0% found this document useful (0 votes)
54 views6 pages

Excavation & Filling Quantity SS V NOV 2017 - APR 2018

The document provides a detailed report on excavation and filling quantities as of December 31, 2017, comparing it to the previous report from November 30, 2017. It includes various chainages with quantities for excavation, filling, ground, top soil, and rock, along with completed and balance quantities. The total quantities for excavation and filling have been summarized, indicating the progress of the construction project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views6 pages

Excavation & Filling Quantity SS V NOV 2017 - APR 2018

The document provides a detailed report on excavation and filling quantities as of December 31, 2017, comparing it to the previous report from November 30, 2017. It includes various chainages with quantities for excavation, filling, ground, top soil, and rock, along with completed and balance quantities. The total quantities for excavation and filling have been summarized, indicating the progress of the construction project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Excavation and Filling Quantity [ As at 30/11/2017 ]

Quantity (m3) [According to Construction Drawings] Already Completed Quantity (m3) Balance Quantity (m3)

Item Chainage UC Filling Soft UC Filling Soft Remarks


UC Excavation UC Filling Ground Top Soil Rock * UC Excavation UC Filling Ground Top Soil Rock UC Excavation UC Filling Top Soil Rock
Treatment Treatment

1 18+000 - 18+125 26,314.50 - 1,425.91 - 23,555.10 - 1,425.91 - 2,759.40 - - -

2 18+125 - 18+430 - 198,354.78 12,378.26 2,258.49 - 116,790.75 12,378.26 2,258.49 - - 93,942.29 - -

3 18+430 - 18+795 131,016.54 - 6,519.42 - 89,903.17 - 6,519.42 - 41,113.37 - - -

4 18+795 - 19+115 - 139,594.58 27,150.28 2,945.31 - 102,951.09 19,372.10 2,945.31 - - 63,793.77 - -

5 19+115 - 19+300 170,373.44 - 3,449.65 - 129,558.79 - 3,449.65 - 40,814.65 - - -

6 19+300 - 19+460 - 32,459.65 4,987.49 5,407.62 - 14,945.36 4,987.49 5,407.62 - 22,501.78 - -

7 19+460 - 19+670 159,177.58 - 5,793.68 - 99,273.62 - 5,793.68 - 59,903.96 - - -

8 19+670 - 20+360 1,449,062.11 - 12,688.53 71,797.97 318,109.37 - 12,688.53 - 1,130,952.74 - - 71,797.97

9 20+360 - 21+950 - 533,330.96 25,538.58 5,885.09 - 74,770.46 24,100.06 5,885.09 - 484,099.08 - -

10 21+950 - 22+000 7,429.93 - 245.26 - 1,098.44 - - - 6,331.49 - 245.26 -

11 22+000 - 22+390 - 124,875.87 11,024.80 1,929.20 - 9,434.08 11,024.80 1,929.20 - 126,466.59 - -

12 22+390 - 22+415 3,373.49 - 535.69 - 166.04 - - 369.65 -

13 22+415 - 22+960 - 176,033.18 15,082.43 2,579.06 - 31,195.37 15,082.43 2,579.06 - 159,920.24 - -

14 22+960 - 23+090 21,851.14 1,078.46 384.92 - - 384.92 - 21,851.14 1,078.46 - -

15 23+090 - 23+290 - 54,611.57 1,078.46 - - - - - 54,611.57 1,078.46 -

16 23+290 - 23+525 120,145.51 2,403.52 428.51 - - - 428.51 - 120,145.51 2,403.52 - -

17 23+525 - 23+665 - 11,620.93 1,023.22 - - - 1,023.22 - - 11,620.93 - -

18 23+665 - 23+840 46,342.33 1,884.54 2,200.54 - 39,705.98 - 2,200.54 - 6,636.35 1,884.54 - -

19 23+840 - 23+890 - 4,149.31 525.09 - - 4,149.31 525.09 - - - - -

20 23+890 - 24+105 89,080.67 - 3,744.06 - 85,094.36 - 3,744.06 - 3,986.31 - - -

21 24+105 - 24+700 - 270,334.62 50,885.60 1,088.58 - - 79,466.93 37,732.29 1,088.58 - - 241,753.29 - -

