a) The first contamination barrier is kept as it was during operation but the
mechanical opening systems are permanently blocked and sealed (valves, plugs
etc.). The containment building is kept in a state appropriate to the remaining
hazard. The atmosphere inside the containment building is subject to appropriate
control. Access to the inside of the containment building is subject to monitoring
and surveillance procedures.
b) The unit is under surveillance and the equipment necessary for monitoring
radioactivity both inside the plant and in the area around it is kept in good
condition and used when necessary and in accordance with national legal
requirements. Inspections are carried out to check that the plant remains in good
condition. If necessary, checks are carried out to see that there are no leaks in
the first contamination barrier and the containment building.
Stage 2
a) The first contamination barrier is reduced to a minimum size (all parts easily
dismantled are removed). The sealing of that barrier is reinforced by physical means
and the biological shield is extended if necessary so that it completely surrounds the
barrier. After decontamination to acceptable levels, the containment building and the
nuclear ventilation systems may be modified or removed if they no longer play a role
in radiological safety and, depending on the extent to which other equipment is
removed decontaminated, access to the former containment building, if it is left
standing, can be permitted. The non-radioactive parts of the plant (buildings or
equipment) may be converted for new purposes.
b) Surveillance around the barrier can be relaxed but is desirable for periodic spot
checks to be continued, as well as surveillance of the environment. External
inspections of the sealed parts should be performed. Checks for leaks are no longer
necessary on any remaining containment buildings.
Stage 3
All materials, equipment and part of the plant, the activity of which remains
significant despite decontamination procedures are removed. In all remaining parts
contamination has been reduced to acceptable levels. The plant is decommissioned
258 M. Cumo
Other terms that are widely used to describe the strategy adopted for the
decommissioning are those that have been introduced in USA by the Nuclear
Regulatory Commission (US NRC):
ENTOMBMENT:
The radioactive inventory is enclosed in a monolithic structure, e.g. concrete, to
secure the public safety. The monolithic structure should ensure integrity for about
100 years to derive benefit from the decay of the nuclides. After the entombment
period, all enclosed components are very low radioactive and the assumption should
be that dismantling at that time can be performed in a “conventional” way. During
entombment the plant remains under a nuclear license.
2
60 years is a limitation existing in the USA. In other countries this condition may last longer up to 100
years and more
3
If a plant is allowed to sit idle for 30 years, for example, only about 1/50th of its original radioactivity
from cobalt-60 will remain; after 50 years, some 1/1,000th will remain.
Experiences & Techniques in the Decommissioning of Old Nuclear Power Plants 259
On the other side, the SAFSTOR option may really imply a simple “close and seal the
door”, or a combination of immediate dismantling and safe store. In the latter case it
may be considered the immediate dismantling of systems and buildings which are
not, or only slightly, contaminated and a SAFSTOR strategy for the most radioactive
portion of the plant. Also the safe storage period may range from 30 to more than 100
years, depending on a number of parameters and conditions that will be discussed
later.
The third strategy (ENTOMBMENT) has never been applied yet to a NPP. There are
several reasons for that. The first one is that the size of a NPP is too large to be
simply entombed. A second reason is related to the fact that most power reactors will
have radionuclides in concentrations exceeding the limits for unrestricted use even
after 100 years and more and therefore this strategy cannot be successful.
ENTOMBMENT is, however, a possible strategy for smaller reactors and for other
small nuclear facilities.
Post-Operation – It is the sum of the activities that are needed to maintain the safety
of the plant even after the plant has been definitely shutdown. These activities are
more relevant while the spent fuel is still present in the plant.
Dismantling – It is the real demolition activity. It may be a rather simple and quick
activity, using conventional tools, but it may also be a very complex activity in the
case of highly radioactive parts, using remote cutting and other sophisticated tools.
