This document provides calculations for the design of bored piles and pile caps to support bridges along roads crossing a river. It includes: - Pile data such as diameter, length, spacing, and concrete strength - Calculations to determine required reinforcement for the piles based on axial and bending capacity - Calculations of ultimate shear and moment demands on the pile caps from the pile reactions - Design of flexural and shear reinforcement for the pile caps to resist the demands based on concrete strength and reinforcement ratios - Check of pile caps for punching shear due to concentrated pile loads

Uploaded by

David Sinambela
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
141 views8 pages

Chapter 11 - Section Design

This document provides calculations for the design of bored piles and pile caps to support bridges along roads crossing a river. It includes: - Pile data such as diameter, length, spacing, and concrete strength - Calculations to determine required reinforcement for the piles based on axial and bending capacity - Calculations of ultimate shear and moment demands on the pile caps from the pile reactions - Design of flexural and shear reinforcement for the pile caps to resist the demands based on concrete strength and reinforcement ratios - Check of pile caps for punching shear due to concentrated pile loads

Uploaded by

David Sinambela
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Penyusunan FEED Redesign Relokasi DOC. NO.

:
Jalan MT. Haryono dan Jalan MH. RDMP-L2-60-CVL-CAL-102A4
Thamrin, Kali Cinyemeh serta Jalan
Pelabuhan Proyek RDMP RU IV REV NO. : 0
Cilacap
CALCULATION FOR BRIDGES ON PAGE NO. : 1/8
CROSS COUNTRY PIPE WIDTH
SPAN 30 M

11. SECTION DESIGN

11.1. Bored Pile

PILE DATA

Pile Cap Size Bore Pile


Width in x-direction, Bx = 4.50 m Diameter pile, d = 0.8 m
Width in x-direction, By = 22.00 m Length of pile, L = 27 m
Front Toe, L1 = 1.85 m Ctr.of outer pile to edge, a = 1 m
Back Toe, L2 = 1.85 m No. of pile = 14 pcs
Thickness Concrete strength, fc' = 35 Mpa
hp = 0.80 m spacing in x-direction, xi = 2.5 m
ht = 1.10 m spacing in y-direction, yi = 3.4 m

REINFORCEMENT

Max. axial force, Pmax = Pall = 2825 kN


Max. moment, Mmax = 1187 kNm
Load factor, K = 1.2 φ= 0.9
Ultimate axial load, φPn = Pu = K.Pmax = 3390 kN Pn = 3766.56 kN
Ultimate moment, φMn = Mu = K.Mmax = 1424 kNm Mn = 1582.58 kNm
Pile diamater, Dpile = 800 mm
Area of pile, Ag = 502655 mm2
Compressive strength, f'c = 35 Mpa = 5 ksi
Kn = Pn/(fc'*Ag) = 0.21
Rn = Mn/(fc'*Ag*d) = 0.11
From interaction diagram, ρ = 0.02 where, γ= 0.8
As need = ρ *Ag = 10053 mm2
Use reinforcement Dbar = 32 mm
As = 804 mm2
= 13
Flexural Reinforcement 14 D 32 mm
Ratio = 0.89
Use D13 - 100 mm as shear reinforcement
Penyusunan FEED Redesign Relokasi DOC. NO. :
Jalan MT. Haryono dan Jalan MH. RDMP-L2-60-CVL-CAL-102A4
Thamrin, Kali Cinyemeh serta Jalan
Pelabuhan Proyek RDMP RU IV REV NO. : 0
Cilacap
CALCULATION FOR BRIDGES ON PAGE NO. : 2/8
CROSS COUNTRY PIPE WIDTH
SPAN 30 M
Penyusunan FEED Redesign Relokasi DOC. NO. :
Jalan MT. Haryono dan Jalan MH. RDMP-L2-60-CVL-CAL-102A4
Thamrin, Kali Cinyemeh serta Jalan
Pelabuhan Proyek RDMP RU IV REV NO. : 0
Cilacap
CALCULATION FOR BRIDGES ON PAGE NO. : 3/8
CROSS COUNTRY PIPE WIDTH
SPAN 30 M