22 24+700 - 24+820 27,926.61 - 390.04 - 24,545.87 - 390.04 - 3,380.74 - - -

23 24+820 - 25+030 - 25,005.17 - - - - - - - 25,005.17 - -

24 25+030 - 25+320 81,747.94 - 2,307.70 31,496.05 - - - 81,747.94 - 2,307.70 31,496.05

25 25+320 - 25+370 - 395.91 - - - - - - - 395.91 - -

26 25+370 - 25+770 357,973.90 - 5,220.45 104,303.35 143,391.90 - 4,168.98 - 214,582.00 - 1,051.47 104,303.35

27 25+770 - 25+950 - 29,194.80 83.33 - - 83.33 - - 29,194.80 - -

28 25+950 - 26+230 285,673.93 - 3,157.03 40,959.09 1,576.32 - 562.68 - 284,097.61 - 2,594.35 40,959.09

29 26+230 - 26+500 - 50,006.20 17,428.16 260.20 - - 473.86 585.91 260.20 - - 66,960.50 - -

Total 2,977,489.62 1,655,334.05 164,475.60 73,555.04 248,556.46 955,812.92 434,177.21 125,263.34 65,908.15 - 2,018,303.21 1,385,632.44 7,646.89 248,556.46
Excavation and Filling Quantity [ As at 31/12/2017 ]
Quantity (m3) [According to Construction Drawings] Already Completed Quantity (m3) Balance Quantity (m3)

Item Chainage UC Filling Soft UC Filling Soft Remarks


UC Excavation UC Filling Ground Top Soil Rock * UC Excavation UC Filling Ground Top Soil Rock UC Excavation UC Filling Top Soil Rock
Treatment Treatment

1 18+000 - 18+125 26,314.50 - 1,425.91 - 23,555.10 - 1,425.91 - 2,759.40 - - -

2 18+125 - 18+430 - 198,354.78 12,378.26 2,258.49 - 121,768.69 12,378.26 2,258.49 - - 88,964.35 - -

3 18+430 - 18+795 131,016.54 - 6,519.42 - 89,903.17 - 6,519.42 - 41,113.37 - - -

4 18+795 - 19+115 - 139,594.58 27,150.28 2,945.31 - 102,951.09 19,372.10 2,945.31 - - 63,793.77 - -

5 19+115 - 19+300 170,373.44 - 3,449.65 - 129,558.79 - 3,449.65 - 40,814.65 - - -

6 19+300 - 19+460 - 32,459.65 4,987.49 5,407.62 - 14,945.36 4,987.49 5,407.62 - 22,501.78 - -

7 19+460 - 19+670 159,177.58 - 5,793.68 - 99,273.62 - 5,793.68 - 59,903.96 - - -

8 19+670 - 20+360 1,449,062.11 - 12,688.53 71,797.97 383,622.80 - 12,688.53 - 1,065,439.31 - - 71,797.97

9 20+360 - 21+950 - 533,330.96 25,538.58 5,885.09 - 84,373.10 24,100.06 5,885.09 - 474,496.44 - -

10 21+950 - 22+000 7,429.93 - 245.26 - 1,098.44 - - - 6,331.49 - 245.26 -

11 22+000 - 22+390 - 124,875.87 11,024.80 1,929.20 - 10,683.20 11,024.80 1,929.20 - - 125,217.47 - -

12 22+390 - 22+415 3,373.49 - 535.69 1,105.78 - 166.04 - 2,267.71 - 369.65 -

13 22+415 - 22+960 - 176,033.18 15,082.43 2,579.06 - 40,926.40 15,082.43 2,579.06 - - 150,189.21 - -

14 22+960 - 23+090 21,851.14 1,078.46 384.92 - - 384.92 - 21,851.14 1,078.46 - -

15 23+090 - 23+290 - 54,611.57 1,078.46 - - - - 54,611.57 1,078.46 -

16 23+290 - 23+525 120,145.51 2,403.52 428.51 - 10,285.40 - 428.51 - 109,860.11 2,403.52 - -

17 23+525 - 23+665 - 11,620.93 1,023.22 - 990.90 - 1,023.22 - (990.90) 11,620.93 - -

