DESIGN PRESENTATION FOR
StoryBoard
+Design Principles
Design Thinking
+Concept
Proposed Plans
+Zoning + Layout
+Mood Images
Inspiration
+Look
and feel
3D Visuals
+Base Building Analysis
Site Analysis
+
Lessons Learnt
Implementation Strategy
+
01-STORYBOARD
STORYBOARD I DESIGN STRATEGY
INNOVATION + EXPERIENCE = POSITIVE OUTCOMES
FORGING THE PATH
OF NEW ERA
BUILDING A SOCIAL TECHNOLOGY QUITE AND BALANCE FUN PLACE TO WORK
COMMUNITY COLLABORATION WELL BEING FLEXIBLE
02-CONCEPT
CONCEPT I DESIGN THINKING
INSPIRATION FROM THE LOGO INSPIRATION FROM NATURE INSPIRATION FROM SCIENCE
CONCEPT I DESIGN THINKING
03-ZONING
ZONING I CONCEPT MAPPING
ZONING I SPACE PLANNING
Meeting room Meeting room
Visitor’s zone
core-Meeting room
Reception
Cafeteria collaboration
Bain Marie
Recreation
Breakout
Critical rooms
Meeting room
MD room zoned
towards the sw corner
04-PROPOSED LAYOUT
PROPOSED LAYOUT I PLAN & SPACE BUDGET
SNO. DESCRIPTION ACHD Nos
1 LINEAR WORKSTATION 301
2 120 DEGREE WS 56
3 CABIN 6
4 EXECUTIVE CABIN 1
5 UNASSIGNED SPACE 31
HEAD COUNT 395
6 14 PAX BOARD ROOM 2
7 4 PAX MEETING ROOM 6
8 RESTING ROOM 2
9 VISITORS BOOTH 2
10 COLLAB AREA 2
11 COFFEE POINT 1
110 PAX CAFETERIA +
12 RECREATION 1
13 HUB ROOM 1
14 ELECTRICAL PANEL ROOM 1
15 REPRO 3
15 WAITING LOUNGE 1
16 STORE ROOM 1
17 RECEPTION 1
PROPOSED LAYOUT I PLAN & SPACE BUDGET
SNO. DESCRIPTION ACHD Nos
1 LINEAR WORKSTATION 301
2 120 DEGREE WS 56
3 CABIN 6
4 EXECUTIVE CABIN 1
5 UNASSIGNED SPACE 31
HEAD COUNT 395
05-MOOD IMAGES
MOOD IMAGE I INSPIRATION
06-CONCEPTUAL SKETCHES
DESIGN EVOLUTION
SCHEMATIC I RECEPTION SKETCH
SCHEMATIC I BOARDROOM SKETCH
SCHEMATIC I COLLABORATION SKETCH
SCHEMATIC I OPEN OFFICE TOWARDS CAFETERIA - SKETCH
SCHEMATIC I CAFETERIA - SKETCH
07-LOOK AND FEEL
LOOK AND FEEL I RECEPTION -OPTION 1
LOOK AND FEEL I RECEPTION -OPTION 2
LOOK AND FEEL I RECEPTION -OPTION 2
LOOK AND FEEL I BOARDROOM -OPTION 1
LOOK AND FEEL I BOARDROOM -OPTION 2
LOOK AND FEEL I EXECUTIVE CABIN
09-LESSONS LEARNT
LESSONS LEARNT
RECEPTION
FLOORING - ISSUES OF CONCRETE FLOOR EVENNESS.
NOW WE ARE GOING WITH LEATHER FINISH MARBLE STONES FOR EVENNESS AND HANDLE TRAFFIC MOVEMENT
LESSONS LEARNT
SPATIAL PLANNING - COLLAB
COLLAB SPACES - EARLIER DESIGN HAD COLLAB POCKETS IN THE CENTRAL SPACES, WHICH MADE THE PEOPLE CONSCIOUS AND
SENSE OF BEING WATCHED.
NOW ALL ARE COLLABS ARE ZONED IN SEMI PRIVATE SPACES. NICHES AND POCKETS ARE CREATED AWAY
FROM THE FOCUS AREA FOR BETTER EFFICIENCY. SINCE THE USERS ARE ASSIGNED TO THEIR SEATS (NO LAPTOPS), ITS
IMPORTANT TO INCULCATE THE USERS ABOUT THE TYPES OF COLLAB SPACES
LESSONS LEARNT
FURNITURES
CAFETERIA - FURNITURES TO HAVE MOVABLE, STACKABLE AND FOLDABLE OPTIONS.
