100% found this document useful (1 vote)
172 views3 pages

Enhanced A154 Form For Indoor FDH (DIY) 65-01-004-025

This document contains several schedules and reports related to an FDH block wiring project for a building: 1) An FDH block wiring schedule listing 7 shops wired on the ground floor with internet, telephone, and TV sockets available in each. 2) A drop fiber cable test result table showing test results for outdoor drop fiber from the main telecom room to each of 7 shops. 3) A work completion certificate documenting the installation of telecom equipment including rosettes, a shelf, splitter, and rack.

Uploaded by

kjhkkhk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
172 views3 pages

Enhanced A154 Form For Indoor FDH (DIY) 65-01-004-025

This document contains several schedules and reports related to an FDH block wiring project for a building: 1) An FDH block wiring schedule listing 7 shops wired on the ground floor with internet, telephone, and TV sockets available in each. 2) A drop fiber cable test result table showing test results for outdoor drop fiber from the main telecom room to each of 7 shops. 3) A work completion certificate documenting the installation of telecom equipment including rosettes, a shelf, splitter, and rack.

Uploaded by

kjhkkhk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

FDH(I) Block Wiring Schedule

Building Name
MOHAMMED AHMED SAEED AL HOTAH AL PLOT#
AMRY Prepared by Date: 10/4/2017
OLT Master EID 65-01-004-025 Verified by Date: 10/4/2017
FDH# PROJECT # Contractor ZK TECHNICAL SERVICES LLC

Patch Panel Internet Tel. Socket TV Socket


Sl# Spl# Sp/Port ODF# ODF port# FDB# FDB PORT# FDB Block/ FLAT/ SHOP / ONT serial # Vendor Available Socket Available Available Remarks
Location Floor OFF (Y/N)? Available (Y/N)? (Y/N)?
(Y/N)?

1 1 1 0 1 1 GF SHOP-1 Y Y Y N 2 CAT6 points


2 1 2 0 2 1 GF SHOP-2 Y Y Y N 2 CAT6 points
3 1 3 0 3 1 GF SHOP-3 Y Y Y N 2 CAT6 points
4 1 4 0 4 1 GF SHOP-4 Y Y Y N 2 CAT6 points
5 1 5 0 5 1 GF SHOP-5 Y Y Y N 2 CAT6 points
6 1 6 0 6 1 GF SHOP-6 Y Y Y N 2 CAT6 points
7 1 7 0 7 1 GF SHOP-7 Y Y Y N 2 CAT6 points
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
DROP FIBER CABLE TEST RESULT

Date 10/4/2017
OWNER MOHAMMED AHMED SAEED AL HOTAH AL AMRY BLDG Commercial
PLOT# 65-01-004-025 EID#

Attestation Wave Length


Point "A" Point "B" Floor/Shop Cable Length Cable type Status
(M) (db) (nm)
Shop#1 13M 0.21 OK
Main Telecom Room

Outdoor Drop Fiber

Shop#2 18M 0.18 OK


Shop#3 25M 0.19 OK
(Spliter)

1310
Shop#4 25M 0.22 OK
Shop#5 22M 0.18 OK
Shop#6 18M 0.21 OK
Shop#7 12M 0.19 OK
Work Completion Certificate

OWNER MOHAMMED AHMED SAEED AL HOTAH AL AMRY BLDG Commercial


PLOT# 65-01-004-025 EID#

ZK Technical Services is responsible for below work in plot 65-01-004-025

Description of Work Notes

1 Fixing of Rosetes (7) Fixed on different places as customer requirements


2 Installation of Shelf (1) upto 24 ports Installed in main telecom room
3 Installation of Spliter (1) upto 32 ports Installed in main telecom room
4 Installation of 15u rack Installed in main telecom room

The work has been completed on 10-4-2017

Project Manager

SK Technical Services