Safe Storage – It is the period in which the plant is left in dormancy, waiting
for the radioactive decay. The plant is not left without controls, but a number
of activities are still needed and, in some cases, some maintenance and even
construction activities are necessary to maintain the safety for the workers and
the public.
Isotope Half-life
Principal Associated Materials
(years)decay γ energy where isotopes
mode (MeV) can be found
NEUTRON ACTIVATION PRODUCTS FOUND IN NUCLEAR REACTORS4
H3 5 12,3 β- - C,O,S2
C14 5730 β- - G, M, S
Na22 2 2,6 EC, β + 0,51 - 1,28 O
Cl36 3,1 108 β -, EC - C
Ar39 2 269 β- - C
41 5
Ca 1 10 EC - C
Ca45 0,4 β- - C
V49 2 0,9 EC - S2
Mn54 0,9 EC, γ 0,83 A, M, S
Fe55 2 2,7 EC - C, M, O, S2
EC, γ
57 2
Co 0,7 0,12 - 0,14 S2
β, γ
60 2 -
Co 5,3 1,2 – 1,3 C, M, O, S, Z
Ni59 7,5 104 EC - C, M, O, S, Z
β
63 2
Ni 100 -
- C, M, O, S2
Zn65 0,7 β +, γ, EC 0,51 – 1,12 A
Zr93 1,5 106 β- - O, Z
Nb94 2 104 β -, γ 0,70 – 0,87 M, O, S, Z
EC, γ -
93 3
Mo 3,5 10 0,3 M
Ag108m 130 EC, γ 0,4 – 0,6 – M, O, S
0,7
Ag110m 0,7 β -, γ 0,6 – 0,9 M, O, S
EC, γ
133 2
Ba 10,7 0,08 – 0,36 C
Sm151 93 β -, γ 0,02 C
Eu152 13,4 β -, γ EC 0,1 C, G
Eu154 8,2 β-, γ 0,1 – 1,3 C, G
4
Fission products are also often found in nuclear reactors as a result of defects in the fuel
cladding
5
Important in fusion devices also
Experiences & Techniques in the Decommissioning of Old Nuclear Power Plants 261
Worker doses are not included in the previous list, since it is assumed that with
proper preparation and the use of proper tools, including remote operations and
decontamination activities, the worker dose can always be reduced to acceptable
levels. Also environment and public health impact levels have not been included in
this list, since they are generally so low that do not present any serious concern. Of
course also these elements have to be taken into account in a complete strategy
evaluation.
• Work force policy - In general at the time of final plant shutdown of one unit the
work force is between 200 and 500 people. If the unit is isolated on the site and if
the utility has no other nuclear operating plant, the social situation may become
acute, also in areas industrially developed. Therefore the worker decrease curve
shall be carefully studied and their useful employment in the decommissioning
process shall be planned, even considering their requalification.
• Pressures by central or local authorities - Pressures may exist from local and
central authorities to clean up the site as soon as possible to solve the
occupational issue mentioned above, to improve the "image" of a certain area
with touristic or agricultural objectives, and so on.
Detailed planning of the decommissioning activity is also a difficult task. Very few
activities are routine activities and some last for years.
It is also necessary to mention that planning is also difficult because the plant
configuration is different day by day. To keep under control the status of the plant
and its configuration is an heavy task, addressed generally with complex and specific
planning tools.
6. Waste management
Wastes related to plant decommissioning come only from the structures of the plant
which have been either irradiated or contaminated with radioactive isotopes.
Criteria for waste classification are not standardized worldwide and therefore a
consensus classification is not possible. Criteria may be related to the type of
isotopes, to their concentration and/or to the total amount of radioactivity in a
package. However, in general, 3 categories of wastes are identified:
264 M. Cumo
1. Low level radwaste – these are waste that would not be radioactive (i.e. their
radioactivity will be below the clearance level6) in a period that can last from few
days to some decades. This type of waste is not the waste that concern most in the
decommissioning. In the cases in which also concentration is important, then it
becomes a very important issue for decommissioning. In fact, one of the isotopes
that may influence the entire decommissioning process is Cobalt-60, which has
an half-life of 5,3 years. Since it is present in significant quantities in all plants
and since it is dangerous to workers, because it decays with a strong gamma, it
may lead to very large quantities of waste. Therefore the need for concentration
of radioactivity, the appropriate treatment and the waste form is strictly related to
the country regulations, definitions and disposal costs for such a type of waste.