FURNITURES ARE SHORTLISTED ON BASIS OF FLEXIBILITY.
LESSONS LEARNT
ACOUSTICS
OPEN CEILING - SINCE OUR CEILING IS EXPOSED, IT IS NEEDED TO HAVE ACOUSTIC ELEMENTS AT REGULAR INTERVAL.
STANDALONE ACOUSTIC INSTALLATIONS ARE BEING PROPOSED.
LESSONS LEARNT
VALUE ADDS
COST SAVING - BRANDED LOOK ALIKES, READILY AVAILABLE MATERIALS AND CARPETS CAN BE WORKED ECONOMICALLY.
10-BASE BUILDING ANALYSIS
22.4 m 16.0 m
29.8 m
30.8 m
30.4 m
21.2 m
16.6 m
28.3 m
TOILET RATIO AS PER NORMS - FOR HEADCOUNT OF 395
GENTS - 237 [60%]
WC 1:25 = 9 no.
WB 1:25 = 9 no.
URINALS
(HALF THE NUMBER OF WC) = 5 no.
LADIES - 158 [40%]
WC 1:15 = 10 no.
WB 1:15 = 10 no.
01 About Space Matrix
02 Our Eco System
RISKS WE FORESEE
&
OUR STRATEGY
Our Eco System
Can Carpenters read...
Can Contractors read...
Can Construction Managers read... DRAWINGS
Inability to read drawings can result in:
● Delays
● Rework on site
● Quality issues that cannot be mitigated / rectified
LOSE DESIGN INTENT
Risks We Foresee
TECHNOLOGY &
DESIGN TIME PROCUREMENT EHS
PROCESS
HOW ARE WE
DIFFERENT ?
●
●
DESIGN VALIDATION
ON SITE BY DEDICATED TEAM
03 Approach On Site Execution
BASE BUILD
READINESS
SITE LOGISTICS
EHS COMPLIANCE
●
●
PROJECT EXECUTION
●
●
● PROJECT CLOSEOUT
●
●
●
●
BASE BUILD
READINESS
●
SITE LOGISTICS
●
●
EHS COMPLIANCE
●
PROJECT EXECUTION
●
● PROJECT CLOSEOUT
BASE BUILD
READINESS
SITE LOGISTICS
● EHS COMPLIANCE
●
●
● PROJECT EXECUTION
●
PROJECT CLOSEOUT
●
BASE BUILD
READINESS
SITE LOGISTICS
EHS COMPLIANCE
PROJECT EXECUTION
70% Completed timber ceiling
on site.
PROJECT CLOSEOUT
Quality
Time Saving
Flexibility
Consistency
Lean Planner Material Tracker
CCTV Camera Monitoring
PPC DASHBOARDS
BASE BUILD
READINESS
●
●
SITE LOGISTICS
●
●
●
EHS COMPLIANCE
●
●
●
PROJECT EXECUTION
PROJECT CLOSEOUT
SNAG LIST SNAG LIST
VENDOR EVALUATION ROOT CAUSE ANALYSIS
04 SEZ / PROCUREMENT CAPABILITIES
Our USP - Global Sourcing
RESEARCH
CONTINUOUS REVIEWS
REFERENCE
CHECKS
PROPER EMPANELMENT
Vendor Onboarding
•
•
•
•
•
•
05 IMPLEMENTATION STRATEGY
Services Delivery Strategy - People
06 RELEVANT PROJECTS
ASTRA ZENECA
SHELL
FORD
SYMANTEC
WORLD BANK
WORLD BANK
1,00,000 SF I INTERIOR DESIGN
ARUBA NETWORKS
ATHENA
LINKEDIN
Bangalore | 160,000 SF | Design & Build
ABBOTT
MUMBAI | 520,000 SF | Design & Build
ABBOTT
MUMBAI | 520,000 SF | Design & Build
NORTHERN TRUST
Pune | 230,000 SF | Design Consultancy
UBER
Singapore | 55,000 SF | Design Consultancy
CISCO
Singapore | 120,000 SF | Design Consultancy
COCA - COLA
ADOBE CAMPUS
AXIS BANK
MUMBAI | 425,000 SF |Design & Build
EPAM
AXIS BANK
MUMBAI | 425,000 SF |Design & Build
JPMC
AXIS BANK
MUMBAI | 425,000 SF |Design & Build
SYNECHRON
PUNE 600,000 SF Design & Build
SUZLON ONE EARTH
PUNE 600,000 SF Design & Build
FLOOR 7
CONCEPT – APPLYING THE VALUES TO THE PLAN
FLOOR 8
CONCEPT – APPLYING THE VALUES TO THE PLAN