Company:                           Project:                                          Engineering Contractor:
OFFSITES ENGINEERING WORKS
                                          FOR THE ERBIL REFINERY
                                       40,000 B/D EXPANSION PROJECT
                                                Contract no.:    10J01762-01
Company doc. no.:                                     Job no.:   10J01762            Engineering doc. no.:
              N/A                             Sheet       1        of   9                       10J01762-ELE-RE-000-001
                                          OFFSITES ENGINEERING WORKS FOR THE
                                       ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
                                    ILLUMINATION LEVEL CALCULATION REPORT
 D0     27/09/2011 Issued for Construction                                     F. Caldarigi         S. Caputi       F. Cilia
 C0     29/07/2011 Issued for Company Approval                                 F. Caldarigi         S. Caputi       F. Cilia
REV.        DATE                              REVISION TITLE                   PREPARED             CHECKED        APPROVED
File name: 07213-ELE-RE-0-001-D0
                            OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
                                           ILLUMINATION LEVEL CALCULATION REPORT
Company doc. no.:                        Rev.:     C0         D0                                              Engineering doc. no.:
                                                            Sheet     2       of      9                         10J01762-ELE-RE-000-001
                                                                    INDEX
1  GENERAL ....................................................................................................................................3
 1.1    Scope of the Document .........................................................................................................3
 1.2    Definitions ..............................................................................................................................3
 1.3    Language...............................................................................................................................3
 1.4    Codes and Standards ............................................................................................................3
 1.5    Project Documentation...........................................................................................................3
 1.6    Abbreviations .........................................................................................................................4
 1.7    Ambient Data .........................................................................................................................4
2 GENERAL ....................................................................................................................................4
3 DESIGN CALCULATION METHOD ..............................................................................................5
 3.1    General Area Lighting ............................................................................................................5
 3.2    Pumps Area Lighting .............................................................................................................6
 3.3    Indoor Lighting .......................................................................................................................8
   3.3.1    Substation Building Lighting ............................................................................................8
   3.3.2    Control Building Lighting ................................................................................................8
4 ATTACHMENTS ...........................................................................................................................9
File name: 07213-ELE-RE-0-001-D0
                            OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
                                          ILLUMINATION LEVEL CALCULATION REPORT
Company doc. no.:                        Rev.:    C0      D0                                      Engineering doc. no.:
                                                         Sheet     3       of   9                  10J01762-ELE-RE-000-001
1        GENERAL
1.1       Scope of the Document
           This document is dedicated to give basic criteria referring the illumination level calculation for
           outdoor and indoor areas for the offsites engineering works for the Erbil refinery 40.000 B/D
           expansion project.
    1.2    Definitions
              Project:                                                 Off-sites Engineering Works inherent to the Erbil
                                                                       Refinery 40,000 B/D Expansion Project.
              Company:                                                 KAR Engineering & Construction (KAR)
              Engineering                                              ENERECO Qatar Engineering and Consulting, the
                                                                       engineering contractor nominated by the Company
                                                                       to perform the Off-sites Engineering Works (OSBL)
                                                                       inherent to the Erbil Refinery 40,000 B/D Expansion
                                                                       Project.
              Ventech:                                                 It’s the interface Contractor responsible for the
                                                                       design of the new Refinery Plant, the so called In
                                                                       Site Battery Limit (ISBL)
1.3        Language
           The official language of the project is English.
           All documents, including supplies instruction and communications shall be written in English.
1.4       Codes and Standards
           Reference standard codes for this calculation report are:
                                                 Electrical Installation in Petroleum Processing Plant Lighting-
            API-540
                                                 Section 7
1.5       Project Documentation
           The documents listed below form an integral part of the lighting calculation report:
           The documents in the following table are indicated in order of precedence:
    Item                       Number                   Rev                             Description
                                                                 SLD for Lighting and Socket Distribution Board
     1        10J01762-ELE-DW-000-005
                                                                 0.4/0.23 kV
     2        10J01762-ELE-DW-000-014                            External Lighting Layout
     3        10J01762-ELE-DW-000-021                            Lighting Installation Details
File name: 07213-ELE-RE-0-001-D0
                            OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
                                          ILLUMINATION LEVEL CALCULATION REPORT
Company doc. no.:                        Rev.:   C0      D0                                      Engineering doc. no.:
                                                        Sheet     4    of    9                     10J01762-ELE-RE-000-001
    Item               Number                          Rev                            Description
      4        10J01762-ELE-DW-000-024                          Substation Lighting and Socket layout
                                                                Substation Building MCC - Ground Floor Plan and
     5         10J01762-CIV-DW-000-101
                                                                Roof Plan -
     6         10J01762-CIV-DW-000-111                          Control Building - Ground Floor Plan and Roof Plan -
1.6      Abbreviations
           The following abbreviations are used in this document:
                  A.C. or a.c.           Alternating current
                  I.E.S.                 Illumination Engineering Society of North America
                  S.I.                   System International
1.7      Ambient Data
           Site Elevation:                                                                  330m.a.m.s.l
           The following ambient and environmental conditions shall be considered for the project.