2. Intermediate level radwaste – this is the waste which needs up to some centuries
to decay below the clearance threshold level
3. High level radwaste – All other radioactive waste, that do not fit in the 2 previous
categories are classified as high level waste. This category may include activated
materials, components contaminated with transuranic isotopes, Carbon-14
isotopes, such as graphite blocks of Magnox reactors, etc. Vitrified residues of
reprocessing certainly fall into this category.
The need for proper processing indeed exists. However, in many cases the required
technologies and the goals are the same as those for operational wastes. In particular,
the goals to be achieved and optimized should be minimization of the quantities and
volumes at the origin, stabilization, concentration, conditioning, sorting and
packaging. Among the technologies used for waste conditioning we may recall:
nitrification, bitumization, polymerization, cementation, super-compaction,
incineration, vitrification, etc.
In fig.2 below a flow diagram is depicted to show the process of producing, treating,
characterizing and packaging of decommissioning wastes.
6
The clearance ‘’is the removal of material from a system of regulatory control provided that
the radiological impact of these sources after removal from the system is sufficiently low as
not to warrant any further control’’
Experiences & Techniques in the Decommissioning of Old Nuclear Power Plants 265
7. Decontamination technologies
Decontamination objectives can vary according to the specific strategy chosen and
according to the specific phase of the decommissioning process. For example in the
SAFSTOR strategy the decontamination can be reduced to eliminate the easy
removable contamination and to minimize the doses to workers at the end of the safe
store period.
Chemical techniques use diluted or concentrated solvents which come in contact with
the radioactive substances to be dissolved. The dissolution may imply also the
dissolution of part of the base material or simply of the radioactive deposit film on the
surface. This last way is adopted when there is an interest in maintaining the integrity
of the base metal such as in the case of operating plants, where the decontamination is
applied only to reduce worker doses during maintenance activities. Chemical
decontamination is applied by a continuous flushing in intact piping, creating a closed
loop, and it is preferred for areas where access is difficult and for decontaminating the
internal surfaces of piping. Chemical decontamination can be also successfully used
for large areas such as floors and walls.
8. Dismantling technologies
The conditions under which the cutting operations are carried out depend on the
location and space of the working area, on the qualification and experiences of the
Experiences & Techniques in the Decommissioning of Old Nuclear Power Plants 267
• the technique (tool) should be used in practice, so that experience exists and a
safety in furnish, spare parts and handling is available
• the technique (tool) should only generate a minimum of secondary waste, e.g.
dust, particles, smokes, aerosols with controlled dispersion, liquid effluents
• low risk of contamination for personnel on site
• the technique (tool) has to be compatible to the working-environment.
In thermal cutting techniques, the solid material is melted and then blown away.
Since molten states of material are present, the net amount of force needed is much
smaller than for the techniques which use strain energy. Hence the contribution of
mechanical force is only a minor part of thermal cutting processes.
It is possible to subdivide the thermal cutting techniques, according to the type of heat
source, in:
• gas processes
• arc processes
• plasma arc processes
• a composition of the above processes
The energy density of the heat source increases from the gas flame over the arc and
the plasma arc to the laser beam.
268 M. Cumo
The abrasive water jet cutting technique is based on the application of plain water
jets. Abrasive particles are accelerated by a high speed water jet and cause the
removal of the material. Instead of an erosion process as in case of plain water jets,
abrasive water jets cut by micro-chipping the material by the sharp-edged particles.
