0% found this document useful (0 votes)
121 views16 pages

Bill of Quantities 111

This document provides a cost estimate for renovation works broken down into 6 items: general requirements, concrete works, carpentry works, painting works, replacement of roofings, and tiling works. It lists the materials, quantities, unit costs, and total costs for both original and additional materials. The total estimated cost for additional materials is over $186,000, with the largest portions attributed to concrete works ($86,335), carpentry works ($50,736), and painting works ($55,028).

Uploaded by

Diana Abalos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
121 views16 pages

Bill of Quantities 111

This document provides a cost estimate for renovation works broken down into 6 items: general requirements, concrete works, carpentry works, painting works, replacement of roofings, and tiling works. It lists the materials, quantities, unit costs, and total costs for both original and additional materials. The total estimated cost for additional materials is over $186,000, with the largest portions attributed to concrete works ($86,335), carpentry works ($50,736), and painting works ($55,028).

Uploaded by

Diana Abalos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 16

ORIGINAL COST ADDITIVE DEDUCTIVE

Item DESCRIPTION QTY UNIT UNIT COST TOTAL COST QTY UNIT UNIT COST TOTAL COST QTY UNIT

I GENERAL REQUIREMENT
Mobilization/Temporary Structure Utilities And
Services/demobilization 1.00 lot - -

