ANNUAL REPORT
2013-14
VIKASA SOUDHA
JUNE 2014
1
SL. PAGE
CONTENTS
NO. NO.
1 INTRODUCTION
PREFACE
2 ORGANISATIONAL STRUCTURE
NIGAM
12.1.16 VEERABHADRESHWARA
GEOGRAPHICAL AREA
The geographical area of Karnataka is 1,91,791 Sq. Km., accounting for 5.83% of the
total area of the country.
The cultivable command area of the State is 1,40,598 sq. Km. The net sown area is
1,07,000 sq. Km. The ultimate Irrigation Potential under Major and Medium Irrigation
Projects has been estimated as 35,000 sq. Km or 35.00 Lakh Ha.
PROGRESS IN BRIEF
There are 211Major and Medium Irrigation Projects in the State, out of which 60
projects are completed, 151 are ongoing.
The Water Resources Department has established three special purpose vehicles,
namely, Krishna Bhagya Jala Nigama Limited (KBJNL), Karnataka Neeravari Nigama
Limited (KNNL) and Cauvery Neeravari Nigam Limited (CNNL), under the companies Act of
1956, to mobilize financial resources for speedy completion of major and medium irrigation
projects with-in the targeted period.
“Krishna Bhagya Jala Nigam Limited” was formed vide G.O. No. ID/25/WBM/95,
dated: 6-5-94, to expedite the works of Upper Krishna Project (UKP). This Nigam is
functioning since 19th August 1994.
”Karnataka Neeravari Nigam Limited” was formed vide G.O. No. ID: 201: KBN: 98,
dated: 26-11-98, to expedite the works in Krishna Basin, except UKP. This Nigam is
functioning since 9th December 1998.
”Cauvery Neeravari Nigam Limited” was formed vide G.O. No. WRD: 32: KBN: 2003,
Dated: 12.05.2003, to expedite the works in Cauvery Basin. This Nigam is functioning since
3rd June 2003.
2. ORGANISATIONAL STRUCTURE
WATER RESOURCES DEPARTMENT
PRINCIPAL SECRETARY
SECRETARY
ADMINISTRATOR
UKP, B.GUDI CE,
MALAPRABHA
PROJECT
ZONE,
DHARWAD
ADMINISTRATOR
IRRIGATION
PROJECT ZONE, CE, UPPER
GULBARGA BHADRA
PROJECT,
CHITRADURGA
3. ACHIEVEMENTS OF WATER RESOURCES DEPARTMENT DURING
2013-14
Cumulative irrigation potential of 28.37 lakh Ha. has been created from Major &
medium irrigation projects upto end of March 2014.
An irrigated potential of 6,40,542 Ha. has been created so for under Upper
Krishna Project, Such as, NLBC, JBC, NRBC, ALBC, ARBC are nearing
completion.
For efficient & effective water management under the Command Areas of Major
& medium irrigation projects, Water Resources Department has established
2831 Water Users Co-operative Societies.
FIC has been given priority in order to bridge the gap between potential created
and utilized. During 2013-14, FIC’s have been created for 56627 Ha. under
CADA.
During this water year, regulation of water has been managed effectively.
Approval has been obtained from CWC and Planning Commission, GoI, New
Delhi for the Project Report of Modernization of Narayanapur Left Bank Canal
under Upper Krishna Project amounting to Rs.3752.18 crores, to improve water
use efficiency (WUE) and to provide water to the tail end suffering Atchkat of
about 1,00,000 Ha.
In order to accelerate the land acquisition and R&R works due to submersion of
rising of Almatti dam to the height of 524.25 mtrs, a High Level Committee has
been constituted under the Chairmanship of the Hon’ble Chief Minister and
Action Plan Review Committee has been constituted under the Chairmanship of
Chief Secretary.
During 2013-14, under Upper Krishna Project Stage III, progress of Mulwad
LIS, Chimmalagi LIS, Koppal LIS, Indi LIS (extension) Narayanapur Right Bank
Canal, Rampur LIS (extension), Mallabad LIS and Herakal LIS works have been
accelarated.
The largest micro-irrigation scheme in the Country, i.e., Ramthal (Marol) LIS to
irrigate an area on 24,000 ha. with an estimated cost of Rs.767.00 crores is
entrusted on turnkey basis and the works are in progress.
For the early completion of some of the ongoing irrigation projects, which were
lingering due to shortage of funds for many years, the Government of India launched the
Accelerated Irrigation benefit programme, during 1996-97. Since then, 11 projects in the
State, namely, Upper Krishna project (UKP) Stage-I, Phase-III, Malaprabha, Hirehalla,
Ghataprabha, Karanja, Upper Krishna project (UKP) Stage-II, Maskinala, Varahi, Bhima
LIS, Guddadamallapura LIS,and Gandhorinala have received / are receiving Central Loan
Assistance (CLA) / (CA) under Accelerated Irrigation benefit programme (AIBP).
During 2013-14, Guddadamallapura LIS, Varahi, Hipparagi and Bhima LIS are
the 4 projects that have received C.A. under A.I.B.P.
The cumulative C.A. (including grants) released upto end of March 2014 under
AIBP & PM’s package is `.5893.50 crores. The cumulative expenditure incurred
on these projects up to the end of March 2014 is `. 9808.66 crores.
Hon’ble PM’s Special Package:- During 2006-07, the Special Rehabilitation Package was
launched by the Government of India to mitigate the distress of farmers in selected 31
districts of the Country from where large numbers of Suicide cases by the farmers were
reported.
Malaprabha and Ghataprabha are already receiving Central Assistance under AIBP.
Markandeya, Chiklihole and Votehole projects are completed. Hippargi, Dudhganga, ERM
of Bheemasamudra tank and Modernisation of canal systems of Bhadra are availing central
assistance under this package.
Details of central assistance received under AIBP & PM’s Special Package during
2013-14 are as follows:
Details of Central Assistance (CA) under AIBP and PM’s Package during 2013-14
(`. in Crores, Potential in Hectares.)
Central Central
Expenditure till Assistance
Sl. Assistance
Name of Project 03/2014 during received during
No. sought during
2013-14 2013-14
2013-14
1 Guddadamallapura LIS 13.50 22.11 22.11
2 Bhima LIS 62.15 141.27 141.27
3 Varahi 74.31 19.51 19.51
4 Hipparagi 208.74 16.93 16.93
TOTAL 358.70 199.82 199.82
Sl. 1996- 1997- 1998- 1999- 2000- 2001- 2002- 2003- 2004- 2005- 2006- 2007- 2008- 2009- 2010-
Project 2011-12 2012-13 2013-14 CUMULA
No 97 98 99 2000 2001 02 03 04 05 06 07 08 09 10 11
TIVE
2 UKP Stage-II - - - - - 250.00 275.05 163.48 204.68 233.79 183.47 102.07 8.019 85.00 150.18 - - 1655.73
3 Malaprabha 1.50 12.00 10.00 13.50 - 10.00 25.56 - 12.00 20.00 13.50 35.34 49.44 110.53 0.00 90.72 98.29 502.38
4 Hirehalla 2.75 6.00 6.00 8.00 8.00 10.00 8.78 14.71 - - - - - - - - - 64.24
5 Ghataprabha - 15.00 12.50 20.00 45.00 5.00 75.00 13.02 62.09 65.00 30.805 29.04 95.61 56.16 20.6 - - 544.82
6 Karanja - 7.50 16.00 15.64 18.00 10.00 34.37 75.27 - - - - 12.25 - 0.00 - - 189.03
Guddadamallapura
11 - - - - - - - - - - - - - 32.40 24.84 - - 22.11 79.35
LIS
TOTAL 61.25 90.50 94.50 157.14 171.00 492.50 620.85 266.48 396.30 344.64 349.49 259.73 277.40 540.55 248.24 270.56 109.88 182.89 4933.89
Expenditure (`. in Crores)
Sl. 1996- 1997- 1998- 1999- 2000- 2001- 2002- 2003- 2004- 2005- 2007- 2009- 2010- 2011- 2012- 2013-14 CUMUL
Project 2006-07 2008-09
No 97 98 99 2000 2001 02 03 04 05 06 08 10 11 12 13 A
UKP Stage-I -
1 155.74 92.30 77.58 116.40 187.80 235.33 214.69 94.19 92.18 61.13 46.19 50.10 239.11 57.51 134.44 36.73 135.10 2026.52
Phase-III
2 UKP Stage-II - - - - - 534.10 352.29 236.48 268.17 272.29 234.58 119.51 76.98 104.10 100.66 129.90 24.05 - 2453.11
3 Malaprabha 5.12 14.92 22.64 9.87 5.15 15.87 14.45 14.42 19.64 19.62 31.28 56.37 27.72 28.20 94.81 79.20 80.35 - 549.63
4 Hirehalla 11.35 17.12 12.06 15.82 22.68 11.41 11.69 9.94 18.45 - - - - - - - - - 130.52
-
5 Ghataprabha - 20.47 28.82 20.04 26.96 72.77 57.57 55.45 64.68 92.47 77.29 76.90 44.56 65.22 84.22 115.54 - 902.96
6 Karanja - 15.68 29.95 28.48 25.67 26.55 23.62 18.64 - - - - 10.78 8.27 21.92 7.07 - - 216.63
7 Gandhorinala - - - - - 15.35 16.82 10.09 12.34 27.73 34.96 - 17.97 23.79 - - - - 159.92
74.31
9 Varahi - - - - - - - - - - 32.85 81.22 64.76 49.68 41.76 18.91 63.17 426.66
62.15
10 Bhima LIS - - - - - - - - - - - - - 30.18 38.37 53.36 76.11 260.17
Guddadamalla 13.05
11 - - - - - - - - - - - - - 6.66 31.59 21.43 5.90 78.63
pura LIS
TOTAL 172.21 160.49 171.05 190.61 268.26 911.38 693.00 440.57 475.46 473.24 457.15 384.10 481.88 373.61 547.77 462.14 384.68 149.51 7197.11
DETAILS OF PROJECTS ASSISTED UNDER AIBP PROGRAMME (YEARLY)
UKP Stage-
1 114.00 57.00 155.74 100.00 50.00 92.30 100.00 50.00 77.58 100.00 100.00 116.40 100.00 100.00 187.80 200.00 200.00 235.33
I Phase-III
3 Malaprabha 3.00 1.50 5.12 24.00 12.00 14.92 20.00 10.00 22.64 27.00 13.50 9.87 - - 5.15 20.00 10.00 15.87
4 Hirehalla 5.50 2.75 11.35 6.00 6.00 17.12 6.00 6.00 12.06 8.00 8.00 15.82 8.00 8.00 22.68 10.00 10.00 11.41
5 Ghataprabha - - - 30.00 15.00 20.47 25.00 12.50 28.82 40.00 20.00 20.04 45.00 45.00 26.96 30.00 5.00 72.77
6 Karanja - - - 15.00 7.50 15.68 16.00 16.00 29.95 15.64 15.64 28.48 18.00 18.00 25.67 20.00 10.00 26.55
8 Maskinala - - - - - - - - - - - - - - - - - -
Total 122.50 61.25 172.21 175.00 90.50 160.49 167.00 94.50 171.05 190.64 157.14 190.61 171.00 171.00 268.26 545.00 492.50 911.38
(As on 31-3-2014)
(`.in Crores)
Contd....
UKP Stage-I
1 181.00 181.00 214.69 - - 94.19 115.85 98.48 92.18 39.01 17.38 61.13 74.87 76.18 46.19 94.46 71.23 50.10
Phase-III
3 Malaprabha 25.56 25.56 14.45 - - 14.42 12.00 12.00 19.64 20.00 20.00 19.62 54.00 13.50 31.28 60.27 35.34 56.37
Ghataprabh
5 75.00 75.00 57.57 13.01 13.015 55.45 62.09 62.09 64.68 65.00 65.00 92.47 123.21 30.81 77.29 99.33 29.04 76.90
a
7 Gandorinala 17.87 17.87 16.82 - - 10.09 19.05 19.05 12.34 8.47 8.47 27.73 55.87 45.53 34.96 - - -
Total 621.97 620.85 693.00 266.47 266.48 440.57 463.05 396.30 475.46 336.70 344.64 473.24 494.97 349.49 457.15 410.22 259.73 384.10
Contd…
2008-09 2009-10 2010-11 2011-12
Sl. No Project CLA CLA CLA
CLA Expenditu CLA Expenditur CLA CLA Expenditur CLA Expenditur
Sanctio Sanction Sanctione
Released re Released e Sanctioned Released e Released e
ned ed d
UKP Stage-I 57.51 0.00 134.44 149.45 134.50 36.73
1 102.14 91.92 239.11 169.97 152.98 212.06
Phase-III
2 UKP Stage-II 44.14 8.019 76.98 94.45 85.00 104.10 166.88 150.18 100.66 - - 129.90
3 Malaprabha 33.94 49.44 27.72 135.00 110.53 28.20 56.20 0.00 94.81 100.80 90.72 79.20
4 Hirehalla - - - - - - - - - - - -
5 Ghataprabha 57.82 95.61 44.56 99.05 56.16 65.22 22.89 20.60 84.22 - - 115.54
6 Karanja 37.53 12.25 10.78 - - 8.27 4.88 0.00 21.92 16.95 - 7.07
8 Maskinala - - - - - - - - - - - -
9 Varahi 22.41 20.17 64.76 29.24 26.32 49.68 5.70 0.00 41.76 8.73 - 18.91
10 Bhima LIS - - - 65.16 58.64 30.18 59.35 52.62 38.37 50.38 45.34 53.36
Guddadamall 6.66 24.84 31.59 31.90 - 21.43
11 - - - 36.00 32.40 27.60
apura LIS
Total 316.00 277.40 481.88 660.90 540.55 373.61 555.56 248.24 547.77 358.21 270.56 462.14
Contd…
CUMULATIVE
2012-13 2013-14
Sl.No Project
CLA CLA Expenditure CLA CLA Expenditure CLA
Expenditure
Sanctioned Released upto 03/13 Sanctioned Released upto 03/13 Released
- - -
1 UKP Stage-I Phase-III - - 135.10 1380.67 2026.52
Sl.No Project CA CA CA CA CA CA CA CA CA
Expendi CA Expendi Expendi Expen Expendit
Sancti Releas Sancti Sanctio Release Sancti Releas Sanctio Releas
ture Released ture ture diture ure
oned ed oned ned d oned ed ned ed
1 Hipparagi - 52.84 78.50 115.36 80.87 99.05 114.78 124.24 281.20 281.20 348.28 143.36 129.03 244.74
2 Votehole 0.29 1.62 - - - - - - - - - - - -
Modernisation
3 - 220.88 45.26 32.44 127.93 47.64 108.49 258.14 58.98 0.00 147.10 58.49 52.64 225.46
of Bhadra
4 Dudhganga - 5.49 1.22 3.83 11.68 3.01 0.00 9.10 4.08 3.67 6.21 0.42 - 7.84
ERM of
5 Bheemasamudra - - - - - - 4.30 3.48 0.00 4.30 0.00 0.00 4.00 - 2.00
tank
Total 0.00 0.29 280.83 124.98 151.63 220.48 154.00 226.75 391.48 348.56 284.87 501.59 206.27 181.67 480.04
ERM of
5 Bheemasamudra - - - - - - 3.48 2.00
tank
Programme & Progress of Special Development Plan for the year 2013-14 under Major
& Medium Irrigation Projects
ABSTRACT
(Rs. in lakhs, Potential in Ha.)
Annual
Programme for
Revenue Name of the
Sl No District Taluk 2013-14
division project
Fin. Phy.
Fin. Phy.
Progress Progress
1 2 3 4 5 6 7 9 12
KARNATAKA NEERAVARI NIGAM LIMITED (KNNL)
Afzalpur
Gulbarga Amarja 3000.00 1000 1030.97 442
Aland
Lower
Chincholi Mullamari 1000.00 313 783.9 0
Project
1 Gulbarga Gulbarga Gandorinala 500.00 113 1518.17
Chittapura Bennithora 1000.00 200 2767.60 0
Singatalur 23500.00 10000 17078.77 10446
Bellary Hadagali Filling up of 10
Tanks of 1500.00 - 1145.00
Hoovinahadagali
Total Gulbarga 30500.00 11626 24324.41 10888
Chikkamagal N.R pura
ore Tarikere
Challakere
Hosadurga Upper Bhadra
2 Bangalore Chitradurga 19000.00 0 26717.29 0
Chitradurga Stage-I
Hiriyur
Tumkur Sira
Kolar Chikkaballapur
Chikkamagal Ubrani
3 Mysore Tarikere 500.00 0 1151.45 0
ur Amrutapura
23
Cammand Area Development Authority (CADA):
Annual Programme 2013-14 Progress upto 03/2014
Works Financial Financial
Physical Physical
(In Lakhs) (In Lakhs)
FIC (Hectares) 27289 174757 9302.34 56626.97
Ayacut Roads (Km.) 15438 2749 8675.79 1694
FDC (Hectares) 6430 159696.80 4524 134676
Land Reclamation 12074 60107 1397 5363
Total (CADA) 44659.72 20292.86
24
6. WATER RESOURCES DEVELOPMENT ORGANISATION
OBJECTIVES OF W.R.D.O.
PLANNING AND INVESTIGATION UNIT:
The vision of this organisation is to identify the sources of water to meet the
increasing demand of the various user sectors of water and to formulate technically and
economically feasible water resource projects with reference to availability of water and
allocated water. The target is to bring out more areas under irrigation. The objectives of P
& I unit are as below:
25
Examination of feasibility in respect of representation received for the proposals of
Major and Medium irrigation projects, Hydro electric projects, industrial water requirement,
scheme for drinking water supply etc.,
Water Resources Projects, are also prepared for inter-basin transfer of water from the
surplus basin to deficit basin.
The unit is vested with the responsibility of scrutiny of proposal related to industrial
use, Hydro and thermal power stations.
o Flood Flow Canal to feed water to the suffering atchcut of TLBC and
provide irrigation facility.
In addition to the investigation works of Major and Medium Irrigation Projects, the
following works are also dealt by this unit.
Requisitions from public regarding Water Resources Department are answered within
the stipulated period of one month and updated periodically in the Departmental
Website.
26
GEOMATICS CENTRE:
1) Data base of Water Resources Information System from micro to macro level
which includes Integration of entire water availability, utilization and requirement
etc., can be generated.
2) A data base indicating each revenue survey boundary under the atchkat, can be
generated using R.S. & GIS technology.
4) Project wise planning & water budgeting can be made for optimum utilization of
the water as per State Water Policy.
1) Preparation of different Maps for K.G & Cauvery Units of Central Office based on
information provided by the respective units.
2) Generation of Isohyetal and Zonal re-organization GIS Maps in digital formats for
Karnataka.
27
3) Catchment area GIS maps with influencing rain gauges for the 236 Major, medium and
minor irrigation projects for Dam Safety preparedness as per the requirement of hydrology
unit is being prepared and provided to hydrology unit.
5) Preparation of GIS digital Maps of all hydro meteorological stations of Karnataka State as
per the information provided by the hydrology unit of Central Office is completed.
6) GIS Digital Map of all the projects coming under Krishna river basin of Karnataka,
Maharastra and Andhra States has been prepared and furnished to Krishna Godavari unit of
Inter State Water dispute for Krishna Tribunal.
7) GIS Map of the garland canals of Netravathi river diversion scheme for project No.1, 2 and 3
from the input data of ALTM (Air Borne Laser Terrain Mapping) survey provided by NRSC
Hyderabad has been prepared and handed over to planning unit.
8) Maintenance and updating of Water Resources Department website. The website address is:
http://waterresources.kar.nic.in.
9) Acquiring different Resources data pertaining to Karnataka State and furnishing to the
Government in connection with Chennai- Bangalore-Chitradurga Industrial corridor.
28
gauging stations spread all over the State for analyzing and validation of Hydrometric and
Hydro meteorological data.
The following Meteorological stations are working under the Jurisdiction of WRDO:
A. Hydrological Stations:
1. Current Meter Gauging Stations - 32
2. Stage Discharge Stations - 10
3. Silt and Sedimentation observations stations - 22
B. Hydro meteorological Stations:
1. Fully Climatic Stations - 87
2. Autographic Rain gauge Stations - 166
3. Standard Rain gauge Stations - 759
The data obtained from these Hydrological and Hydro meteorological stations are
scrutinized, analyzed and processed. The data of Rain gauge Stations maintained by Water
Resources Development Organization are published by the Department of Economics and
Statistics after obtaining the data from the concerned Tahasildar office’s of the respective
Taluks. Also the daily inflow, outflow of the major and medium reservoirs, weirs and
anicuts are collected from respective zones and are being processed. Besides this, yield
studies are being carried out for the irrigation, drinking and power projects. H.M.datas are
being sent daily to KSNDMC.