When using the correct abrasive material, which has to be harder than the work piece
material, any material can be cut - metals as well as ceramics, glass and concrete.
With abrasive water jets, severance cutting as well as gouging, is possible. To
generate abrasive water jets two different methods are currently available. The
abrasive can be added to a plain water jet in a special mixing head (injection jet), or a
premixed and pressurised abrasive water suspension can be released to the nozzle to
form the abrasive jet (suspension jet). Sharp-edged mineral particles such as silicon
sand, corundum or garnet sand are used as abrasives. The increasing number of
cutting applications has helped the abrasive water suspension jet (AWSJ) to become
more important despite the high consumption of water and abrasives.
The last groups of techniques are the mechanical cutting techniques. A limited list of
such techniques is reported below as an example of the available alternatives to be
optimized on a case by case basis:
• Grinder
• Hacksaw and Guillotine Saw
• Shears
• Milling Cutters and Orbital Cutters
• Knurl Tube Cutter (rotary disk knife or cutting wheel or plumber's pipe cutter)
• Diamond Saws and Cables
The issue of health and safety aspects and the broader one of the environmental
impact of the decommissioning process is far reaching and it may only be
summarized.
The first aspect is probably the most significant. Decommissioning is a very labour
intensive activity and workers will be in contact with radioactive and other toxic
wastes. However, all the means of the plant are still available to reduce the worker
doses to the minimum and, while individual doses will always be below acceptable
levels, an ALARA (As Low As Reasonably Achievable) analysis of single activities
and process could reduce the cumulative occupational doses to values below a few
years of plant operation for the entire decommissioning process (few hundreds of
man-Sv).
Risks to the public are extremely low in comparison with those associated with plant
operation. Radioactive inventory available for release to atmosphere or water bodies
is a very small fraction of the previous ones. In general the most dangerous situations
are associated with large fires in contaminated areas, breaks in tanks with large
inventories of liquid radwaste, drop of contaminated loads. All these situations,
however, in general would not even require the activation of an emergency plan.
The total cost of decommissioning is dependent on the sequence and timing of the
various stages of the program. Deferment of a stage tends to reduce its cost, due to
decreasing radioactivity, but this may be offset by increased storage and surveillance
costs.
Even allowing for uncertainties in cost estimates and applicable discount rates,
decommissioning contributes less than 5% to total electricity generation costs. In
USA many utilities have revised their cost projections downwards in the light of
experience, and estimates now average 325 million dollars per reactor all-up.
270 M. Cumo
The cost of decommissioning nuclear power plants is based on the following factors:
In addition, costs depend on such country- and site-specific factors as the type of
reactor, waste management and disposal practices and labor rates. The importance of
the last item is due to the fact that decommissioning is a labour intensive activity and,
therefore, its cost is strongly connected with labour practices, working hours and, of
course, labor rates.
Total decommissioning costs include all costs from the start of decommissioning until
the site is released for unrestricted use.
The results, which include a 25 per cent contingency factor, showed a range of costs
for an immediate Stage 3 decommissioning of between 97 and 173 million U.S.
dollars (1984). Costs for combining Stages 1 and 3 ranged from 117 to 181 million
dollars. Only the United States estimated the costs of combining Stages 2 and 3, from
158 to 186 million dollars. While these figures cannot be absolutely precise, due to
differences in the original contingency factors and definitions of decommissioning
stages among countries, they nevertheless show what order of magnitude actual
decommissioning costs are likely to be for large power plants.
In the last case a detailed database and a computer code treating a large number of
information are needed.
For example, one of these computer codes (STILLKO) has been developed in
Germany by NIS Company and has been extensively used not only in Germany, but
also in many European countries, including Italy. The STILLKO Cost Breakdown
Structure (CBS) includes all decommissioning activities that are necessary for the
successful completion of the decommissioning project, beginning with the licensing
procedure up to the green field status at the end. The CBS is organized into different
levels in a hierarchical structure as described in fig. 3.
