0% found this document useful (0 votes)
128 views10 pages

Lapo Hospital Borehole & Water Treatment Plan

The document outlines the proposed development of a hospital for LAPO in Benin, Edo State, Nigeria. It includes specifications and costs for a borehole water supply system and water treatment plant. The borehole system involves drilling a 230m deep borehole, installing casing and screening, and developing the borehole. The water treatment plant includes filters, tanks, pumps and other equipment to treat water from the borehole. The total estimated cost for the borehole and water treatment plant is 9,009,874.50 Nigerian Naira.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
128 views10 pages

Lapo Hospital Borehole & Water Treatment Plan

The document outlines the proposed development of a hospital for LAPO in Benin, Edo State, Nigeria. It includes specifications and costs for a borehole water supply system and water treatment plant. The borehole system involves drilling a 230m deep borehole, installing casing and screening, and developing the borehole. The water treatment plant includes filters, tanks, pumps and other equipment to treat water from the borehole. The total estimated cost for the borehole and water treatment plant is 9,009,874.50 Nigerian Naira.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

PROPOSED HOSPITAL DEVELOPMENT

FOR LAPO
AT ADESUWA COLLEGE RD,
BENIN, EDO STATE.

BOREHOLE & WATER TREATMENT PL

TBP-026 Page 2 of 5
PROPOSED HOSPITAL DEVELOPMENT
FOR LAPO
AT ADESUWA COLLEGE RD,
BENIN, EDO STATE.

ITEM DESCRIPTION

A BOREHOLE

1 Conduction of thorough geophysical survey at site accompanied


with relevant technical report

NOTE: GEOPHYSICAL SURVEY EXAMINATION


COMPLETE WITH REPORT MUST BE CARRIED OUT
PRIOR TO BOREHOLE DRILLING. THAT IS THIS
BILL OF QUANTITIES IS SUBJECT TO SLIGHT
ADJUSTMENT DEPENDING ON THE OUTCOME OF THE
GEOPHYSICAL SURVEY

2 Mobilisation of personel and equipment

3 Setting up of equipment for drilling and dismantling.


Construction of mud pit

4 Drilling of 230mm diameter hole for installation of 150mm diameter


casing pipe to a maximum depth of 230m (refer to the Vertical Electrical
Sounding VES 1 location as per the attached Geophysical Investigation
report)

5 Supply and install 150mm casing pipe

6 Supply and install 150mm Stainless steel screen

7 Supply and install 40mm diameter white tigre pressure riser mains pipe,
complete with stainless steel sockets.

8 Supply and install gravel packing round the 150mm diameter casings/screen

9 Submersible pump 3HP with starter and all accessories of 5m³/hr Capacity
Head 120m complete with 2.5mm2 electrical cable

10 Development of borehole till the water is clean and free of sand

11 Conduction of yield test for 24hrs complete with test report under the
supervision of the Consultants/Client's representatives

12 Water level electrode complete with cable and probes

TBP-026 Page 3 of 5
PROPOSED HOSPITAL DEVELOPMENT
FOR LAPO
AT ADESUWA COLLEGE RD,
BENIN, EDO STATE.

13 Cement grouting of borehole annular space up to 10m from the top surface

14 Construction of well head

15 Nylon safety rope

16 Preparation and submission of a drilling and completion report complete


with the particulars/parameters of the Borehole

TOTAL TO SUMMARY

TBP-026 Page 4 of 5
PROPOSED HOSPITAL DEVELOPMENT
FOR LAPO
AT ADESUWA COLLEGE RD,
BENIN, EDO STATE.

