Rate Analysis Sbcon

The document provides a rate analysis for various construction materials and labor costs including: 1) Unit rates for materials and labor for plain cement concrete (PCC) mixes with different ratios and reinforced cement concrete (RCC) mixes of various grades. 2) The materials listed include aggregates, sand, cement and additives along with carriage costs. Labor includes roles like mazdoor, mason, and helper. 3) For steel reinforcement, the rate analysis gives costs for TMT bars, cover blocks and bar bending labor.

Uploaded by

Kamarajan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
535 views24 pages

Rate Analysis Sbcon

The document provides a rate analysis for various construction materials and labor costs including: 1) Unit rates for materials and labor for plain cement concrete (PCC) mixes with different ratios and reinforced cement concrete (RCC) mixes of various grades. 2) The materials listed include aggregates, sand, cement and additives along with carriage costs. Labor includes roles like mazdoor, mason, and helper. 3) For steel reinforcement, the rate analysis gives costs for TMT bars, cover blocks and bar bending labor.

Uploaded by

Kamarajan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 24

RATE ANALYSIS

CODE DESCRIPTION UNIT QUANTITY RATE

PC Plain Cement Concrete


PC01 PCC 1:3:6
i Details for 1 Cu.M
Material Cost
Stone Aggregate (Single size) : Below 40 mm nominal size
M007 (0.70 cum - 7.5% for voids i.e. 0.05 = 0.65 cum) Cu.m 0.65 890.00
M009 Stone Aggregate (Single size) : 20 mm nominal size Cu.m 0.24 1225.00
M022 M.sand 2nd Class Cu.m 0.47 1800.00
M015 Portland Cement Tonne 0.22 6600.00
M018 Hire Charges For Concrete Mixer With Hopper (.25-.4 Cu.m) Tonne 0.07 800
M019 Needle Vibrator Tonne 0.07 350
Labour Cost
L006 Rock Hole Driller Day 0.10 350
L001 Mazdoor Day 1.63 500
L002 Helper Male Day 0.70 400
Carriage of Stone Aggregate (Single size) : Below 40 mm
M008 nominal size Cu.m 0.89 115.00
(0.70 cum - 7.5% for voids i.e. 0.05 = 0.65 cum)
M023 Carriage Of M.Sand Cu.m 0.47 107.00
M017 Carriage Of cement Tonne 0.22 95
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1 Cu.m

PC02 PCC 1:4:8


i Details for 1 Cu.M
Material Cost
Stone Aggregate (Single size) : Below 40 mm nominal size
M007 (0.70 cum - 7.5% for voids i.e. 0.05 = 0.65 cum) Cu.m 0.65 890.00
M009 Stone Aggregate (Single size) : 20 mm nominal size Cu.m 0.24 1225.00
M022 M.sand 2nd Class Cu.m 0.47 1800.00
M015 Portland Cement Tonne 0.17 6600.00
M018 Hire Charges For Concrete Mixer With Hopper (.25-.4 Cu.m) Tonne 0.07 800.00
M019 Needle Vibrator Day 0.07 350.00
Labour cost
L006 Rock Hole Driller Day 0.10 350
L001 Mazdoor Day 1.63 500
L002 Helper Male Day 0.70 400
Carriage of Stone Aggregate (Single size) : Below 40 mm
M008 nominal size
(0.70 cum - 7.5% for voids i.e. 0.05 = 0.65 cum)
Cu.m 0.65 115.00
M010 Carriage of Stone Aggregate Cu.m 0.24 107.00
M023 Carriage Of M.Sand Cu.m 0.47 107.00
M017 Carriage Of cement Tonne 0.17 95.00
ii Total Cost SQM
C001 Contingency LS 0.15
iii Total Cost For 1 Cu.m