This unit is collecting and compiling the rainfall data and flow data of our State
regularly. This data is being used for carrying out water availability studies for the newly
proposed projects which are being proposed by planning unit of Water Resources
Development Organization. Also the yield is being revised of existing projects whenever
needed. This unit is carrying out the flood studies of the new projects whenever it is
required. Apart from this, letters are being addressed to project authorities to get the daily
data of Reservoirs and Anicuts which will also be used for the preparation of water year
books of Reservoirs and Anicuts. These data are being given to the users on their request.
This unit is preparing and furnishing yield for the following projects:
Evaluation and review of safety of large dams in the State coming under Major,
Medium and Minor Irrigation Zones is being carried out under the guidance of Dam Safety
Review Panel Constituted under Chairmanship of Ex-chairman Central Water Commission
and consisting of Panel of Experts.
There are 143 large dams in the State, which are more than 15 m in height or store 60
mcum or more water. The Dam Safety Review Panel was constituted by the Government
vide GO. No. WRD : 35 : DSP : 2004 Bangalore, Dated 23-01-2007, under the Chairmanship
of Dr Y.K Murthy, former Chairman, CWC, New Delhi, and the Superintending Engineer,
Monitoring and Evaluation, Bangalore, as the Convener of this Panel. The Panel evaluates
the safety review of each dam after inspecting the dam by the Panel of experts and furnishes
recommendations. The main panel has inspected 41 dams and all the inspection reports have
been submitted. The Dam Safety Review Panel (DSRP) was re-constituted under the
Chairmanship of Shri A.K. Bajaj, Ex-Chairman, Central Water Commission, New Delhi,
vide GO No: WRD : 10 : DSP : 2011 : Dtd. 27-04-2012.
Apart from the above 143 dams as referred above, government has constituted two
separate teams for inspecting remaining large dams coming under Major and Medium
Irrigation Projects Zone vide GO. No. WRD 22: DSP : 2006 Dated 04-12-2006 and two
more teams have also been formed to inspect large dams coming under Minor Irrigation
Zone, vide GO. No. WRD: 18 : DSP : 2006, Dated 28-05-2007. These Teams have so far
inspected 77 dams and all the inspection reports are submitted.
30
Second round of inspection of all the large dams will be commenced during 2014-15.
Vide G.O. No. ID 49 MBI 95 (Part III) Bangalore, Dated 01/01/1996, the Chief
Engineer, (Now Superintending Engineer) Monitoring and Evaluation, Bangalore has been
appointed as Member-Secretary of the High Level Committee for monitoring the National
Bank for Agriculture and Rural Development assisted ongoing major, medium and minor
irrigation projects in Karnataka under the Chairmanship of Development Commissioner,
GOK. Now the NABARD assisted projects progress is reviewed by the Empowered
Committee under the Chairmanship of Development Commissioner, Government of
Karnataka.
Six medium irrigation projects and 88 minor irrigation projects are taken up in the
State under the assistance of NABARD under RIDF-I. Likewise one major irrigation project
and 3 minor irrigation projects were taken up under RIDF-II, under RIDF-III one minor
irrigation project, under RIDF-IV 20 MI projects, under RIDF-V one MI project, under
RIDF-VI 36 MI projects, under RIDF-VII 15 M.I projects, under RIDF-VIII 76 MI projects,
under RIDF -IX 191MI projects, under RIDF-X 191 MI projects, under RIDF-XI 290 MI
projects, under RIDF-XIII 831 MI projects and under RIDF-XIV 358 MI projects, under
RIDF-XV- 416 MI projects, under RIDF- XVI-274 MI projects and under RIDF – XVII-354
MI projects have been taken up.
This Office consolidates the expenditure figures of works from the concerned project
authorities, verify the same and submit the proposals to the Government for obtaining
reimbursement from Nabard.
During this Year proposals have been obtained from project authorities to the tune of
Rs. 135.71 crores and after verification, proposals to the tune of Rs. 107.61 Crores have been
submitted to Government to seek reimbursement from NABARD.
30 Projects under CADA are taken up in the State with assistance of NABARD under
RIDF XVI. The Claims of expenditure incurred by various CADA are consolidated and
submitted to Government for onward transmission to NABARD for reimbursement. During
31
this year Rs.21.95 Crores worth proposals have been submitted to Government for
reimbursement.
WATER RATES:
The season wise and crop wise details of area irrigated and demand raised year wise
are being collected from all irrigation projects coming under irrigation zones, same is
consolidated and reports are submitted to Government.
The Inter State Water Dispute Unit headed by the Chief Engineer (I.S.W.) is
functioning in WRDO under Water Resources Department. The staff members consisting of
the Superintending Engineer, Executive Engineer, Assistant Executive Engineers, Assistant
Engineers, Second Division Assistants, Stenographers & Typists are performing the works of
Inter State Water Disputes in Krishna-Godavari Unit.
32
The Cauvery unit of Water Resources Development Organisation, Bangalore deals with the
matters concerning sharing of waters of the River Cauvery with the other riparian States viz.,
Tamil Nadu, Kerala and Union Territory of Pondicherry.
CAUVERY UNIT:
To safe guard the interests of Karnataka and to substantiate the stand of the
Government before the Supreme Court/Cauvery water Disputes Tribunal a team of
Advocates along with the Advocate General of Karnataka is appointed and their services are
being utilised.
The Cauvery Water Disputes Tribunal was set up by the Ministry of water Resources,
Government of India, vide its Notification dated: 2.6.1990 with Head Quarters at New Delhi
for adjudication of the Cauvery Water Dispute.
To render technical advice in Cauvery Water Disputes matter two Technical Advisors
were appointed by the Government and their services are still being continued.
Cauvery Technical Committee was constituted in 05.02.1992 with the sole intention
of giving valuable advice to the Government on Cauvery Water Disputes matter and
necessary action to be taken by the Government both in the Tribunal as well as Supreme
Court.
1.1 The Krishna Water Disputes Tribunal (Bachawat Tribunal) constituted in April 1969
for adjudication of the water disputes regarding the Inter-State River Krishna and the
River Valley thereof, emerging from the letters of complaint of Mysore (present
Karnataka), Maharashtra and Andhra Pradesh, gave its first report in December, 1973
and further report containing the final order in May, 1976.
1.2 According to Bachawat Tribunal, the enbloc allocation to the 3 States under Scheme
‘A’ including regeneration is as under:
33
A Master Plan Committee constituted to formulate schemes for effective
utilization of Karnataka’s share of water gave its report in 2002 making scheme wise
allocation.
1.3 The Bachawat Tribunal had also devised the Scheme 'B' to allocate surplus waters
available in the Krishna Basin and recommended for allocation of 25% to
Maharashtra, 50% to Karnataka and 25% to Andhra Pradesh. But this is not a part of
the Order of the Tribunal.
1.4 Considering the Complaints filed by the 3 basin States, for constituting a Water
Dispute Tribunal in the matter of sharing of surplus water available in Krishna River
Basin, the Central Government constituted the new Krishna Water Disputes Tribunal
on 02.04.2004. The officials of this unit have worked with full effort in assisting the
Technical Committee constituted for giving necessary technical advice to argue
effectively the right of the State and the legal team by providing necessary
information from time to time during preparation for arguments before the Supreme
Court and the Tribunals.
1.5 In the report given by the Krishna Water Disputes Tribunal-II on 30th December,
2010, fresh availability of water has been estimated and the State of Karnataka has
been allocated 911 tmc. This is an additional quantity of 177 tmc., apart from the
previous allocation of 734 tmc made by the Bachawat award. Apart from this, the
order to utilize 303 tmc by increasing the height of Almatti dam from the existing
519.6 m to 524.256 m is an achievement of the State. The Krishna Water Decision
Implementation Board has to be set up by the Union Government for implementation
of KWDT orders, in which a representative of the State has to be nominated, as per
the directions of the Tribunal.
1.6 The State of Andhra Pradesh has filed a SLP before the Supreme Court, challenging
and opposing several points contained in the report of the Tribunal given on
30.12.2010.
1.7 After hearing the applications filed by the Party States seeking Explanation /
Guidance and Clarifications on the Final Order given by the Tribunal under Sec.5(3)
of the Act, the KWDT gave its Further Report containing Final Order on 29.11.2013.
34
1.8 Without modifying the allocations made by KWDT-I at 75% dependability (including
return flow), the allocations made by KWDT-II under different dependabilities are as
follows:
The State of Andhra Pradesh and Karnataka have filed SLP in the Supreme Court,
seeking legal clarifications on several points contained in the Final Order and Further
Report issued by the Tribunal on 29.11.2013. The 3 SLP’s including the SLP filed by
Andhra Pradesh questioning the Tribunal Order of 30.12.2010 will be taken up for
hearing on 21.07.2014.
2.1 The Godavari Water Disputes Tribunal (Bachawat Tribunal) constituted in April 1969
for adjudication of the water dispute regarding Inter-State River Godavari and the
river valley thereof emerging from the letters of Andhra Pradesh, Mysore (now
Karnataka), Maharashtra, Orissa and Madhya Pradesh States, gave its report on 27th
November, 1979 by incorporating the bipartite / tripartite agreements entered by the
Party States and Further (final) Report on 7th July 1980,. Only Manjra Sub-basin of
Godavari Basin is in Karnataka and the State has a share of 22.37 tmc in Godavari
basin.
2.2 As per the agreement in the final order of the Tribunal, by constructing Polavaram
project by Andhra Pradesh, 80 tmc of Godavari waters can be diverted to Krishna
basin. Karnataka can utilize 23 tmc (21 tmc + 10% regeneration) additional water in
Krishna basin from the date of approval to Polavaram Scheme by Central
Government. Schemes have been formulated to utilize this water.
2.3 The state of Orissa has filed an Original Suit (O.S.4/2007) before the Hon’ble
Supreme Court, praying for stay of clearance given by the Government of India. The
State of Karnataka has filed an impleadment application on the legal advice, for
35
intervening in the case since the availability of water to the State is affected by
diversion of waters from Polavaram to Vijayawada according to the GWDT orders.
There is no information about further hearings.
3.1 Malaprabha dam was constructed during 1972 across river Malaprabha at
Naviluteertha, Belgaum district. In view of the reduction in the inflow of Malaprabha
river at the dam site, the meeting of drinking water needs of Hubli and Dharwad cities
has become a difficult task. To overcome this difficulty, a scheme has been evolved
to supply drinking water, by diverting 7.56 tmc of water to Malaprabha basin from
Karnataka portion of Mahadayi basin.
3.2 Government of Goa kept on opposing the drinking water Scheme by stating that
Mahadayi is a deficit river basin and by this, diversion will have adverse impact in
Goa.
3.3 The Ministry of Water Resources, Government of India, on 30.04.2002, accorded ‘in
principle clearance’, for this scheme. On account of the protest by Goa, Union
Government kept the above clearance ‘in abeyance’ on 19th September 2002.
3.4 The States of Karnataka, Maharashtra and Goa submitted their complaint regarding
distribution of Mahadayi River Waters to the Government of India. Based on the
complaints, Government of India constituted Mahadayi Water Dispute Tribunal to
resolve the issues on 16.11.2010. Accordingly the Original Suit O.S-4/2006 filed by
the Government of Goa was dismissed by the Supreme Court in its order dated
20.01.2011. In order to argue effectively on behalf of State of Karnataka before the
Tribunal, the Government has constituted legal team consisting of nine other
advocates under the leadership of
Sri. F.S. Nariman, Senior Counsel. The officers / staffs of this unit are working in a
similar manner as done for Krishna Water Disputes Tribunal.
3.5 Proceedings before the newly constituted Tribunal began on 06.09.2012. During the
hearing of the interlocutory application filed by State of Goa, requesting the
Tribunal to restrain the State of Karnataka from constructing the projects in
36
Mahadayi basin, the Tribunal ordered the Party States to file their Statement of Case
on 16.12.2012.
3.6 Accordingly, the States of Karnataka, Maharashtra and Goa have filed their
Statement of Cases on 02.01.2013, 02.01.2013, 07.02.2013 respectively before the
Tribunal. Replies and rejoinders are filed by the Party States.
3.8 As per the order given by the Tribunal during the sitting from 22.10.2013 to
24.10.2013, site inspection of Mahadayi basin was taken up by the Tribunal and
Party States from 12.12.2013 to 24.12.2013.
3.9 Proceedings before the Tribunal was resumed on 04.03.2014, the State of Goa was
permitted to file the amended Statement of Case and interlocutory application. For
this, the State of Karnataka filed its replies and State of Goa filed its rejoinders
before the Tribunal.
4.1 Andhra Pradesh has raised an Inter State Water Dispute in the matter of Minor
Irrigation Projects of Tumkur and Kolar districts and Paragodu project drinking
water supply scheme. It has filed Original Suit (O.S. No. 5/2003) before the
Hon’ble Supreme Court and the arguments are under progress. In connection with
the above matter Andhra Pradesh has proposed two witnesses. The Cross
examination of the Andhra Pradesh witness have been completed. The Cross
examination of the three witness from Karnataka also have been completed.
4.2 When the suit came for hearing on 03.09.2013 it was instructed to club the case
along with Civil Appeal No.2453 which was filed before the Supreme Court in
2007 by the State of Karnataka challenging the order given by Cauvery Water
Disputes Tribunal under Sec.5(2) of the
ISWD Act, 1956. The next date of hearing is not yet fixed.
37
V. CAUVERY UNIT:
1. Cauvery unit under WRDO renders technical assistance to the Advocates engaged by
the State to appear on its behalf before the Cauvery water Dispute Tribunal and
Supreme Court in respect of Cauvery Water Disputes work. This unit also prepares
documents and other materials required in connection with the disputes.
2. This unit deals with the related correspondence with the Central Government and
other State Governments.
7. Making arrangements for conferences with Senior Advocates at Bangalore & New
Delhi.
8. In order to provide Technical support in all respects to the Legal Team regarding
preparation of case, filing of pleadings, Interlocutory Applications, Special Leave
Petitions, Original Suits and assistance during arguments etc., of Karnataka before the
Cauvery Water Dispute Tribunal and the Supreme Court of India, an office was
established and named as Cauvery Water Cell at New Delhi in 1990 and which is
still functioning in the premises of Karnataka Bhavan-III (Bheema), HUDCO Place,
Andrews Ganj, New Delhi.
38
Progress during 2013 -14
Before The Cauvery Water Disputes Tribunal:-
The Cauvery Water Disputes Tribunal rendered its Decision on 05.02.2007 which
was notified by Government of India in the Gazette on 19.02.2013.
Tamil Nadu filed I.A. Nos. 5 of 2013, 6 of 2013 and 7 of 2013 in Civil Appeal
No.2456/2007 seeking directions from the Supreme Court to direct Government of India to
constitute Cauvery Management Board and Cauvery Water Regulation Committee to
effectively implement the Final Order of Cauvery Water Dispute Tribunal.
As the Constitution of the Cauvery Management Board and the Cauvery Water
Regulation Committee would take longer time to be established, State of Tamil Nadu insisted
that there should be a mechanism for effectively implementing the Final Order and Decision
of the CWDT. This led to the formation of the pro-tem Supervisory Committee by the
Supreme Court.
The Supreme Court in its order dated 10.05.2013 directed Government of India to
Constitute a Supervisory Committee for implementation of the Final Order dated: February
5, 2007 which was notified on February 19, 2013. Accordingly, Government of India
constituted the Supervisory Committee on 22.05.2013.The Supervisory Committee has so far
conducted four meetings regarding the flows to be made available by Karnataka to Tamil
Nadu.
Tamil Nadu and Karnataka filed Written Submissions on 02.01.2014 and 03.01.2014
respectively. Supreme Court heard the Civil appeal nos.2453/2007(Karnataka), 2454/2007
(Kerala) 2456/2007(Tamil Nadu) on 15.01.2014 and ordered to list this group of matters
39
‘For Directions’ on March 12, 2014. Matter did not come up on that day, due to the
Constitution Bench which was adjudicating the education matter.
Civil Appeals and related matters which are pending before the Supreme Court are
yet to be listed for hearing.
Financial Aspects:
The total grants allotted for Cauvery, Krishna & other Water Disputes for the year
2013-14 is Rs. 1782.33 Lakhs, under Head of Account 2701-80-001-0-19 (Technical)-015
(Subsidiary Expenses). Out of total grant Rs. 917.40 lakhs, the amount released for Cauvery
Water Dispute is Rs 294.40 Lakhs. The expenditure incurred during the year 2013-14 for
Cauvery Water Dispute is Rs. 294.40 Lakhs.
Experts Committee for the Project planned for diversion of West Flowing River:
A committee has been constituted under the Chairmanship of Sri D.N. Desai, Retd.
Secretary for a detailed review of the earlier Master plan and to prepare a revised
master plan for effective utilization of the quantity of water allocated on Karnataka has
under KWDT-I and II and the additional water which will be made available to the state
after the completion of present ongoing proceedings under Section 5(3) of tribunal.
The committee comprises of both official, non-official members. The Chairman of the
Committee has submitted the report to the Government on 5-1-2013 for approval.
40
Mahadayi Master Plan Committee:
In order to utilise maximum water in Mahadayi basin by diverting it into Krishna basin
a committee has been constituted under the Chairmanship of Sri. J.R.K. Karadi,
Retired Engineer-in-Chief to study and submit the Draft Master Plan to Government.
Committee conducted several meetings and inspected the site. Master plan has been
submitted to government on 10-12-2013.
S.R.Committee:
The Schedule of Rates Committee for preparing the Schedule of Rates for the year
2013-14 was constituted by Govt., vide GO No.WRD: 112:KBN: 2013 Bangalore
Dated 18/09/2013, with Sri. Shivashankar, Retired Secretary Irrigation Department
and Chairman, Technical sub-committee, Cauvery Neeravari Nigama as the Chairman
of the committee. The committee conducted four meetings for discussion and
finalization of the draft S.R. for the year 2013-14 was submitted to the Government.
The Schedule of Rates for the year 2013-14 was approved by the Government and
brought into effect from 10-01-2014 vide GO No.WRD: 112:KBN: 2013 Dated
02/01/2013 in the Water Resources Department ( Major & Medium Irrigation)
including all the three nigamas viz., Cauvery Neeravari Nigama Niyamitha, Karnataka
Neeravari Nigama Niyamitha and Krishna Bhagya Jala Nigama Niyamitha and all
other non-nigama zones.
Expert Committee formed for identifying water resources to meet the long term
water requirement of Bangalore City.
A committee has been formed under the Chairmanship of Sri. B.N. Thygaraja, Retired
Chairman, Bangalore Water Supply and Sanitation Board in the Government order
dated: 25-11-2010. The committee is formed to formulate the project for meeting the
water supply requirement of Bangalore city for the next 50 years as a long term
measure. The committee is conducting meetings and working towards identifying the
various resources available to meet the increasing requirement. The committee has
conducted 25 meetings and submitted its final report to the Government.
41
(1) Inspection reports / Audit paras outstanding as on 31/03/2014:
Inspection report in the beginning of 2013-14 : 24
Total No. of paras pending : 36
The details are enclosed in the Annexure-5
Draft replies for the above questions are submitted to the Government.
42
7. CENTRAL MECHANICAL ORGANISATION
INTRODUCTION :
The zone of Central Mechanical Organization, Bangalore has been established during
1984 and is functioning at present with the assistance of 3 divisions and 14 sub-divisions.
The jurisdiction of the zone is state-wide & will be rendering suitable advice regarding
mechanical aspects. The head of this organization is re-designated as Chief Engineer,
Hydrology and C.M.O., Bangalore having its head quarter at Bangalore vide G.O. No: 27
SESAA dt: 23/9/1999.
This report consists only that of the activities of C.M.O.
1. The main duties and functions of the organization are briefly as follows:
i) Inspection of sick machinery in the Public Works and Water Resource Department
and
scrutiny / sanction of repair estimates.
ii) Disposal of surplus and unserviceable machinery.
iii) Rehabilitation of surplus vehicles / machinery.
iv) Review of efficiency and performance of machinery.
The Central Mechanical organization is striving hard to achieve the above objectives
since its inception and the report on the achievements during 2013-14 is as follows:
2. In order to ensure optimum utilization of machinery, available in Public works and
Irrigation department, the monthly returns of machinery of divisions are being obtained and
reviewed regularly for its various performance aspects such as: a) fuel usage b) oil
usage c) Kms. Run with reference to standards fixed d) idleness surpluses and
rehabilitation e) sick vehicles / equipments identification and its speedy repairs f)
disposal of unserviceable machinery are reviewed and follow up action ensured until
their disposal through Central Mechanical Organization.