On the second level, the decommissioning phases are divided into the following cost
categories:
• Project management and project administration
• Planning and licensing
• Plant operation and security
• Plant technical activities for Safe Enclosure
• Preparations for Dismantling
• Dismantling activated and contaminated components
• Decontamination
• Conventional dismantling
• Waste management
• Radiological and conventional worker protection
These cost categories have been created according to functional points of view and
represent the volume of the decommissioning activities. The cost categories may
occur in every decommissioning phase, with suitable contents of the cost categories
regarding the respective phase.
The third level is used to allocate the decommissioning activities to the buildings and
areas on site. Using this level in the cost structure it is possible to assign the work
directly to the place where it arises but also to determine the sequence of the activities
and their schedule in relation to the specific building.
On the fourth level, individual tasks are defined which allow a room by room or
system by system planning, regarding to the situation on site. The execution of the
tasks may be done parallel in different buildings, building levels or rooms.
On the fifth, the lowest level, the decommissioning tasks are divided into activities.
These activities are formed in a way that each of them can be individually calculated.
It is useful to mention that a standardization of cost items has been developed in the
framework of OECD and European Union and that it can be a useful reference for the
future.
The drawback to this system is that the amount estimated would not be in place if the
plant were to be shut down before the end of its normal lifetime. To avoid this, a fund
could be established at the start of the plant's operation which would cover the cost of
decommissioning whenever it became necessary. However, this represents a heavy
burden for the utility at the moment when construction and start-up costs are already
high, and thus, although it may be imposed by law, this solution is clearly not
favoured by utilities.
Financing methods vary from country to country. Among the most common are:
• External sinking fund (Nuclear Power Levy): This is built up over the years from
a percentage of the electricity rates charged to consumers. Proceeds are placed in
a trust fund outside the utility’s control. This is the main US system, where
sufficient funds are set aside during the reactor’s operating lifetime to cover the
cost of decommissioning.
• Prepayment, where money is deposited in a separate account to cover
decommissioning costs even before the plant begins operation. This may be done
in a number of ways, but the funds cannot be withdrawn other than for
decommissioning purposes.
• Surety fund, letter of credit, or insurance purchased by the utility to guarantee
that decommissioning costs will be covered even if the utility defaults.
In Italy a fund has been established to enable the decommissioning of Italian NPPs
and the closure of the nuclear fuel cycle. These special provisions are included in the
Financial Statement of the SOGIN Company.
In this field the role of the universities may be limited, since the matter is more
related to an industrial development in many cases at competitive levels among
suppliers, but it is anyway important, in the advanced and high technology fields
(advanced chemical decontamination, waste treatment such as vitrification,
robotization, waste stream characterization), as well as in computer codes for dose or
environmental impact calculations.
First ENEL and then SOGIN have carried out a number of activities in the framework
of the general decommissioning programs. They are both in-field activities and
planning and designing activities. The current situation at the four NPP's is the
following:
Garigliano
• Reactor defuelling and off-site shipment of spent fuel: 1985 - 1987
• Radiological characterisation of plant systems, components and structures:
1990
• Safe Enclosure of Reactor building: 1990 - 1998
• Safe Enclosure of Turbine building: 1994 - 1995
• Treatment of low-level waste and retrieval/conditioning of intermediate-
level and high-level waste: 1988 - 1999
• Dismantling and safe enclosure of existing Radwaste system, demolition of
Off-gas stack and Safe Enclosure condition to be reached within the year
2003
Latina
• Reactor defuelling and off-site shipment of spent fuel: 1988 - 1991
• Radiological characterisation of plant systems, components and structures:
1992
• Decontamination and dismantling of systems and components: 1992 - 1996
• Decontamination of the spent fuel pool: 1996 - 1999
• Treatment of radioactive waste, dismantling of primary circuit ducts and
components and Safe Enclosure condition to be reached within the year
2006
Trino
• Radiological characterisation of plant systems, components and structures:
1992 - 1994
• Reactor defuelling: 1991
• Temporary dry storage of spent fuel at plant site within the year 2003
• Safe Enclosure condition to be reached in the year 2007
Caorso
• Radiological characterisation of plant systems, components and structures:
1992 - 1995
Experiences & Techniques in the Decommissioning of Old Nuclear Power Plants 275
Engineering and R&D Departments of ENEL were also involved in the development
and design of special equipments and tools, used for waste retrieval and
decontamination of structures.