PC02 PCC 1:5:10


i Details for 1 Cu.M
Material Cost
Stone Aggregate (Single size) : Below 40 mm nominal size
M007 (0.70 cum - 7.5% for voids i.e. 0.05 = 0.65 cum) Cu.m 0.65 890.00
M009 Stone Aggregate (Single size) : 20 mm nominal size Cu.m 0.24 1225.00
M022 M.sand 2nd Class Cu.m 0.47 1800.00
M015 Portland Cement Tonne 0.13 6600.00
M018 Hire Charges For Concrete Mixer With Hopper (.25-.4 Cu.m) Tonne 0.07 800.00
M019 Needle Vibrator Day 0.07 350.00
Labour cost
L006 Rock Hole Driller Day 0.10 350
L001 Mazdoor Day 1.63 500
L002 Helper Male Day 0.70 400
Carriage of Stone Aggregate (Single size) : Below 40 mm
M008 nominal size
(0.70 cum - 7.5% for voids i.e. 0.05 = 0.65 cum)
Cu.m 0.65 115.00
M010 Carriage of Stone Aggregate Cu.m 0.24 107.00
M023 Carriage Of M.Sand Cu.m 0.47 107.00
M017 Carriage Of cement Tonne 0.13 95.00
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1 Cu.m

RC Reinforced Cement Concrete


RC01 RCC M25 Grade 1:2:3 with SP
i Details for 1 Cu.M
Material Cost
M009 Stone Aggregate (Single size) : 20 mm nominal size Cu.m 0.53 1225
M020 Stone Aggregate (Single size) : 10 mm nominal size Cu.m 0.23 850
M011 Coarse Sand Cu.m 0.46 700
M015 Portland Cement Tonne 0.36 6600
M018 Hire Charges For Concrete Mixer With Hopper (.25-.4 Cu.m) Day 0.07 800
M028 Plasticizer / SuperPlasticizer LIT/KG 1.65 176
M027 Sundries LS 14.30 3
M019 Needle Vibrator Day 0.07 350
Labour Cost
L001 Mazdoor Day 0.90 500
L002 Helper Male Day 1.56 400
L008 Mason - First Class Day 0.06 600
L009 Mason - Second Class Day 0.06 500
M010 Carriage of Stone Aggregate Cu.m 0.76 107
M012 Carriage Of Coarse sand Cu.m 0.46 107
M017 Carriage Of cement Tonne 0.36 95
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1 Cu.m

RC02 RCC M25 Grade Design Mix Including Pump


i Details for 1 Cu.M
Material Cost
M009 Stone Aggregate (Single size) : 20 mm nominal size Cu.m 0.57 1225
M020 Stone Aggregate (Single size) : 10 mm nominal size Cu.m 0.28 850
M011 Coarse Sand Cu.m 0.43 700
M015 Portland Cement Tonne 0.40 6600
M028 Plasticizer / SuperPlasticizer LIT/KG 1.65 176
M029 Production Cost of Concrete by Batch Mix Plant Cu.m 1.00 350
M030 Pumping Charges Cu.m 1.00 150
M019 Needle Vibrator Day 0.07 350
M027 Sundries LS 14.30 3
Labour Cost
L008 Mason - First Class Day 0.17 600
L001 Mazdoor Day 2.00 500
L002 Helper Male Day 0.90 400
M010 Carriage of Stone Aggregate Cu.m 0.85 107
M012 Carriage Of Coarse sand Cu.m 0.43 107
M017 Carriage Of cement Tonne 0.40 95
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1 Cu.m

RC03 RCC M20 Grade 1:1.5:3


i Details for 1 Cu.M
Material Cost
M009 Stone Aggregate (Single size) : 20 mm nominal size Cu.m 0.57 1225
M020 Stone Aggregate (Single size) : 10 mm nominal size Cu.m 0.28 850
M011 Coarse Sand Cu.m 0.43 700
M015 Portland Cement Tonne 0.40 6600
M018 Hire Charges For Concrete Mixer With Hopper (.25-.4 Cu.m) Day 0.07 800
M019 Needle Vibrator Day 0.07 350
M027 Sundries LS 14.30 3
Labour Cost
L001 Mazdoor Day 2.00 500
L002 Helper Male Day 0.90 400
L008 Mason - First Class Day 0.17 600
M010 Carriage of Stone Aggregate Cu.m 0.85 107
M012 Carriage Of Coarse sand Cu.m 0.43 107
M017 Carriage Of cement Tonne 0.40 95
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1 Cu.m