1. In order to achieve the above objectives, the monthly returns of machinery, along
with requirement and surplus availability details are got regularly from Civil divisions and
the same is reviewed. For this purpose presently, computer is being made use of.
4 To review the optimum utilization of the available machinery and at the same time
arrange for the requirement from out of the surplus availability so that unnecessary purchase
is avoided.
6. Apart from the Irrigation & PW Departments, this organization assists other
Government departments in inspecting sick machinery, repairing the same or scrutinizing
the estimates prepared thereby.
44
Major Developments / Highlights of the year:-
Apart from the routine repairs works carried out by the sub-divisions of this
organization, surprise inspections of vehicles/ equipments are conducted in order to
prevent under logging and proper upkeep of the documents of vehicles and such
instances if any, are being reported to Government.
Achievements during 2013-14:
II. Inspections
IV) In the process of major repairs to vehicles, useful assemblies and accessories
of scrapped vehicles were identified and utilized on repairs.
V) This organization is also inspecting vehicles / equipment pertaining to Boards /
Corporations and Central Government after levying inspection fees.
VI) Review has been taken up regarding expenditure incurred on repairs and time taken
for such repair in workshops. After detailed review limit has been fixed for expenditure
to be incurred on repairs and time limit for carrying out repairs.
45
4) Disposal of surplus and unserviceable machinery
Disposal of unserviceable machinery in Water Resources & Public Works Department
which have been recommended for scrap during routine course of inspection.
NOTE:- Even though programme is drawn out , it mainly depends upon the inflow of
machinery for repairs which cannot be predicated in advance . However the progress is
monitored monthly and suitable action is being taken whenever lapses are observed.
Major Hurdles :- Even though C.M.O. is exclusively created and entrusted with the task
of repairing the sick machinery, it is observed that many civil divisions are not observing the
instructions issued by Government i.e., the vehicles are not sent to Government C.M.O.,
workshops for repairs. On the other hand, repairs are carried out by the civil divisions
themselves, depriving the C.M.O. from performing its functions.
REMEDY:- It is proper to utilize the Mechanical Engineers and Mechanical staff under
C.M.O. to the optimum capacity. The Government may issue instructions to the Heads of
46
different departments to get the repairs of their vehicle / equipments in C.M.O., workshop
only. Also proposal to stay the organization has also been submitted to Govt. Proposal regd.
Re-strengthening of CMO has also been submitted to Govt. as suggested by A.G. if proper
orders are issued optimum utilization of services of technical staff can be ensured.
Filling up of vacancies:- Since the origin of this organization the vacancy position in key
technical posts like Assistant Engineers, Junior Engineers, Mechanics and Foremen have not
been filled up fully at any point of time. As on date the percentage of vacancy in these cadre
is as under.
Sanctioned Working % of Vacancy
Strength Strength
Assistant Engineer 58 40 68.96%
Junior Engineers 46 31 67.39%__
Remedy:-
From the above, it could be made out that without full cadre strength, works cannot
be carried out to the optimum capacity.
V. CONCLUSION:-
Viewing the aims, functions and the achievements of the C.M.O., it is imperative that
this organization needs to be strengthened and due encouragement with all the necessary co-
operation from the various Civil Divisions has to be imparted to it to achieve ever lasting
results in the up-coming of the organization.
47
8. KARNATAKA ENGINEERING RESEARCH STATION, K.R.SAGAR
Karnataka Engineering Research Station was started during 1944 as a small Research
Unit. The Research Station, which forms a wing of the State Water Resources Department,
had a phenomenal growth and today it is one of the oldest Research Organizations of its kind
in the country. The main objectives of the Research Station are to find solutions to various
problems encountered by the field Engineers in Civil Engineering discipline. The Research
Station has solved many intricate problems posed by Public Works Department, Water
Resources Department, other Civil Engineering Departments and other agencies.
The Director of the rank of Chief Engineer heads the Research Station. He is assisted
by the Joint Director, who is also the Principal of Engineering Staff College, which is a wing
of K.E.R.S.
The activities of the Research Station are grouped into 4 divisions as under.
Hydraulics Division
Technical Services Division
Soil Mechanics & Foundation Engineering Division
Coastal Engineering Division
Hydraulics Division:
Model studies of various components of irrigation & power projects like spillway and
energy dissipating arrangements, assessment of carrying capacity of canal system by
backwater computation, gauging of canals, calibration of current meters, capacity evaluation
of reservoir by conventional hydrographic survey as well as remote sensing techniques are
the studies entrusted to this division.
48
collection of daily rainfall and hydro-meteorological data, maintenance of buildings and
quarters of KERS, maintenance of library are other works entrusted to this division.
The main objectives of this division are to investigate the causes of coastal erosion
along coast line of Karnataka, collection of field data and suggest remedial measures to
contain coastal erosion and conduct model studies if necessary. Also pre monsoon and post
monsoon monitoring of sea walls and monthly monitoring of sea walls constructed by Port
Authorities are being done by this Division.
Through the above Divisions, the Research Station has been playing a key role in
solving many Engineering problems in the field of hydraulics, concrete, building materials,
soil, rocks and problems connected with roads, sea erosion etc.
49
Creation of Dam Safety Organisation:
The Engineering Staff College conducts mainly three types of training Courses.
Chapter 2.0: Achievements of the last two years and the year of reporting
-
- - - - -
This format is not applicable to this Institution. The Grant allotted (Works Portion) and
expenditure incurred by KERS including Engineering Staff College is furnished.
Physical Achievements :
Year 2011-12 :
During the year 2011-12, 254 Nos. of studies covering Hydraulic studies, Rating of
current meters (51 Nos), Gauging of canals, Capacity evaluation of reservoirs, Testing of
Building Materials, Soils, Water quality testing, monitoring of sea walls, design of sea wall
sections etc., referred by different agencies have been completed and reports sent to
51
concerned authorities and 21 studies are under progress. 14 studies are held up for want of
details from project authorities.
During the year 7 Nos. of Orientation courses, 7 Nos. of short term courses and 9
Nos. of Special Training Courses were conducted and 1045 candidates were trained. Further
26 CEP courses, 4 SCP Courses and 1 TSP Course were conducted and 463 candidates were
trained. Totally 1508 candidates were trained during the year up to end of 31st March 2012
Year 2012-13:
During the year 2012-13, 258 Nos. of studies covering Hydraulic studies, Rating of
current meters (44 Nos), Gauging of canals, Capacity evaluation of reservoirs, Testing of
Building Materials, Soils, Water quality testing, monitoring of sea walls, design of sea wall
sections etc., referred by different agencies have been completed and reports sent to
concerned authorities and 23 studies are under progress. 6 studies are held up for want of
details from project authorities and another 4 canal gauging works has been held up, as the
Project authorities have not provided necessary infrastructure at the selected gauging sites.
During the year 3 Orientation courses for the Probationary AEE’s, 6 short term
courses for Minor Irrigation Engineers and 19 short term institutional courses were
conducted and 660 candidates were trained. Further 35 CEP courses, 5 SCP Courses and 1
TSP Course were conducted and 554 candidates were trained. Totally 69 courses were
conducted and 1214 candidates were trained during the year up to end of March 2013.
52
Year 2013-14 :
During the year 2013-14, 214 Nos. of studies covering Hydraulic studies, Rating of
current meters (26 Nos), Gauging of canals, Capacity evaluation of reservoirs, Testing of
Building Materials, Soils, Water quality testing, monitoring of sea walls, design of sea wall
sections etc., referred by different agencies have been completed and reports sent to
concerned authorities and 23 studies are under progress. 3 studies are held up for want of
details from project authorities and another 3 canal gauging works has been held up, as the
Project authorities have not provided necessary infrastructure at the selected gauging sites. 3
studies have been dropped.
During the year 10 Orientation courses and 4 short term courses were conducted and
495 candidates were trained. Further 26 CEP courses, 5 SCP Courses and 3 TSP Course were
conducted and 400 candidates were trained. Totally 48 courses were conducted and 895
candidates were trained during the year up to end of March 2014.
The design report for providing of the permanent sea wall in Hosabetta near
Bykampadi village of Mangalore Taluk at 25.975 KM to 26.150 KM, 26.225 KM to
26.275 KM, 26.300 KM to 26.325KM and 26.350KM to 26.400KM ( totally 300.00
meters) has been submitted to Executive Engineer, Port and Fisheries Division udupi.
The reports pertaining to design of sea wall ; from Chainage 136.600KM to
136.687Km of Shiroor, Kulihitlu town ; from Chainage 130.971KM to 131.057KM
of Paduvari town ; from Chainage 48.200KM to 48.285KM , 48.110KM to
48.195KM, 48.350KM to 48.435KM of Tenkayermal ; from Chainage 68.689KM to
68.767KM Kidiyur, padukere ; from Chainage 77.750KM to 77.837KM Hooda
Pradesha kooraga in Udupi; from Chainage 34.00KM to 34.300KM & from Chainage
34.590KM to 34.890KM of Shasihitlu town in Mangalore have been submitted to
Executive Engineer, Port Division, Udupi
53
Post monsoon monitoring of 21 sea walls in Bhatkal Taluk, 27 works in Kumta and
32 works in Honnavara Taluk were completed.
Effect on quality of river water due to return flow from irrigated land ( Cauvery River
between K.R.Sagara and T. Narasipura ) is being finalised.
Study on evaluation/assessment of properties of concrete using manufactured sand
and natural sand is in progress.
A new basic study to analyse the quality of ground water in Bilikere Grama
Panchayath limit of Hunsur taluk has been taken up and is in progress.
A regional flood frequency study encompassing 43 gauge stations of the entire
Cauvery basin in Karnataka was completed and got reviewed by NIH Belgaum.
A regional flood frequency study encompassing 138 gauge stations of the entire
Krishna basin in Karnataka was completed in the lines of Cauvery basin study and got
reviewed by NIH Belgaum.
A regional flood frequency study encompassing 23 gauge stations of the West
Flowing River Basin in Karnataka was completed and got reviewed by NIH Belgaum.
The above three research reports ultimately help in preparation of a flood manual for
Karnataka after Validation of the recommended Regional Flood equations. Validation
aspects are to be finalized and taken up in the forth coming years, in association with
the WRDO Bangalore
Design flood studies of three MI Tanks referred by MI department have been
scrutinized and findings have been submitted to the authorities.
Design Flood Study of Tonnur Tank, referred by CNNL has been completed and
report submitted.
Rain Fall Data of 262 rain gauge stations located in Cauvery Basin has been analyzed
by L-Moment Method and fitting 5 different 3-parameter distributions viz., GEV,
GLO, GPA, LN3 and PE3 to find extreme values of different return periods. Thiessen
Polygons of the Rain Gauge network and Isopluvial maps of precipitations of
different return periods for Cauvery Basin have been prepared based on the locations
of RG stations and estimated extreme values.
Model study for energy dissipation arrangement of Devarabilikere pickup project is in
progress.
Model study on gate operation schedule for Upper Tunga Project is in progress.
54
Model study for the construction of bridge cum barrage across Bhima river near
Jholathadagi, of Yadgir Taluk in Gulbaraga was completed and interim report
submitted to Chief Engineer, KBJNL, Bhimarayanagudi.
Study on radial crest gate operation schedule of Kanva Reservoir is in progress.
Gauging of Tungabhara LBC at M-47, M-60, M-69and Ch.28 was completed and
report submitted to the concerned authorities.
Gauging of Turvekere and Nagamangala distributary canal at 175m and 340 m was
completed and report submitted to the concerned authorities.
Gauging of Tumkur branch canal at ch. 30324m, 32510m and 62700m coming under
Hemavathy LBC would be taken up after the project authorities provide necessary
infrastructure.
Gauging of Vishveshwaraiah link canal at ch. 37 km and 27 km coming under
Hemavathy LBC would be taken up after the project authorities provide necessary
infrastructure.
Gauging of Hemavathy LBC at Ch. 181.85 km and 182.30 km near Nagamangala
Taluk would be taken up after the project authorities provide necessary infrastructure.
Gauging of D.Devaraja Urs canal at various chainages were completed and report
submitted to the concerned authorities.
Gauging of Pandavapura branch canal at ch. 153.025 km coming under Hemavathy
LBC was completed and report submitted to the concerned authorities.
Study to assess the improvement in efficiency of major canals in Karanataka after
their modernization was taken up. Initially the canals coming under TLBC would be
studied and subsequently the study on other canals would be taken up.
Study to assess the source of silt in Tungabhadra reservoir is being initiated and
shortly expression of interest would be notified.
Test on embankment soil sample of Vishnusamudra Tank (Ch. 500.00 to 950 m) near
Kadur taluk, Chikamagalore district is completed and report will be sent after the
payment of testing charges.
Test on embankment soil sample of Hemavathi left canal branch at chainage 614.00m
near Nagasamudhra tank is in progress.
Test to determine SBC of soil sample for construction of office building of the
Executive Engineer, CNNL, D&I Division, Bannur is in progress.
55
Test on CBR for NABARD road work referred by AEE, CNNL, sub division,
Pandavapura is in progress.
Test on road aggregate & bitumen for road under NABARD connecting Bangalore-
Mysore Sri-Rangapatana KRS road near 10th mile of RBLL in Sri-Rangapatana
taluk, Mandya district referred by AEE, CNNL, Gauging sub division, K.R.Sagar is
in progress.
Test on road aggregate & bitumen for road under NABARD connecting Naganahalli
village on Bangalore-Mysore road to Lakshmipuram village in Mysore taluk referred
by AEE, CNNL, Gauging sub division, K.R.Sagar is in progress.
Test on soil sample of Our lady of victory church, Somavarpet, Kodagu district was
completed.
Determining of Swell pressure on soil sample of Kattepura right bank canal CC lining
report was sent to the concerned.
Test on soil sample pertaining to Karnataka Housing Board, Saraswathipuram,
Mysore, MIG No. 59 was completed.
Soil test report regarding construction of bridge near Madavamanthri canal at Kukure
distributary canal at chainage 0.500, 1.400, 2.200 was sent to the concerned.
Report on testing of soil samples for the Construction of 5 lakh litres of capacity
GLSR tank near Kadakola, Mysore, was sent to the concerned..
Soil test for the new hostel building foundation at KERS was completed.
Test on foundation soil for construction of Government first grade college, Koppa,
Maddur taluk, referred by Arun construction was completed.
Test on soil samples for the construction of building at Shree Sai Erators pvt ltd., at
Hebbal Industrial area, Mysore was completed.
APMC two package roads, Gundalpet regarding improvements to road:-Quality
control result completed and final report was sent to the concerned.
Testing of aggregates and bitumen used for the asphalting work of Basaralu road
referred by AEE, No.32, HLBC, CNNL was completed.
CBR test pertaining to oad development work between Tumbasoge and Itna village
referred by AEE, Kabini Reservoir Sub Division, CNNL was completed.
A study on improving the strength of soil in Varahi Project area is in progress.
A study on Black cotton soil sample by mixing lime and Rock Dust is in progress.
56
A study on improving CBR value of Varahi soil sample by mixing admixture is in
progress.
For the year 2013 -14 a grant of Rs. 190.56 lakhs was sanctioned to KERS under the
head of account 2701-80-004-1-05 plan, survey works. With this grant the following
works were carried out ; landscaping work in front of the ESC office and hostel
building , construction of open type dining hall in the hostel and construction of semi
field gauging demonstration channel in Brindavan area. The construction of new
hostel building is in progress.
The Dam Safety Cell is assisting the Member Secretary, State Level Dam Safety
Committee in Karnataka in the following activities in respect of Dam Safety issues:
1. Communicating the deficiencies observed in the Health Status reports of Large
dams to the Chief Engineers, concerned.,
3. Finalisation of the draft compliance for the minutes of the National Committee on
Dam Safety.
4. Finalisation of the Additional Note on Agenda for the ensuing meeting of NCDS.
5. Pursuing the Chief Engineers in-charge of large dams to send the following.
c) Other details keeping in view the proceedings of NCDS / SLDSC and the
“Terms of reference of SLDSC”.
The Dam Safety Cell-2, attached to the Director, Karnataka Engineering Research
Station, comprising of One Assistant Executive Engineer, including 3 Assistant Engineer’s,
3 Junior Engineer’s and supporting administration staff has been created by the Government,
vide Government Order No. WRD-60 /¸ÉøÀJ / 2009 dt: 06-07-2009 ( read with modification
57
letter No. WRD 60 /¸ÉøÀJ / 2009 dt: 03-08-2009), is assisting the Member Secretary, State
Level Dam Safety Committee(SLDSC) in Karnataka, in carrying out the following functions
from 01-06-2009.,
To prepare the Agenda Notes for the meetings of the State Level Dam Safety
Committee (SLDSC) before the meeting and to prepare the Draft Proceedings after
the meeting and to submit the same to the Government for confirmation
Communicating the copies of the approved proceedings to all the concerned and to
pursue them for communicating compliance.
To pursue with all the concerned to communicate the “Technical Preparedness” of the
zone / organization ( as appropriate) for the Draft Dam Safety Act and to place the
same for discussions before the special meeting of State Level Dam Safety
Committee (SLDSC) to finalise the Technical Preparedness of the whole State for the
“Dam Safety Bill-2010”.
To place the issues pertaining to the following for discussions in the Special Meeting
of State Level Dam Safety Committee (SLDSC), viz.,
a) Action to be taken at various level after the enactment of the “Dam Safety Act”.
The 32nd meeting of NCDS was held on 27-12-2013 at New Delhi. The minutes of
the meeting received from Central Water Commission, New Delhi has been communicated to
all Chief Engineers in-charge of Large Dams with request to communicate the compliance to
the said minutes vide ltr No. 4676-97 dated: 03-02-2014.
58
Review of Health Status Report of Large Dams in Karnataka:
During the year 10 Orientation courses and 4 short term courses were conducted and
495 candidates were trained. Further 26 CEP courses, 5 SCP Courses and 3 TSP course were
conducted and 400 candidates were trained. Totally 48 courses were conducted and 895
candidates were trained during the year up to end of March 2014.
.
No.of courses
Sl. Category of training No.of persons
conducted upto 31st Remarks
No programme trained
March 2014
2. CEP 26
3. SCP 5 400
4. TSP 3
Total 48 895
59
2.3.4 Audit observations / Inspection findings:
Audit inspection party has conducted audit inspection of Technical Services Division
and SSWBO Sub Division of KERS for the period 2009-10 to 2012-13 from 24.03.2014 to
02.04.2014.
60
(b)Training programmes outside State :
No of
Details of training programmes. officers/staff
attended
Water Quality Monitoring Techniques” held at CWRDM, Kerala from 2
19-11-2013 to 23-11-2013
Two day workshop on Design Flood Issues held at New Delhi from 2
19-11-2013 to 20-11-2013
Orientation Programme
61
Orientation Programme
62
9. WATER AND LAND MANAGEMENT INSTITUTE (WALMI)
Introduction:
To maximize returns from investments made in irrigation projects in the State, it is necessary
to manage water and land in a systematic and scientific way. This requires capacity building
of Government Staff as well Water Users. To meet these capacity building needs, Water and
Land Management Institute (WALMI) started functioning at Dharwad on 12-5-1986 and was
later registered as a Society under the Karnataka Societies Registration Act, 1960 on
16.06.1986. WALMI: imparts training; renders technical assistance, advises Government on
legal, policy, organizational and procedural changes; organizes demonstrations in
collaboration with other organizations; conducts special studies and brings out publications.
Training:
WALMIs training activities focused on the training required for implementation of the State
Water Policy and the Irrigation Sector Reforms. Special emphasis was laid on training on
Participatory Irrigation Management, Water Management and Land Development. Office
bearers of Water Users Cooperative Societies throughout the State as well as some farmers
were also trained by WALMI. As against a target of 2940 persons to be trained, 3451
persons were trained during.
Technical Assistance:
WALMI rendered technical assistance to the Water Resources Department and organizations
coming under the Department on implementation of State Water Policy, Participatory
Irrigation Management and necessary legal and policy changes.
Financial Progress:
During the year, WALMI received Grant-in-aid of `.172.00 lakhs under Command Area
Development. Total expenditure of `.174.44 lakhs was incurred during the year up to end of
March 2014.
64
PROJECTS UNDER
65
10. HIGHLIGHTS OF KRISHNA BHAGYA JALA NIGAM
LIMITED FOR THE YEAR 2013-14
10.1 1. Upper Krishna Project Stage – III:
Upper Krishna Stage-III is contemplated to provide irrigation for 5.30 lakh Ha.
command area coming under Bijapur, Bagalkot, Gulbarga, Yadgir, Raichur, Koppal
and Gadag Districts of Northern Karnataka.
