INTRODUCTION
Electrical networks, machines and equipments are often subjected to various types
of faults while they are in operation. When a fault occurs, the characteristic values (such
as impedance) of the machines may change from existing values to different values till the
fault is cleared.
There may be lot of probabilities of faults to appear in the power system network,
including lighting, wind, tree falling on lines, apparatus failure, etc. A fault in an electric
power system can be defined as , any abnormal condition of the system that involves the
electrical failure of the equipment, such as , transformers, generators, busbars, etc. The
fault inception also involves in insulation failures and conducting path failures which
system network operate at normal voltage and current ratings. Once the fault takes place in
a circuit or device, voltage and current values deviates from their nominal ranges. The
faults in power system causes over current, under voltage, unbalance of the phases,
reversed power and high voltage surges. This results in the interruption of the normal
equipments such as circuit breakers and relays in order to limit the loss of service due to
Electrical faults in three-phase power system mainly classified into two types,
namely open and short circuit faults. Further, these faults can be symmetrical or
unsymmetrical faults. Let us discuss these faults in detail. These faults occur due to the
failure of one or more conductors. The figure below illustrates the open circuit faults for
single, two and three phases (or conductors) open condition. The most common causes of
these faults include joint failures of cables and overhead lines, and failure of one or more
phase of circuit breaker and also due to melting of a fuse or conductor in one or more
phases. Open circuit faults are also called as series faults. These are unsymmetrical or
2. Does your project will stand able during real-life disaster phenomena?
rotating machines.
Power- is the rate of doing work or transferring heat, the amount of energy transferred or
the system.
Distribution- is the final stage in the delivery of electricpower; it carries electricity from
At the present time, along with the development of the Internet, automation
becomes a very interesting theme to debate. This paper discusses the development
of automation system for residential electricity cut off using network based embedded
controller. Nowadays, various type of device for home residential electricity works
dependently on human to control signals to reset the state of input. Based on this
power supply main switch and update the data into data centre. The users able to view
updated power consumption as well as billing information in the provider web services.
Cut-off warning message is send to users via email and short message services. The
system helps the electricity provider to reduce the operation cost as the system could
cut off electricity automatically when the usage limit is exceeded. ( 2012 International
Droop control method has been widely applied to achieve equal power sharing
required to mitigate the harmonics and noises in the calculated instantaneous power
and obtain the average power used for the generation of frequency and voltage
references. Unfortunately, the design of low-pass filters has not been studied
of the droop controlled system, analyzes the effects of the low-pass filters on system
stability and provides a design method for an optimal cutoff frequency. The
effectiveness of the proposed design method is verified by simulations. ( 2017 IEEE
3rd International Future Energy Electronics Conference and ECCE Asia (IFEEC 2017
- ECCE Asia))
The transmission grid is often already described as "smart" because, among other
things, it is operated with the extensive use of continuous monitoring and control
mechanisms. In contrast, there is little or no monitoring of load or power flow in the low
voltage part of the system, and grid operators have only limited opportunity to adapt the
grid to prevailing conditions in real time. Consequently, the transition to so-called "Smart
Grids" is much more demanding for the distribution grid system. Nevertheless, it is here
that the changes are taking place and where the greater part of the infrastructure exists.
(SINTEF, 2017)
CHAPTER 3
METHODOLOGY
proposal for the improvement of the power control system and protective measurements
here in Philippines. This chapter is all about Methodology states the process we
I. Instrumentations/Materials
Relay
9 volts battery
Copper Wires
PCB Generic
Resistors
II. Procedures
4. Finished Products.
III. Assumptions
1. The Materials are alternatives and components used was not enough to
2. This Design is just a miniature design of what researcher’s design for actual
situation.
This research is conducted, experimented and tested here in Bislig City. Materials
V. Block Diagram
CHAPTER 4
I. Presentation of Data
Researchers gathered the following data and presented as shown in the Table1
(Shown Below).
3V CUTOFF YES
6V CUTOFF YES
9V CUTOFF YES
The cutoff of system at any voltage level will help the system to maintain protective
but still has a feedback that is the light Emitting Diode Still Responsing Even the power is
cutoff.
III. Analysis of Data
The system is made up of resistor, power supply, Relay LED. The Relay detects
the current passing by and sent them to the system back again (Feedback System) which
later reacts the whole system to cut off but still there is a certain outputs.
CHAPTER 5
I. Summary
This research is all about power system automatic cutoff designed to determine the
protect the whole system at unnecessary power level. Relay as the main protective devices
II. Conclusions
This research is really applicable to real-life situation. This project may not be a
stand-able during real-life d phenomena but is represents the whole or the most actual
design applicable for it. This project only uses less expensive and alternatives materials
III. Recommendations
project, we recommended
Researchers, to Research more about this Power system automatic cutoff project
Teachers, to have this project as part of their syllabus. As a learning profit for their
students.
Students, to have an advance research of this project. That will help for further
improvement