Standard Billboard 1.00 lot - -

SUB-TOTAL - -
II CONCRETE WORKS (21.6 cu.m) 8.75 cu.m
Perimeter Pavement (216 sq.m)
Portland Cement 195.00 bags - 80.00 bags 436.59 34,927.20
Sand 20.00 cu.m - 9.00 cu.m 1,195.43 10,758.83
Gravel 10.00 cu.m - 4.50 cu.m 1,195.43 5,379.41
12mm dia. X 6.0m RSB 190.00 pcs - 80.00 pcs 416.32 33,305.58
#16 tie wire 40.00 kgs - 18.00 kgs 109.15 1,964.66
SUB-TOTAL - 86,335.67
III CARPENTRY WORKS (220.53 sq.)
Eaves (A=136.53sq.m.)
1/4" thk x 4' x 8' Ficem board 52.00 pcs - -
Good Lumber 924.18 bdft - -
Assorted Nails 12.00 kgs - -
Replacement of damaged ceilings (A=84 s.m) 41 sq.m
Dismantling of damaged ceiling (selective) 1.00 lot - 0.50 lot 20,790.00 10,395.00
1/4" thk x 4' x 8' Ficem board 35.00 pcs - 17.00 pcs 796.95 13,548.15
Good Lumber 546.32 bdft - 273.00 bdft 86.63 23,648.63
Assorted Nails 10.00 kgs - 5.00 kgs 109.15 545.74
Air vents 6.00 pcs - 3.00 pcs 866.25 2,598.75
Scaffoldings
Scaffoldings (Rental) 1.00 lot -
SUB-TOTAL - 50,736.26
IV PAINTING WORKS (531.925 sq.m)
Exterior eaves (A=136.53sq.m.) 35 sq.m
body filler 3.00 gals - 0.75 gals 1,016.40 762.30
glazing putty 8.00 gals - 2.00 gals 1,145.76 2,291.52
flat wall enamel 2 coats 12.00 gals - 3.00 gals 1,108.80 3,326.40
semi gloss enamel 2 coats 12.00 gals - 3.00 gals 1,201.20 3,603.60
Oil tinting color 3.00 liters - 0.75 liters 887.04 665.28
Paint Thinner 3.00 gals - 0.75 gals 480.48 360.36
Brush 4" 2.00 pcs - 0.50 pcs 129.36 64.68
Roller Brush with Pan 2.00 pcs - 0.50 pcs 323.40 161.70
Sand paper 20.00 sq.ft. - 5.00 sq.ft. 88.70 443.52
Miscellaneous- rugs,pallate,masking tape, etc. 1.00 lot - 0.25 lot 5,544.00 1,386.00
Ceiling (A=84sq.m.) 41 sq.m
body filler 2.00 gal - 1.00 gal 1,016.40 1,016.40
glazing putty 6.00 gals - 3.00 gals 1,145.76 3,437.28
flat wall enamel 2 coats 8.00 gals - 4.00 gals 1,108.80 4,435.20
semi gloss enamel 2 coats 8.00 gals - 4.00 gals 1,201.20 4,804.80
Oil tinting color 3.00 liters - 1.50 liters 887.04 1,330.56
Paint Thinner 2.00 gals - 1.00 gals 480.48 480.48
Brush 4" 2.00 pcs - 1.00 pcs 129.36 129.36
Roller Brush with Pan 2.00 pcs - 1.00 pcs 323.40 323.40
Sand paper 20.00 sq.ft. - 10.00 sq.ft. 88.70 887.04
Miscellaneous- rugs,pallate,masking tape, etc. 1.00 lot - 0.50 lot 5,544.00 2,772.00
Painting Outer wall (A=310.995 sq.m) 86.80
Concrete Nuetralizer 10.00 gals - 2.80 gals 526.68 1,474.70
Concrete Putty 16.00 gals - 4.48 gals 609.84 2,732.08
flat wall latex 2 coats 24.00 gals - 6.72 gals 979.44 6,581.84
gloss latex 2 coats 24.00 gals - 6.72 gals 1,145.76 7,699.51
Accry tinting color 6.00 liters - 1.68 liters 406.56 683.02
Paint Thinner 5.00 gals - 1.40 gals 480.48 672.67
Brush 4" 4.00 pcs - 1.00 pcs 129.36 129.36
Roller Brush with Pan 4.00 pcs - 1.00 pcs 323.40 323.40
Sand paper 20.00 sq.ft. - 5.60 sq.ft. 88.70 496.74
Miscellaneous- rugs,pallate,masking tape, etc. 1.00 lot - 0.28 lot 5,544.00 1,552.32
Re-painting of Old Roofing 1.00 lot 30,000.00 30,000.00
SUB-TOTAL - 55,027.53
V REPLACEMENT OF ROOFINGS (492.75 ln.m)
Tinsmithry (492.75 ln.m)
Dismantling of existing roof 1.00 lot - -
0.4mm thk Long Span ribtype roofing 492.75 ln.m - - 342.75 ln.m
0.4mm thk pre-painted ridge roll 18.00 pcs - -
0.4mm thk pre-painted valley gutter 8.00 pcs - -
0.4mm thk pre-painted gutter 25.00 pcs - -
0.4mm thk pre-painted flashing 22.00 pcs - -
0.4mm thk pre-painted fascia cover 47.00 pcs - -
2 1/2" Tekscrew 5,910.00 pcs - -
1/8" x 1/2" Roof Blind Rivets 5.00 boxes - -
Roofing Sealant 4.00 liters - -
Silicon Sealant 20.00 tubes - -
SUB-TOTAL - -
VI TILING WORKS (A=45.82 sq.m)
300mm x 300m Floor tiles unglazed (Stair) 292.00 pcs - -
200mm x 200mm button tiles (RAMP) 512.00 pcs - -
Tile Trim 10.00 pcs - -
Portland Cement 25.00 bags - -
Sand 1.00 cu.m. - -
Tile adhesive 5.00 bags - -
Tile grout 25.00 bags - -
SUB-TOTAL - -
VII PLUMBING WORKS
storm drainage line and downspout
4"Ø Storm Pipe (Series 600) 62.00 pcs - -
4"Ø elbow 48.00 pcs - -
clamp 48.00 pcs - -
Solvent Cement 4.00 liters - -
catch basin (16 sets)
100mm thk chb(4'') 136.00 pcs - -
Portland Cement 6.00 bags - -
Sand 2.00 cu.m. - -
Gravel 2.00 cu.m. - -
12mm x 6.00 mtrs RSB 40.00 pcs - -
1-1/2" x 1-1/2" angle bar 6.00 pcs - -
welding rod (5 kgs) 3.00 boxes - -
#16 tie wire 10.00 kgs - -
SUB-TOTAL - -
VIII ELECTRICAL WORKS
12 watts LED Bulb 67.00 pcs - -
Receptacle 4 inches dia. 67.00 pcs - -
Emergency Lights 8.00 units - -
Exhaust Fan (400mm x 400mm) 5.00 sets - -
Utility box 16.00 pcs - -
Junction box 67.00 pcs - -
1-Gang convenience outlet 16.00 sets - -
3.5 mm2 THHN copper wire 1.00 box - -
Acrylic Directional Signages with backlight (EXIT) 3.00 units - -
1.5HP Airconditioning Unit (Split type) with installation 2.00 units - -
Miscellenous (Electrical tape, screws, hacksaw blade, etc…) 1.00 lot - -
SUB-TOTAL - -