The progress of project sub-components under UKP Stage-III including R&R
& LAQ and BTDA have been expedited during 2013-14. During 2013-14 an
expenditure of Rs.914.83 Crores has been incurred for implementation of UKP
Stage-III Project. Irrigation Potential of 14,145 Ha. is created under UKP Stage-III
Projects (Chimmalgi, Indi, Rampur & Mallabad LIS). The progress achieved under
UKP Stage-III Project implementation during 2013-14 are as under:
A. Mulwad LIS :
a) Head Works of Mulwad LIS
Stage–III viz; (a) Balance electro-
mechanical works at Baluti 1st
Head Work, (b) Balance civil and
electro-mechanical works at
Hanumapur 2nd Head Work, and
(c) 3rd Head Work at Masuti are in
advance stage of progress.
c) Tenders invited for initial 10 Km reach of both Bijapur & Malghan Main
Canals of Mulwad LIS Stage-III.
d) Estimates for 4th-A Lift on Malghan Canal & for and for further KMs of Main
Canals of Bijapur & Malghan Canal are under finalization.
66
B. Chimmalagi LIS :
a) Water let out in the completed
Combined Canal of 2.10 Km, West
Canal Km 0.00 to 20.00 & East
Canal Km 0.00 to 13.00 including
Distributaries to provide irrigation
for 2,473 Ha.
D. Rampur LIS :
67
E. Koppal LIS :
(a) 1st and 2nd Head Works awarded on turnkey basis and works are in
progress.
(b) Consultancy work of detailed survey investigation, preparation of design,
drawing, estimate and bid document for adopting Micro-irrigation System
under Koppal LIS is commenced.
F. Herkal LIS :
G. NRBC Extension:
(a) The works of extension of NRBC Main canal from Km 95.00 to 125.00
awarded under 6 packages and works have been commenced.
(b) Consultancy work of detailed survey investigation, preparation of design,
drawing, estimate and bid document for NRBC Main Canal from Km
125.00 to 168.00 is in progress.
H. Mallabad LIS :
(a) 1st Head Work of Mallabad LIS at KM 20.90 of JBC near Balabatti village
awarded on turnkey basis is almost completed. Also, Main Canal KM 0.00
to 4.00 under Lift No.1 is completed.
(b) 2nd and 3rd Head works of Mallabad LIS at KM 20.00 on MBC and at KM
5.40 of SBC respectively awarded on turnkey basis and works are in
advanced stage of progress.
(c) Main Canal KM 0.00 to 10.00 coming under 2nd and 3rd Head Works of
Mallabad LIS awarded in packages are in progress.
(d) Power Line work for Lift No.1 of Mallabad LIS is in progress.
(b) The work of base-line socio-economic survey and preparing R&R frame
work for UKP Stage-III through consultancy is completed.
(c) To review and accelerate the land acquisition and R & R works due to
raising of Almatti dam upto RL 524.25 Mt., a High Power Committee under
the Chairmanship of Hon’ble Chief Minister is constituted vide GO dated
29.10.2013 and the 1st meeting of the High Power Committee was
conducted on 12.12.2013 under the Chairmanship of Hon’ble Chief
68
Minister, GOK. Also, the 1st meeting of Action Plan Review Committee
constituted under the Chairmanship of Chief Secretary to Government on
16.01.2014.
(d) In the Action Plan Review Committee held on 17.01.2014, it was decided
to formulate and finalise guidelines for considering payment of land
compensation to the LAQ proposals initiated earlier also as per the new
Land Acquisition Act.
(e) Out of the 20 villages to be rehabilitated under submergence of Almatti
Reservoir, by conducting Grama Sabhas for 12 villages, the lands for
relocating rehabilitation centres are identified and land acquisition process
is also initiated.
(f) Under Unit-II of Navanagar, Bagalkot the infrastructure works viz; Water
Supply, Storm Water Drain, Roads, UGD System and Electrification works
awarded and commenced.
2. New initiatives :
(a) Narayanapur Left Bank Canal – Extension, Renovation and
Modernisation (NLBC-ERM) project.
The Detailed Project report for Narayanapur
Left Bank Canal – Extension, Renovation
and Modernisation (NLBC-ERM) project
submitted by KBJNL and the State
Government has been cleared in the
Technical Advisory Committee (TAC) of
CWC, Ministry of Water Resources,
Government of India in it’s meeting held on
08.10.2013 for Rs.3752.18 Crores (2012-13
PL). Also, the Planning Commission, GOI
accorded investment clearance for the Remodeling work of JBC Main
project. This NLBC-ERM project is one of Canal
the largest such projects in India and
proposes to use innovative technologies
like ICT, SCADA & Automation to ensure
equitable distribution of water amongst
farmers.
As part of the approved project, the
remodelling of Main / Branch Canals of
NLBC, SBC, MBC, JBC & IBC have been
awarded on tender basis and works
commenced. The works will be completed
in the closure period of 2014 by end of June
2014. Also, the work of SCADA based
Automation and GIS System for NLBC &
HBC Network (Phase-I) is awarded on Layout of SCADA based Automation
tender basis and work is in progress.
69
The estimates for remodelling of Distributaries and Lateral networks under
NLBC canal network are under finalisation and the works are planned for
implementation during 2014-15. The total implementation period of the
NLBC-ERM project is 3 years.
Under 2nd Stage of Ramthal (Marol) LIS, the works of providing Drip Irrigation
System for 24,000 Ha. of command area in Hungund taluk of Bagalkot district
(in lieu of 12,600 Ha. as contemplated in conventional system of irrigation)
have been awarded under 2 packages via; East Side Area 11,300 Ha.
(Package-I) and West Side Area 12,700 Ha. (Package-II). The works are in
progress. The scope of project includes O&M for 5 years. This is one of the
largest single project in the world of its nature taken up in KBJNL. More than
20,000 farmers are to be benefited under the scheme.
Laying of main Drip pipelines under Ramthal (Marol) LIS 2nd stage for Drip Irrigation System
Administrative approvals for the following new schemes have been accorded
by the Government during 2013-14 for implementation of projects under
KBJNL.
(i) Nandawadagi Lift Irrigation Scheme.
(ii) Budihal-Peerapur Lift Irrigation Scheme.
70
(iii) Filling up of Mamadapur, Sarwad, Babaleshwar, Butanal, Begaum
Talab and Tidagundi tanks in Bijapur district by lifting water from river
Krishna.
(iv) Sankh Lift – Filling up of 4 MI tanks project in Indi taluk.
(v) Bhuyyar Lift - Filling up of 8 MI tanks project in Indi taluk.
71
UPPER KRISHNA PROJECT
A) About Krishna Bhagya Jala Nigam Limited:
In order to accelerate the implementation of the Upper Krishna Project (UKP)
by mobilising resources from the capital market, KBJNL was incorporated on 19th
August 1994 under the Companies Act, 1956 as Company, wholly owned by the
Government of Karnataka for planning, investigation, estimation, execution,
operation and maintenance of all components coming under the UKP. The Company
is funding the Rehabilitation and Resettlement of the people affected by the Project.
The company is authorised to let out water and recover revenues from individuals,
groups of farmers including Water Users Co-operative Societies, Towns, City
Municipalities and Industries.
72
Under KWDT-II Award, the allocation made for Upper Krishna Project Stage –
III is 130.90 TMC. It is contemplated to provide irrigation for 5.30 Lakh Ha. under
UKP Stage– III in the command coming under Gulbarga, Yadgir, Bijapur, Bagalkot,
Raichur, Koppal & Gadag Districts in Northern Karnataka. In accordance with the
“in-principle” administrative approval for Rs.17,207.00 Crores (PL 2011-12)
accorded by the Government vide G.O. Dtd:24.01.2012, implementation of project
components of UKP Stage – III viz: Mulwad, Chimmalgi, Indi, Mallabad, Koppal,
Herkal, Rampur LI Schemes and NRBC Extension works have been taken up and
are in various stages of progress.
Cumulative expenditure of Rs.1568.04 Crores has been incurred on UKP
Stage – III Projects works till March 2014.
Under UKP Stage– III total irrigation potential of 26,718 Ha. is created till
March 2014 (under Chimmalgi, Indi, Rampur & Mallabad LI Schemes).
C) Barrages across River Bhima, Krishna under Krishna Basin and across
River Manjra in Godavari Basin:
73
(c) Across River Manjra (Godavari Basin) :
The other Irrigation Projects namely Ramthal (Marol) LIS, Thimmapur LIS,
Teggi-Siddapur LIS, Rolli-Mannikeri LIS, Sonthi LIS, NRBC Distry.No.9A and
Filling up of MI Tanks Projects in Northern Karnataka are being implemented
under KBJNL.
74
KBJNL, DAM ZONE, ALMATTI
Dam Zone Almatti was established on 30.01.1977. Two Circle Office & Eight
Division offices with 24 Sub-Divisions, One Senior Health Office (Class-I) with its 4
Anti-Malaria Units and Deputy Conservation of Forest with its 3 Sub-Divisions comes
under jurisdiction of this Zone.
The projects of Almatti Dam, ALBC, ARBC and Mulwad LIS under UKP
Stage-II, Mulwad, Chimmalagi and Herkal LIS under UKP Stage-III and other
Schemes such as Ramthal (Marol), Timmapur, Teggi-Siddapur, Sonna and Rolli-
Mannikeri LI Schemes comes under the jurisdiction of this Zone. Also, filling up of
MI Tanks in Bijapur & Bagalkot Districts and Landscape & Garden development
works at Almatti Dam site comes under the jurisdiction of this Zone. Status of
projects under KBJNL Dam Zone is as under :
1) Almatti Dam: The work was completed during September 2002 itself and
water is being stored upto FRL 519.60 M and being utilized for irrigation.
Further, as per the KWDT-II Award, the Reservoir Storage at Almatti Dam is
to be raised upto RL.524.256 M. The FRL survey taken up using LiDAR
Technology upto RL 524.256 M is completed.
2) Almatti Left Bank Canal: Head work already commissioned. Total length of
Main Canal is 85.00 KMs. 67 KMs Main Canal under Stage-I is completed.
Under Stage-II, Main Canal KM 67.00 to 85.00 is completed (except balance
work in KM 72 which is in advance stage of completion). Distributaries No.1 to
40 was also completed.
75
An area of 19,707 Ha. is notified for Rabi 2013 and water let out for irrigation
upto Km 67.00 of Main Canal and in Disty.No.1 to 27.
3) Almatti Right Bank Canal: Head work already commissioned. Main Canal of
67.50 Km completed including Distributary No.1 to 24. Out of 9,900 Ha,
potential of 8,940 Ha. is notified for Rabi 2013 and water let out for irrigation.
The scheme contemplates lifting water in two Stages under UKP Stage-II. 1st
and 2nd Head Works viz; Baluti and Hanumapur were already commissioned
(for Stage-II) including the Lead off canal Km 0.00 to 5.00 which leads water
from 1st to 2nd jackwell (for Stage-II requirement).
The Head Works of Mulwad LIS Stage – III namely; (a) Balance Electro-
mechanical works under Baluti 1st Head Work, (b) Balance Civil and Electro-
mechanical works under Hanumapur 2nd Head Work, and (c) Masuti 3rd Head
Works awarded on turnkey basis are in advance stage of progress.
The Lead–off Canal of 5.50 Km length between 1st & 2nd Head work of
Mulwad LIS awarded and work is in progress. Combined Canal of 1.175 Km
of Mulwad LIS Stage-III which caters the discharge for 2.27 Lakh Ha. is
awarded and work is in progress. Further, tenders invited for initial 10 KMs
reach of both Bijapur & Malghan Main Canals of Mulwad LIS Stage-III and are
in process.
76
The Head Work for 1st Phase (4,614 Ha.) of the scheme was completed and
commissioned. Further, balance Civil and Electro-mechanical works of the
Head Work awarded on turnkey basis are almost completed. The Combined
Canal of 2.10 KM length and West Main Canal KM 0.00 to 20.00 including
Distributaries there under are completed and water letout for irrigation.
Further, works under West Main Canal Km 20.00 to 51.92 and East Main
Canal Km 0.00 to 50.00 are also completed. The works of East Main Canal
from Km 50.00 to 90.00 awarded in 4 Packages are in progress. Tenders
invited for East Main Canal Km 90.00 to 132.261 under 2 Packages (including
Aqueduct for Don River Crossing).
Irrigation potential of 5,684 Ha. is created till March 2014. Notified area for
Rabi 2013 is 2,473 Ha. Water let out for irrigation in Combined Canal, West
Main Canal Km 0.00 to 20.00 & East Main Canal Km 0.00 to 13.00.
6) Herkal Lift Irrigation Scheme : This scheme under UKP Stage-III envisages
providing irrigation for 15,344 Ha. in Bilgi Taluk of Bagalkot District. The Head
Works of Herkal (North) and Herkal (South) are awarded on turnkey basis
and works are in progress.
Construction of 1st Head work completed. 1st Stage West Main Canal KM 0.00
to 21.00 and Disty.No.1 to 18 are completed and water letout for irrigation.
Further, West Main Canal KM 21.00 to 62.74 and Disty.No.19 to 25 are also
completed (except NH crossing at KM 24.68). 1st Stage East Main Canal KM
0.00 to 10.00 is completed and water letout. Further, East Main Canal from
KM 10.00 to 46.00 is almost completed and balance reach from KM 46.00 to
51.74 is in progress. Disty.No.1 to 20 is almost completed.
Construction of 2nd Head Work is completed. Under 2nd Stage of the scheme
it was contemplated to provide irrigation for 12,000 Ha. through conventional
system of irrigation. Government vide GO No.WRD/195/KBN/2012 dated
16.08.2012 had accorded Administrative approval for adopting Drip Irrigation
System under 2nd stage of Ramthal (Marol) LIS on Pilot Basis at an estimated
cost of Rs.786.11 crores. Under the Drip Irrigation System, it is planned to
provide irrigation for 24,000 Ha. of Command in Hungund taluk.
The works of providing Drip Irrigation System under 2nd stage of Ramthal
(Marol) LIS in two packages viz; (a) East side area 12,300 Ha. (Package-I)
and (b) West side area 11,700 Ha. (Package-II) are awarded on turnkey
tender basis and works are in progress. The scope of works of providing Drip
Irrigation System includes 5 years of operation and maintenance also.
77
8) Thimmapur Lift Irrigation Scheme: This LI Scheme takes off at KM 5.40 of
Main Canal of ARBC. The Scheme contemplates providing irrigation to
20,100 Ha. of command area of Bagalkot Taluk.
Potential of 16,826 Ha. created to end of March 2014. An area of 5,549 Ha.
is notified for Rabi 2013 and irrigation facility is provided.
10) Sonna Lift Irrigation Scheme: This LI Schemes is taken up on the foreshore
of Almatti Reservoir. Scheme contemplates providing irrigation to 1,055 Ha in
Bilgi Taluk of Bagalkot Dist.
The scheme is completed and commissioned. Water let out for irrigation since
2010.
78
The Government vide GO dated 28.02.2014 has accorded administrative
approval for taking up filling up of Mamadapur, Sarwad, Babaleshwar,
Buthnal, Begaum Talab and Tidagundi MI Tanks in Bijapur district by lifting
water from river Krishna near Devaragennur village at an estimated cost of
Rs.172.92 crores. Tenders invited for the work is in process.
The project has been phased out in stages and development of 77 Acres of
land along the left bank on the D/s of Dam is being implemented under
Phase-I. Musical fountain work is completed and opened to public shows.
Moghal Garden with fountains and entrance plaza works are also completed.
In the later phase of landscape development works, providing water theme
parks, courts etc., are planned in about 220 Acres.
16) SCP-TSP Works:- Under this programme, works like Sprinkler Irrigation
coming under ALBC, ARBC and Mulwad LIS command area and others
works like CC Roads, Drainage, Community Hall etc. to provide basic
amenities to SC/ST beneficiaries are taken up.
79
PROGRAMME AND PROGRESS DURING 2013-14
(a) Details of irrigation potential and the physical programme and progress during
2013-14:
The annual financial programme of this Zone for the year 2013 -14 was
Rs.1039.02 Crores and the financial progress achieved to the end of March-
2014 is Rs.907.10 Crores.
80
KBJNL, O & M ZONE, NARAYANPUR
Considering the vast area already notified and the phase of development of
irrigation in the subsequent period, the Government has accorded sanction for
creation of separate Zone to look after Operation and Maintenance activities of UKP
vide G.O. No.ID/115/WBM/91, Dated: 14/10/1991. Owing to the Government order,
the office of the Chief Engineer, O&M Zone, UKP Narayanpur came into existence
from 03.01.1992. This Zone is brought under Krishna Bhagya Jala Nigam Limited
with effect from 15.11.1995. One Circle, four Divisions and Sixteen Sub-Divisions
comes in the jurisdiction of this Zone.
This Zone has been vested with the responsibility to monitor the water
management in an irrigated area of 1.00 lakh hectares under Stage-I & II of UKP.
This canal wise details of Notified area for irrigation are as under :
Sl.
Canal Notified Area in Ha.
No
1 Narayanpur Left Bank Canal 50,133
2 Rampur Lift Irrigation Scheme 19,311
Apart from Operation and Maintenance of Canal network in NLBC from Km.
0.00 to 78.00, NRBC Km. 0.00 to 82.00 & Rampur LI Scheme, this Zone is also
looking after the following project works:
Rampur LIS under UKP Stage-II contemplates providing irrigation for 20,235
Ha. Already 1st Head Work at Navali and 2nd Head Work at Anehosur, 14 KM
Lead-Off Canal and East Main Canal KM 0.00 to 20.00 including West
Distributary works are completed and water let out for irrigation.
The 1st and 2nd Head Works awarded on turnkey basis are in progress. The
consultancy work of Survey investigation, planning, preparation of design &
drawings, estimates etc. for the Drip Irrigation System is in progress.
g) Nandawadagi LIS :
82
Drip Irrigation System at an estimated cost of Rs.1530.00 crores. The
estimates for Head Works are under finalization.
h) SCP-TSP WORKS :
Under this Zone works of SCP-TSP are being implemented.
The annual financial programme of this Zone for the year 2013-14 was
Rs.577.00 Crores and the financial progress achieved to the end of March-
2014 is Rs.380.95 Crores.
83
KBJNL, CANAL ZONE NO. 1, BHEEMARAYANAGUDI
ORGANISATION:
Canal Zone No.1, Bheemarayanagudi is functioning with two circle i.e.NRBC
Circle No.2, Krishnapur & JBC Circle, Bheemarayanagudi and there are 8 Divisions
and 36 Sub-Divisions coming under the jurisdiction of the Zone.
84
All the works of Main Canal from Km 82.00 to 95.00 and Distry.No.15 to 18
are completed. Certain works of additional laterals taken under on D-15, 16 &
18 are in almost completed.
Against the contemplated command area of 84,000 Ha, irrigation potential
96,120 Ha. is notified for Rabi 2013. Water has been letout for irrigation
under NRBC upto Km 95 including network of Distry. No.1 to 18.
Under UKP Stage-III :
Under UKP Stage-III, extension of Narayanapur Right Bank Canal from KM
95.00 to 168.50 is envisaged to provide irrigation for 61,747 Ha. in Raichur
District. The works of construction of NRBC from KM 95.00 to 125.00 are
awarded in 6 Packages and the works have commenced. Further, the
consultancy work of survey investigation and preparation of estimates for
balance Canal Network from Km 125.00 to 168.50 is in progress.
3. NRBC Disty.No.9(A) :
NRBC Disty.No.9(A) off-takes at KM 55 of NRBC on right side for providing
irrigation for 15,250 Ha. in Deodurga and Manvi taluks of Raichur district.
The construction of NRBC Disty.No.9(A) KM 0.00 to 29.12 (including
Aqueduct from KM 8.18 to 10.48) is completed. Further, the works of Arkera
Branch Distributary KM 0.00 to 22.18 are also almost completed. Wadawatti
Branch Distributary from KM 0.00 to 10.00 is almost completed and works
from Km 10.00 to 27.00 awarded under 4 packages have commenced.
Potential of 455 Ha. is created during 2013-14 under NRBC Disty.No.9(A).
5. Bhima Flank :
This scheme under UKP Stage-III envisage providing irrigation for 21,572 Ha.
in Shahapur taluk of Yadgir district. The technical feasibility of the scheme is
being examined.
85
6. Bridge Cum Barrage Works across River Bhima :
The Sonthi LI Scheme is posed for Central Assistance under AIBP. In-
principle approval for the scheme is obtained from CWC, GOI on
27.04.2012. The DPR prepared for an estimated cost of Rs.600.00 crores
(PL 2012-13) is submitted to CWC on 27.11.2012 and the same is under
examination in Ministry of Water Resources, Government of India.