ST Steel Reinforcement For RCC


i Details For 1000kg + 50kg wastage
Material Cost
M024 TMT Bars For reinfocement Tonne 1.05 53000
M026 Cover Block LS 260.00 1.78
Labour Cost
L010 Barbender Day 10.00 450
L002 Helper Male Day 10.00 400
M025 Carriage Of Steel Tonne 1.05 2000
M027 Sundries LS 269.00 3
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1 MT

CM Cement Mortar
CM01 Cement Mortar 1:3 With Seived Sand
i Details for 1 Cu.M
Material Cost
M015 Portland Cement Tonne 0.51 6600
M013 Sieved Sand Cu.m 1.07 900
M027 Sundries LS 40.00 3
Labour Cost
L001 Mazdoor Day 0.75 500
L002 Helper Male Day 0.07 400
M017 Carriage Of cement Tonne 0.51 95
M014 Carriage Of Seived sand Cu.m 1.07 107
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1CuM

CM02 Cement Mortar 1:3 With coarse Sand


i Details for 1 Cu.M
Material Cost
M015 Portland Cement Tonne 0.51 6600
M011 Coarse Sand Cu.m 1.07 700
M027 Sundries LS 40.00 3
Labour Cost
L001 Mazdoor Day 0.75 500
L002 Helper Male Day 0.07 400
M012 Carriage Of Coarse sand Cu.m 1.07 107
M017 Carriage Of cement Tonne 0.51 95
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1CuM

CM03 Cement Mortar 1:3 With M.sand


i Details for 1 Cu.M
Material Cost
M015 Portland Cement Tonne 0.51 6600
M021 M.sand 1st Class Cu.m 1.07 2300
M027 Sundries LS 40.00 3
Labour Cost
L001 Mazdoor Day 0.75 500
L002 Helper Male Day 0.07 400
M017 Carriage Of cement Tonne 0.51 95
M023 Carriage Of M.Sand Cu.m 1.07 107
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1CuM

CM04 Cement Mortar 1:4 with Seived Sand


i Details for 1 Cu.M
Material Cost
M015 Portland Cement Tonne 0.38 6600
M013 Sieved Sand Cu.m 1.07 900
M027 Sundries LS 40.00 3
Labour Cost
L001 Mazdoor Day 0.75 500
L002 Helper Male Day 0.07 400
M017 Carriage Of cement Tonne 0.38 95
M014 Carriage Of Seived sand Cu.m 1.07 107
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1CuM

CM05 Cement Mortar 1:4 With Coarse Sand


i Details for 1 Cu.M
Material Cost
M015 Portland Cement Tonne 0.38 6600
M011 Coarse Sand Cu.m 1.07 700
M027 Sundries LS 40.00 3
Labour Cost
L001 Mazdoor Day 0.75 500
L002 Helper Male Day 0.07 400
M017 Carriage Of cement Tonne 0.38 95
M012 Carriage Of Coarse sand Cu.m 1.07 107
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1CuM
CM06 Cement Mortar 1:4 With M.Sand
i Details for 1 Cu.M
Material Cost
M015 Portland Cement Tonne 0.38 6600
M021 M.sand 1st Class Cu.m 1.07 2300
M027 Sundries LS 40.00 3
Labour Cost
L001 Mazdoor Day 0.75 500
L002 Helper Male Day 0.07 400
M017 Carriage Of cement Tonne 0.38 95
M023 Carriage Of M.Sand Cu.m 1.07 107
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1CuM