11.2. Pile Cap

11.2.1. X-DIRECTION
Detail calculation for moment and shear due to piles reaction can be found at
Appendix D

Design shear and moment of pile-cap


Ultimate Moment (Mu = Mup - Mus)
Mu = 6254 kNm
or Mu / L = 284 kNm/m
Ultimate Shear (Vu = Vup - Vus)
Vu = 19238 kN
or Vu / L = 874 kN/m

11.2.1.1. Design for flexural reinforcement

Ultimate moment for design, Mu = 284 kNm


Concrete class, f'c = 28 Mpa
Steel Reinforcement class, fy = 390 Mpa
Pile cap thickness, h = h7+h8 = 1100 mm
Concrete cover, d' = 75 mm
Elastic modulus of steel, Es = 2.E+05 Mpa
Shape factor for concrete block, ϐ1 = 0.85
ρb = ϐ1*0.85*fc'/fy*600/(600+fy) = 0.031
Rmax=0.75*ρb*fy*[1-1/2*0.75*ρb*fy/(0.85*fc;)] = 7.419059917
Reduction factor for flexure, φ = 0.8
Effective thickness pile-cap, d= h - d' = 1025 mm
Width of pile-cap, b = 1000 mm
Nominal moment for design, Mn = Mu/φ = 355.329 kNm
Moment resistance factor, Rn=Mn/(b.d2) = 0.33821 Nmm < Rmax OK
Ratio for area of steel
Ratio required, ρr = 0.0009 m= 16.39
Minimum steel ratio, ρmin = 0.002
Governed steel ratio, ρ = 0.0020
Area of steel required, Asreq = 2050 mm2
Penyusunan FEED Redesign Relokasi DOC. NO. :
Jalan MT. Haryono dan Jalan MH. RDMP-L2-60-CVL-CAL-102A4
Thamrin, Kali Cinyemeh serta Jalan
Pelabuhan Proyek RDMP RU IV REV NO. : 0
Cilacap
CALCULATION FOR BRIDGES ON PAGE NO. : 4/8
CROSS COUNTRY PIPE WIDTH
SPAN 30 M

Use rebar diameter, D = 25 mm Ab = 490.874 mm2


Spacing of rebar = 239.451 mm
Rebar design: = D 25 - 200 mm
As = 2454 mm2
Design ratio =
= 0.84
Asreq / As
For T&S define 50% of main reinforcement
As' = 1227.18463 mm2
Use rebar diameter = 19 mm Ab' = 283.529 mm2
Spacing of rebar = 231.04 mm
Rebar design: =
Rebar design: = D 19 - 200 mm
As = 1418 mm2
Design ratio =
= 0.87
Asreq / As

11.2.1.2. Design for shear reinforcement

Ultimate shear force, Vu = 874442 N


Reduction factor for shear, φ = 0.6
Ultimate capacity of concrete, Vcmax = 0.5*φ*(√fc')*b*d
Vcmax = 1627137 N > Vu OK
Vc = 0.17*(√fc')*b*d = 922044 N > Vu No required
φVs = Vu - φVc = 321216 N
Nominal shear force, Vs = 535360 N
Use rebar diameter, D = 16 mm spacing, Sy = 350 mm
Area of steel, Av=0.25*π*D2*b/Sy = 574 mm2
Spacing of shear reinf. (X) direction
Sx= Av*fy*d/Vs = 429 mm
Rebar design: X-direction = D 16 - 450 mm
y-direction = D 16 - 350 mm
Penyusunan FEED Redesign Relokasi DOC. NO. :
Jalan MT. Haryono dan Jalan MH. RDMP-L2-60-CVL-CAL-102A4
Thamrin, Kali Cinyemeh serta Jalan
Pelabuhan Proyek RDMP RU IV REV NO. : 0
Cilacap
CALCULATION FOR BRIDGES ON PAGE NO. : 5/8
CROSS COUNTRY PIPE WIDTH
SPAN 30 M