Potential of 2,429 Ha. is created during 2013-14 under Sonthi LIS.
The Gugal Bridge cum Barrage with installation of 69 Vertical Gates across
River Krishna near Gugal village in Deodurga taluk of Raichur district is
completed during 2012-13. The water stored at the Gugal Barrage is being
utilized by the farmers with their own pump sets for irrigation. The Bridge-
cum-barrage also facilitated communication between Yadgir and Raichur
Districts.
Above remodeling package works are planned for completion by end of June
2014.
SCP-TSP WORKS :
Under this Zone works of SCP-TSP are being implemented.
87
PROGRAMME AND PROGRESS DURING 2013-14
(a) Details of irrigation potential and the physical programme and progress during
2013-14:
(Area in Ha)
Sl Planned Created Programm Progress
N Name of the Project potentia upto e for During
o l March -13 2013-14 2013-14
The annual financial programme of this Zone for the year 2013 -14 was
Rs.624.50 Crores and the financial progress achieved to the end of March-
2014 is Rs.283.07 Crores.
88
KBJNL, CANAL ZONE NO.2, RAMPUR
ORGANISATION:
(a) Indi Branch Canal from Km 0.00 to 172.00 including Distry.No.1 to 46,
(b) Indi Lift Canal works from Km 0.00 to 147.00
(c) Filling up of 20 MI tanks under Indi taluk of Bijapur District (Anachi, Sunkh
and Bhuyyar Lifts)
(d) Itaga-Sangam LIS.
(e) Ghattaraga and Kallur-B Barrages across River Bhima.
The Indi Branch Canal takes off at Km 77.52 of Narayanpur Left Bank Canal,
which is situated about 1 Km away from Kembhavi village of Shorapur taluka in
Gulbarga District and traverses for a length of 172 Km with a head discharge of
2,943 cusecs (83.49 cumecs) through the districts of Gulbarga and Bijapur irrigating
an area of 30,831 Ha. and 1,00,464 Ha respectively (Total 1,31,295 Ha.).
The works of construction of Indi Branch Canal from Km 0.00 to 64.00 are
tackled and completed under Stage-I, Phase-II of UKP creating irrigation potential of
60,721 Ha. The works of construction of Indi Branch Canal from Km 65.00 to 172.00
are tackled and completed under Phase-III of Stage-I to create the balance irrigation
potential of 70,574 Ha. Up to March 2013 total an area of 1,31,584 Ha Irrigation
Potential of 1,31,584 Ha has been created.
The Notified area under IBC for Rabi 2013 is 1,24,111 Ha. and irrigation is
being provided.
89
INDI LIFT CANAL :
Under UKP Stage-II, the Head work of Indi Lift Irrigation Scheme and the
Canal Network from Km 0.225 to 97.30 including Distry.No.1 to 40B & laterals there
under are completed. Out of contemplated irrigation potential of 41,900 Ha. upto end
of March 2014 irrigation potential of 43,000 Ha. has been created and water letout
for irrigation on regular basis since July 2008. Notified area for Rabi 2014 is 46,672
Ha.
Under UKP Stage – III, extension of Indi Lift Main Canal from KM 97.30 to
147.00 to provide irrigation for 20,690 Ha. in Indi & Sindagi Taluks of Bijapur Dist is
envisaged. Already, the works of construction of Indi Lift Canal from Km 97.30 to
120.00 (including aqueduct from KM 110.00 to 113.00) are completed and water
letout for irrigation. Further, Indi LIS Main Canal KM 120.00 to 147.00 awarded
under 4 packages are in progress. Disty.No.41 to 52 are completed are also
completed. The estimates for tail end distributary are finalized and tenders for the
work in suitable packages to be invited. The work of providing additional pumping
machinery at the Head work is almost completed.
The work of filling up of 8 MI tanks from river Bhima in Indi Taluk – Anachi
Lift, is awarded on turnkey basis and is in progress.
ITAGA-SANGAM LI SCHEME :
This scheme was taken up for providing irrigation to the suffering command in
the tail end of IBC Disty.No.11. The work was commenced during October 2005 and
completed and commissioned in June 2010. The irrigated area from this scheme is
1,200 Ha. which includes 911 Ha. of suffering atchcut under Disty.No.11 of IBC and
additional potential of 289 Ha.
90
BARRAGES ACROSS RIVER BHIMA :
The two barrages namely Ghattaraga and Kallur-B barrages across River
Bhima were completed during 2004-05 and the water stored at these barrages is
being utilised by the farmers through their own pumpsets for irrigation.
SCP-TSP WORKS :
Details of irrigation potential and the physical programme and progress during
2013-14:
(Area in Ha)
Planned Created Programm Progress
Sl
Name of the Project potentia upto e for During
No l March -13 2013-14
2013-14
1 Indi Branch Canal. 1,31,261 1,31,584 -- --
2 Indi Lift Canal (Upto Km 97.30) 41,900 43,000 -- --
3 Indi Lift Canal (Km 97.30 to 147.00) 20,690 8,000 2,000 2,072
The annual financial programme of this Zone for the year 2013 -14 was
Rs.236.43 Crores and the financial progress achieved to the end of March-
2014 is Rs.116.94 Crores.
***********
91
10.2 BAGALKOT TOWN DEVELOPMENT
AUTHORITY
1. SALIENT FEATURES OF BAGALKOT TOWN:
Bagalkot Town is historically famous from the glory and one of the largest
town in the northern parts of Karnataka which is situated on the right bank of
Ghataprabha river at 16o-12’ longitude and 75o-12’ latitudes.
The Bagalkot Town is situated at a distance of 40 KMs (by road) South West
of Almatti Dam. The lowest portion of the town is at an elevation of RL 512.19 Mtr.
and the maximum elevation being RL 533.53 Mtr. A substantial portion of this town
will get submerged in the backwaters of Almatti Reservoir when the Dam is raised to
its ultimate FRL of 524.256 Mtr.
Resettlement plan consists of acquiring lands for locating the new Bagalkot
Town and to provide basic infrastructure in the new town. The lands required for the
new town have already been acquired (about 4,544 acres) and possession has been
taken.
2. ORGANISATION STRUCTURE:
92
10 Construction of Railway 1000.00
11 Maintenance of BTDA Colony and Navangar. 800.00
12 New Supply Machinery and Maintenance 250.00
13 Consultancy and training charges 90.00
14 Establishment 2591.94
Total:- 67700.00
The Project cost of the above components under AIBP prepared for
Rs.677.00 crores and Rs.360.49 crores under special package scheme. Thus the
total cost of the project works out to Rs.1037.49 crores.
The works taken up under Stage-I Phase-I, II, are completed and the works
under Phase-III are nearing completion. Structures up to RL 521.00 M contour have
been evaluated and compensation paid. Plots for the PDFs below RL 521.00 Mtr.
contour have been allotted in New township of Bagalkot. Most of the PDFs
constructed their houses in the allotted sites.
Considering the problems due to backwater effect, Govt. has announced the
special package of Rs.638.00 Crores (Rs.500.00 Crores for Bagalkot town +
Rs.138.00 crores for R&R) Vide G.O.NO.RD1/124/REH/2002/Bangalore
Dt.16/11/2002 to improve the existing conditions of old Bagalkot Town. The details
of special package are as under:
5. PRESENT STATUS :
I. a) Compensation payment to the structures between contour RL 521.00
M to RL 523.00 M is paid and site allotment is under process.
b) The demarcation of plots in 50 Sectors of Unit-II is completed. The
infrastructures facilities like Roads, UGD, Storm Water Drains &
93
Electrification for Unit-II of Navanagar have been awarded and works
commenced.
II. The UGD Network in old Town for Non-submersible portion of Bagalkot has
been completed.
III. The work of providing water supply system including revamping of existing
pipeline for non-submersible portion of Bagalkot town has been completed
and is functioning.
IV. The improvements to roads i.e. 3 link roads, 5 main roads, 7 internal roads
in slum area of Bagalkot Town are completed.
VI. Construction of 50 bedded Hospital building along with Doctors and Nurse
Quarters in old Bagalkot Town are completed and now Hospital is
functioning
******
95
PROJECTS UNDER
96
12. KARNATAKA NEERAVARI NIGAM LIMITED
A ON GOING PROJECTS
1 Ghataprabha Project
2 Hipparagi Project
3 Markandeya Project
4 Dudhganga Project
5 Lifting of water from Hiranyakeshi river to GRBC
6 Bellary Nala Project
7 Sri. Rameshwara LIS
8 Kinaye Project
9 Malikwad LIS
10 Kallol-Yadur Bridge cum barrage
B TO BE STRAT PROJECTS
11 Construction of Sangam Barrage
12 Filling of Shragaon – Basavanna Tank:
13 Filling of Kadapur Tanks
14 Filling up of 22 tanks from Hironyakeshi river
UNDER POLLAVARAM BASIN WATER ALLOCATION
C AWAITING FOR THE ADMINISTRATIVE APPROVAL
PROJECTS
15 Sri Mahalakshmi Lift Irrigation Scheme
16 Tubachi – Babaleshwar Lift Irrigation Scheme
D YET TO BE APPROVED (NEW PROJECTS)
17 Veerabhadreshwar Lift Irrigation Scheme
18 Kallola – Yadura Bridge Cum Barrage
UNDER “SCHEME B” PROJECTS (AWAITING FOR THE
E
ADMINISTRATIVE APPROVAL AND WATER ALLOCATION)
19 Kepwada Lift Irrigation Scheme
20 From Kochari Barrage Lift Irrigation Scheme
21 Aralikatte Lift Irrigation Scheme
22 Mastihole – Managutti Lift Irrigation Scheme
23 Yamakanamaradi Lift Irrigation Sceheme
97
12.1.1. Ghataprabha Project:
GLBC (109 Km.) : GLBC has been completed to its full length of 109 km
and water has been let out for irrigation in all 61 blocks.
GRBC (199.093 Km.) : GLBC lining works are taken up under Ghataprabha
stage – III. About 104.00 kms Main Canal lining, Dy above 20 cuses
494.40Km & Dy.Less than 20 cuses, 712.70 Km completed. Government
has accorded administrative approval to the revised project estimate of
Ghataprabha Project Stage III amounting to Rs.1210.51 crores vide GO
dated 18/10/2009.
Distributories under GRBC (37 nos.) : Out of total length 199.033 Kms a
length of 196 Km has been completed, except lining n some reaches (Km
122, 131, 144, 145, 197 to 199.33). Balance work yet to be started. Water
letout for irrigation upto Km. 190.
Chikkodi Branch Canal (88 Km.) : There are total 37 distributary blocks
under GRBC. Works are completed in distributary blocks 1 to 23, 25, 26,
28 to 31 to 33 & 37. [Except km 13,14 & 15 of Chichakandi dy (BL 24), km
14,17 & 18 of Shardal dy (BL 27), km 13 of Bagalkot dy (BL 34), km 3 to 5
98
of Mallapur dy (BL 35), & km 9 of Kamatagi dy (BL36)] Works in 24, 27,
34, 35 & 36 are under progress. Distributories under CBC (25 nos.) :
Completed to its full length of Kms. 88 and water is let out for irrigation. All
works are completed.
Barrage proper: Barrage proper: The barrage works are completed. b) Crest
gates: Fabrication & erection of crest gates works completed and water
impounded (stored) in the reservoir since 2004.
Lifting systems: The works for the lifting systems of two foreshore LI
schemes, namely Halyal and Ainapur. The works of Ainapur lifting system
and Halyal stage-I & II stage completed. Karimasuthi 3rd stage under Halyal
LIS is completed and Savalgi –Tungal 4th stage completed under Halyal
LIS .
Ainapur LIS: Works of Pump House, Rising main & Delivery Chamber are
completed. Length of East canal is 0 to 27.52 km is completed & West canal
is 0 to 12 km is completed. Except Dy No-7 remaining distributories
completed and FIC’s are under progress. Water is let out in main canal and
distributories.
Ainapur 2nd Stage: The works of Pump House, Rising main & Delivery
Chamber are completed. East canal 0 to 30 km and West canal 0 to 7 are
nearing completion. There are 11 Distributories in each canal and Two
distributories in West canal and are in progress and nearing completion.
The estimates of FIC’s are in approval stage. Water is let out in main canal
and distributories.
Halyal L.I.S.: Works of pump House, Jackwell, Delivery Chamber & Rising
Main under Stg-1 & 2 are completed. Work of Intake Canal is completed.
Lead off canal works are completed. Halyal east canal km.0 to 40
99
completed. Except Dy No-16 remaining all distributories of each canal are
completed. Halyal West canal from Km 0 to 20 are completed. Except Dy
No.5,6,7 remaning distributories of west canal are completed. Water is let
out in main canal and distributories.
Some of the FIC’s construction works of Halyal East & West canal are under
progress. Taking administrative approval to the remaining estimates and
tender is under progress.
Karimasuti 2nd Stage:- Head work and rising main works are completed.
North Branch canal 0 to 7 Km and south branch canal 0 to 6Km tenders
are completed. Out of 3 distributories of North canal one distributory is
completed and remaining two distributories works are yet to be constructed.
Distributories of South canal are completed. Survey work for FIC is under
progress. Water is let out in main canal and distributories.
Savalgi-Tungal L.I.S.: Head work completed. except Km. 7 east canal from
0 to 24 are completed. The tunnel work in Km No.7 is nearing completion.
West canal 0 to 7 Km all works are completed. Some of the FIC’s
construction works of East canal are under progress. Taking administrative
approval to the remaining FIC’s estimates and tender is under progress.
Water is let out in main canal and distributories.
Land acquisition:
Submergence: The total submergence of land at FRL is about 3000 ha, out
of which 1659 ha (4100 Acres) is cultivable land and 1341 ha (3314 Acres)
is in river portion.
Canals: Total extent of cultivable land required for this project is about
9884A 15 Guntas.
For land acquisition process for 5456 A 20 G is in progress, out of this Rs.
6820 Lakhs paid for 5446 A 36 G, for remaining land 9 A 24 G the process
of acquisition is under progress.
Land acquisition for R.C’s Rs. 727.30 Lakhs paid and remaining Rs. 94.70
Lakhs is under progress.
The Project is included in the PM’s Package and the GOI has released
Rs.115.00 crores during 2008 – 09.
101
Dam & Allied works: The dam and allied works have been entrusted to
KSCC Ltd. The concreting work of dam is completed (Except curtain
grouting), dyke works are also completed. Construction of parapet is
completed and electrification work and erection of 6 crest gates are
completed. Water is impounded since 2005.
102
12.1.4 Doodhganga project:
The works are from Km. 46 to 49 and 54 to 62 are completed. The works
in Km.44, 45 & 50 are under progress. For the works of Km. 51 and 52
(tunnel from Ch. 49.500 to 51.200 Km. with approaches and exit) tunnel
work is in progress. Execution of approach and exit of tunnle is completed.
103
The tunnel 1100 Mts length completed. The work of Km. No. 53 stands
deleted due to modified alignment. The works of Km. 63 to 65 are held up
due to LAQ n Maharastra. Works of Dy. Blocks are under progress and
nearing completion. An op of 182.72 Ha is created on Bidari branch canal.
(ii) Dattawad RBC from Ch. 0+000 to Ch.7+650 km (tail end) LAQ proposals
is submitted & from Ch. 0+000 to 17+000 alignment approval is awaited.
8.00 TMC of water has been allocated under scheme ‘A’ of KWDT.
This scheme has been proposed to meet the likely shortage of water due
to over utilisation under GLBC.
The said LIS has been entrusted to M/s Kirloskar Brothers Pvt. Ltd, on
turnkey basis.
104
12.1.6 Sri Rameshwara LIS :
This lift Irrigation is proposed to irrigate 13800 Ha areas of Gokak,
Ramadurga and Savadatti Taluks of Belgaum District by utilising the 2.2
TMC of water. The water will be drawn from Ghataprabha river by suitable
intake structure.
Land Acquisition : Intake Channel, Pump House, Jack well & Sub Station:
These are Located near Aralimatti Village covering an area of 5.10 Acres for
which 6(1) Notification has been issued, awarded and payment made.
[
Canal Network : Length of main canal & branch canal System is about 79
Km and the works are nearing completion. The length of distributory
network system is about 224.38 and the works are nearing completion.
Revised DPR & estimate amounting to Rs.331.55 crores has been cleared
from Planning Commission of GoI.
The master plan committee has allocated 1.68 TMC of water under scheme
‘A’ of KWDT.
The work construction of Bellary nala irrigation project has been entrusted
to M/s. EPI Ltd (A Government of India undertaking) by Government of
Karnataka.
105
Total length of main canal is 106 km, works in reach from km 40 to 85 is
under progress.
All the works of main canal are carried out in various stages except canal
length coming under forest area.
At present, the works of Bellarynala project has been started and works are
under progress.
The administrative approval has been accorded for Rs. 9.309 crores under
GO dated 22.09.2007. The revised estimate for Rs.79.00 crores has
approved.
Dam work has been handed over to agency for Rs. 58.32 crores. Work
started.
DPR for Rs. 41.00 crore has been submitted to MD KNNL, Bangalore.
Detailed project report for the work of filling of Kadapur tank of Chikodi Tq
from Krishna river is got prepared for Rs 390.00 lakhs and the estimate is
Administratively approved by the Government vide G.O No
d¸ÀAE/82/J£ïLJ£ï/2012 Dated: 2-11-2012. This project comprises of filling of
the tank & there by raising the ground water table.
107
The proposal for Shri Mahalaxmi LIS was prepared for Rs. 52.00 cores and
forwarded to the WRDO vide T.O lrt No. 1631dt. 11-6-2010 and requested
for water allocation of 1-17 TMC from the Govt. Accordingly Govt has
allotted 1.17 TMC of water from Dudhaganga river for the above project vide
G.O No.d¸ÀAE 49 PÉ©J£ï 2009 Bangalore dtd 19-3-2012 under Krishna Basin
23.00 TMC of water allocation. Under this 1.17TMC of water allocation 17
villages of Chikkodi Taluka drinking water & water required for 4861 Ha
irrigation facility is covered.
At present, for the detailed survey, design and for preparation of detailed
project report by adopting Lift Irrigation Project under drip irrigation Net
work system and also proposal for construction of New barrage across
Dudhaganga river on u/s of karadaga barrage is prepared for Rs 29.00
lakhs approved.
DPR for the above project is got prepared for Rs 444.66 Crores. The report
for the above scheme for providing irrigation facility to 22277 Ha area and
allocation of 3.3 TMC water demand is submitted to Government for water
allocation.
108
DETAILS SHOWING BUDGET ALLOCATION AND RELEASE OF GRANTS
TO NIGAM (KNNL IRRIGTION NORTH BELGUM) FOR THE YEAR 2013-
14 (AS ON 31/03/2014)
(Rs. in Crores)
1. KARNATAKA NEERAVARI NIGAM LIMITED 9(KNNL IRRIGTION
NORTH BELGUM)
Annual
Sl. Release
Head of Account allocatio Balance
No. s
n
Ghataprabha Irrigation
1 - - -
Project
2 Hipparagi Irrigation Project 15000 12829.85 85.53
Markandeya Reservior
3 - - -
Project
Dudhaganga Irrigation
4 1000 - -
Project
Lifting of water from
5 - - -
Hiranyakesi river to GRBC
6 Ballary nala Project - - -
7 Shri Rameshwar LIS 6000 7332.96 122.20
8 Kinaye Irrigation Project - - -
Total 22000 20162.81 91.65
109
DETAILS OF FUND POSITION OF KNNL (KNNL IRRIGTION NORTH
BELGUM) FOR FY 2013-14 AS ON 31.03.2014
(Rs. In crores)
Grant
Budget released Exp.projects Shortfall Balance to Pending
Sl Allocatio from & debt against be bills as
Particulars
No n for FY GOK as service as on budget released on
2013-14 on 31.3.14 allocation to nigam 31.3.14
31.3. 14
1 Capital Grants
(Rs.495-100+150-55.53=10)
(4701 works & EST) 99.25 185.22 254.12 -154.87 -154.87 11.33
2 Dr Nanjundappa Pkg - - - - - -
3 PM’s Farmers suicide
Package(Hipparagi irrigation 148.55 208.74 319.77 -171.22 -171.22 -
project)
4 AIBP
a Ghataprabha - - 147.86 -147.86 -147.86 22.09
b Dudhaganga 7.91 7.70 8.60 -0.67 -0.67 2.70
C Rameshwar 115.64 115.92 117.77 -2.13 -2.13 27.25
6. SCP 42.00 127.35 127.36 85.36 85.36 6.09
7. TSP 10.48 20.32 20.31 9.83 9.83 0.89
8. Roads 62.97 62.97 62.97 - - 0.89
Total 486.80 728.22 1058.76 -371.58 -371.58 71.24
9. Debt Servicing
- - - - - -
(Rs.109 P & Rs.44.82 int)
Grand Total 486.80 728.22 1058.76 -371.58 -371.58 71.24
110
KNNL IRRIGATION NORTH BELGAUM
DETAILS OF BUDGET ALLOCATION BY GOK
(Rs. In crores)
The Malaprabha River originates near Chorla Ghats in Sahyadri and flows
eastwardly for a length of 200Km before joining the River Krishna at Kudal
Sangam in Bagalkot District. The annual average yield of the river is
1368m.cum (48.35tmc)
On-going Schemes
1 Malaprabha Project
2 Harinala Irrigation Project
Kalasa Nala & Bandhur Nala
3
Diversion Schemes.