CM07 Cement Mortar 1:5 with Seived Sand


i Details for 1 Cu.M
Material Cost
M015 Portland Cement Tonne 0.31 6600
M013 Sieved Sand Cu.m 1.07 900
M027 Sundries LS 40.00 3
Labour Cost
L001 Mazdoor Day 0.75 500
L002 Helper Male Day 0.07 400
M017 Carriage Of cement Tonne 0.31 95
M014 Carriage Of Seived sand Cu.m 1.07 107
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1CuM

CM08 Cement Mortar 1:5 with coarse sand


i Details for 1 Cu.M
Material Cost
M015 Portland Cement Tonne 0.31 6600
M011 Coarse Sand Cu.m 1.07 700
M027 Sundries LS 40.00 3
Labour Cost
L001 Mazdoor Day 0.75 500
L002 Helper Male Day 0.07 400
M017 Carriage Of cement Tonne 0.31 95
M012 Carriage Of Coarse sand Cu.m 1.07 107
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1CuM

CM09 Cement Mortar 1:5 with M.Sand


i Details for 1 Cu.M
material Cost
M015 Portland Cement Tonne 0.31 6600
M021 M.sand 1st Class Cu.m 1.07 2300
M027 Sundries LS 40.00 3
Labour Cost
L001 Mazdoor Day 0.75 500
L002 Helper Male Day 0.07 400
M017 Carriage Of cement Tonne 0.31 95
M023 Carriage Of M.Sand Cu.m 1.07 107
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1CuM

CM10 Cement Mortar 1:6 with Seived sand


i Details for 1 Cu.M
Material Cost
M015 Portland Cement Tonne 0.25 6600
M013 Sieved Sand Cu.m 1.07 900
M027 Sundries LS 40.00 3
Labour Cost
L001 Mazdoor Day 0.75 500
L002 Helper Male Day 0.07 400
M017 Carriage Of cement Tonne 0.25 95
M014 Carriage Of Seived sand Cu.m 1.07 107
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1CuM

CM11 Cement Mortar 1:6 with coarse sand


i Details for 1 Cu.M
Material Cost
M015 Portland Cement Tonne 0.25 6600
M011 Coarse Sand Cu.m 1.07 700
M027 Sundries LS 40.00 3
Labour Cost
L001 Mazdoor Day 0.75 500
L002 Helper Male Day 0.07 400
M017 Carriage Of cement Tonne 0.25 95
M014 Carriage Of Seived sand Cu.m 1.07 107
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1CuM

CM12 Cement Mortar 1:6 with M.Sand


i Details for 1 Cu.M
Material Cost
M015 Portland Cement Tonne 0.25 6600
M021 M.sand 1st Class Cu.m 1.07 2300
M027 Sundries LS 40.00 3
Labour Cost
L001 Mazdoor Day 0.75 500
L002 Helper Male Day 0.07 400
M017 Carriage Of cement Tonne 0.25 95
M023 Carriage Of M.Sand Cu.m 1.07 107
ii Total Cost
C001 Contingency LS 0.15
iii Total Cost For 1CuM

BR Brickwork
BR01 230mm Brickwork with 1:4 CM
Details for 1Cu.m Brickwork using 1:4 Cement Mortar With
Coarse Sand
Material Cost
M031 Non Modular Common burnt clay bricks class 7.5 No.s 494.00 5.6
CM05 Material Cost for 1:4 Coarse Sand Cu.m 0.25 3377.00
Labour Cost
L008 Mason - First Class Day 0.36 600
L009 Mason - Second Class Day 0.36 500
L001 Mazdoor Day 1.37 500
L002 Helper Male Day 0.20 400
CM05 Labour Cost for 1:4 Coarse Sand Cu.m 0.25 553.59
M032 Carriage Of Bricks No.s 494.00 0.372
L015 Scaffolding and Staging sqm 4.35 5
Total Cost
C001 Contingency LS 0.15
Total Cost For 1CuM
i For 230mm Brick Work in sqm