IX PARTITION @ LABORATORY ROOM


a. 4" CHB Partition
100mm thk chb(4'') 100.00 pcs - -
Portland Cement 22.00 bags - -
Sand 2.00 cu.m. - -
Gravel 0.50 cu.m. - -
12mm x 6.00 mtrs RSB 22.00 pcs - -
#16 tie wire 4.00 kgs - -
1/4" thk x 4' x 8' ordinary plywood 3.00 pcs - -
Assorted Lumbers 60.00 bdft - -
Assorted Nails 5.00 kgs - -
b. Tileworks (20.45 sqm) Counter top
600mm x 600mm Synthetic Granite Tile 60.00 pcs - -
Tile Trim 12.00 pcs - -
Portland Cement 9.00 bag - -
Sand 0.50 cu.m. - -
Tile adhesive 3.00 bags - -
Tile grout 10.00 kgs - -
c. Fixtures
Stainless Sink with complete accessories 2.00 sets - -
SUB-TOTAL - -

X LINKS BETWEEN BUILDINGS


a. Concrete works
Portland Cement 25.00 bags - - 25.00 bags
Sand 2.50 cu.m - - 2.50 cu.m
Gravel 1.00 cu.m - - 1.00 cu.m
12mm dia. X 6.0m RSB 22.00 pcs - - 22.00 pcs
#16 tie wire 5.00 kgs - - 5.00 kgs
b. Roofing Works
1/4" x 2" x 2" Angle Bar 9.00 pcs - - 9.00 pcs
1.2mm thk 2" x 4" C-Purlins 3.00 pcs - 6.00 pcs 857.59 5,145.53
1.2mm thk 2" x 6" C-Purlins 2.00 pcs - 2.00 pcs 1,013.51 2,027.03
welding rod 5.00 kgs - 5.00 kgs 116.94 584.72
4" dia. X 3m G.I. Pipe 6.00 pcs - - 6.00 pcs
Base Plate (0.3m x 0.3m) 6.00 pcs - -
Bolts 16mm dia. 24.00 set - -
0.4mm thk Pre-painted Long Span Rib-type roofing 23.85 ln.m - -
0.4mm thk Pre-painted ridge roll 2.00 pcs - -
0.4mm thk Pre-painted gutter 4.00 pcs - 4.00 pcs 311.85 1,247.40
2-1/2" Tekscrew 250.00 pcs - -
1/2" x 1/8" roof blind rivets 1.00 box - -
Roofing Sealant 1.00 pack - -
Silicon Sealant 1.00 tube - -
Red oxide primer 1.00 gal - -
Paint Thinner 1.00 gal - -
Paint Brush 3" 2.00 pcs - -
SUB-TOTAL - 9,004.67

XI STAINLESS RAILINGS (29.75 ln.m)