4 Javaluhalla L.I.S. *
111
5 Bennihalla L.I.S. *
6 Kolachi L.I.S. *
7 Konnur L.I.S. *
8 Shiggaon L.I.S
Out of the above schemes Harinala Project has been completed during
2006-07 and the remaining schemes are under different stages of progress.
112
1,96,132Ha in Belgaum, Bagalkot, Dharwad and Gadag districts.
Malaprabha River is one of the tributary of River Krishna.
The total irrigation potential created upto March 2014 is 196033 ha against
target of 1,96,132 Ha.
Kolach Right Bank Canal:- The Canal takes off from Right Bank of Kolachi
Weir near Ramadurga Kolachi Right Bank Canal is 64Km in length and
irrigates 5,877Ha (Approximate 20,000acres) of Land in Ramadurga,
Badami, Nargund and Ron talukas.
113
Lift Irrigation Schemes:- 10 No.s of foreshore Lift Irrigation Schemes are
taken upto provide irrigation facilities to the displaced persons, rehabilitated
along the foreshore of the reservoir. Irrigated an area of 26,931Ha.
Dam & Allied works: The dam works including head regulators for LBC and
RBC are completed. Water is impounded in the dam.
Canal works: The entire length of RBC (11Km) and LBC (9Km) are completed.
Total potential of 3,480Ha under this project has been created. FIC works are
completed.
R & R works: The project involves partial submergence of only one village
involving 256 families and out of 256 R & R works for 58 families are completed.
For balance of 198 families R & R works are under progress.
115
NAME OF THE PROJECT HARINALA IRRIGATION PROJECT
Location Tigadi Village
Year of Inception 1998
Original Estimated cost - Rs. 0.83 Crores
Latest Estimated cost-Rs.73.00 Crores
Original and Latest estimated cost
Administrative Approval No: CE: 114:
(Rs. in Crores), including
MPS: 92 Dated 11/14.9.98 (Rs. 26.95
administrative/
Crores).
Technical sanction approval number &
Technical sanction: CEI (N): BGM:
Date.
Reg.No.CIN–17 for May 1999 (Rs.26.95
Crores).
Length of Canal Left Bank Right Bank
a) Main Canal 9.00 Km 10.72 Km
Districts benefited Belgaum.
Number of villages and Taluks
Bailhongal taluk.
Benefitted
Physical Financial
Programme during 2013-14 - Rs.0.50 Crores
Progress achieved up to end of March-
- Rs. 1.95 Crores
2014
Programme for 2013-14 (Physical
- Rs. 0.50 Crores
Financial)
Cumulative progress up to end of
3,480 Ha Rs. 77.25 Crores
March 2014
The KNNL Board has recommended in its 25th meeting held on 7.6.2005 to
take up works in non-forest area by entrusting the work to any Government
agency. Accordingly the Government vide its order No.JASAME 22 VEBYATA
2004 (Part-1) Bangalore dated 9.10.06 has approved to take up Kalasa Nala
Banduranala diversion schemes in non-forest area. (4.40 km out of 4.80 km
of Kalasanala and 4.90 km out of 5.80 km of Banduranala).
116
Further the Government vide letter No.JASAME 22 VEBYATA 2004
dated.21.10.06 has given directions to take-up the above works through
KSCC duly following all the necessary procedures as per KTPP Act 1999.
Since the project is a inter-state dispute project and some time was required
for KSCC to take up works on tender basis, the works in non-forest areas
were taken-up by entrusting 2 works on piece work basis, each not
exceeding Rs.5.00 lakhs, in respect of Kalasa Nala diversion scheme.
In this order, Government has withdrawn the works entrusted to KSCC and
has instructed KNNL to proceed with tendering process for balance works
immediately duly following the prescribed procedure as per KTPP Act 1999.
Accordingly tender for the balance work of ICC from Kalasa to Malaprabha
River was invited and work is awarded and it is in progress.
Tenders are finalised for Phase–II of the balance work of ICC from Kalasa to
Malaprabha River (Earthwork and Box pushing technique) and works are in
progress.
117
Districts Benefited Belgaum, Dharwad, Gadag and Bagalkot
Number of villages and Taluks Hubli-Dharwad & Other villages (Drinking water
Benefited supply)
Physical Financial
Programme during 2013-14 Rs. 15.00 Crores for KalasaNala
-
Rs. 0.0 Crores for BhandurNala
Progress achieved upto end of March 2014 Rs. 53.04 Crores for KalasaNala
-
Rs. 0.00 Crores for BhandurNala
Programme for 2013-14 (Physical & Financial). Rs. 15.00Crores for KalasaNala
-
Rs. 0.00 Crores for BhandurNala
Cumulative progress upto End of March 2012 Rs. 172.91 Crores under Kalasa Nala
& Rs. 0.00 Crores under
BhandurNala
Brief description: The work of Inter-Connecting channel from Kalasa
reservoir to Malaprabha river has been entrusted on
tender basis and works are under progress.
119
Radder Naganur: Diversion weir, intake canal, Jackwell-cum-Pump house,
control room, delivery chamber and raising main are completed. Pumps
and motors are installed and power line work is also completed.
The water allocation as per the revised Master Plan of Krishna Waters
under Scheme `A` is 0.30 tmc. The estimated cost of the project is
Rs.190.61 lakhs. The work is entrusted to M/s. SPML, Bangalore on
turnkey basis. The work is started on 12-9-2005 & it is proposed to be
completed by end of December-2013.
120
Location: Asuti village
Year of Inception: 2005
Year of completion (in case of
Under progress
Completed Projects)
Original Estimated cost: Rs. 2.25
Original and Latest estimated
Crores
cost
Administrative approval: WRD.
(Rs. in Crores), including
58.MPS.1999 (P) (K), Bangalore dated:
administrative/
23.08.03.
Technical sanction approval
Technical Sanction:CEI (N). Reg.No.162
number & Date.
for August 2005.
Gadag
Districts benefited
Number of villages and Taluks
Nargund
Benefited
123
Pumping Machinery - Finished View
124
Sprinkler & Lateral Lines:
125
12.3 AN OVERVIEW OF PROJECTS UNDER THE CHIEF
ENGINEER, UPPER TUNGA PROJECT CIRCLE,
SHIMOGA
The following are the projects under the jurisdiction and control of Upper
Tunga Project Circle, Shimoga.
DAM AND ALLIED WORKS: - Dam work is completed in all respect. Water
is being stored in the dam since 2007. The instrumentation work and
electrification works are completed. Power block portion of mini hydrl
project is completed and further work of power house with tail race channel
is taken up by private agency.
127
Head regulator: Construction of regulator at Km.0145 is completed for
providing hoisting arrangement for 5 gates is completed & Commissioned.
Distributory:
During the year 2013-14 the grant allotted is Rs.100.00 Crores and
the expenditure incurred up to end of March 2014 is Rs. 253.61 Crores.
Since inception of project, cumulative expenditure to the tune of Rs.
1770.32 Crores has been incurred.
128
12.3.2 TUNGA LIFT IRRIGATION SCHEME
Tunga lift irrigation scheme was earlier proposed near Gajanur to Lift
1.428 TMC water from D/Stream of UTP reservoir and to feed 3 tanks
namely Aihole, Barehalla and Gowdanakere tanks of Shimoga taluk and to
irrigate 5162 Acres in premonsoon and 4870 acres in post monsoon period.
During the year 2013-14, the grant allotted is Rs. 5.00 Crores and
expenditure of Rs.12.25 crores has been incurred and total expenditure
since inception is 12.47 crores.
During the year 2013-14 the grant allotted is Rs. 2.00 crores and the
expenditure incurred up to end of March 2014 is Rs. 0.69 crores. Since
inception up to end of March 2014, cumulative expenditure of Rs. 23.14
129
crores has been incurred on the project and 890 Ha. of potential created
under Ist stage.
The project comprises of 25.517 km of RBC and 10.907 km, of LBC. The
LBC i.e. 10.907 km has been entrusted on tender basis and all the works
are completed. Out of the total length of 25.517 km, all works of RBC
works are completed.
The distributory network coming under RBC and LBC canal is entrusted
to 3 agencies and completed. F.I.C. works are also completed.
Power required for this project is approved by HESCOM and deposit
has been made to HESCOM. The work for getting power supply from
Holitagi sub-station to jack well, pump house is Completed &
Commissioned.
During the year 2013-14, the grant allotted is Rs. 1.00 crores and the
expenditure incurred up to end of March 2014 is Rs. 0.25 crores. Since
inception of the project an amount of Rs. 21.10 crores has been spent up to
end of March 2014.
During the year 2013-14, the grant allotted is Rs. 29.48 crores and the
expenditure incurred up to end of March 2014 is Rs. 13.05 crores. Since
inception of the project an amount of Rs. 91.06 crores has been spent up to
end of March 2014. It is one of the project assisted under AIBP.
During the year 2013-14 the grant allotted is Rs. 5.00 crores and the
expenditure incurred up to end of March 2014 is Rs. 11.51 crores. Since
inception upto end of March 2014, cumulative expenditure of Rs. 126.70
crores has been incurred for this project.
131
hamlets, filling of MI tanks within the command area and sub soil
replenishment.
The Government vide GO dated 12.01.09 has administratively approved the
DPR for Rs. 272.00 crores. Agency for construction of Dam & Allied works
is entrusted. work to be started. During the year 2013-14, The grant
allotted is Rs. 1.00 crores and the expenditure incurred is Rs. 2.58 crores
only. Cumulative expenditure upto March 2014 since inception of project is
Rs. 5.37 crores.
During the year 2013-14 the Grant allotted is Rs. 0.10 crores and no
expenditure has been incurred. Project is yet to be started.
During the year 2013-14 the grant allotted is Rs. 8.00 crores and expenditure
incurred is Rs. 6.69 crores. Since inception of project to and of March 2014
cumulative expenditure of Rs. 7.78 crores has been incurred.
Nidige tank is located in mid way between Shivamogga & Bhadravati, Besiders
Tumkur Honnavar National Highway. This tank to being feeded from Bhadra Left
bank canal. This tank is having as water spread area of 18.00 Ha. ( 44 A-21 G).
This tank has been handed over to Nigam vide G.O. No. 247 / JA.JA.©. 2006 /
¢:24-1-2007 for improvement including boating Center. An estimate was
prepared for Rs. 900 lakhs & placed before the TSC. The matter was discussed in
132
76th meeting held on 13-4-2007 and sub-Committee as formed. The sub-
Committee inspected the spot and as per the instruction given the estimate was
splet in to two parts in the I-Phase an estimate amount for Rs. 477.00 was
prepared. The same estimate has been recasted for Rs. 655.00 lakhs and
submitted CE’s office. Then the NH widening work was taken up by High-way
department and is completed. Hence for the revised DPR reinvestigation survey
estimate is also prepared for Rs. 180.00 lakhs and submitted to CE’s Office.
PURLE TANK;
Purle tank is located 6 Km from Shimoga City situated between Shimoga-
Holehonur Road, Solapura-Mangalore National High Way ( N.H. 13) at Purle village.
This tank is being feeded from Tunga right bank Canal and Bhadra left bank
canal. This tank having an water spread area of 35 Acr 21 Guntas ( 14.38 Ha.)
This tank has been handed over to Nigam vide G.O. No. WRD/247 /MMB/ 2006
Dated: 24-01-2007 for improvements including Boating Centre. Recreation Centre.
An estimate prepared Rs. 940.00 Lakhs and placed before the TSC. The matter
was discussed in 76th Meeting held on 13.04.2007 and sub-committee was
formed. The Sub-Commiittee has inspected the spot and as per their instruction
taken land scope consultant and prepared estimates in two part. ( Phase-1 &
Phase-11). The Phase-1 estimate including Deepending the Tank. Formation of
Bund, Silt Trap, inlet Way, Entrance Arch / Ticket Couter etc., Hence, the Phase-1
Estimate has been during 2013-14, a grant of Rs. 0.10 crores is allotted and no
expenditure is incurred till March 2014 at present proposal for dropping the above
work from Nigama is submitted.
For the year 2013-14 a grant of Rs. 15.00 crores is allotted and the
expenditure incurred to end of March-2014 for Rs. 0.46 crores only. (Survey work)
The Project is yet to be commissioned.
133
12.3.12 KACHAVI LIFT IRRIGATION SCHEME:
The project envisage lifting of 0.15 TMC of water from Varada river near
Kachavi village, Soraba Tq. Shimoga district for filling of 21 tanks under 11 villages
to overcome the water scarcity in these villages. Administrative approval is
accorded vide G.O.No.WRD/14/MMB/2011 dtd. 18-12-2012 for Rs.16.50 crores,
presently the preparation of DPR is under progress. During 2013-14 a grant of
Rs.1.00 crores is allotted and no expenditure is incurred till March-2014.
134
The canal coming under the Bhadra reservoir was constructed 46 years ago & the
canals were without concrete lining & because of this the canal lost its shape &
size. So, now the intension is to give a proper shape & size for the canal by
providing concrete lining & supply the water till the tail end.
The estimate cost of Modernisation of Bhadra canal system has been revised to
Rs.1200.00 and the proposal has been submitted to the CWC, New Delhi for
clearance.
Grant allocated for the year 2013-14 is Rs.30.00 Crores. The expenditure incurred
during the year 2013-14 is Rs.50.75 Crores. The upto date expenditure incurred is
Rs.1043.15 Crores.Works are nearing completion.
As the canal constructed was unlined, at many reaches canal has lost its shape
and seepage was observed in the structures. Hence, it was planned to Modernise
the whole canal system by providing CC lining to canals and by renovating and
reconstructing the structures.
The DPR of this project is submitted to CWC for obtaining clearance. This
project is proposed to be taken up under externally aided fund by Asian
Development Bank along with introduction of Integrated Water Resources
Management (IWRM) programme under the selected projects of Upper
Tungabhadra basin.
This Project envisages lifting water near Thimmapur of Harihar Tq. from
Tungabhadra River to augment water for 22 tanks of Davangere district and
providing water to Hagribommanahalli tank. 1.00 TMC of water has been
allocated to this Project. Administrative approval has been accorded for Rs.
100.00 crores vide Government order No. MI/33/LIS/2006/05.01.2007.
This work is entrusted on Turnkey basis and the work is in progress.
The estimated cost of the project : Rs. 112.70 Crores (As per tender)
135
Total expenditure incurred : Rs. 100.44 crores upto Nov-2013 as per
CAO figures.
Status of project: This Project is proposed to be completed by Dec-2013.
Land Acquisition for Jack well No-1 is in award stage. Acquisition for Jack
well No-2 is in 6(i) notification stage. The work is under progress.
M.S. Pipe for rising main of 47.625 km is laid. For distribution system PSC
pipe of 23.915 km is supplied and 18.493 km is laid. HDPE pipe of 34.630
km is supplied and 34.630 km is laid and the work is under progress. Power
supply to Jack well No-1and Jack well No-2 is completed.
During 2013-14 the Karnataka Neeravari Nigam has allotted a grant of Rs 1000.00
Lakhs. Work is under progress. Expenditure incurred during 2013-14 is Rs
856.17Lakhs. An update expenditure of Rs 9701.13 Lakhs has been incurred to
end of March 2014.
The allocation of water for this project is 3.32 TMC..Revised allocation and
present utilization is 2.52 TMC.
138
IMPROVEMENTS TO CANAL SYSTEM:
Before nigam the update expenditure incurred on development of tanks from 2005-
06 to March 2011 is Rs 635.34 Lakhs. No Grant has been allotted during 2013-14
from nigam under Head of Account 2701.
The spill- over works and fresh works have been taken up during 2013-14.
No expenditure incurred during 2013-14. update expenditure for
modernization canal system is Rs 1481.32 Lakhs to end of March 2014
under budget grant.
139
12.3.21 RANIKERE FEEDER CANAL:
The Government has accorded administrative approval for this Ranikere Feeder
Canal project Vide G.O.No.WRD. PWD 31 BGC 77/11.11.1997 for Rs. 249.00
Lakhs. The revised estimated cost of this project is Rs.896.00 Lakhs.
140
Gayathri Reservoir Project has been constructed between 1952-53. The
maintenance of this project has been handed over by the Minor Irrigation
during 1997 to this circle. This reservoir has been constructed across
Suvarnamukhi river near Kudalahalli village, Hiriyur taluk. Chitradurga
District. The original estimate cost of the project was Rs.39.85 Lakhs. The
Irrigation potential created under this project was 2305 Ha. of land. This
project is under maintenance.
During 2012-13 a grant of Rs 100.00 Lakhs is allotted for Modernisation
of Gayathri Project canal system. The spill over works and fresh works has
been taken up during 2012-13. Expenditure incurred during 2012-13 is Rs
62.77 Lakhs. For modernization canal system of this project an up date
expenditure of Rs 401.03 Lakhs has been incurred to end of March 2013.
The Grant allotted during 2012-13 under Head of Account 2701 is Rs.
23.42 Lakhs. The expenditure incurred during 2012-13 is Rs 23.42 Lakhs.
141
12.3.26 HODIRAYANAHALLA DIVERSION SCHEME:
The draft tender Schedule has been placed before 114th T.S.C for
approval submitted to TSC for approval. TSC has raised certain
observations. The action is being taken to submit the compliance to the
observations of TSC.
During 2013-14 Rs. 200.00 Lakhs grant is allocated under the Head
of account 4701.
The expenditure incurred during 2013-14 is Rs.4.54 Lakhs on conducting
Survey. The upto date expenditure incurred on this project for preliminary
142
survey and investigation including payment made to Forest Department for
release of forest land till the end of March 2014 is Rs 154.37 Lakhs.
At present the Bheemasamudra tank is filled up with silt since the tank
is 500 year old. Due to this storage capacity of tank is reduced to 0.18
TMC. The catchment area of tank has scanty rainfall, due to this storage
capacity of the tank is reduced.
The Restoration and renovation of this tank is taken up under AIBP grant of
central government. The improvement of this tank under Prime Minister
Farmers Sucide Package for Rs 400.00 Lakhs was got administratively
approved by the Govt on 19.06.2007. The restoration and renovation of this
tank is taken up on tender. So for about 1.80Km of lining works is
completed in canal No1, 4 Nos of cross drainage work is completed and 147
m chute channel is completed. Rs.100.00 Lakhs grant is allotted during
2012-13 under 4701 for restoration and renovation of Bheemasamudra
tank. The expenditure incurred during the year 2012-13 is Rs 45.46 Lakhs.
An update expenditure of Rs 231.49Lakhs has been incurred to end of
March 2013.
143
12.3.28 CONSTRUCTION OF LINK CANAL FROM HEBBEHALLA TO
MADAGADAKERE :
The farmers, MLAs and areca Co-operative societies of Kadur, Birur and
Tarikere Taluk have represented the Government to divert water from
Hebbehalla which is sub- tributary to Somavahine a tributary to Bhadra
river to Madadaga Kere in order stabilize the Atchakat as the rainfall has
become scanty in recent years resulting in reduction of storage of water.
The Government has ordered to investigate the project. The preliminary
project report (PIR) for Rs.69.73 Lakhs was prepared by the superintending
engineer, Major Irrigation Investigation Circle Mysore.
Further superintending engineer, Major Irrigation Investigation Circle
Mysore. has prepared revised estimate of the project amounting to Rs
140.00 Crores through private survey consultancies, and obtained formal
approval by the government vide Lr No WRD 61 MMB 2010 Dt 29.11.2010.
The project has been transferred to major irrigation department from
investigation circle, Mysore.
The designed total water requirement for this project is 1.538 TMC. The
utilization of 0.50 TMC is available. The water resources development
organization, Bangalore in their letter Dt 12.05.2010 has stated that the
advisory committee of Krishna water dispute Tribunal has submitted the
proposal to the tribunal to allocate 1.50TMC of water to this project out of
23 TMC of water to be reallocated to the state under Indira Pollavaram
project of Andra Pradesh.