           −         Max ambient temp.:                                                     50°C
           −         Min ambient temp.:                                                     0°C
           −         Max annual precipitation:                                              762 mm/year
           −         Relative Humidity (MIN)                                                20%
           −         Relative Humidity (MAX)                                                65%
           −         Max wind load:                                                         32 m/s (72 miles/h)
           −         Prevailing wind direction:                                             from North-East
           −         Seismicity:                                                            UBC 3
2        GENERAL
           This illumination level calculation for outdoor and indoor areas shall be performed to give the
           required levels in accordance with codes and standards.
                     Type of Location                                                                    Lux
                     General Area                                                                         20
                     Pump areas, compressor houses, etc. at or near equipment                            300
                     Substation and Electrical Rooms                                                     240
                     Kitchen Room                                                                        400
                     Battery Room                                                                        180
                     Control Room                                                                        360
                     Meeting room                                                                        480
File name: 07213-ELE-RE-0-001-D0
                            OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
                                          ILLUMINATION LEVEL CALCULATION REPORT
Company doc. no.:                        Rev.:   C0      D0                                      Engineering doc. no.:
                                                        Sheet   5      of    9                    10J01762-ELE-RE-000-001
                     Type of Location                                                                    Lux
                     Training Room                                                                       600
                     Office type 1                                                                       420
                     Office type 2                                                                       600
                     Office type 3                                                                       420
           All lighting circuits for external lighting shall be supplied from Lighting and Socket Distribution
           Panel - External, (LS-DB-001), voltage level 0.4/0.23 kV AC, 50 Hz . Supplied from MCC-020,
           0.4/0.23 kV.
           All lighting fixtures in the Electrical Substation shall be supplied from Lighting and Socket
           Distribution Panel – Substation Building, (LS-DB-002) supplied from MCC-020, 0.4/0.2
           supplied from MCC-20, 0.4/0.23 kV.
           All lighting fixtures in the Control Room shall be supplied from Lighting and Socket Distribution
           Panel – Control Building. (LS-DB-003) Supplied from MCC-20, 0.4/0.2 supplied from MCC-
           020, 0.4/0.23 kV.
3      DESIGN CALCULATION METHOD
3.1      General Area Lighting
           Pole mounted lighting fixtures shall be 250 W, mercury vapour, an suitable for safe area.
           Lighting poles shall be 9 meters high, of round, tapered of aluminum.
           The illumination level calculation has been performed using software DIALUX 4.9 which uses
           Point-by-Point Method for calculation.
           DIALux reports – see attachments no: 1
           Report consists:
           - lighting fixtures data sheet
           - lighting fixtures arrangement
           - luminary diagram
           - isolines
           - calculation grids
           Lighting Calculation results:
                                                 Pumps Area Lighting – Type 1
                                                  Fluorescent Lighting 2x36 W
                          Description                                               Process area
                Area dimensions (a × b)                                               11.1 × 5 m
              Fittings provides for layout                                                  8
File name: 07213-ELE-RE-0-001-D0
                            OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
                                          ILLUMINATION LEVEL CALCULATION REPORT
Company doc. no.:                        Rev.:   C0      D0                                      Engineering doc. no.:
                                                        Sheet   6      of    9                     10J01762-ELE-RE-000-001
        Resultant of expected illumination                                            332 lux (1)
           Where a is the length of the area considered, b is the width of the same area in meters.
      (1) This result was obtained by considering quartz metal halide lamps because the use of mercury vapor
          lamps for lighting purposes will be banned in the EU in 2015 and in the USA, ballasts and fixtures were
          banned in 2008.
3.2      Pumps Area Lighting
           Lighting fixtures mounted under the shelter shall be 2x36 W, fluorescent type, suitable for
           Zone 2
           The illumination level calculation has been performed using software DIALUX 4.9 which uses
           Point-by-Point Method for calculation.