Grab railing @ PWD CR 3.25 ln.m - -
Railing @ ramp (entry to TB-DOTS) 26.50 ln.m - -
Railing @ ramp (Going to Birthing) 10.88 ln.m 2,852.85 31,044.09
SUB-TOTAL - 31,044.09

XII Repair/Replacement of Doors and Windows


Dismantling of Existing Doors 1.00 lot - - 1.00 lot
D-3 Single Swing Analok Door (0.9m x 2.1m) (CR-PWD) 1.00 set - - 1.00 set
D-2 Single Swing Analok Door (0.9m x 2.1m) 8.00 sets - - 8.00 sets
Replacements of window locks 1.00 lot - -
Repair of Broken Doors(Knob,hinges,ect.) 1.00 lot 10,000.00 10,000.00
SUB-TOTAL - 10,000.00

XIII Customized Partition Between MHO and Conference Hall


D-1 Analok Sliding Door with fixed glass (4.3m x 2.7m) 1.00 set - -
SUB-TOTAL - -

XIV Partition at Comfort Rooms


Aluminum panel partition (1.5m x 2.1m) 3.15 ln.m - -
Aluminum Door (0.7m x 2.1m) 2.00 sets - -
Faucet 6.00 pcs - -
Teflon Tape 3.00 rolls - -
SUB-TOTAL - -

XV Customized Reception Table with provision of convenience outlet


3/4" Thk Marine Plywood 12.00 pcs - -
Finishing nail 5.00 kgs - -
Wood Glue 4.00 gals - -
1/2' x 2' s4s 40.00 bdft. - -
Wood Putty 5.00 gals - -
Sanding paper 40.00 sq,ft - -
Oil tinting color 6.00 quartz - -
Paint Brush 3" 4.00 pcs - -
Flat Wall Enamel 2coats 4.00 gals - -
Quick Dry Enamel 4.00 gals - -
Body Filler 2.00 gals - -
Sanding Sealer 2.00 gals - -
Utility box 10.00 pcs - -
2-gang convenience outlet 10.00 sets - -
3.5mm2 THHN copper wire 1.00 box - -
MIscellaneous(Drawer Puller / Cabinet Holder w/ complete
accessories, etc.) 1.00 lot - -