The project details have been obtained from the office of the Executive
Engineer, Major Investigation Division, Mysore. and to take necessary action
to implement the project. During 2012-13 government has allotted an grant
of Rs 100.00 Lakhs.
145
Expendi
Grant for ture
Sl. Remark
Head of Account the year incurre
No s
2013-14 d in
2013-14
01 02 03 04 05
V- 2702-M&MI
01 2702 –Bhadra Project 250.00 96.22
02 2702- Tunga Anicut Project 00.00 0.00
Sub Total(V) 250.00 96.22
Dam: Work is completed and water is being stored in reservoir since Dec-
2001.
146
Right Bank Canal (82 km): Main canal works are completed. All
distributaries are completed and 12422 Ha.FIC works are completed.
Tenders for the strengthening of embankment in vulnerable reaches &
concrete lining of main canal (selected reaches) has been invited for
Rs.11.63 crores. Tender Agreement No.43 Dated:12-03-2013
Entrustment amount Rs.12.35 crores at 1.22% below, work is under
progress. Total atchkat is 13435 Ha.
Left Bank Canal (60 km): All works of main canal completed. All
distibutories on LBC are completed. 6506.65 Ha FIC works
completed. Tenders for the strengthening of embankment in
vulnerable reaches & concrete lining (selected reaches) on main canal
has been invited for Rs.7.95 crores. Tender Agreement No.44
Dated:12-03-2013. Entrustment Amount Rs.8.68 crores at 2.94%
above, work is under progress. Total atchkat is 6799 Ha.
The details of target and achievement of the project for 2011-12 to 2013-14
are as follows:
Financial (Rs. in
Sl
Crores)
. Year
Targe
No. Achievement
t
1 2011-12 23.50 10.59
2 2012-13 13.50 13.03
3 2013-14 18.60 35.23
147
12.4.2 BHIMA LIFT IRRIGATION SCHEME:
Barrage
Length- 2.250 km
Height - 18.40 m
Gross Storage – 3.166 TMC
Live Storage - 2.41 TMC
Allocation &Utilisation – 6.00 TMC
Gate works: Gate works are completed during Aug-2010, and water is
being stored partially as the rehabilitation centre works are to be
completed.
Balundagi Lift: Construction of intake channel, jackwell, pump
house, raising main with PSC pipes and delivery chamber are
completed.
Balundgi Canal: Construction of Balundagi main canal from 0 to
63.76 is completed except few structures and small reach of lining.
Water is allowed in the canal upto tailend on trail basis. Distributary
works and FIC works are in progress.
Allagi Lift: Construction of intake channel (except lining), jackwell,
pump house, raising main with PSC pipes and delivery chamber are
completed. Lift is commissioned on 25-02-2014.
Allagi Canal :Construction of Allagi main canal work from Km. 0 to 5
& 5 to 10 Km. is almost completed, and from 10 to 20 Km & 20 to
35.787 Km packages are nearing completion.
Rehabilitation and Resettlement:
Villages affected due to submergence – 10 Nos.
No of centres to be formed – 9 No
Population affected – 8801
Families affected – 1658
Government vide GO dated 18.5.05 have constituted District Level
Rehabilitation Advisory Committee. R&R Package is approved by the govt.
The site has been identified for construct rehabilitation centre and even land
acquisition has been proposed and 4(1) notification has been issued.
Construction of Balundgi rehabilitation is completed and handed over to
Gram Panchayat. Bankalaga centre is also completed and inaugurated on
19-02-2013 and formal Hakku Patra are also issued to the rehabilitanats.
Tarapur, Duddangi, Mangalore, Hiriyala & Badgihal RC works are nearing
completion.
149
The details of target and achievement of the project for 2011-12 to
2013-14 are as follows: -
Dam & allied works: The works were carried out by KSCC and the
same are already completed. The work of providing & erection of
radial crest gates is completed.
Canal works:
150
RBC: Total length of LBC is 7 km and works are completed Potential
of 566Ha is created.
FIC: FIC works of 566 Ha under RBC and FIC works of 7290.83 Ha
under LBC are completed. The balance potential of 86.17Ha will be
created during 2014-15.
The project has been originally estimated for Rs. 45.00 crores at 1990-
91 schedule of rates. The latest estimated cost of the project is Rs. 220.00
Crores and expenditure to end of March 2014 is Rs. 224.90 crores.
A) Earthen Dam: Completed including erection of spillway gates. Water is
being stored in reservoir since August 2001.
B) Right Bank Canal (80 km): Works are completed.
151
D) R&R : Out of 7 Nos. of rehabilitation centres, 6 nos. are completed.
Balance works of Gadilingadahalli Rehabilitation Centre No.3 are nearing
completion.
E) Strengthening works of RBC : Strengthening works in selected
reaches from Km. 0 to 40 are completed. Works from Km.40 to 80 km in
selected reaches are nearing completion. Further for ERM survey under
progress.
Total irrigation potential of the project is 9713 Ha, Out of which 9400 Ha
created upto end of March 2014. The balance potential of 313 Ha will be
created during 2014-15.
The details of target and achievement during 2011-12 to 2013-14 is
as under:
Financial (Rs.in
Sl.
Crores)
No Year
Achievemen
. Target
t
1) 2011-12 12.50 7.36
2) 2012-13 10.50 11.57
3) 2013-14 12.50 11.16
Amarja irrigation project envisages construction of a dam across the River Amarja,
a tributary to River Bhima in Krishna Basin, near Sangolgi village in Aland Taluk
of Gulbarga District with canals on both banks to provide irrigation facilities to an
extent of 8903 Ha. The allocation proposed under this project is 1.92 TMC,
utilization is 1.906TMC.
A) DAM: 960 m long and 31.85 m high earthen dam with a storage capacity
of 43.87 Mcum will submerge 641 ha of land, affecting 3 villages and a
population of 4,500. Dam works are completed during 1999 and water is
being stored since 2001.
152
B) CANALS: The Left Bank Canal is 54.78 Km long and the Right Bank
Canal is 42.428 Km long which will irrigate 4,856 Ha. and 4,047 Ha. of
land, respectively. Total number of distributaries under RBC are 29 Nos.
and DPO’s 20 Nos. and under LBC are 33 Nos. & 19 Nos. are respectively.
Worsks are completed. Bed difference observed and hence the subject
rectification works of Amarja project was placed before the 25th Board
meeting of KNNL held on 07.06.2005. After detailed Deliberation the Board
authorized for closure of works for previous contracts on “As is where
basis” so that rectification works can be taken up without further delay
(vide ltr no 993 dtd:23.06.2005). Under this proceedings, the rectification
works were proposed for Rs.100.00 crores. The work is transferred to KNNL
during April 2005 vide GO No. WRD 29 TMZ 04 dated 18.04.2005.
Rectification of canal works was taken in five packages for LBC & RBC
,the work of 5 packages are under progress, the project is proposed to
completed by 2014-15.
1) Km. 0.00 to 7.00: Works of main canal and distributaries No. D-1, 4, 5
are completed, D-2, 3, 6, are under progress. The work is proposed for
recending.
3) km. 20.00 to 42.48: Works of main canal and distributaries No. D-9,
10, 11, 12, 16, 17, 19, 20, 21, 22, 24, 25, 26, 27, 28, 29, are completed,D-
13, 14, 15, 18, are under progress. The work is proposed for recending.
The details of target and achievements of the project for 2011-12 to 2013-14
are as follows:
153
No. Target Achievement Target Achievement
2011- Dry-1000 0
1) 30.00 13.10
12 Wet-4467 2231
2012- Dry-1136 292.26
2) 23.50 19.65
13 Wet-2736 978.50
2013- Dry-
3) 33.50 7.34 441.96
14 2543.74
Wet-1844 162.65
A) DAM:- The project has 926.54 mtrs, length of earthen embankment. The
spillway of the project is located on left flank saddle and comprises of broad
crested weir of 64 m length, with 6 Nos. of gates size 9.15 m x 5.50. The
spillway is designed for maximum discharge of 864.80 cumecs (30700
cusecs). Water is being stored in the reservoir since 1973.
B) CANAL:-R.B.C.
The total length of Right Bank canal is 14.00 Km, and is completed. The
discharge capacity at head is 1.28cumecs (45 cusecs). The contemplated
atchkat is 1741 ha, the canal section is damaged at many reaches.
Therefore modernization / renovation under AIBP/ERM of main canal and
Distributaries are taken-up and the works are in progress.
L.B.C.:- The total length of Left Bank Canal is 21.00 km, and is completed.
The discharge capacity at head is 2.74Cumecs (97 cusecs). Contemplated
atchkat under LBC is 3482 ha. the canal section is damaged at many
reaches. Therefore modernization / renova- tion of main canal and
Distributaries are taken-up and the works are in progress.
The above modernization works have been taken-up under ERM –AIBP
assistance at an estimated cost of Rs.1493 lakhs with 25% Central Share
and 75% State share. The works are taken-up in seven packages and the
agreement is concluded during 2011-12. The suffering achkat of 972 Ha, at
the tail end will be brought under irrigation. The financial progress achieved
is Rs.654.64lakhs.
154
Hattikuni Tank Project is located on Hattikuni stream near Hattikuni village
about 12 Kms, from Yadgir Town. The project was administratively
approved by G.O.NO. PWD 12 MIP 57 dated 20/26-12-1957 for Rs.
22,08,300/-. The revised cost of completion is Rs. 91.00 Lakhs and
approved by G.O.NO. PWD 54 MTP 83, Bangalore dated 24 Sept. 1983.
A) DAM:-
The project has 923.50 mtrs, length of earthen embankment and the
length of the spillway is 76.20 mtrs, with 9 N0s. of gates size 7.62m x
1.82 mtrs. The spillway is designed for maximum flood discharge of
13306 cusecs. Water is being stored in the reservoir since 1973.
B) CANAL:-Only L.B.C.
The total length of Left Bank canal is 14.00 Km, and is completed. The
discharge capacity at head is 1.41 cumecs (50 cusecs) to irrigate 2145
Ha. The canal section is damaged at many reaches. Therefore
modernization / renovation under AIBP/ERM of main canal and
Distributaries are taken-up and the works are in progress.
A) DAM:- The project has 600 mtrs, length of earthen embankment and
is completed in the year 1987. The length of the spillway is 60 mtrs,
with flush escape, ungated Ogee weir. The spillway is designed for
maximum discharge of 218.06 cusecs (7700 Cusecs), water is being
stored in the reservoir since 1987.
B) CANAL:-Only R.B.C. :
The total length of Right Bank canal is 11.00 Km, and is completed.
The discharge capacity at head is 0.73 cumecs (26 cusecs) to irrigate
1417 Ha. The canal section is damaged at many reaches. The
modernization under AIBP/ ERM has been proposed.
155
The modernization under AIBP/ ERM has been proposed and proposal was
submitted to the Project Appraisal Organization CWC Delhi, for an amount
of Rs. 397.00 Lakhs.
156
Revised cost of the project is 635.18 crores. Cummulative expenditure and
potential created up to 3/2014 are Rs. 573.83 crores and 22,793ha.
Respectively.
Achtkat details :
a)Contemplated Achtkat 29227 Ha
b)Covering districts 1. Bidar.
c)Covering Talukas. 1. Bhalki, 2. Bidar, and 3. Humnabad.
DAM:- The Dam has 810.00 length of Earthen Embankment with zonal
section maximum height of dam 23.00m to store the gross storage of 21.22
M.cum (0.749 TMC) and live storage of 18.88 M.cum (0.666 TMC)
R.B.C.:- The total length of Right Bank Canal is 43.00 Km, and is
completed. The discharge capacity and head is 1.61M.cum (57.20 Cusecs).
The canal section is damaged at many reaches. Therefore
modernization/renovation of main canal and distributaries under
AIBP/ERM has been proposed and same has been submitted to CWC,
Delhi, for Central Assistance vide this office ltr.No.KNNL/CEG/ERM/TA-
1/AE-6/ CDO/2009-10 dated 12-01-2010 amounting to Rs.821.00 Lakhs.
Irrigable command area is 2024 ha.
L.B.C. :- The total length of left bank canal is 28.00 Km and is completed.
The discharge capacity and head is 0.99 M.cum (35.20 cusecs). Irrigable
command area is 1255 ha.Modernization under ERM is taken up and
works are is below progress as the grants from centre is not received.
DAM :- The Dam has 2340 m length of earthen embankment with zonal
section, maximum height of the dam is 15.50 m to store the gross storage of
26.56 MCum (0.92 TMC) and live storage of 25.01 MCum (0.88 TMC).
161
Repairs &
maintenance 100.00 - -
(2701)
Dam safety 50.00 - -
Total 1612.64 979.51 60.74
Physical (Dry) 313.00 0 0
Physical (wet) 152.28 0
0
Financial
SCP 224.53 89.00 39.64
TSP 00 0
Amarja SDP 2829 734.81 25.97
Total 3053.53 823.81 26.97
Physical (dry) 2543.74 441.96 17.34
Physical (wet) 1844 162.65 8.82
Financial
SCP 400.00 26.01 6.50
TSP - - -
Bhima lift
AIBP 19200.00 6717.55 34.98
irrigation scheme
Total 19600.00 6743.56 41.48
Physical (dry) 18288.00 5686.13 31.09
Physical (Wet) 10000.00 4038.39 40.38
162
Programme
Progress
for the
Sl.no project Financial/physical upto %
year 2013-
3/2014
14
State 39 6.76 17.33
SCP 8 6.74 84.25
TSP 3 2.12 70.66
Total 50. 15.62 31.24
physical 0 0 -
2. On going Projects:-
Tungabhadra Project, (Original works are completed long back. But only
modernization works are being taken up.), Hirehalla Project, Singatalur Lift
Irrigation Scheme and other Lift Irrigation Schemes.
164
Original cost: Rs. 17.44 Crores
Original and latest estimated (Sanctioned by Nizam Government in
cost in Crores
1951)
5. Including administrative
approval no. and
Revised Cost: Rs. 194.40 Crores (ID 122
date/Technical Sanction. MTP 92 Dated: 05-06-1996)
Latest cost: Rs. 302.00 Crores
Length of canal
6. a) Main canal 226.00 km
b) Distributaries 707.00 km
7. Length of ayacut roads 1150 Km
8. District benefited Raichur and Koppal
Number of village and Tq Gangavathi Tq, Sidhnoor Tq, Manvi Tq,
9.
benefited Devadurga & Raichur Taluk
No of WUCS
a) Formed 585
10.
b) Registered 244
c) Handed over 46
Programme during 2011-12
(including LBMC,LBHLC and
11. Rs. 477 Lakhs
distributaries of LBMC,RBLLC
and RBHLC)
Progress achieved during 2011-
12 upto end of March 2012(
Expenditure: Rs. 83.41 Lakhs
12. including LBMC,LBHLC and
distributaries of LBMC,RBLLC
and RBHLC)
Intake Canal :- The total length of the Canal is 6.71 Km and excavation of
Canal work is nearing completion.
Mundawada Branch Canal :- The Canal works are under progress and an
Irrigation potential of 1432 Acres is created during 2012-13.
Left Bank Main Canal 1st Reach :- The works from 0.00 to 14.50 Km are
entrusted to the agencies. Works from Km 0.00 to 7.00 are under progress.
2nd Lift :- Jackwell is completed upto roof level and rising main works are
under progress.
Mundargi branch Canal :- The total length of the Canal is 72.00 Km. The
works from Km 0.00 to 10.00 and from Km 33.00 to 50.00 are under
progress.from km 31.00 to 50.00 Tenders are under progress.
166
Left Bank Main Canal 2nd Reach :- The total length of the Canal is 28.98
Km and works are progress in 4 packages.
Left Bank Main Canal 3rd Reach :- The canal works from km 0.00 to 10.00
are under progress. and from km 13.49 to17.87 work entrusted to agency.
Further balance works are under tender process.
The Dam works of this project and major portion of canals are
completed and dedicated to the nation on 26-12-2001 by the Hon’ble chief
Minister of Karnataka. Themain canals(left side and right side) of this
project are completed. Out of total 64Distributaries , 62 distributaries have
been completed and 2 Distributaries are underProgresss out of 8330
Ha,potential created is 8206 Ha and balance potential of 124 Ha is
programmed to create during the year 2014-15.
Canals:
The total length of canal is 24.60 km. The earthwork excavation and
embankment from km 0.00 to 24.60 km is completed. The PCC slab lining
work in the reach from km 0 to 24.60 is also completed. Work of all the 75
CD structures is completed. Construction of Railway Bridges at Railway
crossings at km 20.70 of RBC and at km 19.70 of LBC is completed.
Construction of Pipe Culvert on NH 63 crossing at km.21.28 of RBC and Pipe
Culvert on NH-63 at km 19.82 of LBC is completed.
Distributaries :
The construction of distributaries under RBC from Dy. No.1 to 37 is completed in
all respects, except for Distributary 35 which is delayed due to Land Acquisition
problems. Water has been let out upto distributary no.34. The construction of
distributaries under LBC from Dy.1 to 27 including Distributary no.21 (Branch
Canal) is completed. Distributary no.21 (Branch Canal) is having a length of
14.775 km. Earth work and lining work for the distributory is completed. Water is
let-out up to Distributary No. 27 including Distributary No. 21 (Branch canal).
Land Acquisition:
168
An area of 4448.00 Acres has been acquired in the villages of Yelburga and Koppal
taluks of Koppal district for earthen embankment, Spillway works, Submergence
area, Canals and Distributaries, Quarry, Ayacut roads, Camp colony and for
Rehabilitation centres under Hirehalla Project. Acquisition of 440.38 Acres of land
is in different stages of the process.
(i) Earthen Embankment: The earthen embankment is completed upto
its top level in its entire length including end connections to spillway.
(ii) Spillway : The Spillway with radial gates is completed .
(iii) Sluices: The canal sluices at right flank and left flank are completed.
Rehabilitation Works:-
For rehabilitation for Mudlapur, Shirur, Muttal and Veerapur villages Govt
has sanctioned an amount of Rs. 5426.11 Lakhs under Govt order No:
PÀAE/88 DgïEºÉZï 2010 ¨ÉAUÀ¼ÀÆgÀÄ, ¢: 27-11-2010. Excluding the expenditure of
Hagaribommanahalli Project comprised of two canals viz right bank and left bank
canals having lengths of 33.81 Km and 16.51 Km respectively to irrigate 1594 Ha
under right bank canal and 1371 Ha under left bank canal totaling to 2965 Ha.
The cropping pattern envisaged in the original project report is Khariff paddy to an
extent of 2965 Ha and DCW crops to an extent of 2965 Ha during Rsbi.
170
The Dam is of earthen homogeneous section and zonal section in high bank. The
length of Dam including breaching section is 1606.60 M. The length of earthen
Dam is 1490.47 M. The maximum height of the Dam is 15.21 M above the deepest
river bed. The spillway is of chute type fitted with 10 No’s of vertical left gates of
size 9.15x6.10 M each. Maximum flood discharging capacity of the spillway is 2698
Cumes.
The Chief Engineer , Irrigation Central Zone, allocated 100.00 lakhs for
maintenance works during the year 2014-15 vide letter No 240 Dated
28/04/2014.
The construction of the dam and allied works commenced during the year 1972
and was completed by March 1981. Water was stored from 1978, and the dam has
filled up once during 1981. No problem have been encountered with and the dam
is functioning satisfactorily as per available records.
The Narihalla dam is an earthen dam of 295 M length and has a maximum
height of 32.92 M above the river bed level. The spillway for the dam is provided on
the left bank and designed as a chute spillway with a stilling basin at the
downstream end. The spillway is fitted with 5 No’s of vertical type crest gates of size
6.09x9.14 M. The reservoir formed by the construction of the Dam has a gross
storage of 22.93 Mcum and a live storage of 20.86 Mcum. The Scheme
contemplates utilization of 8.07Mcum for irrigation, 5.35 Mcum for domestic
waters supply to Sandur town and 3.56 Mcum for industrial water supply NMDC.
The project benefits an area of 3500 acres.
The Chief Engineer , Irrigation Central Zone, allocated 85.00 lakhs for
maintenance works during the year 2014-15 vide letter No 240 Dated
28/04/2014.
After the reorganization of the states in the year 1956, the RDS head works
and first 27 miles of the canal with distributaries 1 to 14 are fall in the
territory of Karnataka State and remaining canal anddistributories in
Andhra Pradesh.
The canal runs for a length of 27 miles (42.60 Km) in Karnataka State and
remaining length of 62 miles in Andra Pradesh. There are 14 distributaries
in Karnataka State and the ayacut benefited is 5879.00 acres .The number
of distributaries in Andhra Pradesh is 22 and area benefited in Andhra
Pradesh is 87,500 acres.
