World's Safest Karting Tracks
World's Safest Karting Tracks
GUE360
KARTING
THE WORLD’S SAFEST KARTING TRACKS.
made in eu
ABOUT US
Mitja Safar, Jernej Copi,
CEO director of business
development
360K
360 KARTING 360 KARTING Giuseppe De Agrò, James Heap,
USA Representative EU Production plant senior partner US sales director
and technical offices
AFTER
SAFETY ON TRACK
OPERATIONAL EFFICIENCY
In 360 KARTING we aproach to the projects comprehensively from the very first
step. This means that we consider all the factors in rental karting business and,
most important, we prioritize them.
Our mission is to build world‘s safest karting tracks. Making your customers smile
is what motivates us. We consider running your business together with peace of
mind our most important value.
SOLUTION
realized within a multiple stage project.
TRACK From initial decisions to concept definition
OPENING and technical execution stages.
Each of these stages will bring you a step
closer to rental karting business management
with peace of mind.
1. 2. 3. 4. 5. 6.
DESIGN ENGINEERING COMPONENTS EXECUTION OPERATIONAL TECHNICAL
SUPPORT & START-UP MAINTENANCE
SERVICE PROGRAM
Concept design Engineering Safety barrier Logistics Safety briefing Start-up set
service system protocol module
Track installation Long-term service
Multi-level Go-kart fleet
structures maintenance
module
Floor coatings
Pit and track
Accessories marshal operation
module
Improves clarity of your goals, control over the business and especially
helps you to provide superior racing entertainment experience to your
only real boss – your client.
INPUT IT BRINGS:
CUSTOMER’S INPUT: OUTPUT TRACK & PIT AREA: Let’s start today.
Data/files
Vision
Ideas 1st draft SAFETY DESIGN:
Possibilities 2d design Elements
3d visualization Protocols
STARTING POINT:
On-site photos BUSINESS GUIDELINES:
Options Investment calculation
Proven practices
Financial guidelines
PROJECT:
Execution timeline
IT BRINGS:
IT BRINGS:
SUPERIOR + ABSORBTION
ADVANCED ABSORBTION
STANDARD ABSORBTION
SUPERIOR ABSORBTION
ABSORPTION ELEMENTS
RIGID
RIGID ABSORPTION MAKES POSSIBLE
SIMPLIFIED FIXING
RAPID LAYOUT
ON SPECIFIC SPOTS
60% CHANGE
RIGID
ELASTIC ABSORPTION
20%
RIGID
FLEX SUPERSAFE
0%
ELASTIC
ELASTIC
ELASTIC
ELASTIC
EXTRO-SLIM
THE IMPACT
FORCE OF
STANDARD
BLOCK BARRIER OUTDOOR
ADVANCED
SUPERIOR
SUPERIOR +
Impact
monitoring
system
Modularity
MODULARITY
CATEGORY OF TYPE OF ANCHORING SYSTEM SUITABLE FOR OUTDOOR TRACKS WITH WIDE RUN-OFF AREAS.
ABSORPTION BARRIERS LEVEL OF IMPACT ABSORPTION: STANDARD
ACCESSORIES
see the list of components
SPECIAL FEATURES
VERSION
GROSS DIMENSIONS NET DIMENSIONS MODIFIED ABSORBING BOTTOM VERTICAL STACKING BALASTING (WATER OR SAND)
BLOCK BARRIER OUTDOOR 100.40.50 1400 X 400 X 500 1000 X 400 X 500
BLOCK BARRIER OUTDOOR 220.40.50 2600 X 400 X 500 2000 X 400 X 500
CATEGORY OF TYPE OF ANCHORING SYSTEM SUITABLE FOR INDOOR TRACKS ON LESS EXPOSED AREAS.
ABSORPTION BARRIERS BOTH SIDE USAGE - SINGLE LANE BARRIER
LEVEL OF IMPACT ABSORPTION: ADVANCED
ASYMMETRIC
SYMMETRIC
ACCESSORIES
see the list of components
BLOCK BARRIER INDOOR 50.40.50 900 X 400 X 500 500 X 400 X 500
BLOCK BARRIER INDOOR 100.40.50 1400 X 400 X 500 1000 X 400 X 500
BLOCK BARRIER INDOOR 200.40.50 2400 X 400 X 500 2000 X 400 X 500
CATEGORY OF TYPE OF ANCHORING SYSTEM SUITABLE FOR INDOOR; ON MOST PARTS OF THE TRACK.
ABSORPTION BARRIERS LEVEL OF IMPACT ABSORPTION: SUPERIOR
ACCESSORIES
see the list of components
flex connector
VERSION
DIMENSIONS
CATEGORY OF TYPE OF ANCHORING SYSTEM SUITABLE FOR INDOOR; ON MOST EXPOSED PARTS OF THE TRACK.
