Material Schedule Revised
Material Schedule Revised
SUPER STRUCTURE
6 inch blocks no 3.5 1365 4,778
Y 12 steel no 80 12 960
links no 6 690 4,140
cement(block work) bags 55 13 715
stone ton 95 10 950
dpc rolls 120 2 240 SUPER STRUCTURE 28,712
cement(plaster) bag 55 81 4,455
building sand(plaster) ton 80 54 4,320
cement(motar) bag 55 54 2,970
building sand(motar) tones 80 64.8 5,184
FRAMES
Windows frames no 200 8 1,600
Door frames no 410 9 3,690
glass panes no 60 8 480
mukwa doors no 950 3 2,850 FRAMES 11,140
flash doors no 350 6 2,100
air vents no 30 14 420
PLUMBING MATERIALS
9ltrs Close Complete Toilet Pans no 950 6 5,700
110mm PVC Pan Connectors no 65 6 390
110mm PVC Plain bends no 74 6 444
110mm PVC Connection Tees no 65 6 390
110mm PVC Vent Valves no 60 6 360
110mm PVC Complete Gully Traps no 130 30 3,900
1/2" Copper Connectors no 35 12 420
1/2" Angle Valves no 53 12 636
1/2" Pillar Taps no 70 4 280
1/2" BIB Taps no 54 4 216
1 1/4" Rubber P Traps no 75 6 450
1 1/4" Waste Fittings no 70 6 420
9ltrs Cistern (Urinals) no 150 2 300
1 1/2" Rubber P Traps no 90 4 360
1 1/2" Waste Fittings no 80 4 320
110mm PVC Pipes no 150 12 1,800
500mls PVC Glue no 70 3 210
1/2" CPVC Female Adaptors no 15 20 300
1/2" CPVC Bends no 15 30 450
3/4" CPVC Tees no 15 20 300
3/4" - 1/2" CPVC Reducing Bushes no 16 20 320
3/4" CPVC Pipes no 90 15 1,350 PLUMBING 27,539
1/2" CPVC Pipes no 75 8 600
500mls CPVC Glue no 95 6 570
1/2" CPVC Valves no 65 14 910
3/4" CPVC Valves no 85 4 340
1/2" CPVC Unions no 30 14 420
3/4" CPVC Unions no 35 8 280
3/4" CPVC Bends no 19 20 370
40mm PVC Pipes no 40 3 120
50mm PVC Pipes no 48 2 96
40mm PVC Inspection Bends no 20 8 160
40mm PVC Plain Bends no 20 6 120
40mm PVC Plain Tees no 24 3 72
50mm PVC Plain Tees no 30 5 150
50mm PVC Inspection Bends no 40 5 200
Thread Tape no 15 15 225
3kg General Purpose Putty no 45 2 90
500mls Silicone(Clear) no 40 4 160
Wash Hand Basin with stand no 620 2 1,240
Concrete Wash Troughs no 700 2 1,400
Urinals no 700 1 700
ELECTRICAL MATERIALS
Single phase meter box no 65 1 65
D.B Box 6 way no 60 1 60
20mm conduit pipes no 15 30 450
90degree bends no 5 30 150
Looping boxes no 5 30 150
Earthing rod no 100 1 100
Earthing box no 50 1 50
Neutral bars no 50 2 100
Metal saddles bundles 50 2 100
Ceiling nails kg 50 1 50
1.5mm cables red rolls 210 2 420 ELECTRICAL
5,070
1.5mm cables black rolls 210 2 420 MATERIALS
2.5 cables red,black&green rolls 240 2 480
Double socket outlets no 60 3 180
2 gang 2way switches no 45 3 135
1 gang 1way switches no 40 3 120
60amps MCB no 80 2 160
30amps MCB no 50 2 100
10amps MCB no 55 1 55
Couplings no 25 45 1,125
Flourescent fittings no 150 4 600
ROOFING REQUIREMENTS
fascia boards no 100 5 500
50 x 50 timber no 45 15 675
4'' steel nails kg 40 10 400
3'' wire nails kg 25 12 300
4'' wire nails kg 25 12 300
roofing sheets 3m metres 53 45 2,385
150 x 50 timber no 75 13 975
100 x 50 timber no 65 10 650
75 x 50 timber no 45 17 765
5'' wire nails kg 25 10 250
roofing nails no 3 50 125 ROOFING
14,780
Wall Flash no 55 28 1,540 REQUREMENTS
soft wire kg 40 3 120
particle boards no 115 12 1,380
cover strips bundles 140 7 980
cornice bundles 210 10 2,100
ceiling nails kg 25 5 125
1.5'' wire nails kg 20 4 80
2'' wire nails kg 20 8 160
3'' steel nails kg 40 8 320
Wall filler kg 13 50 650
EXTRAS -
labour (including blasting) 48,237 48,237
Formwork for Concreting 1,300 1,300
food 600 3 1,800 1,800
Transportation of Materails to Site 2,500 2 5,000 5,000
TOTAL MATERIAL AND LABOUR COST FOR ABLUTION BLOCK AND ZMK 177,770 177,770
WASHROOM