18 23+665 - 23+840 46,342.33 1,884.54 2,200.54 - 43,742.10 - 2,200.54 - 2,600.23 1,884.54 - -

19 23+840 - 23+890 - 4,149.31 525.09 - - 4,149.31 525.09 - - - - -

20 23+890 - 24+105 89,080.67 - 3,744.06 - 85,094.36 - 3,744.06 - 3,986.31 - - -

21 24+105 - 24+700 - 270,334.62 50,885.60 1,088.58 - - 79,466.93 37,732.29 1,088.58 - - 241,753.29 - -

22 24+700 - 24+820 27,926.61 - 390.04 - 24,545.87 - 390.04 - 3,380.74 - - -

23 24+820 - 25+030 - 25,005.17 - - - - - - - 25,005.17 - -

24 25+030 - 25+320 81,747.94 - 2,307.70 31,496.05 - - - 81,747.94 - 2,307.70 31,496.05

25 25+320 - 25+370 - 395.91 - - - - - - - 395.91 - -

26 25+370 - 25+770 357,973.90 - 5,220.45 104,303.35 166,596.00 - 4,872.70 - 191,377.90 - 347.75 104,303.35

27 25+770 - 25+950 - 29,194.80 83.33 - - 83.33 - - 29,194.80 - -

28 25+950 - 26+230 285,673.93 - 3,157.03 40,959.09 1,576.32 - 562.68 - 284,097.61 - 2,594.35 40,959.09

29 26+230 - 26+500 - 50,006.20 17,428.16 260.20 - - 473.86 585.91 260.20 - - 66,960.50 - -

Total 2,977,489.62 1,655,334.05 164,475.60 73,555.04 248,556.46 1,060,948.65 459,737.94 125,263.34 66,611.87 - 1,916,540.97 1,360,071.71 6,943.17 248,556.46
Excavation and Filling Quantity [ As at 31/01/2018 ]
Quantity (m3) [According to Construction Drawings] Already Completed Quantity (m3) Balance Quantity (m3)

Item Chainage UC Filling Soft UC Filling Soft Remarks


UC Excavation UC Filling Ground Top Soil Rock * UC Excavation UC Filling Ground Top Soil Rock UC Excavation UC Filling Top Soil Rock
Treatment Treatment

1 18+000 - 18+125 26,314.50 - 1,425.91 - 23,502.80 - 1,425.91 - 2,811.70 - - -

2 18+125 - 18+430 - 198,354.78 12,378.26 2,258.49 - 131,209.59 12,378.26 2,258.49 - - 79,523.45 - -

3 18+430 - 18+795 131,016.54 - 6,519.42 - 96,585.80 - 6,519.42 - 34,430.74 - - -

4 18+795 - 19+115 - 139,594.58 27,150.28 2,945.31 - 102,951.30 19,372.10 2,945.31 - - 63,793.56 - -

5 19+115 - 19+300 170,373.44 - 3,449.65 - 94,354.50 - 3,449.65 - 76,018.94 - - -

6 19+300 - 19+460 - 32,459.65 4,987.49 5,407.62 - 14,945.40 4,987.49 5,407.62 - 22,501.74 - -

7 19+460 - 19+670 159,177.58 - 5,793.68 - 117,102.32 - 5,793.68 - 42,075.26 - - -

8 19+670 - 20+360 1,449,062.11 - 12,688.53 71,797.97 525,013.90 - 12,688.53 - 924,048.21 - - 71,797.97

9 20+360 - 21+950 - 533,330.96 42,535.90 5,885.09 - 124,220.20 42,535.90 5,885.09 - 451,646.66 - -

10 21+950 - 22+000 7,429.93 - 245.26 - 1,098.50 - - - 6,331.43 - 245.26 -

11 22+000 - 22+390 - 124,875.87 11,024.80 1,929.20 - 23,725.60 11,024.80 1,929.20 - - 112,175.07 - -

12 22+390 - 22+415 3,373.49 - 535.69 1,105.78 - 166.04 - 2,267.71 - 369.65 -

13 22+415 - 22+960 - 176,033.18 30,630.66 2,579.06 - 60,431.70 30,630.66 2,579.06 - - 146,232.14 - -

14 22+960 - 23+090 21,851.14 1,078.46 384.92 - 9,680.80 - 384.92 - 12,170.34 1,078.46 - -