ABSORPTION BARRIERS LEVEL OF IMPACT ABSORPTION: SUPERIOR +
ACCESSORIES
see the list of components
VERSION
DIMENSIONS
TRACK (MLT)
STRUCTURES
RAMP MLT to MLT
CURVED RAMP
RAMP MODULES LEVELED MODULES BANKED SEMI-OVAL BSO TO BSO MLT TO MLT RAMP
CURVED
KEY FEATURES
PRECISELY DESIGNED TRANSITIONS COMPLETE COMPATIBILITY OF MODULES
• DESIGN AND CALCULATION BASED ON GLOBAL • COMPLETE ACCORDANCE WITH THE STANDARD
STANDARDS REQUESTS OF WORLD‘S SAFEST KARTING TRACKS
SUPPORT FRAMES
• ENSURES SOLID STRUCTURE SUPPORT • ALLOWS OPTIMAL SELECTION OF IMPACT
ABSORBING ELEMENTS
• BRINGS COMPLETE FREEDOM IN GROUND
FLOOR TRACK LAYOUT DESIGN
1. 4.
360K FLOOR COATING SOLUTION IS A LOW VISCOSITY AND
SOLVENT FREE WATER BASED TWO-PART EPOXY TOP COAT.
360 Karting provides the standard technical requirements For the best results and long-term performance of 360K
for successful long-term application of the Floor coating Floor coating solution, the floor must be prepared and
solutions and off-site support by 360K track installation cleaned before the application. The preparation procedure
team. can be done based on detailed instructions, provided
within the 360K FCS manual.
RUN-OFF ZONES PIT AREA AND STARTING GRID 2. DESIGN:
AND TRACK ISLANDS Complete pit area and starting grid
4. APPLICATION:
Floor coating with extremely enhanced visuals to enhance the overall racing The floor coating solutions (FCS) design is a
grip to maximize energy absorption experience complementary part of the Concept design service. This 360K floor coating solution should be applied following
before impact service is based on consideration of the track layout and the precise procedure, depending on various atmospheric
optimized coating application. The service is provided by and other technical factors. For this purpose 360K
3. 6. 360 Karting design team. installation team will ensure continuous supervision by
an expert person, including the pre-check of the surface,
application method and after application test. This service
is included with the turn-key project installation service.
ACCESSORIES
THEM INTO THREE GROUPS FOR EACH KEY ON-TRACK POSITIONS: TRACK
ACCESSORIES, PIT AREA ACCESSORIES AND HOSPITALITY ACCESSORIES.
2 color starting LED lights. Red and Catwalk modules for safe walking
green emitting diodes. Standard throughout the Pit-Stop zone.
size PEHD housing mounted on Polyethylene shell, metal sheet
aluminum structural truss and leg covering of walking surface
impact protectors. Comes with metal and double steel console for
anchoring bases and connection set. installation. this product will
Compatible with timing software. increase safety and aesthetic
factor of your Pit-Stop area.
SIGNALISATION PANEL
PIT AREA SAFETY RAILING
HELMET HOLDER
LIGHT BOX
WINNER’S PODIUM
1. 2. 3. 4. 5. 6. 7. 8.
On-site inspection Set of documents, Physical on-site It’s the last technical
• WE WORK WITH GLOBAL LOGISTIC COMPANIES
based on predefined including detailed presence of 360K step before the track
• WE OFFER THIRD PARTY CERTIFIED QUALITY AND QUANTITY INSPECTIONS checkpoints done plan of resources team of installation accepts the drivers.
• WE USE PROVEN PROCEDURES FOR SPECIFIC NATIONAL CERTIFICATE REQUIREMENTS by qualified 360K based on specific specialists.
installation specialists. track concept, on-site The success of track
The scope of this technical conditions, On-site management testing, done in
service is ensuring the pre-installation report of available resources accordance with pre-
optimal conditions for and eventual specific to minimize installation defined protocol covers
the further installation requirements. time and ensure all crucial technical
activities. complete conformity aspects and represents
of all installation a key starting point
procedures. for long-term racing
experience in complete
360K works with local safety.
teams of workers and
contractors.
*Lack of structured and well prepared track installation process may result in
unexpected delays and additional pre-opening costs. 360 Karting ensures the
implementation of proven installation process based on experience acquired in
over 50 recent track installations worldwide
SERVICE LOCATION
INTRODUCTION SESSIONS:
IN HOUSE AT 360K EUROPE OR 360K USA
ADVANCED SESSIONS:
ON LOCATION AT CUSTOMER’S TRACK
WE PROVIDE:
PROGRAM START-UP SET
[email protected]
+386 5 901 13 44
www.360karting.com