11.2.1.3. Check for punch-shear due to pile reaction

Punch-shear requirement, fv = 0.3*√fc' = 1.587 Mpa


Reduction factor for
= 0.6
shear, φ
r=
Bored-pile spacing X-direction, X = 2500 mm 1250
X/2 =
r=
Bored-pile spacing X-direction, X = 3400 mm 1700
y/2 =
Bored-pile to edge of pile-cap, a = 1000 mm
r (min x,y,d/2) = 512.5 mm
hp = h7 = 800 mm
ht = h7 + h8 = 1100 mm
Lt = b7 = 1850 mm
Depth of critical
punch-shear,
h = hp+(r+a)/Lt*(ht-
= 1045.27 mm
hp)
Effective depth of critical punch-shear,
d = h - d' = 970.27 mm
Length of critical section of punch-shear,
Lv = 2*(r+a) + π/2*r = 3830.0 mm
Area of critical section of punch-shear,
Av = Lv * 4003419. mm
=
h 8 2
Nominal puch-shear capacity, Pn=Av*fv = 6.4E+06 N
Capacity for punch-shear, φPn = 3813 kN
Maximum Axial Pile reaction, Rp = 2849 kN < φPn OK

11.2.2. Y-DIRECTION
11.2.2.1. Design for flexural reinforcement

Area of cross section,


A1 = Bx * h7 = 3600000 mm2
A2 = (b6 * h5)/2 = 277500 mm2
A3 = (b7 * h8)/2 = 277500 mm2
A4 = b3 * h8 = 306000 mm2
Penyusunan FEED Redesign Relokasi DOC. NO. :
Jalan MT. Haryono dan Jalan MH. RDMP-L2-60-CVL-CAL-102A4
Thamrin, Kali Cinyemeh serta Jalan
Pelabuhan Proyek RDMP RU IV REV NO. : 0
Cilacap
CALCULATION FOR BRIDGES ON PAGE NO. : 6/8
CROSS COUNTRY PIPE WIDTH
SPAN 30 M

Atot =
= 4461000 mm2
A1+A2+A3+A4
Effective thickness pile-cap, d= h - d' = 1025 mm
Width of pile-cap, b = 1000 mm
Minimum steel ratio, ρmin = 0.002
Area of steel required,
= 8922 mm2
Asreq
Use rebar diameter, D = 19 mm Ab = 283.529 m
Spacing of rebar = 200 mm Bx= 4500 m
Area of steel, As = 6167 mm2
= 12334 mm2
Rebar
= D 19 - 200 mm
design:

11.3. Breast Wall


11.3.1. Ultimate shear and moment on breast wall
Detail calculation for moment and shear due to piles reaction can be found at Appendix E

SUMMARY OF LOAD COMBINATION FOR ULTIMATE STRESS DESIGN


Vertical Horizontal Moment
Load Combination P Tx Ty Mx My
(kN) (kN) (kN) (kNm) (kNm)
STRENGTH - I 20619 3903 216 11578 931
STRENGTH - III 12743 3232 438 6936 1804
STRENGTH - V 12743 3232 251 6936 983
EXTREME - I 30% 14427 7295 3649 21490 12798
SERVICE LOAD - I 12916 3252 271 9021 1162
Max 20619 7295 3649 21490 12798
1 meter 937 977 582

11.3.2. Flexure Reinforcement


Penyusunan FEED Redesign Relokasi DOC. NO. :
Jalan MT. Haryono dan Jalan MH. RDMP-L2-60-CVL-CAL-102A4
Thamrin, Kali Cinyemeh serta Jalan
Pelabuhan Proyek RDMP RU IV REV NO. : 0
Cilacap
CALCULATION FOR BRIDGES ON PAGE NO. : 7/8
CROSS COUNTRY PIPE WIDTH
SPAN 30 M