ITEM DESCRIPTION

B WATER TREATMENT PLANT (WTP)

1 Pressure sand filter (stainless) diameter - 800mm, height - 1400mm


Duty - 5m3/hr, incluing all mounting accessories and chemicals

2 Activated carbon filter (stainless) diameter - 800mm, height-1400mm


Duty-5m3/hr including all mounting accessories and chemicals

3 Cascaded raw water tank (stainless) 4.0mL x 2.5mW x 1.5mH


diameter of 3 compartments subject to future expansion in length

4 Filteration pump: to transfer raw water from raw water tank through the
filter tanks to the clean water storage tank
Duty: 5m3/hr, Head 40m

5 Dosing pumps system

6 Laboratory test of treated water by two independent laboratories


approved by the consultants

7 Piping accessories: pipes, fittings and valves for various connection from
borehole through aeration, filtration to storage tank

8 Automatic central motor control panel to control all the system all
inclusive with float switches

10 Electrical cables

9 Commissioning and training of operator

10 Provision for the construction of water treatment plant house roof


Dimension: 5.0m(L) x 4.0m(W) x 3.0m(H)
Note: There should be no covering on the aeration tank area.
the exact location/dimension of aeration tank area shall be
advised and decided on site.

TOTAL TO SUMMARY

TBP-026 Page 5 of 5
PROPOSED HOSPITAL DEVELOPMENT
FOR LAPO
AT ADESUWA COLLEGE RD,
BENIN, EDO STATE.

ITEM DESCRIPTION

SUMMARY OF COST

BOREHOLE & WTP

A BOREHOLE

B WATER TREATMENT PLANT

TOTAL TO SUMMARY

TBP-026 Page 6 of 5
PROPOSED HOSPITAL DEVELOPMENT
FOR LAPO
AT ADESUWA COLLEGE RD,
BENIN, EDO STATE.

TREATMENT PLANT SERVICES

TBP-026 Page 7 of 5
PROPOSED HOSPITAL DEVELOPMENT
FOR LAPO
AT ADESUWA COLLEGE RD,
BENIN, EDO STATE.

MAKE & QTY RATE RATE TOTAL


CATALOGUE DELIVERED FIXED COST
REF. TO SITE
=N= =N= =N=

100,000.00

Lot 185,000.00

Lot 105,000.00

(m)
230 6,500.00 975.00 1,719,250.00

API 230 1,083.00 130.00 278,990.00

12 18,500.00 1,295.00 237,540.00

80 635.00 64.00 55,920.00

Lot 45,000.00

(set)
LOWARA 1 1,350,000.00 65,500.00 1,415,500.00
OR APPROVED
EQUAL
Lot 165,000.00

Lot 35,000.00

Lot 75,000.00

TBP-026 Page 8 of 5
PROPOSED HOSPITAL DEVELOPMENT
FOR LAPO
AT ADESUWA COLLEGE RD,
BENIN, EDO STATE.

Lot 55,000.00

Lot 25,000.00

Lot 14,500.00

Lot 40,000.00

4,551,700.00

TBP-026 Page 9 of 5
PROPOSED HOSPITAL DEVELOPMENT
FOR LAPO
AT ADESUWA COLLEGE RD,
BENIN, EDO STATE.

MAKE & QTY RATE RATE TOTAL


CATALOGUE DELIVERED FIXED COST
REF. TO SITE
=N= =N= =N=

STAINLESS 1 220,000.00 22,000.00 242,000.00


STEEL

STAINLESS 1 220,000.00 22,000.00 242,000.00


STEEL

STAINLESS 1 975,630.00 146,344.50 1,121,974.50


STEEL
set
WILO or 2 325,000.00 32,500.00 715,000.00
APPROVED
EQUAL

JESCO 2 95,000.00 8,600.00 207,200.00

Lot 75,000.00

Lot 65,000.00

Lot 1,600,000.00

Lot 65,000.00

Lot 125,000.00

Lot

4,458,174.50

TBP-026 Page 10 of 5
PROPOSED HOSPITAL DEVELOPMENT
FOR LAPO
AT ADESUWA COLLEGE RD,
BENIN, EDO STATE.

MAKE & QTY RATE RATE TOTAL


CATALOGUE DELIVERED FIXED COST
REF. TO SITE
=N= =N= =N=

4,551,700.00

4,458,174.50

9,009,874.50