0% found this document useful (0 votes)
33 views4 pages

JULAI 2015: Prepare Memo + Trial Test Special X-Check Prepare Memo + Trial Test Special X-Check

The document contains a schedule for August, September, and October listing various tasks related to testing and sampling. In August, tasks include cutting samples of TSR 113, training on cutting dumbbells, and cutting special x-check samples. September tasks involve registering TSR 113, continuing glove sample cutting, preparing memos and trials for glove and special x-check testing. October tasks focus on labelling, posting, and testing dates for special x-check and PT glove samples.

Uploaded by

sabbysamura
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views4 pages

JULAI 2015: Prepare Memo + Trial Test Special X-Check Prepare Memo + Trial Test Special X-Check

The document contains a schedule for August, September, and October listing various tasks related to testing and sampling. In August, tasks include cutting samples of TSR 113, training on cutting dumbbells, and cutting special x-check samples. September tasks involve registering TSR 113, continuing glove sample cutting, preparing memos and trials for glove and special x-check testing. October tasks focus on labelling, posting, and testing dates for special x-check and PT glove samples.

Uploaded by

sabbysamura
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

JULAI 2015

Isnin Selasa Rabu Khamis Jumaat Sabtu Ahad

27 28 29 30 31
Potong Sampel TSR 113 - Unblended

OGOS 2015
1 2

3 4 5 6 7 8 9

Trial test TSR + Result Form

Training cutting dumbbell ( 1@2 hari shj)

Potong Sample Special X-check PRI


10 11 12 13 14 15 16

Print label, Packing & Labelling TSR 113

Potong Sampel Special X-check VR

17 18 19 20 21 22 23

Posting TSR

Potong Sample Special X-check N2

24 25 26 27 28 29 30

Potong Sampel PT Glove

Prepare Memo
+ Trial Test
Special X-check
PRI

31
SEPTEMBER
Isnin Selasa Rabu Khamis Jumaat Sabtu Ahad

1 2 3 4 5 6
Register TSR 113 (e-precision)

Sambung potong Sampel PT Glove

7 8 9 10 11 12 13

Testing Date
TSR
TSR 113
113

Prepare Memo + Trial Test


PT Glove

Packing Sample Special X-check PRI


Prepare Memo +
Trial Test Special
X-check VR

Print label & Packing Sample PT Glove


14 15 16 17 18 19 20

Prepare Memo
Posting Sample + Trial Test
Special X-check Special X-check
PRI N2

Print label & Packing Sample


Special X-check VR

Labelling Sample PT Glove

21 22 23 24 25 26 27
Labelling Sample Special X-check VR
28 29 30

Closing
Closing
Posting
Posting Date
Date
Sample
Sample Submit
Submit
PT Result
Glove TSR
TSR 113
113
e-presicion
e-presicion

Posting
Posting Sample
Sample
Special X-check VR

Print label & Packing Sample


Special X-check N2
OKTOBER
1 2 3 4

Labelling Sample
Special X-check
N2

5 6 7 8 9 10 11

Testing Date Special X-check


PRI

Posting Sample
Special X-check
N2

12 13 14 15 16 17 18

19 20 21 22 23 24 25

Testing Date Special X-check


VR

Testing Date
PT Glove - Unaged

26 27 28 29 30 31

Testing Date Special X-check


N2

Testing Date
PT Glove- Aged

You might also like