After plants shutdown the plant staff were significantly reduced; part of the personnel
were transferred to fossil power plants, and retired personnel were not replaced.
13. Conclusions
Some broad conclusions can be drawn from the issues that have been briefly
discussed.
correct funding scheme is very important to provide for all necessary funds at the end
of the plant operating life.
International consensus and harmonization are needed in several areas. This need has
been recognized only recently, in the last years, when a greater number of NPP's have
terminated their service life.
A decision making process transparent both to the politicians and to the public, who
deserve the information they want in an activity that is finally for their assurance, is
undoubtedly useful.
This design has been aimed at strongly simplifying the plant layout, the components
construction and assembling on the site in order to reduce construction times and
costs.
This effort has produced, as a parallel significant result, a huge simplification of all
decommissioning activities. In particular, the basic design choices of the MARS
plant affecting decommissioning are shown in Table 3. These choices produce the
results shown in Table 4.
The selected plant characteristics (specific power, temperature, pressure, thermal inertia, etc.) have
allowed to simplify all non safety-related auxiliary systems thanks to reduced performances.
The extensive use of passive systems to assure plant safety has allowed to eliminate some traditional
safety-related auxiliary systems (e.g. injection systems) or to strongly simplify other ones, reducing
the number of redundant components (e.g. boron emergency shutdown).
The selected plant power has allowed to reduce the size of main components, making them easily
transportable.
The selected process parameters, even if reducing the plant global efficiency, guarantee a great
retention of fission products inside the fuel matrix, that, together with low stressed fuel cladding,
strongly reduce the amount of fission products dispersed within the primary coolant.
The selected structural materials (extensive use of stainless steel, elimination of cobalt alloys, etc.)
have allowed to reduce the materials activation.
The adoption of metal structures to support components, to build the working floors and the
biological screen, have allowed to limit the amount of concrete in the plant, simplifying and
speeding the construction phase.
The adoption of flanged connections between components and piping (also for the primary loop)
has allowed the easy mounting and dismounting of all components.
The adoption of an innovative design for all big components has allowed the possibility of their
easy and fast construction, assembling and disassembling.
The disassembling of flanged connections allows the easy and fast removal of all primary loop
components (the biggest components may be also disassembled in transportable sub-components)
with no needs for special equipment or complex activities to disassembly activated components
inside the reactor building.
The general plant simplification allows a huge reduction, up to 50% in comparison with a same size
traditional plant, of the number of contaminated or activated components (pumps, valves, tanks,
etc.), with the correspondent reduction of the amount of radioactive materials.
The limited size, as well as the possibility of disassembling of components allows their easy
transportability.
The use of a "clean" primary coolant and the reduced number of components allows the reduction of
total and specific contamination of all materials facing the primary coolant.
The exclusive use of metallic structures allows the strong reduction, up to 50% in comparison with a
same size traditional plant, of the volume of concrete buildings potentially contaminated.
The reduced number of components to be removed, their limited size and the presence of flanged
connections make the decommissioning operations faster and faster than in traditional plants
(usually characterized by a lot of big components welded to piping).
The short and easy decommissioning phase allows a strong reduction of doses to personnel.
The short and easy decommissioning phase allows a strong reduction of decommissioning cost.
278 M. Cumo