BR02 115mm Brickwork with 1:4 CM


Details for 1Cu.m Brickwork using 1:4 Cement Mortar With
Coarse Sand
Material Cost
M031 Non Modular Common burnt clay bricks class 7.5 No.s 565.00 5.6
CM05 Material Cost for 1:4 Coarse Sand Cu.m 0.28 3377.00
Labour Cost
L008 Mason - First Class Day 0.45 600
L009 Mason - Second Class Day 0.45 500
L001 Mazdoor Day 0.70 500
L002 Helper Male Day 1.55 400
CM05 Labour Cost for 1:4 Coarse Sand Cu.m 0.28 553.59
M032 Carriage Of Bricks No.s 565.00 0.372
L015 Scaffolding and Staging sqm 8.69 5
Total Cost
C001 Contingency LS 0.15
Total Cost For 1CuM
i For 115mm Brick Work in sqm

BR03 230mm Brickwork with 1:5 CM


Details for 1Cu.m Brickwork using 1:5 Cement Mortar With
Coarse Sand
Material Cost
M031 Non Modular Common burnt clay bricks class 7.5 No.s 494.00 5.6
CM08 Material Cost For CM 1:5 with Coarse Sand Cu.m 0.25 2915.00
Labour Cost
L008 Mason - First Class Day 0.36 600
L009 Mason - Second Class Day 0.36 500
L001 Mazdoor Day 1.37 500
L002 Helper Male Day 0.20 400
CM08 Material Cost For CM 1:5 with Coarse Sand Cu.m 0.25 546.94
M032 Carriage Of Bricks No.s 494.00 0.372
L015 Scaffolding and Staging sqm 4.35 5
Total Cost
C001 Contingency LS 0.15
Total Cost For 1CuM
i For 230mm Brick Work in sqm

BR04 115mm Brickwork with 1:5 CM


Details for 1Cu.m Brickwork using 1:5 Cement Mortar With
Coarse Sand
Material Cost
M031 Non Modular Common burnt clay bricks class 7.5 No.s 565.00 5.6
CM08 Material Cost Of CM 1:5 with Coarse Sand Cu.m 0.28 2915.00
Labour Cost
L008 Mason - First Class Day 0.45 600
L009 Mason - Second Class Day 0.45 500
L001 Mazdoor Day 0.70 500
L002 Helper Male Day 1.55 400
CM08 Labour Cost Of CM 1:5 with Coarse Sand Cu.m 0.28 546.94
M032 Carriage Of Bricks No.s 565.00 0.372
L015 Scaffolding and Staging sqm 8.69 5
Total Cost
C001 Contingency LS 0.15
Total Cost For 1CuM
i For 115mm Brick Work in sqm

PL1 Plastering 12mm thick


PL11 1:4 with Sieved sand
For 10 Sq.m
Material Cost
CM04 Material Cost of CM 1:4 with sieved sand Cu.m 0.14 3591.00
M027 Sundries LS 12.61 3
Labour Cost
L009 Mason - Second Class Day 0.67 500.00
L001 Mazdoor Day 0.75 500.00
CM04 Labour Cost of CM 1:4 with sieved sand Cu.m 0.14 553.59
L002 Helper Male Day 0.92 400.00
L015 Scaffolding and Staging sqm 10.00 5.00
Total Cost
C001 Contingency LS 0.15
Total Cost for 10 Sq.m
Total Cost for 1 Sq.m

PL12 1:5 with seived sand


For 10 Sq.m
Material Cost
CM07 Material Cost for CM 1:5 with seived sand Cu.m 0.14 3129.00
M027 Sundries LS 12.61 3
Labour Cost
L009 Mason - Second Class Day 0.67 500.00
L001 Mazdoor Day 0.75 500.00
CM07 Labour Cost for CM 1:5 with seived sand Cu.m 0.14 546.94
L002 Helper Male Day 0.92 400.00
L015 Scaffolding and Staging sqm 10.00 5.00
Total Cost
C001 Contingency LS 0.15
Total Cost for 10 Sq.m
Total Cost for 1 Sq.m