15 23+090 - 23+290 - 54,611.57 1,078.46 - - - - 54,611.57 1,078.46 -

16 23+290 - 23+525 120,145.51 2,403.52 428.51 - 952.80 - 428.51 - 119,192.71 2,403.52 - -

17 23+525 - 23+665 - 11,620.93 1,023.22 - 3,077.40 1,023.22 - - 8,543.53 - -

18 23+665 - 23+840 48,662.90 1,884.54 2,200.54 - 48,662.90 920.80 2,200.54 - - 963.74 - -

19 23+840 - 23+890 - 5,153.20 525.09 - - 5,153.20 525.09 - - - - -

20 23+890 - 24+105 89,080.67 - 3,744.06 - 80,599.20 - 3,744.06 - 8,481.47 - - -

21 24+105 - 24+700 - 270,334.62 60,475.90 1,088.58 - - 82,848.20 60,475.90 1,088.58 - - 247,962.32 - -

22 24+700 - 24+820 27,926.61 - 390.04 - 24,545.87 - 390.04 - 3,380.74 - - -

23 24+820 - 25+030 - 25,005.17 - - - - - - - 25,005.17 - -

24 25+030 - 25+320 81,747.94 - 2,307.70 31,496.05 10,082.80 - - - 71,665.14 - 2,307.70 31,496.05

25 25+320 - 25+370 - 395.91 - - - - - - - 395.91 - -

26 25+370 - 25+770 357,973.90 - 5,220.45 104,303.35 238,026.50 - 4,872.70 - 119,947.40 - 347.75 104,303.35

27 25+770 - 25+950 - 29,194.80 83.33 - - 83.33 - - 29,194.80 - -

28 25+950 - 26+230 285,673.93 - 3,157.03 40,959.09 1,576.20 - 562.68 - 284,097.73 - 2,594.35 40,959.09

29 26+230 - 26+500 - 50,006.20 17,428.16 260.20 - - 473.90 585.91 260.20 - - 66,960.46 - -

Total 2,979,810.19 1,656,337.94 206,611.45 73,555.04 248,556.46 1,272,890.67 549,957.29 181,991.02 66,611.87 - 1,706,919.52 1,312,992.10 6,943.17 248,556.46
Excavation and Filling Quantity [ As at 28/02/2018 ]
Quantity (m3) [According to Construction Drawings] Already Completed Quantity (m3) Balance Quantity (m3)

Item Chainage UC Filling Soft UC Filling Soft Remarks


UC Excavation UC Filling Ground Top Soil Rock * UC Excavation UC Filling Ground Top Soil Rock UC Excavation UC Filling Top Soil Rock
Treatment Treatment

1 18+000 - 18+125 26,314.50 - 1,290.70 - 24,208.80 - 1,290.70 - 2,105.70 - - -

2 18+125 - 18+430 - 198,354.78 12,378.26 2,400.60 - 135,060.69 12,378.26 2,400.60 - - 75,672.35 - -

3 18+430 - 18+795 131,016.54 - 6,159.60 - 96,585.80 - 6,159.60 - 34,430.74 - - -

4 18+795 - 19+115 - 139,594.58 27,150.28 2,947.60 - 102,006.70 19,372.10 2,947.60 - - 64,738.16 - -

5 19+115 - 19+300 170,373.44 - 3,449.80 - 94,354.50 - 3,449.80 - 76,018.94 - - -

6 19+300 - 19+460 - 32,459.65 4,987.49 5,407.70 - 14,945.40 4,987.49 5,407.70 - 22,501.74 - -

7 19+460 - 19+670 159,177.58 - 5,793.68 - 117,102.32 - 5,793.68 - 42,075.26 - - -

8 19+670 - 20+360 1,449,062.11 - 12,805.40 71,797.97 578,943.13 - 12,805.40 1,861.50 870,118.98 - - 69,936.47

9 20+360 - 21+950 - 533,330.96 42,535.90 10,198.70 - 143,589.40 42,535.90 10,198.70 - 432,277.46 - -

