FMEA
FMEA
SECTION ONE
Introduction
To
FAILURE MODE
EFFECTS & ANALYSIS
FMEA
1.0
1.1
MANUFACTURING RESPONSIBLE
ENGINEER/TEAM
DFMEA
SUPPORTS DESIGN PROCESS
in REDUCING RISK of
FAILURES
by
¾ AIDING IN THE OBJECTIVE EVALUATION
OF DESIGN REQUIREMENTS AND
DESIGN ALTERNATIVES
1.3
DFMEA
ALSO SUPPORTS DESIGN
PROCESS
By
1.4
PFMEA
THE PROCESS FMEA
¾ IDENTIFIES POTENTIAL PRODUCT
RELATED PROCESS FAILURE MODES
1.5
FMEA APPLICATIONS
IN
MANUFACTURING SETTINGS
DFMEA
FMEA APPLICATIONS
IN
MANUFACTURING SETTINGS
PFMEA
1.7
1.8
FMEA
ADVANTAGES
(AND LIMITATIONS)
ADVANTAGES:
1.9
FMEA
ADVANTAGES
(AND LIMITATIONS)
LIMITATIONS*
1.10
SECTION TWO
FMEA PLAN
UTILIZING KEY
PRODUCTION PROCESSES
AND
PRODUCT EVALUATION TOOLS
2.0
• TEAMWORK
• MANAGING PROCESSES
• STATISTICAL PROCESS
CONTROL
2.1
FMEA REQUIRES
TEAMWORK
TRAINING
and
COMMITTED LEADERSHIP
2.2
MANAGING PROCESSES
UTILIZE A STYLE OF MANAGEMENT THAT
IS ALSO PEOPLE ORIENTED IN CONTRAST
TO ONE THAT IS SOLELY ORIENTED
TOWARD RESULTS
PROCESS-ORIENTED
MANAGEMENT
¾ SUPPORT AND STIMULATE EFFORTS TO
IMPROVE THE WAY EMPLOYEES DO
JOBS
MANAGEMENT CRITERIA
• DISCIPLINE
• TIME MANAGEMENT
• SKILL DEVELOPMENT
• PARTICIPATION & INVOLVEMENT
• MORALE
• COMMUNICATION
2.3
STATISTICAL PROCESS
CONTROL
(SPC)
STATISTICAL TOOLS
• PARETO Diagrams
• CAUSE-AND-EFFECT Diagrams
• HISTOGRAMS
• CONTROL Charts
• SCATTER Diagrams
• GRAPHS
• CHECKSHEETS
2.4
PROCESS INCORPORATION
• METHODS
• MATERIALS
• MACHINES
• MANPOWER
• ENVIRONMENT
• MEASUREMENT
2.5
FMEA PROJECTS
SELECTION & PURPOSE
TANGIBLE EFFECTS
¾ SUCCESSFUL DEVELOPMENT OF NEW
PRODUCTS
¾ SHORTENING OF PRODUCT
DEVELOPMENT TIME
¾ FEWER PROCESSES
¾ IMPROVED QUALITY
2.6
FMEA PROJECTS
SELECTION & PURPOSE
INTANGIBLE EFFECTS
¾ INCREASED QUALITY-CONSCIOUSNESS
AND PROBLEM-CONSCIOUSNESS
¾ IMPROVED STANDARDIZATION
2.7
FMEA PROJECT
IMPLEMENTATION
QUANTITATIVE METHODS
• SEVERITY RANKING
• OCCURRENCE RANKING
• DETECTION RANKING
RISK PRIORITY NUMBER
(RPN)
2.8
QUALITATIVE METHODS
• BRAINSTORMING ANALYSIS
• CUSTOMER(S) INPUT
FINANCIAL IMPACT
2.9
DESCRIPTIONS
DESIGN
POTENTIAL FAILURE MODE CAN BE
DESCRIBED AS THE MANNER IN WHICH A
COMPONENT, SYSTEM, OR SUBSYSTEM
COULD FAIL TO MEET THE DESIGN INTENT.
THESE FAILURE MODES SHOULD BE
DESCRIBED IN “PHYSICAL” OR TECHNICAL
TERMS.