PL13 1:6 with Seived sand


For 10 Sq.m
Material Cost
CM10 Material Cost for CM 1:6 with Seived Sand Cu.m 0.14 2733.00
M027 Sundries LS 12.61 3
Labour Cost
L009 Mason - Second Class Day 0.67 500.00
CM10 Labour Cost for CM 1:6 with Seived Sand Cu.m 0.14 541.24
L001 Mazdoor Day 0.75 500.00
L002 Helper Male Day 0.92 400.00
L015 Scaffolding and Staging sqm 10.00 5.00
Total Cost
C001 Contingency LS 0.15
Total Cost for 10 Sq.m
Total Cost for 1 Sq.m
PL2 Plastering 20mm thick
PL21 1:4 with Sieved sand
For 10 Sq.m
Material Cost
CM04 Material Cost for CM 1:4 with Seived Sand Cu.m 0.22 3591.00
M027 Sundries LS 12.61 3
Labour Cost
L009 Mason - Second Class Day 0.94 500.00
CM04 Labour Cost for CM 1:4 with Seived Sand Cu.m 0.22 553.59
L001 Mazdoor Day 1.02 500.00
L002 Helper Male Day 1.10 400.00
L015 Scaffolding and Staging sqm 10.00 5.00
Total Cost
C001 Contingency LS 0.15
Total Cost for 10 Sq.m
Total Cost for 1 Sq.m

PL22 1:5 with seived sand


For 10 Sq.m
Material Cost
CM07 Material Cost for CM 1:5 with Seived Sand Cu.m 0.22 3129.00
M027 Sundries LS 12.61 3
Labour Cost
L009 Mason - Second Class Day 0.94 500.00
CM07 Labour Cost for CM 1:5 with Seived Sand Cu.m 0.22 546.94
L001 Mazdoor Day 1.02 500.00
L002 Helper Male Day 1.10 400.00
L015 Scaffolding and Staging sqm 10.00 5.00
Total Cost
C001 Contingency LS 0.15
Total Cost for 10 Sq.m
Total Cost for 1 Sq.m

PL23 1:6 with Seived sand


For 10 Sq.m
Material Cost
CM10 Material Cost for CM 1:6 with Seived Sand Cu.m 0.22 2733.00
M027 Sundries LS 12.61 3
Labour Cost
L009 Mason - Second Class Day 0.94 500.00
L001 Mazdoor Day 1.02 500.00
CM10 Labour Cost for CM 1:6 with Seived Sand Cu.m 0.22 541.24
L002 Helper Male Day 1.10 400.00
L015 Scaffolding and Staging sqm 10.00 5.00
Total Cost
C001 Contingency LS 0.15
Total Cost for 10 Sq.m
Total Cost for 1 Sq.m
AMOUNT MATERIAL COST LABOUR COST

