Literature Review 1. Analysis of Cost Overrun For Flyover Bridges Construction Project Using Fuzzy Logic
The document discusses 5 literature reviews related to delays and cost overruns in construction projects such as bridge and highway construction. The first review analyzes cost overrun factors for bridge construction projects in Indore using fuzzy logic. The second identifies causes of delays in bridge construction. The third examines delays and cost overruns in highway construction projects in India. The fourth identifies delay factors through a case study of an ongoing construction project. The fifth ranks causes of delays in construction projects identified through a survey. The conclusion notes that the literature provided knowledge on how delays occur and can be overcome to successfully schedule and manage resources in construction projects.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
124 views3 pages
Literature Review 1. Analysis of Cost Overrun For Flyover Bridges Construction Project Using Fuzzy Logic
The document discusses 5 literature reviews related to delays and cost overruns in construction projects such as bridge and highway construction. The first review analyzes cost overrun factors for bridge construction projects in Indore using fuzzy logic. The second identifies causes of delays in bridge construction. The third examines delays and cost overruns in highway construction projects in India. The fourth identifies delay factors through a case study of an ongoing construction project. The fifth ranks causes of delays in construction projects identified through a survey. The conclusion notes that the literature provided knowledge on how delays occur and can be overcome to successfully schedule and manage resources in construction projects.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3
LITERATURE REVIEW
1. Analysis of Cost Overrun for Flyover Bridges Construction Project Using
Fuzzy Logic Bridges Construction industry is measured as one of the most dynamic and risky industrial sector. Project failure takes place in terms of project delay, cost over runs and poor quality. In this project, I aim to identify and analyze the major cost overrun factors in bridge construction projects in Indore. The cost is measured as one of the most important success parameter of any project. The cost overrun factors are identified based on questionnaire survey and expert opinion which is ranked using Relative Important Index (RII) scale. Graphs showing the variation of cost overrun for different combination of cost overrun factors are obtained. This project work presents an application of fuzzy logic for developing cost overrun evaluation model using Fuzzy toolbox of MATLAB Program Software. This project work aims to identify the main factors affecting the construction cost overrun in the construction industries. A list containing 74 factors of cost overrun which are accountable for the cost overrun in the construction industries was prepared based on data collection, questionnaire survey and by conducting interviews. Finally, the model has been calibrated on real case study.
2. Causes of Delay in Construction of Bridge
The construction industry is the tool through which a society achieves its goal of urban and rural development. Delays in construction are the most serious problems which even slowly down the national development. It is one of the sectors that provides important ingredient for the development of an economy. It is widely accepted that a project is successful when it is finished on time. Unfortunately, due to many reasons, large number of construction projects fails to follow the planned schedule and hence delayed. Construction delay is considered to be one of the recurring problems in the construction industry and it has an adverse effect on project success in terms of time, cost and quality. So, careful study and planning of each and every activity of a construction project becomes important in order to minimize delays. This paper presents the causes of delay occurring on an ongoing bridge construction project with respect to construction of bridge girders of three spans of a Major bridge across river Sabarmati, Gandhi Nagar, Gujarat as a case study.
3. Study of Delay in Execution of Infrastructure Projects –Highway
Construction Nowadays, highway construction suffers from delay and cost overruns, which causes traffic problems, changes of design, poor planning, disputes, cost overruns, poor safety practices and time delays. Researchers in developed countries have realized the seriousness of this shortfall and suggested solutions to resolve it. Due to the inherent risks and increasing complexity of modern construction projects, delays and cost overruns have become common facts in the industry. Researchers and practitioners have used many techniques to assess project delays and apportion delay responsibility among the parties involved. This research deals with the causes which severely effect in delay of infrastructure projects in India. The delays and cost overruns have become a hallmark of infrastructure projects in India, research in delay and cost overrun in highway projects has not been popular researched yet. Any construction project success can be realized by achieving its objectives within the planned time, budget and level of quality. One of the major problems that face the construction projects in general and road projects in specific is being behind the schedule, i.e., delay in submission. Delay can be defined as postponing the project completion time due to predicted and unpredicted causes. Completion time is very essential in construction; because “Time is Money”. In some cases, to the contractor, delay causes higher overhead costs because of longer construction period. As well as that, material costs may increase due to inflation. To the client, especially if he is investor, delay means losing profits that are planned to be earned after starting the investment on the scheduled time.
4. Study of Delay Management in a Construction Project - A Case Study
The problem of delays in construction industry is a global phenomenon and there is no exception. The main purpose of this study is to identify the delay factors and the effect on the project completion by doing a case study in ongoing projects. By analyzing the reasons for delay, possible recommendations are given. The major factors identified in this case study are delays due to contractor, client and also due to nature’s act like rain. The most important causes were delays in contractor's payments, shortage of material in construction, change in material, the weather condition, shortage of manpower (skilled, semi-skilled and unskilled labor), frequent change of staffs, poor site management and improper management of the engineers. Some of the delays are delay in submission of drawings, space constraints, and delay in payment by client, delay in material supply and local problems like strikes. The major effects of delay are cost impact, reduced labor productivity, postponement in work, change in labor allocation etc. Not all delays can be rectified, but few of them can be overcome by improving management responsibilities.
5. Study on Time Delay Analysis for Construction Project Delay Analysis
Time delay is one of the biggest problems facing in many construction buildings in India. Completing projects on time is the key factor of the project, but the construction process is subject to many variables and unpredictable factors, which result from many sources such as availability of resources, external factors, performance of parties and type of building. If there is a delay in project it leads to loss of productivity, increased cost, contract termination and disputes between contractor and owner. The aim of this project is to examine the causes and effects of delay on building construction project during construction phase and to provide control measures for time overrun in the project. A study carried out on construction schedule delays and various delay analysis techniques and methods in order to evaluate the causes of delay and their impacts in the construction project. Then a questionnaire survey is done to find the major causes of delay faced by Client, Contractor, Consultant and Project manager. Population sample of 35 was used in which 30 was deployed. From the survey and study identified 67 causes of delay under 9 major groups such as Project team, Owner, Contractor, Consultant, Architect, material, labor, equipment and external factors. Then a ranking method is done based on relative importance index method to find major cause of delay. It is found that the most common factors of delay which is repeated in most of the project are lack of funds to finance the project to completion, labor shortage, material shortage, lack of effective communication, lack of supervision and changes in drawings. The outcome of the project is to provide recommendation to control delay in the project during construction phase. LITERATURE RIVEW SUMMARY On studying the above journals and literature it gave me the knowledge of how delays are occurred in the project and also gave the knowledge of how to overcome those delays. Above journals gave the idea of how to schedule, track and allocate the resources to the project in a good and manner full way to overcome or to avoid delays in the completion of the project and to make the project successful.