2.10
DESCRIPTIONS
PROCESS
POTENTIAL FAILURE MODE IS DEFINED AS
THE MANNER IN WHICH THE PROCESS
COULD FAIL TO MEET THE
REQUIREMENTS OF THE DESIGN INTENT.
THE FMEA TEAM SHOULD BE ABLE TO
POSE AND ANSWER THE FOLLOWING
QUESTIONS:
¾ HOW CAN THE PROCESS/PART FAIL
TO MEET SPECIFICATIONS?
¾ REGARDLESS OF ENGINEERING
SPECIFICATIONS, WHAT WOULD A
CUSTOMER (END USER,
SUBSEQUENT OPERATIONS, OR
SERVICE) CONSIDER
OBJECTIONABLE?
2.11
EXAMPLES
GROUNDED FRACTURED
SHORT CIRCUITED OXIDIZED
OPEN CIRCUITED STICKING
CRACKED BURRED
HANDLING DAMAGE LEAKING
DEFORMED LOOSENED
BENT TOOL WORN
IMPROPER SET-UP DIRTY
THESE ARE SOME “TYPICAL” FAILURE
MODES. IT IS RECOMMENDED THAT A
COMPARISON OF SIMILAR PROCESSES
AND A REVIEW OF CUSTOMER
(SUBSEQUENT OPERATION AND END USER)
CONSIDERATIONS BE CONDUCTED.
2.12
PROBABILISTIC ERRORS
DEFINITION: A PROBABILISTIC ERROR IS
ONE THAT CANNOT BE
PREDICTED WITH
CERTAINTY.
SAMPLE PROBLEM
THE VOLTAGES OF 50 BATTERIES OF THE
SAME TYPE HAVE A MEAN OF 1.52 VOLTS
AND A STANDARD DEVIATION OF 0.04 VOLT.
FIND THE PROBABLE ERROR OF THE MEAN
AND THE 50% CONFIDENCE LIMITS.
SOLUTION:
Comment [VJ1]:
PROBABLE ERROR OF THE MEAN = 0.6745σ x
= 0.6745σ ÷√N = 0.6745s ÷√N-1 = 0.6745(0.04 ÷√49)
= 0.00385 VOLTS
2.13
FAILURE MODE
TECHNICAL ANALYSIS
2.14
PROCESS REVIEW IN
PRACTICE
FAILURE MODE ERRORS INTRODUCE A
RISK INTO A PROCESS (OR PROCESSES). A
CONTROL SYSTEM PROVIDES A MEANS OF
“CATCHING” AN ERROR BEFORE ANY
DAMAGE IS INCURRED.
EXAMPLE:
FLOW CHART
PROCESS DIAGRAMMING
FLOW CHART FOR PURCHASING PROCEDURE
2.16
FMEA PLAN
ONGOING EVALUATORY
PROCEDURES
2.17
SECTION THREE
Implementing
FMEA
3.0
IDENTIFYING POTENTIAL
FAILURES
PRODUCT CONSIDERATIONS
&
PRODUCTION OPERATIONS
FAILURE MODES
DEFINITION
ALL WAYS IN WHICH A PRODUCT
(INCLUDING EACH OF ITS SPECIFIC PARTS)
OR PROCESS CAN FAIL TO PERFORM ITS
INTENDED FUNCTION. MORE THAN ONE
FAILURE MODE CAN EXIST FOR A GIVEN
PART OR PROCESS. ALSO, SOME FAILURES
MAY BE GRADUAL AND/OR PARTIAL,
WHEREAS OTHERS MAY OCCUR
IMMEDIATELY AND COMPLETELY.
3.1
IDENTIFYING POTENTIAL
FAILURES
TYPES/DEFINITIONS
1. PARETO Diagrams. Classify failures
according to cause. The failures are
diagrammed according to priority, using a
bar-graph format, with 100% indicating the
total amount of failures.
3.2
IDENTIFYING POTENTIAL
FAILURES
TYPES/DEFINITIONS
4. Control Charts. Serve to detect abnormal
variations. Sample data (defining potential
failures) are plotted to evaluate situations and
trends in a process. Comparisons can be made
against required control limits.
5. Scatter Diagrams. Corresponding data are
plotted and the relation between the data (and
impact on prospective failures) can be
analyzed.