10 21+950 - 22+000 7,429.93 - 245.26 - 1,098.50 - 22.50 - 6,331.43 - 222.76 -

11 22+000 - 22+390 - 124,875.87 11,024.80 1,960.60 - 34,598.80 11,024.80 1,960.60 - - 101,301.87 - -

12 22+390 - 22+415 3,373.49 - 535.69 1,105.78 - 166.10 - 2,267.71 - 369.59 -

13 22+415 - 22+960 - 176,033.18 30,630.66 2,774.80 - 76,656.60 30,630.66 2,774.80 - - 130,007.24 - -

14 22+960 - 23+090 21,851.14 1,078.46 1,787.70 - 9,680.80 - 1,787.70 - 12,170.34 1,078.46 - -

15 23+090 - 23+290 - 54,611.57 1,078.46 - - - - - 54,611.57 1,078.46 -

16 23+290 - 23+525 120,145.51 2,403.52 1,212.80 - 7,966.70 - 1,212.80 - 112,178.81 2,403.52 - -

17 23+525 - 23+665 - 13,505.47 974.40 - 3,998.20 974.40 - - 9,507.27 - -

18 23+665 - 23+840 48,662.90 2,398.10 - 48,662.90 2,398.10 - - - - -

19 23+840 - 23+890 - 5,153.20 525.10 - - 5,153.20 525.10 - - - - -

20 23+890 - 24+105 89,080.67 - 3,744.30 - 86,518.90 - 3,744.30 - 2,561.77 - - -

21 24+105 - 24+700 - 270,334.62 60,475.90 3,082.20 - - 88,898.70 60,475.90 3,082.20 - - 241,911.82 - -

22 24+700 - 24+820 27,926.61 - 390.00 - 24,545.87 - 390.00 - 3,380.74 - - -

23 24+820 - 25+030 - 25,005.17 544.90 - - - 544.90 - - 25,005.17 - -

24 25+030 - 25+320 81,747.94 - 2,307.70 31,496.05 29,030.30 - 857.80 - 52,717.64 - 1,449.90 31,496.05

25 25+320 - 25+370 - 395.91 - - - - - - - 395.91 - -

26 25+370 - 25+770 357,973.90 - 7,790.90 104,303.35 292,256.50 - 7,790.90 - 65,717.40 - - 104,303.35

27 25+770 - 25+950 - 29,194.80 1,312.80 - 243.20 1,312.80 - - 28,951.60 - -

28 25+950 - 26+230 285,673.93 - 3,231.30 40,959.09 29,173.20 - 3,231.30 - 256,500.73 - - 40,959.09

29 26+230 - 26+500 - 50,006.20 17,428.16 664.80 - - 473.90 585.91 664.80 - - 66,960.46 - -

Total 2,979,810.19 1,656,337.94 206,611.45 87,015.59 248,556.46 1,441,234.00 605,624.79 181,991.02 83,894.88 1,861.50 1,538,576.19 1,257,324.60 3,120.71 246,694.96
Excavation and Filling Quantity [ As at 31/03/2018 ]
Quantity (m3) [According to Construction Drawings] Already Completed Quantity (m3) Balance Quantity (m3)

Item Chainage UC Filling Soft UC Filling Soft Remarks


UC Excavation UC Filling Ground Top Soil Rock * UC Excavation UC Filling Ground Top Soil Rock UC Excavation UC Filling Top Soil Rock
Treatment Treatment

1 18+000 - 18+125 26,314.50 - 1,416.46 - 23,574.34 - 1,416.46 - 2,740.16 - - -

2 18+125 - 18+430 - 198,354.78 12,378.26 2,400.60 - 141,034.56 14,228.60 1,103.05 - - 69,698.48 1,297.55 -

3 18+430 - 18+795 131,016.54 - 6,323.95 - 95,578.59 - 6,323.95 - 35,437.95 - - -

4 18+795 - 19+115 - 139,594.58 27,150.28 2,947.60 - 103,046.02 17,664.47 2,485.90 - - 63,698.84 461.71 -

5 19+115 - 19+300 170,373.44 - 3,453.57 - 96,752.27 - 3,453.57 - 73,621.17 - - -

6 19+300 - 19+460 - 32,459.65 4,987.49 5,407.70 - 14,450.19 116,609.51 4,565.97 - 22,996.95 841.73 -