SUB-TOTAL - -

XVI Septic Tank near Dental Room


septic tank (2 chamber 3.6m x 2m x 2m)
Excavation 14.40 cu.m. - -
150mm thk chb(6') 330.00 pcs - -
Portland Cement 52.00 bags - -
Sand 3.00 cu.m. - -
Gravel 6.00 cu.m. - -
12mmx6.00mtrs RSB 50.00 pcs - -
10mm x 6.00 mtrs RSB 68.00 pcs - -
#16 tie wire 9.00 kgs - -
sewer line
4"Ø Soil Pipe (Series 600) 8.00 pcs - -
4"Ø elbow 45° 5.00 pcs - -
Wye 4"Ø x 4"Ø 1.00 pcs - -
Wye 4"Ø x 2"Ø 6.00 pcs - -
2"Ø Soil Pipe 5.00 pcs - -
2"Ø elbow 90° 7.00 pcs - -
2"Ø elbow 45° 3.00 pcs - -
SUB-TOTAL - -
XVII CONSTRUCTION OF ELEVATED WATER TANK
a. Earthworks
Excavation 3.00 cu.m - -
Structure Backfill 3.00 cu.m - -
Gravel Bedding 2.50 cu.m - -
b. Concrete Works
Portland Cement 20.00 bags - -
Gravel 2.00 cu.m - -
Sand 1.00 cu.m - -
16mm x 6m RSB 12.00 pcs - -
12mm x 6m RSB 10.00 pcs - -
10mm x 6m RSB 14.00 pcs - -
#16 tie wire 3.00 kgs - -
1/4 thk x 4' x 8' Ordinary Plywood 4.00 pcs - -
2 X 2 X 12 Good Lumber 100.00 bd.ft. - -
Assorted Nails 5.00 kgs - -
c. Metal Works
300mm x 300mm x 12mm Base Plate 4.00 pcs - -
16mm x 250mm Anchor Bolts 16.00 pcs - -
1/4" x 3" x 3" Angle bar 8.00 pcs - - 8.00 pcs
1/4" x 1 1/2" x 1 1/2" Angle bar 20.00 pcs - - 20.00 pcs
E6013 Welding Electrodes 15.00 kgs - - 15.00 kgs
1/4" x 2" Flat Bar 12.00 pcs - - 12.00 pcs
Red Oxide Primer Paint 3.00 gals - - 3.00 gals
6mm x 4' x 8' MS plate 1.00 pcs - - 1.00 pcs
Gi pipe 3/4" S40 x 6 meters 4.00 pcs - - 4.00 pcs
Gi pipe 1/2" S40 x 6 meters 6.00 pcs - - 6.00 pcs
d. Water Lines and Tank
Strainless Cylindrical Tank (800 Liters Capacity) 1.00 unit - - 1.00 unit
2HP Water Pump w/ Start/Stop switch and wires 1.00 unit - - 1.00 unit
1 1/4 GI coupling SC40 4.00 pcs - - 4.00 pcs
1 1/4" x 1" GI coupling Reducer 1.00 pcs - - 1.00 pcs
1" PVC Male adaptor 1.00 pcs - - 1.00 pcs
1" dia. X 3.0m PVC BLUE 5.00 pcs - - 5.00 pcs
1 1/4" GI Pipe Sch. 40 6.00 pcs - - 6.00 pcs
1 1/4" GI Elbow Sch 40 4.00 pcs - - 4.00 pcs
1 1/4" Union Patente 2.00 pcs - - 2.00 pcs
1 1/4" Gate Valve 1.00 lot - - 1.00 lot
TefLon Tape 1/2" 8.00 pcs - - 8.00 pcs
e. Pipe Drilling
Drilling (labor) 1.00 lot - - 1.00 lot
3" GI Pipe S40 (casing) 4.00 pcs - - 4.00 pcs
3" coupling 3.00 pcs - - 3.00 pcs
1 1/4" coupling 4.00 pcs - - 4.00 pcs
1 1/4" GI Pipe 3.00 pcs - - 3.00 pcs
SUB-TOTAL - -
XVIII Miscellaneous
Acrylic "DOH" Logo (2-foot diameter) 4.00 sq.ft - -
Stainless Steel "RURAL HEALTH UNIT" and "DOH" Letters ( 10"
height)
18.00 letters - -

Consultation Table with glass 2.00 sets - -

6-Seater Stainless Steel Waiting Chair 5.00 sets - -

SUB-TOTAL - -
XIX Construction of Waiting Shed
GI Pipe 4" 2.00 pcs 5,691.26 11,382.53

Channel Bar 4" 3.00 pcs 4,500.00 13,500.00

C Purlins 2"x4" 14.00 pcs 857.59 12,006.23

E6013 Welding Electrodes 5.00 kgs 97.02 485.10


0.4mm thk Pre-painted Long Span Rib-type roofing 16.00 ln.m 311.85 4,989.60

0.4mm thk Pre-painted ridge roll 2.00 pcs 311.85 623.70

2 1/2" Tekscrew 195.00 pcs 1.34 260.44

1/8" x 1/2" Roof Blind Rivets 1.00 boxes 267.12 267.12

Roofing Sealant 1.00 liters 801.36 801.36

Silicon Sealant 1.00 tubes 186.98 186.98

Red Oxide Primer Paint 1.00 gals 1,115.73 1,115.73

Floor Slab & Bench 1 lot 44,000.00 44,000.00


SUB-TOTAL - 89,618.79
XX Demolition/Waste Disposal & Land Development
Disposal of Excavated Materials from pavement, septic tank 30.00 cu.m. 450.00 13,500.00

Demolition of Concrete Column of Signage/Old Pavement 1.00 lot 16,000.00 16,000.00