Compressive strength, f'c = 28 Mpa = 4 ksi


Steel yield strenght, fy = 390 Mpa = 60 ksi
Length of breast wall, By = 22000 mm
For 1 meter width:
breastwall width, b = 1000 mm
breastwall thickness, h = 800 mm
Area of breastwall, Ag = b x h = 800000 mm2
Kn = Pn/(fc'*Ag), where Pn = Pu/φ
Rn = Mn/(fc'*Ag*h), where Mn = Mu/φ
Strength reduction factor:
Bending Moment, φ = 0.9 |ACI 318-14; 21.2|
Shear, φ = 0.75 |ACI 318-14; 8.5; 21.2|
Concrete cover, d' = 75 mm
Effective depth, h' = h - 2d' = 650 mm
γ = h'/h = 0.813

Ultimate Load For 1 meter width


Load Combination Pu Mu Pn Mn
Kn Rn
(kN) (kNm) (kN) (kNm)
STRENGTH - I 20619 11578 1041 585 0.046 0.033
STRENGTH - III 12743 6936 644 350 0.029 0.020
STRENGTH - V 12743 6936 644 350 0.029 0.020
EXTREME - I 30% 14427 21490 729 1085 0.033 0.061
SERVICE LOAD - I 12916 9021 652 456 0.029 0.025

From interaction diagram, ρ = 0.01 Kn Rn ρ


2
As need = ρ *Ag = 8000 mm 0.046 0.033 0.01
Use reinforcement Dbar = 25 mm 0.029 0.020 0.01
2
As = 491 mm 0.029 0.020 0.01
2
As (comp) = As (tension) = 1/2 As need = 4000 mm 0.033 0.061 0.01
s = 122.72 mm 0.029 0.025 0.01
0.01

Use:
Compression 2D 25 - 200 ρ = 0.00614
Tension 2D 25 - 200 ρ = 0.00614
ρ = 0.01227
Penyusunan FEED Redesign Relokasi DOC. NO. :
Jalan MT. Haryono dan Jalan MH. RDMP-L2-60-CVL-CAL-102A4
Thamrin, Kali Cinyemeh serta Jalan
Pelabuhan Proyek RDMP RU IV REV NO. : 0
Cilacap
CALCULATION FOR BRIDGES ON PAGE NO. : 8/8
CROSS COUNTRY PIPE WIDTH
SPAN 30 M

11.3.3. Shear Reinforcement

Ultimate axial force, Pu = 937 kN


Ultimate moment, Mu = 977 kNm
Height of abutment, L = 1950 mm
For 1 meter width:
breastwall width, b = 1000 mm
breastwall thickness, h = 800 mm
Strength reduction factor:
Bending Moment, φ = 0.9
Shear, φ = 0.75
As = 9817 mm2
Vu = Mu/L= 500930 N
d' = 75 mm
d = h - d' = 725 mm
Vcmax = 0.2*fc*b*d = 4060000 N
φVcmax = 3045000 N > Vu OK
ϐ1 = 1.4 - d/2000 = 1.038
ϐ2 = 1+Pu/(14*fc'*b*h) = 1.003
ϐ 3 = 1.00
Vuc = ϐ1ϐ2ϐ3* b*d*√(As*fc/(b*d)) = 464550 N
Vc = Vuc + 0.6*b*d = 899550 N
φVc = 674662 N > Vu OK
= only min shear reinfrocement
Vs = Vu/φ = 667906 N
Use D 16 spacing Sy = 350 mm
2
Area Asv = = 574 mm
Sx = Asv*fy*d/Vs = 243 mm
Use D 16 spacing Sx = 200 mm
spacing Sy = 350 mm