7 19+460 - 19+670 159,177.58 - 5,793.68 - 126,478.28 - 5,354.40 - 32,699.30 - 439.28 -

8 19+670 - 20+360 1,449,062.11 - 12,805.40 71,797.97 725,468.10 - 11,959.88 1,861.50 723,594.01 - 845.52 69,936.47

9 20+360 - 21+950 - 533,330.96 42,535.90 10,611.63 - 180,516.50 40,764.71 10,611.63 - 395,350.36 - -

10 21+950 - 22+000 7,429.93 - 245.26 - 1,013.60 - 76.39 - 6,416.33 - 168.87 -

11 22+000 - 22+390 - 124,875.87 11,024.80 1,996.67 - 46,008.76 8,877.80 1,996.67 - - 89,891.91 - -

12 22+390 - 22+415 3,373.49 - 535.69 1,105.78 - 198.82 - 2,267.71 - 336.88 -

13 22+415 - 22+960 - 176,033.18 30,630.66 2,774.80 - 96,461.53 28,066.43 2,703.35 - - 110,202.31 71.45 -

14 22+960 - 23+090 21,851.14 1,078.46 1,787.70 - 11,868.67 - 1,605.11 - 9,982.47 1,078.46 182.59 -

15 23+090 - 23+290 - 54,611.57 1,078.46 - 480.00 - - - 54,131.57 1,078.46 -

16 23+290 - 23+525 120,145.51 2,403.52 2,341.99 - 46,885.00 - 2,341.99 - 73,260.51 2,403.52 - -

17 23+525 - 23+665 - 13,505.47 974.40 - 3,847.27 973.22 - - 9,658.20 1.18 -

18 23+665 - 23+840 48,662.90 2,398.10 - 46,872.16 2,313.79 - 1,790.74 - 84.31 -

19 23+840 - 23+890 - 5,185.32 580.28 - - 5,185.32 580.28 - - - - -

20 23+890 - 24+105 89,080.67 - 3,744.30 - 83,511.14 - 1,780.17 - 5,569.53 - 1,964.13 -

21 24+105 - 24+700 - 270,334.62 60,475.90 3,082.20 - - 127,655.63 60,120.74 2,369.41 - - 203,154.89 712.79 -

22 24+700 - 24+820 27,926.61 - 390.00 - 24,545.87 - 270.16 - 3,380.74 - 119.84 -

23 24+820 - 25+030 - 25,005.17 1,098.32 - - - 1,098.32 - - 25,005.17 - -

24 25+030 - 25+320 81,747.94 - 2,507.00 31,496.05 51,786.90 - 2,507.00 - 29,961.04 - - 31,496.05

25 25+320 - 25+370 - 395.91 - - - - - - - 395.91 - -

26 25+370 - 25+770 357,973.90 - 8,103.01 104,303.35 304,644.35 - 8,103.01 - 53,329.55 - - 104,303.35

27 25+770 - 25+950 - 29,194.80 2,471.18 - 1,826.00 2,471.18 - - 27,368.80 - -

28 25+950 - 26+230 285,673.93 - 3,680.14 40,959.09 73,769.10 - 3,680.14 - 211,904.83 - - 40,959.09

29 26+230 - 26+500 - 50,006.20 17,428.16 664.80 - - 3,429.20 3,555.05 427.20 - - 64,005.16 237.60 -

Total 2,979,810.19 1,656,370.06 206,611.45 91,614.88 248,556.46 1,713,854.15 723,940.98 289,887.30 82,771.00 1,861.50 1,265,956.04 1,139,040.53 8,843.88 246,694.96
Excavation and Filling Quantity [ As at 30/04/2018 ]
Quantity (m3) [According to Construction Drawings] Already Completed Quantity (m3) Balance Quantity (m3)

Item Chainage UC Filling Soft UC Filling Soft Remarks


UC Excavation UC Filling Ground Top Soil Rock * UC Excavation UC Filling Ground Top Soil Rock UC Excavation UC Filling Top Soil Rock
Treatment Treatment

1 18+000 - 18+125 26,314.50 - 1,416.46 - 23,574.34 - 1,416.46 - 2,740.16 - - -

2 18+125 - 18+430 - 198,354.78 12,378.26 2,906.95 - 143,799.28 14,228.60 2,906.95 - - 66,933.76 - -

