[Gentur Maladi Tunggul]
[Inspector 10)
FORM TECH - 6 CURRICULUM VITAE (CV) FOR PROPOSED
PROFESSIONAL STAFF
1 Proposed Position : Inspector 10 Erection 1
2 Name of Firm : PT. Cipta Strada
3 Name of Staff : Gentur Maladi Tunggul, ST
4 Date of Birth : Boyolali, April. 10, 1988 Nationality : Indonesia
5 Education : S1 – Civil Engineering Muhammadiyah University,
Surakarta 2015
6 Membership of Professional
: Certificate for Road and Bridge, LPJK - HPJI.
Associations
7 Other Training : -
8 Countries of Work Experience : Indonesia
9 Languages :
Language Read Write Speak
English Good Good Good
Indonesian Good Good Good
10 Employment Record :
10.1. From March 2017 : To June 2018
Employer : PT. Eskapindo Matra
Position held : Surveyor
10.2. From May 2016 : To February 2017
Employer : CV. Rajendra Karya Mandiri
Position held : Staff Teknik
10.3. From January 2012 : To February 2016
Employer : PT. Adi Cipta Cahaya Gemilang
Position held : Inspector
Construction Supervision Pettarani Elevated Toll Road Page 1 of 3
[Gentur Maladi Tunggul]
[Inspector 10)
11 Detailed Assigned 12 Work Undertaken that Best Illustrates to Capability
Handle the Task Assigned
a) Carry out field inspections 12.1 Name of assignment or project : Construction
together with the relevant Supervision of Toll Road Development project Salatiga -
international experts; Kartasura.
b) Inspect the construction method, Year : 1 March 2017 - 30 June 2018 (16 months)
equipment to be used together Location : Central Java Province
with the relevant international
experts. Client : Directorate General of Highways (Bina Marga)
Main project features : Design and Supervision of Road and
Bridge
Position held : Surveyor
Activities performed : Conducting surveillance and
measurement on job site and making survey report of survey
result and measurement; Oversee every item of work done by
the contractor; Recorded the progress of the work as a report
material; Mengopname each item of work that has been done
by the contractor; Reporting on the work the contractor has
achieved; Provide input to problems that arise in the field
when necessary.
12.2 Name of assignment or project : Construction
Supervision of Ageng Mosquito, Boyolali.
Year : 1 May 2016 - 30 February 2017 (10 months)
Location : Central Java Province
Client : Directorate General of Highways (Bina Marga)
Main project features : Design and Supervision of Road and
Bridge
Position held : Inspector
Activities performed : Oversee every item of work done by
the contractor; Recorded the progress of the work as a report
material; Mengopname each item of work that has been done
by the contractor; Reporting on the work the contractor has
achieved; Provide input to problems that arise in the field
when necessary.
Construction Supervision Pettarani Elevated Toll Road Page 2 of 3
[Gentur Maladi Tunggul]
[Inspector 10)
12.3 Name of assignment or project : Construction
Supervision of Solo new shophouses.
Year : 1 January 2012 - 30 February 2016 (50 months)
Location : Central Java Province
Client : PT. Adi Cipta Cahaya Gemilang
Main project features : Construction Supervision of new
shophouses.
Position held : Surveyor
Activities performed : Conducting surveillance and
measurement on job site and making survey report of survey
result and measurement; Oversee every item of work done by
the contractor; Recorded the progress of the work as a report
material; Mengopname each item of work that has been done
by the contractor; Reporting on the work the contractor has
achieved; Provide input to problems that arise in the field
when necessary.
13 Certification :
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my
qualifications, and my experience. I understand that any willful misstatement described herein may lead to my
disqualification or dismissal, if engaged.
Date : 8/July/2018
(Signature of staff member or authorized representative of the staff) Day / Month / Year
Full Name of Authorized Representative : Ir. Tigor Gading Hakim
President Director
Construction Supervision Pettarani Elevated Toll Road Page 3 of 3