100mm thk chb(4'') 120.00 pcs 21.02 2,522.52

Portland Cement 23.00 bags 407.48 9,372.13

Sand 2.50 cu.m. 1,115.73 2,789.33

Gravel 0.75 cu.m. 1,115.73 836.80

12mm x 6.00 mtrs RSB 23.00 pcs 689.81 15,865.68

#16 tie wire 4.50 kgs 105.11 472.97

Painting Works 1.00 lot 10,000.00 10,000.00

SUB-TOTAL - 71,359.43
TOTAL COST - 403,126.43
DEDUCTIVE REVISED COST
UNIT COST TOTAL COST QTY UNIT UNIT COST TOTAL COST

- 1.00 lot -

- 1.00 lot -

- -

- 275.00 bags -
- 29.00 cu.m -
- 14.50 cu.m -
- 270.00 pcs -
- 58.00 kgs -
- -

- 52.00 pcs -
- 924.18 bdft -
- 12.00 kgs -

- 1.50 lot -
- 52.00 pcs -
- 819.32 bdft -
- 15.00 kgs -
- 9.00 pcs -

- 1.00 lot -
- -

- 3.75 gals -
- 10.00 gals -
- 15.00 gals -
- 15.00 gals -
- 3.75 liters -
- 3.75 gals -
- 2.50 pcs -
- 2.50 pcs -
- 25.00 sq.ft. -
- 1.25 lot -

- 3.00 gal -
- 9.00 gals -
- 12.00 gals -
- 12.00 gals -
- 4.50 liters -
- 3.00 gals -
- 3.00 pcs -
- 3.00 pcs -
- 30.00 sq.ft. -
- 1.50 lot -

- 12.80 gals -
- 20.48 gals -
- 30.72 gals -
- 30.72 gals -
- 7.68 liters -
- 6.40 gals -
- 5.00 pcs -
- 5.00 pcs -
- 25.60 sq.ft. -
- 1.28 lot -
- 1.00 lot -
- -

- 1.00 lot -
267.12 91,555.38 150.00 ln.m -
- 18.00 pcs -
- 8.00 pcs -
- 25.00 pcs -
- 22.00 pcs -
- 47.00 pcs -
- 5,910.00 pcs -
- 5.00 boxes -
- 4.00 liters -
- 20.00 tubes -
91,555.38 -
- 292.00 pcs -
- 512.00 pcs -
- 10.00 pcs -
- 25.00 bags -
- 1.00 cu.m. -
- 5.00 bags -
- 25.00 bags -
- -

- 62.00 pcs -
- 48.00 pcs -
- 48.00 pcs -
- 4.00 liters -

- 136.00 pcs -
- 6.00 bags -
- 2.00 cu.m. -
- 2.00 cu.m. -
- 40.00 pcs -
- 6.00 pcs -
- 3.00 boxes -
- 10.00 kgs -
- -

- 67.00 pcs -
- 67.00 pcs -
- 8.00 units -
- 5.00 sets -
- 16.00 pcs -
- 67.00 pcs -
- 16.00 sets -
- 1.00 box -
- 3.00 units -
- 2.00 units -
- 1.00 lot -
- -

- 100.00 pcs -
- 22.00 bags -
- 2.00 cu.m. -
- 0.50 cu.m. -
- 22.00 pcs -
- 4.00 kgs -
- 3.00 pcs -
- 60.00 bdft -
- 5.00 kgs -

- 60.00 pcs -
- 12.00 pcs -
- 9.00 bag -
- 0.50 cu.m. -
- 3.00 bags -
- 10.00 kgs -

- 2.00 sets -
- -

392.93 9,823.28 - bags -


1,075.88 2,689.71 - cu.m -
1,075.88 1,075.88 - cu.m -
374.69 8,243.13 - pcs -
98.23 491.16 - kgs -