3 18+430 - 18+795 131,016.54 - 6,323.95 - 99,646.84 - 6,323.95 - 31,369.70 - - -

4 18+795 - 19+115 - 139,594.58 27,150.28 2,947.60 - 113,046.02 17,664.47 2,485.90 - - 53,698.84 461.71 -

5 19+115 - 19+300 170,373.44 - 3,453.57 - 96,752.27 - 3,453.57 - 73,621.17 - - -

6 19+300 - 19+460 - 32,459.65 4,987.49 5,407.70 - 14,825.62 4,987.49 4,693.82 - 22,621.52 713.88 -

7 19+460 - 19+670 159,177.58 - 5,354.40 - 126,478.28 - 5,354.40 - 32,699.30 - - -

8 19+670 - 20+360 1,449,062.11 - 11,959.88 71,797.97 792,206.10 - 11,959.88 6,483.64 656,856.01 - - 65,314.33

9 20+360 - 21+950 - 533,330.96 42,535.90 10,611.63 - 199,794.00 39,997.10 10,611.63 - 376,072.86 - -

10 21+950 - 22+000 7,429.93 - 76.39 - 1,013.60 - 76.39 - 6,416.33 - - -

11 22+000 - 22+390 - 124,875.87 11,024.80 1,996.67 - 51,192.65 8,877.80 1,996.67 - - 84,708.02 - -

12 22+390 - 22+415 3,373.49 - 535.69 2,036.98 - 198.82 - 1,336.51 - 336.88 -

13 22+415 - 22+960 - 176,033.18 30,630.66 2,774.80 - 96,461.53 28,885.05 2,703.35 - - 110,202.31 71.45 -

14 22+960 - 23+090 21,851.14 1,078.46 1,787.70 - 17,041.90 - 1,605.11 - 4,809.24 1,078.46 182.59 -

15 23+090 - 23+290 - 54,611.57 1,078.46 - 239.30 - - 54,611.57 839.16 -

16 23+290 - 23+525 120,145.51 2,403.52 3,027.91 - 74,985.10 - 3,027.91 - 45,160.41 2,403.52 - -

17 23+525 - 23+665 - 13,505.47 974.40 - 4,943.46 973.22 - - 8,562.01 1.18 -

18 23+665 - 23+840 48,662.90 2,398.10 - 47,488.68 2,313.79 - 1,174.22 - 84.31 -

19 23+840 - 23+890 - 5,185.32 580.28 - - 5,185.32 580.28 - - - - -

20 23+890 - 24+105 89,080.67 - 3,744.30 - 87,325.30 - 2,133.76 - 1,755.37 - 1,610.55 -

21 24+105 - 24+700 - 270,334.62 60,475.90 3,779.35 - - 133,880.63 62,493.17 3,779.35 - - 196,929.89 - -

22 24+700 - 24+820 27,926.61 - 390.00 - 24,545.87 - 270.16 - 3,380.74 - 119.84 -

23 24+820 - 25+030 - 25,005.17 1,615.12 - - - 1,615.12 - - 25,005.17 - -

24 25+030 - 25+320 81,747.94 - 2,652.40 31,496.05 78,651.10 - 2,652.40 - 3,096.84 - - 31,496.05

25 25+320 - 25+370 - 395.91 - - - - - - - 395.91 - -

26 25+370 - 25+770 357,973.90 - 8,393.81 104,303.35 322,502.30 - 8,393.81 14,800.00 35,471.60 - - 89,503.35

27 25+770 - 25+950 - 29,194.80 2,471.18 - 3,161.40 2,471.18 - - 26,033.40 - -

28 25+950 - 26+230 285,673.93 - 3,680.14 40,959.09 98,521.90 - 3,680.14 - 187,152.03 - - 40,959.09

29 26+230 - 26+500 - 50,006.20 17,428.16 664.80 - - 6,629.70 3,836.70 427.20 - - 60,804.66 237.60 -

Total 2,979,810.19 1,656,370.06 206,611.45 93,003.62 248,556.46 1,892,770.56 772,919.61 180,970.38 88,344.49 21,283.64 1,087,039.63 1,090,061.90 4,659.14 227,272.82