3251.00 1303.54 1 Cu.m

578.50
294.00
846.00
1452.00
56.00
24.50

35.00
815.00
280.00

102.35
50.29
20.90
4554.54
683.18
5237.72

2921.00 1296.87 1 Cu.m

578.50
294.00
846.00
1122.00
56.00
24.50

35.00
815.00
280.00

74.75
25.68
50.29
16.15
4217.87
632.68
4850.55

2657.00 1293.07 1 Cu.m

578.50
294.00
846.00
858.00
56.00
24.50

35.00
815.00
280.00

74.75
25.68
50.29
12.35
3950.07
592.51
4542.58

3980.90 1304.69 1 Cu.m

651.70
193.80
319.20
2402.40 7.2
56.00
290.40
42.90
24.50

450.00
624.00
36.00
30.00
81.32
48.79
34.58
5285.59
792.84
6078.43

4731.55 1636.43 1 Cu.m

698.25
238.00
297.50
2640.00
290.40
350.00
150.00
24.50
42.90

102.00
1000.00
360.00
90.95
45.48
38.00
6367.98
955.20
7323.17

3997.15 1636.96 1 Cu.m

698.25
238.00
297.50
2640.00
56.00
24.50
42.90

1000.00
360.00
102.00
90.95
46.01
38.00
5634.11
845.12
6479.23

56112.80 11407.00 1 tonne

55650.00
462.80

4500.00
4000.00
2100.00
807.00
67519.80
10127.97
77647.77

4449.00 565.94 1 Cu.m

3366.00
963.00
120.00

375.00
28.00
48.45
114.49
5014.94
752.24
5767.18

4235.00 565.94 1 Cu.m

3366.00
749.00
120.00

375.00
28.00
114.49
48.45
4800.94
720.14
5521.08

5947.00 565.94 1 Cu.m

3366.00
2461.00
120.00

375.00
28.00
48.45
114.49
6512.94
976.94
7489.88

3591.00 553.59 1 Cu.m

2508.00
963.00
120.00

375.00
28.00
36.10
114.49
4144.59
621.69
4766.28

3377.00 553.59 1 Cu.m

2508.00
749.00
120.00

375.00
28.00
36.10
114.49
3930.59
589.59
4520.18
5089.00 553.59 1 Cu.m

2508.00
2461.00
120.00

375.00
28.00
36.10
114.49
5642.59
846.39
6488.98

3129.00 546.94 1 Cu.m

2046.00
963.00
120.00

375.00
28.00
29.45
114.49
3675.94
551.39
4227.33

2915.00 546.94 1 Cu.m

2046.00
749.00
120.00

375.00
28.00
29.45
114.49
3461.94
519.29
3981.23

4627.00 546.94 1 Cu.m


2046.00
2461.00
120.00

375.00
28.00
29.45
114.49
5173.94
776.09
5950.03

2733.00 541.24 1 Cu.m

1650.00
963.00
120.00

375.00
28.00
23.75
114.49
3274.24
491.14
3765.38

2519.00 541.24 1 Cu.m

1650.00
749.00
120.00

375.00
28.00
23.75
114.49
3060.24
459.04
3519.28

4231.00 541.24 1 Cu.m

1650.00
2461.00
120.00

375.00
28.00
23.75
114.49
4772.24
715.84
5488.08

3610.65 1504.90 1 Cu.m

2766.40
844.25

216.00
180.00
685.00
80.00
138.40
183.77
21.74
5115.55
767.33
5882.88
1353.06

4109.56 1873.66 1 Cu.m

3164.00
945.56

270.00
225.00
350.00
620.00
155.01
210.18
43.47
5983.22
897.48
6880.70
791.28

3495.15 1503.24 1 Cu.m

2766.40
728.75

216.00
180.00
685.00
80.00
136.74
183.77
21.74
4998.39
749.76
5748.15
1322.07

3980.20 1871.79 1 Cu.m

3164.00
816.20

270.00
225.00
350.00
620.00
153.14
210.18
43.47
5851.99
877.80
6729.79
773.93

55.49 120.77 1 Sq.m


517.10
37.83

335.00
375.00
79.72
368.00
50.00
1762.65
264.40
2027.05
202.70

48.84 120.68 1 Sq.m

450.58
37.83

335.00
375.00
78.76
368.00
50.00
1695.17
254.27
1949.44
194.94

43.14 120.59 1 Sq.m

393.55
37.83

335.00
77.94
375.00
368.00
50.00
1637.32
245.60
1882.92
188.29
84.22 159.40 1 Sq.m

804.38
37.83

470.00
124.00
510.00
440.00
50.00
2436.22
365.43
2801.65
280.17

73.87 159.25 1 Sq.m

700.90
37.83

470.00
122.51
510.00
440.00
50.00
2331.24
349.69
2680.93
268.09

65.00 159.12 1 Sq.m

612.19
37.83

470.00
510.00
121.24
440.00
50.00
2241.26
336.19
2577.45
257.74