FDH(I) Block Wiring Schedule
Building Name
MOHAMMED AHMED SAEED AL HOTAH AL PLOT#
AMRY Prepared by Date: 10/4/2017
OLT Master EID 65-01-004-025 Verified by Date: 10/4/2017
FDH# PROJECT # Contractor ZK TECHNICAL SERVICES LLC
Patch Panel Internet Tel. Socket TV Socket
Sl# Spl# Sp/Port ODF# ODF port# FDB# FDB PORT# FDB Block/ FLAT/ SHOP / ONT serial # Vendor Available Socket Available Available Remarks
Location Floor OFF (Y/N)? Available (Y/N)? (Y/N)?
(Y/N)?
1 1 1 0 1 1 GF SHOP-1 Y Y Y N 2 CAT6 points
2 1 2 0 2 1 GF SHOP-2 Y Y Y N 2 CAT6 points
3 1 3 0 3 1 GF SHOP-3 Y Y Y N 2 CAT6 points
4 1 4 0 4 1 GF SHOP-4 Y Y Y N 2 CAT6 points
5 1 5 0 5 1 GF SHOP-5 Y Y Y N 2 CAT6 points
6 1 6 0 6 1 GF SHOP-6 Y Y Y N 2 CAT6 points
7 1 7 0 7 1 GF SHOP-7 Y Y Y N 2 CAT6 points
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
DROP FIBER CABLE TEST RESULT
Date 10/4/2017
OWNER MOHAMMED AHMED SAEED AL HOTAH AL AMRY BLDG Commercial
PLOT# 65-01-004-025 EID#
Attestation Wave Length
Point "A" Point "B" Floor/Shop Cable Length Cable type Status
(M) (db) (nm)
Shop#1 13M 0.21 OK
Main Telecom Room
Outdoor Drop Fiber
Shop#2 18M 0.18 OK
Shop#3 25M 0.19 OK
(Spliter)
1310
Shop#4 25M 0.22 OK
Shop#5 22M 0.18 OK
Shop#6 18M 0.21 OK
Shop#7 12M 0.19 OK
Work Completion Certificate
OWNER MOHAMMED AHMED SAEED AL HOTAH AL AMRY BLDG Commercial
PLOT# 65-01-004-025 EID#
ZK Technical Services is responsible for below work in plot 65-01-004-025
Description of Work Notes
1 Fixing of Rosetes (7) Fixed on different places as customer requirements
2 Installation of Shelf (1) upto 24 ports Installed in main telecom room
3 Installation of Spliter (1) upto 32 ports Installed in main telecom room
4 Installation of 15u rack Installed in main telecom room
The work has been completed on 10-4-2017
Project Manager
SK Technical Services