3.3
IDENTIFYING POTENTIAL
FAILURES
PROSPECTIVE QUESTIONS
FOLLOWING ARE REPRESENTATIVE
QUESTIONS TO CONSIDER IN SOME BASIC
AREAS THAT MAY REQUIRE FMEA. THIS IS
NOT ALL INCLUSIVE, BUT EXAMPLES TO
EVALUATE.
A. MATERIAL
1. Are there any mistakes in volume?
2. Are there any mistakes in grade?
3. Are there impurities mixed in?
4. Is the inventory level adequate?
5. Is there any waste in material?
6. Is the handling adequate?
7. Is the quality standard adequate?
B. OPERATION METHOD
1. Are the work standards adequate?
2. Is it a safe method?
3. Is it a method that ensures a good product?
4. Is it an efficient method?
5. Are the temperature and humidity adequate?
6. Is the lighting adequate?
7. Is there adequate contact with the previous and
next processes?
3.4
IDENTIFYING POTENTIAL
FAILURES
PROSPECTIVE QUESTIONS
C. MACHINE
1. Does it meet production requirements?
2. Does it meet process capabilities?
3. Does it meet precision requirements?
4. Is the layout adequate?
5. Are there enough machines/facilities?
6. Is everything in good working order?
7. Is operation stopped often because of
mechanical trouble?
D. MANPOWER (OPERATOR)
1. Does s/he follow standards?
2. Is his/her work efficiency acceptable?
3. Is he/she responsible (accountable)?
4. Is he/she qualified?
5. Is he/she experienced?
6. Is he/she assigned to the right job?
7. Does he/she maintain good human
relations?
3.5
Failure Mode
Effect
Severity: 1-10
Causes
Occurrence: 1-10
Controls
Detection: 1-10
RPN = Severity X
Occurrence X Detection
1-1,000
3.6
3.7
SEVERITY (S)
SEVERITY (S) is an assessment
of the seriousness of the effect of
the potential failure mode.
SEVERITY applies to the effect
only. A reduction in SEVERITY
ranking index can be effected only
through a design change.
SEVERITY is estimated on a
“1” to “10” scale.
3.8
NOTE: Make sure team members agree on the criteria for ranking
severity and apply them consistently.
3.9
3.10
3.11
DETECTION (D)
DETECTION (D) is an assessment of the ability
of proposed *type (2) current design controls to
detect a potential cause/mechanism (design
weakness), or the ability of the proposed #type (3)
current design controls to detect the subsequent
failure mode, before the component, subsystem,
or system is released for production. In order to
achieve a lower ranking, generally the planned
design control (e.g., preventative, validation,
and/or verification activities) has to be improved.
DETECTION is estimated on a “1” to “10” scale.
3.12
NOTE: Make sure team members agree on the evaluation criteria and
ranking system, which is consistent, even if modified for
individual product analysis
3.13
IDENTIFYING AND
ESTABLISHING APPROPRIATE
FMEA TEAM(S)
BASE CONSIDERATIONS
3.14
IDENTIFYING AND
ESTABLISHING APPROPRIATE
FMEA TEAM(S)
“ADDITIONAL” CONSIDERATIONS
¾ WHEN POSSIBLE, SELECT AT
LEAST ONE, OR MORE, TEAM
MEMBERS WITH PREVIOUS
FMEA EXPERIENCE
¾ INCORPORATE
“STANDARDIZATION” METHODS
TO OBTAIN OVERALL BENEFIT
OF GIVING CONTROL OF EACH
FMEA PROJECT TO THE PEOPLE
WHO KNOW IT BEST
3.15
SECTION FOUR
FMEA
Documentation
4.0
TECHNIQUES
1. Document and Understand existing Products and
Processes – Review current DOCUMENTATION methods for
existing Products and Processes, where applicable – Evaluate
successes, failures, and relevance of existing DOCUMENTS
FMEA APPLICATIONS
EFFECTIVE DOCUMENTATION
PROCEDURES
Reference Design FMEA form is Appendix – Following
is a description of the categories noted on the DFMEA
form:
1. Part Name/No.
Enter the name and number of the system,
subsystem, or component being analyzed.