           DIALux reports – see attachments no: 2, 3 e 4
           Report consists:
           - lighting fixtures data sheet
           - lighting fixtures arrangement
           - luminary diagram
           - isolines
           - calculation grids
           Lighting Calculation results:
                                                 Pumps Area Lighting – Type 1
                                                  Fluorescent Lighting 2x36 W
                          Description                                               Process area
                Area dimensions (a × b)                                               11.1 × 5 m
              Fittings provides for layout                                                  8
        Resultant of expected illumination                                              332 lux
                                                 Pumps Area Lighting – Type 2
                                                  Fluorescent Lighting 2x36 W
                          Description                                               Process area
                Area dimensions (a × b)                                                6.1 × 5 m
              Fittings provides for layout                                                  6
File name: 07213-ELE-RE-0-001-D0
                            OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
                                          ILLUMINATION LEVEL CALCULATION REPORT
Company doc. no.:                        Rev.:   C0      D0                                      Engineering doc. no.:
                                                        Sheet   7      of    9                     10J01762-ELE-RE-000-001
        Resultant of expected illumination                                              402 lux
           Where a is the length of the local, b is the width of the local in meters
                                                 Pumps Area Lighting – Type 3
                                                  Fluorescent Lighting 2x36 W
                          Description                                               Process area
                Area dimensions (a × b)                                                8.3 × 5 m
              Fittings provides for layout                                                  6
        Resultant of expected illumination                                              300 lux
                                                 Pumps Area Lighting – Type 4
                                                  Fluorescent Lighting 2x36 W
                          Description                                               Process area
                Area dimensions (a × b)                                               28 × 8.5 m
              Fittings provides for layout                                                 24
        Resultant of expected illumination                                              296 lux
           Where a is the length of the local, b is the width of the local in meters
File name: 07213-ELE-RE-0-001-D0
                            OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
                                          ILLUMINATION LEVEL CALCULATION REPORT
Company doc. no.:                        Rev.:   C0      D0                                      Engineering doc. no.:
                                                        Sheet   8      of    9                    10J01762-ELE-RE-000-001
3.3      Indoor Lighting
3.3.1      Substation Building Lighting
           Lighting fixtures mounted inside the Substation Building shall be 2 x 36 W, fluorescent and
           industrial type.
           The illumination level calculation has been performed using software DIALUX 4.9 which uses
           Point-by-Point Method for calculation.
           Report consists:
           - lighting fixtures data sheet
           - lighting fixtures arrangement
           - luminary diagram
           - isolines
           - calculation grids
           Lighting Calculation results:
                                                                                              Average line illumination
                      Indoor Lighting                                  a×b×h
                                                                                                       in lux
               MV/LV Switchgear Room                                40.3 × 12.2 × 5                          248
           Where a is the length of the local, b is the width of the local and h is the high of the local in
           meters
3.3.2      Control Building Lighting
Lighting fixtures to be installed inside the Substation are different for each internal room:
           Kitchen Room                                   Fluorescent fixtures              4×18 W
           Battery Room                                   Fluorescent fixtures              4×18 W
           Control Room                                   Fluorescent fixtures              4×36 W
           Meeting Room                                   Fluorescent fixtures              4×36W
           Office Rooms
           (type 1, type2, type3)                         Fluorescent fixtures              2×36 W
           The illumination level calculation has been performed using software DIALUX 4.9 which uses
           Point-by-Point Method for calculation.
           Report consists:
File name: 07213-ELE-RE-0-001-D0
                            OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
                                          ILLUMINATION LEVEL CALCULATION REPORT
Company doc. no.:                        Rev.:   C0      D0                                      Engineering doc. no.:
                                                        Sheet   9       of   9                    10J01762-ELE-RE-000-001
           - lighting fixtures data sheet
           - lighting fixtures arrangement
           - luminary diagram
           - isolines
           - calculation grids
           Lighting Calculation results:
                                                                                              Average line illumination
                      Indoor Lighting                           a [m]× b [m] × h [m]
                                                                                                       in Lux
                        Kitchen Room                                 6 × 4.2 × 3.6                           449
                       Battery Room                                  6 × 4.2 × 3.6                           230
                       Control Room                                 5.8 × 12.6 × 3.6                         579
                       Training Room                                  6 × 4.2 ×3.6                           683
                       Meeting Room                                 8.4 × 4.2 × 3.6                          718
    Office Rooms type 1 (office -1, office 2,
                                                                    3.75 × 3.15 ×3.6                         470
              office 3, office 4)
    Office Rooms type 2 (office – 5, office 6)                      3.55 × 4.85 ×3.6                         676
          Office Rooms type 3 (office – 7)                          2.45 × 4.70 ×3.6                         476
           Where a is the length of the local, b is the width of the local and h is the high of the local in
           meters
4      ATTACHMENTS
      -    Attachment no.1: General Area Lighting;
      -    Attachment no.2: Pumps Area Lighting – Shelter Type 1;
      -    Attachment no.3: Pumps Area Lighting – Shelter Type 2;
      -    Attachment no.4: Pumps Area Lighting – Shelter Type 3;
      -    Attachment no.5: Pumps Area Lighting – Shelter Type 4;
      -    Attachment no.6:Electrical Substation Lighting
      -    Attachment no.7:Control Building Lighting
File name: 07213-ELE-RE-0-001-D0