1,528.07 13,752.59 - pcs -


- 9.00 pcs -
- 4.00 pcs -
- 10.00 kgs -
5,691.26 34,147.58 - pcs -
- 6.00 pcs -
- 24.00 set -
- 23.85 ln.m -
- 2.00 pcs -
- 8.00 pcs -
- 250.00 pcs -
- 1.00 box -
- 1.00 pack -
- 1.00 tube -
- 1.00 gal -
- 1.00 gal -
- 2.00 pcs -
70,223.32 -

- 3.25 ln.m -
- 26.50 ln.m -
- 10.88 ln.m -
- -

10,972.50 10,972.50 - lot -


6,496.88 6,496.88 - set -
6,496.88 51,975.00 - sets -
- 1.00 lot -
1.00 lot -
69,444.38 -

- 1.00 set -
- -

- 3.15 ln.m -
- 2.00 sets -
- 6.00 pcs -
- 3.00 rolls -
- -

- 12.00 pcs -
- 5.00 kgs -
- 4.00 gals -
- 40.00 bdft. -
- 5.00 gals -
- 40.00 sq,ft -
- 6.00 quartz -
- 4.00 pcs -
- 4.00 gals -
- 4.00 gals -
- 2.00 gals -
- 2.00 gals -
- 10.00 pcs -
- 10.00 sets -
- 1.00 box -

- 1.00 lot -

- -

- 14.40 cu.m. -
- 330.00 pcs -
- 52.00 bags -
- 3.00 cu.m. -
- 6.00 cu.m. -
- 50.00 pcs -
- 68.00 pcs -
- 9.00 kgs -

- 8.00 pcs -
- 5.00 pcs -
- 1.00 pcs -
- 6.00 pcs -
- 5.00 pcs -
- 7.00 pcs -
- 3.00 pcs -
- -

- 3.00 cu.m -
- 3.00 cu.m -
- 2.50 cu.m -

- 20.00 bags -
- 2.00 cu.m -
- 1.00 cu.m -
- 12.00 pcs -
- 10.00 pcs -
- 14.00 pcs -
- 3.00 kgs -
- 4.00 pcs -
- 100.00 bd.ft. -
- 5.00 kgs -
- 4.00 pcs -
- 16.00 pcs -
3,395.70 27,165.60 - pcs -
1,261.26 25,225.20 - pcs -
97.02 1,455.30 - kgs -
800.42 9,604.98 - pcs -
1,115.73 3,347.19 - gals -
9,378.60 9,378.60 - pcs -
776.16 3,104.64 - pcs -
679.14 4,074.84 - pcs -

28,846.13 28,846.13 - unit -


21,829.50 21,829.50 - unit -
132.54 530.15 - pcs -
397.61 397.61 - pcs -
148.13 148.13 - pcs -
288.46 1,442.31 - pcs -
1,715.18 10,291.05 - pcs -
327.44 1,309.77 - pcs -
389.81 779.63 - pcs -
935.55 935.55 - lot -
34.30 274.43 - pcs -

34,650.00 34,650.00 - lot -


2,806.65 11,226.60 - pcs -
366.42 1,099.27 - pcs -
62.37 249.48 - pcs -
1,512.47 4,537.42 - pcs -
201,903.36 -

- 4.00 sq.ft -

- 18.00 letters -

- 2.00 sets -
- 5.00 sets -

- -

- 2.00 pcs -
- 3.00 pcs -
- 14.00 pcs -
- 5.00 kgs -
- 16.00 ln.m -
- 2.00 pcs -
- 195.00 pcs -
- 1.00 boxes -
- 1.00 liters -
- 1.00 tubes -
- 1.00 gals -

0 1 lot -
- -

- 30.00 cu.m. -
- 1.00 lot -
- 120.00 pcs -
- 23.00 bags -
- 2.50 cu.m. -
- 0.75 cu.m. -
- 23.00 pcs -
- 4.50 kgs -
- 1.00 lot -

- -
433,126.43 -

-
-