2. Design Responsibility
Enter the original equipment manufacturer
(OEM), department, and group. Also, include
the supplier name if known.
3. Prepared by
Enter the name, telephone number, company
of the individual (engineer) responsible for
preparing the DFMEA.
4. Customer/Application
Enter the name of the customer (internal/external)
who is the recipient of the DFMEA and the
application (of the design intent).
4.2
FMEA APPLICATIONS
EFFECTIVE DOCUMENTATION
PROCEDURES
5. Key Date
Enter the initial DFMEA due date, which
should not exceed the scheduled production
design release date.
7. Core Team
List the names of the responsible individuals
and departments which have the authority to
identify and/or perform tasks. (It is
recommended that all team members names,
departments, telephone numbers, addresses,
etc. be included on a distribution list.)
8. FMEA Number
Enter the FMEA document number, which
may be used for tracking.
9. Item/Number
Enter the name and number of the item being
analyzed. Use the nomenclature and show the
design level as indicated on the engineering
drawing.
4.3
FMEA APPLICATIONS
EFFECTIVE DOCUMENTATION
PROCEDURES
4.4
FMEA APPLICATIONS
EFFECTIVE DOCUMENTATION
PROCEDURES
13. Classification
This column is intended to be used to
classify any special product characteristics
(e.g., critical, key, major, significant) for
components, subsystems, or systems that
may require additional process controls.
FMEA APPLICATIONS
EFFECTIVE DOCUMENTATION
PROCEDURES
FMEA APPLICATIONS
EFFECTIVE DOCUMENTATION
PROCEDURES
17. Detection (D)
Detection is an assessment of the ability of the
proposed type (2) current design controls to
detect a potential cause/mechanism (design
weakness), or the ability of the proposed type (3)
current design controls to detect the subsequent
failure mode, before the component, subsystem,
or system is released for production. Ranking is
on a scale of “1” to “10” dependent on the
detection level.
4.7
FMEA APPLICATIONS
EFFECTIVE DOCUMENTATION
PROCEDURES
4.8
FMEA APPLICATIONS
EFFECTIVE DOCUMENTATION
PROCEDURES
1. Process
Enter the name of the process being analyzed.
2. Process Responsibility
Enter the original equipment manufacturer
(OEM), department, and group. Also, include
the supplier name if known.
3. Prepared by
Enter the name, telephone number, company of
the individual (engineer) responsible for
preparing the PFMEA.
4. Part Name/No.
Enter the name and number of the system,
subsystem, or component being analyzed.
5. Key Date
Enter the initial PFMEA due date, which
should not exceed the scheduled start of
production date.
4.9
FMEA APPLICATIONS
EFFECTIVE DOCUMENTATION
PROCEDURES
7. Core Team
List the names of the responsible individuals
and departments which have the authority
to identify and/or perform tasks. (It is
recommended that all team members names,
departments, telephone numbers, addresses,
etc. be included on a distribution list.)
8. FMEA Number
Enter the FMEA document number, which
may be used for tracking.
9. Process Function/Requirements
Enter a simple description of the process or
operation being analyzed (e.g., turning, drilling,
tapping, welding, assembling). Indicate as
concisely as possible the purpose of the process
or operation being analyzed. Where the
process involves numerous operations (e.g.
assembling) with different potential modes of
failure, it may be desirable to list the operations
as separate processes.
4.10
FMEA APPLICATIONS
EFFECTIVE DOCUMENTATION
PROCEDURES
FMEA APPLICATIONS
EFFECTIVE DOCUMENTATION
PROCEDURES
13. Classification
This column is intended to be used to classify
any special process characteristics (e.g., critical,
key, major, significant) for components,
subsystems, or systems that may require
additional process controls. If a classification
is identified in the PFMEA, notify the design
responsible engineer since this may affect the
engineering documents concerning control
item identification.
FMEA APPLICATIONS
EFFECTIVE DOCUMENTATION
PROCEDURES
4.13
FMEA APPLICATIONS
EFFECTIVE DOCUMENTATION
PROCEDURES
4.14
FMEA APPLICATIONS
EFFECTIVE DOCUMENTATION
PROCEDURES
SECTION FIVE
Improve Design & FMEA Project
Skills
5.0
Mission
and Values
Objectives
5.1