The project was commenced in the year 1947. The anicut, distributaries
falling in Karnataka State are completed in the year 1958 and water is
letout in the canal during July 1958.
As the RDS main canal was designed to carry 850 cusecs at head and
Karnataka is to provide discharge of 770.00 cusecs at Andhra Pradesh
border (ie. At Km 42.60) after utilizing Karnataka share of 80 cusecs. But
due to disturbed lining accumulation of silt in bed and due to over topping
of water at certain banking reaches coming under Karnantaka State area
are in bad shape and also due to changes in hydraulic parameters of main
canal (as the canal was designed based on the parameters available during
the year 1947) it is not possible to draw more than 640 cusecs at head, So it
is possible to provide only 400-450 cusecs at AP border as against design
discharge of 770 cusecs. The Andhra Pradesh Government constituted
committee to look into the matter and to suggest remedial measures to
improve the flow conditions of the canal. Accordingly four modernisation
works takenup to improve the flow conditions of the canal.
Package-III & IV are almost completed & Package-I & II are under progress.
The work has been entrusted to KRIDL-Raichur (erst while KLAC) on dated
15.04.20116 for Rs 46.83 lakhs .The stipulated period for completion of
work is six months from date of agreement.The supplementary agreements
corresponding to sub-estimates for formation of approach roadto Katarki
LIS and construction of Intake well for Rs 2.00 lakhs and 2.25 lakhs has
also been executed.
The work was started on 15.04.2006. During execution ,as it was felt very
essential to execute some items which were not included in the estimate,
the then Chief Engineer, ICZ, Mnirabad approved EIRL & the agency
completed the following components of the work.
a) Civil works:- Inlet channels, sump well, pump house, laying of pipe line for
raising main and gravity main , distribution chamber have been tackled
and completed.
b) Electrical Equipments:- During 2009 electrification works has been
tackled and completed by another agency M/s Praveen Electricals,
Sirguppa.
i) Scour valves for emptying the pipes & to plug the leakages.
ii) Providing and laying of drainage pipes 450 mm dia NP-2.
iii) Construction of embankment.
iv) Strengthening of pipe joints to arrest joint sinking and movement.
The total expenditure incurred up to the end of March 2014 is Rs. 73.47
Lakhs Grant allocated for the year 2014-15 is Rs.25.00lakhs. After
obtaining approval to the workslip,the balance work will be taken up &
completed in all respects & the scheme will be commissioned.
173
12.5.8 BOYALMARCHED LIS:
This LIS is located on right bank of Kappagal nala, near Boylmarched village
in Manvi Taluk of Raichur district to irrigate suffering ayacut of 1185 acres
at the tail end of distributary no: 89/7 of TLBC. Government accorded
administrative approval to this LIS for Rs 73 lakhs vide
G.O.No:WRD/55/MTP/2001 dated 30.10.2003. The estimate is sanctioned
for Rs 73 lakhs by CE,ICZ, Munirabad vide CER No: 06/2003-04. The work
has been entrusted to KRIDL-Raichur (erst while KLAC) on dated
25.05.2005 for Rs 60.97 lakhs .The stipulated period for completion of work
is six months from date of agreement.
The work was started on 12.02.2006. During execution ,as it was felt
very essential to execute some items which were not included in the
estimate, the then Chief Engineer, ICZ, Mnirabad approved EIRL & the
agency completed the following components of the work.
c) Civil works:- Inlet channels, sump well, pump house, laying of pipe line for
raising main and gravity main , distribution chamber have been tackled
and completed.
d)
e) Electrical Equipments:- During 2007-08 to 2008-09 electrification works
has been tackled and completed by another agency M/s Praveen Electricals,
Sirguppa.
i) Scour valves for emptying the pipes & to plug the leakages.
ii) Air valves at ridge points.
iii) Pressure relief valves near manifold.
iv) Strengthening of pipe joints to arrest joint sinking and movement.
Preethi CAD Consulting Engineers Pvt. Ltd Bangalore have prepared detailed
Project Report to an amount Rs. 54.29 Crores and the same submitted to
Managing Director . K.N.N.L. Bangalore for ERC approval vde letter No 340 Dated
12/05/2014.
TAC cleared with some explanations to submit the proposal MIP control
board. MIP control board in its meeting held on 1-10-2001 approved subject
to condition that before according Technical approval detailed Design &
estimates should be prepared.
The modified estimates prepared considering 2012-13 DSR for Irrigation &
PWD SR which works out to RS.2680 lakhs and resubmitted to MD KNNL
Bangalore along with the detailed report for approval vide letter No.935
Dated:24/6/2013 & to take up the work.
176
project is Rs. 4835.00 Lakhs at 2003-04 price level. And Updated cost of the
Project is Rs.5465.00lakhs.
Stage of work as on 31st March 2012:
The DPR and Detailed estimates for the above Balancing Reservoir is
submitted to Govt. for placing before the 95th TAC held on 6/4/2010
.During the Deliberation of the meeting it was observed that the inter-state
angle should be properly analysed at Govt. level and this interstate matters
which requires the opinion in the light the proceedings being under way
before Tribunal and are in the final stages. Hence the TAC felt that the issue
can be deferred for the time being.
Hence incorporating all the necessary following items for the balance work
revised estimate is technically sanctioned for Rs 180.00 Lakhs vide CER No. 276
/2012-13 & work entrusted to M/S Sri Srinivasa Construction India Pvt.Ltd.,
Bellary vide agreement No.214 /2013-14 Rs. 155.87 Lakhs and work was
commenced on 09-05-2014 & the work is under progress.
178
4)RAISING MAIN: - The balance length of 129.50m of PSC pipes 600 mmdia
and Necessary Ms specials ,valves and valve chambers anchor blocks and
thrust blocks.
179
BREIF DESCRIPTION:
A concrete diversion weir of 145 meters. Length and 17.50 meters height
above the deepest foundation level is proposed to be constructed at
horriabbe site near Siddapura Village, Udupi District.
CANALS:
Varahi Right Bank Canal takes off from the Diversion weir and runs to a
length of 42.73 K.M. A branch canal takes off from Right Bank Canal at
19th K.M. and crosses the river Varahi through an aqueduct and Left Bank
Canal starts from this aqueduct and runs for a length of 44.35K.M. The Lift
Canal start from Left Bank Canal at 7th K.M. of Left Bank and runs for a
length of 33 K.M.
180
Sl. Length, Irrigable
Canal details
No Km area, Ha
1 Varahi Right Bank Canal 42.73 1992
Varahi left bank canal
2. (From off-take at 20th Km of Right Bank 44.35 10987
Canal)
Lift canal (From off-take at 7th Km of Left
3 33.00 2723
Bank Canal)
Total 15702
Villages benefited:
33
1. Kundapura Taluk 8324
villages
35
2. Udupi Taluk 7378
villages
68
Total 15702
villages
Lift irrigation canal (33 Km.) : Works are completed. Power connection
received and commissioned on trial basis. This project is received central
assistance under AIBP since 2007-08.
PROGRESS DURING 2013-14: The total estimated cost of the project is Rs.
569.53 Crores. Cumulative expenditure incurred on the project up to end of March
2014 is Rs. 541.05 Crores. During 2013-14 against the programme of Rs. 81.00
crores, expenditure of Rs. 20.33 crores has been incurred up to end of March
2014.
181
TUNNEL TUNNEL
182
12.7 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER,
UPPER BHADRA PROJECT ZONE, CHITRADURGA.
1. Lifting of 15 TMC of water from Tunga river and delivery to Bhadra reservoir.
2. Lifting of 21.50 TMC of water from Bhadra reservoir and delivering it to
proposed delivery chamber near Ajjampura through a canal system.
3. Construction of Tunnel near Ajjampura and letting out water in Chitradurga
branch canal for irrigating semi-dry crops during Khariff and filling 156 MI
tanks in draught prone areas of Chickamagalur, Chitradurga, Kolar and
Tumkur districts there by increasing the underground water table in the
region and creating basic facility of drinking water in the reason.
183
The report of proposed project is unique and by implementation of
this project there is no submerge/Rehabilitation and involves minimum
damage to the environment.
Project Purpose:
a) Water allocation:
21.50 TMC of water has been allocated under Scheme-A for Upper Bhadra
Project.
b) Details of Project:
An allocation of 1.86 TMC of water has been made for Jaglur branch canal
from Pollavaram Project as available for State Government.
Increasing the ground water table by filling 100 tanks in Tumkur district
and 19 tanks in Kolar district and thereby to provide drinking water facility.
This requires 5.60 TMC of water.
Implementation of Project:
In view of implementing the project speedily three critical works coming in
the intial reaches of Upper Bhadra Project are entrusted on EPC tender
basis to three agencies. Accordingly, the agencies are required to complete
the construction in 3 years and maintain for 5 years.
184
Name of work Agency Tender
Amount
Package-I Lifting of 15 TMC of M/s SEW-JYOTI Rs. 324 Crores
water in two stages for (JV) Hyderabad
a lift of approximately
80m and delivering to
Bhadra reservoir
through 10KM canal.
Package-II Lifting of 21.50 TMC of M/s RNSIL (JV) Rs. 1032 Crores
water in two stages for Hubli
lift of approximately
88m and delivering the
water to proposed
delivery chamber near
Ajjampura through
40.5 Km canal.
Package- Construction of 6.90 M/s SNC Power Rs. 223.96
III Km Tunnel near Corporation Crores
Ajjampura and Limited, Bangalore
delivering the water to
Chitradurga branch
canal. This includes
0.33 Km approach and
2.77 Km length Exite
canal
Progress of Works:
Package-I
The work of raft foundation and raft slab is completed. Laying of 90m
length of rising main is completed for Pump House-I. placing of 5 Nos Draft
tube are erected.
Laying of bed concrete lining for intake canal from on 1428 to 1503 for
117m is completed. Pier work for super-passage at Ch: 1513 is completed
and abutment and wing wall work is under progress. The designs of 15
C.Ds is approved.
Approval is obtained for the power required of 35 MVA for each Pump
Houses at Kanbur and Kasbur. The Electro-Mechanical components
essential for Pump House-I and II viz: 10 Pumps, 10 Draft tubes, 10 Spiral
casing, 10 impellers and 10 shafts motors with accessories. 1 No EOT crane
have been supplied to the work spot. The proposal of Extension of time is
approved upto 31.3.2015 by Managing Director, KNNL vide letter dated 25-
3-2013.
185
The total expenditure incurred upto 31-3-2014 is Rs. 101.61 crores the
amount of pending bill is 1.40 Crores.
Package-II
5 Nos of draft tubes and spiral casings are erected at a situated place.
One pit lines is embedded. Concreting works for pump house-I is under
progress. Fabrication of roof truss is under progress. Lining of fore bay has
been completed. Excavation of canal for a length 14.50 Km is completed.
Work of canal lining is completed upto 9.80 Km. Till date the 32 designs are
approval Eighteen cross drainage works are completed and balance are
under progress. Jambadahalla aqueduct is under progress concreting of 5
trough have been completed out of 34 troughs. Excavation of pump house-2
work has been taken up, till date excavation for a depth of 30M is
completed. Three 30/40 MVA and SFC transformers are erected. The
foundation work for 14 circuit breakers are completed. Electro Mechnical
equipments of Pump House-I & II are supplied to the site. The proposal of
extension of time is approved by MD, KNNL, B’lore vide ltr. Dated 9-1-2013
upto 31-03-15. The total expenditure incurred upto March-2014 is 511.08
crores. The amount of pending bill is Rs.43.23 crores.
Package-III
The Government has accepted the report of the committee constituted under
the chairmanship of Sri. D.N.Desai for the problems arising out of the
construction of tunnel vide Government order dated: 13-6-2012. and
directed to take up the tunnel work. The tunnel excavation work is under
progress. In shaft and exit portion of tunnel. Extension of time has been
granted up to 21-3-2016. The total expenditure incurred upto March-2014 –
2.61 Crores.
Buildings:
186
quarters at Chitradurga is completed and are under usage. The total
expenditure upto March-14 is 4.68 Crores.
Land Acquisition:
Out of Private Land required for Package-1 works, 4(1) notification issued
for an area of 100A-23G and 96A-28G for which 6(1) notification is issued
for out of Private Land required for Package-2 works 4(1) notification issued
for 1360A-39G and 6(1) notification is issued for 1040A-14G.
Package-3 works:
4(1) notification is issued for 151A-14G and 6(1) notification is issued for
150A-34.08G. The proposal of land acquired for Chitradurga Branch Canal
is submitted to Revenue Department. Revenue Secretary to Government of
Karnataka has revised the land rates for Private Land coming under
Package-1, 2 & 3 on 21-03-2012 and has refixed the rates as below.
Package-I 106.12 Ha
Package-II 88.50 Ha
CBC 171.59 Ha
364.50 Ha
187
An extent 364.50 Ha of Revenue Land is identified in Varavu Kaval as
against the extent of forest land to be diverted for Upper Bhadra Project for
handing over this land to Forest Department, Government has given
approved on 26-2-2013.
188
Package-I works
Package – II Works :
189
190
12.7.2 Yettinahole Project:
Providing drinking water to Kolar Chikkabalapur,Ramanagar,Bangalore
Rural districts etc and covers other districts namely
Tumkur,Chickkamaglur,and Hassan coming en-route of gravity canal.
In this Project it is envisaged to lift the flood water available during khariff
season in the months of June to November from the west flowing rivers of
Yettinahole, Kadumanehole, Kerehole Hongadahole is supplied to the above
said areas without affecting the requirement of downstream region.
The water lifted from the barrages is delivered to delivery chamber near
Haravanahalli through pipes burried under ground and carried parallel to
the existing railway line and roads duly taking precaution to minimize the
land acquisition cost.
In the midst of this Canal alignment a Canal of 12.50KM comes in the Upper
reaches and after this it is proposed to construct Gravity Canal near
Byragonanahalli village in Kortagere Taluk and allow the water to the
reservoir with capacity of 5.78TMC.
191
From this Canal it is proposed to construct a Canal on the left side at KM
231.70 and supply drinking water to Koratgere and Madugiri in Tumkur
Districts and also filling minor irrigation tanks in Pennar Valley to an extent
of 50%.
From this Canal it is proposed to construct Gravity Canal to the right side at
KM 248.40 and supply water to Thippagondanahalli Reservoir in Ramanagar
District for drinking water purpose.
After this from KM 274.00 the Canal runs for 75 KM and it is proposed to
supply water to Gowribidanur Taluk to fill MI tanks upto 50% capacity.
The water from Byragondanahalli reservoir the water is lifted upto about 128
KM through a rising Main of 45 Km and water is supplied to Palar Basin
near Kundaru village in Devanahalli Taluk and water is taken through
Gravity Canal and filled to MI tanks upto 50% capacity to recharge the
ground water and drinking water purpose.
The stage two works (conveyance component) i.e. for the work from
Haravanahalli delivery chamber approval is accorded to the line estimated
amount of Rs.5054.000 Crores and the same is proposed to taken up after the
preparation Detailed Project Report are approval to the same is received from
government.
192
Financial Progress:
The foundation stone for the works was laid by Hon’ble Chief minister of
Karnataka state on 3-3-2014. Agreement has been executed and initial works are
under progress.
A grant of Rs.4500 lakhs has been provided for the year 2013-14 and an
expenditure of 169.80 lakhs is incurred upto March-2014 and the cumulative
expenditure is Rs.267.30 lakhs.
193
Yettinahole Inauguration Function:
********
194
PROJECTS UNDER
195
13. CAUVERY NEERAVARI NIGAMA LIMITED
196
13.1 AN OVERVIEW OF PROJECTS UNDER THE CHIEF
ENGINEER, IRRIGATION(S), ZONE, MYSORE.
D. Devaraja Urs Canal project envisages construction of 126 km long Right Bank
Canal from Krishnarajasagar reservoir. Administrative approval has been accorded to the
Original estimate amounting to Rs.18.50 Crores. vide G.O. No.PWD/145/MKS/77, dtd:
23.04.1979. The work was started during 1979. Administrative approval has been accorded
to the revised estimate amounting to Rs.58.10 Crores. vide G.O. No.PWD/145/MMR/86 dtd:
08.08.1988.
The planned utilization from this project is to create an ultimate potential of 80000
acres (32,375 ha.) with a cropping area of Khariff semidry and Rabi semidry 59,500 acres
totalling to 1,39,500 acres. The taluks benefited by this project are Nanjangud, T. Narasipur&
H.D. Kote of Mysore district and Srirangapatna taluk of Mandya district.
The main canal work have been completed upto 126 km and the works of
distributaries are also completed in all respects. The water allowed upto the tail end on trial
basis. 249 cross drainage works and lining to main & distributary canals are completed. The
project is physically completed.
The total irrigation potential created is 78432 acres (31741 ha.) as against the
contemplated potential of 80000 acres (32375 ha.) A balance potential of 1568 acres (634
ha.) could not be created due to Urbanisation, Industrial development and high mounds.
197
During 2013-14, a grant of Rs.7.73 Crores has been allocated. Upto end of March-2014
an expenditure of Rs.16.92 Crores is incurred. The cumulative expenditure incurred since
inception upto end of March-2014 is Rs.532.60 Crores.
The project envisages the construction of a composite dam across Kabini River near
Beechanahally village in H.D. Kote Taluk of Mysore District. Administrative approval has
been accorded to the Original estimate amounting to Rs.3.20 Crores. vide G.O. No.
PWD/1/KRS/57 dtd: 02.02.1959. The work was started during 1960. Administrative approval
has been accorded to the revised estimate amounting to Rs.390.00 Crores vide G.O.
No.PWD/22/MMR/86 dtd: 24.02.1986
The project comprises of both flow and lift irrigation schemes. The planned
utilization is 59.65 TMC which comprises of 32.350 TMC in flow and 27.300 TMC in lift to
create the ultimate potential of 233347 acres (94434 ha.), which comprises of 110000 acres
(44516 ha.) in flow and 123347 acres (49918 ha.) in Lift. The taluks benefited by this project
are H.D.Kote, Nanjangudu and T. Narasipura of Mysore District and Gundlupet,
Chamarajanagara, Yalandhuru and Kollegala of Chamarajanagara District.
FLOW: The Dam and allied works are completed.
The works of earth work excavation and CD works for the entire length of 26 Km of
LBC are completed. The works of earth work excavation and CD works for the entire length
of 202 Km of RBC are completed. The CC lining works of RBC from Ch: 0.00 to 100.00 Km
is almost completed and the CC lining works from 100.00 to 130.00 Km are in progress.
Also, the CC lining works from 130.00 to 140.00 Km are completed. The balance works are
programmed to be completed during 2014-15.
198
The total irrigation potential created under flow from this project since inception to the
end of March 2009 is 109273 acres (44222 ha.) as against the contemplated potential of
110000 acres (44516 ha.) under flow. A balance potential of 727 acres (294 ha.) could not be
created due to high mounds and village limits.
During 2013-14, a grant of Rs90.56 Crores has been allocated. Upto end of March-
2014 an expenditure of Rs 70.60 Crores is incurred. The cumulative expenditure incurred
since inception up to end of March 2014 is Rs896.46 Crores.
The project envisages the construction of a composite dam across Harangi River near
Hulugunda village in Somawarpet Taluk of Kodagu District. Administrative approval has
been accorded to the Original estimate amounting to Rs.11.00 Crores. vide G.O.
No.PWD/02/GHK/63 dtd: 14.11.1969. The work was started during 1964. Administrative
approval has been accorded to the re-revised estimate amounting to Rs.545.00 Crores. vide
G.O.No.PWD/14/MMH/2007 dtd: 30.07.2007.
The project comprises of both flow and lift irrigation schemes. The planned utilization
is 18.00 TMC which includes of 11.38 TMC in flow and 6.62 TMC in lift. The details of
ultimate potential to be created are as below.
Ultimate Potential
Length of Canal
Type Canals to be created
in Km.
in acres (ha.)
Flow
1 LBC 153.00 29472 (11927)
2 RBC 138.50 71323 (28863)
3 MI tanks - 2600 (1053)
Lift
199
1 Somwarapet LIS 10.00 1500 (607)
2 Piriyapatna LIS 50.00 30000 (12141)
Total 134895 (54591)
The taluks benefited by this project are Hunsur, K.R. Nagara,Periyapatna of Mysore
District, Arkalgudu of Hassan District and Somawarpet of Kodagu District.
FLOW IRRIGATION:
The Dam and allied works are completed. The works of earth work excavation and
CD works for entire length of 153 Km of LBC and the entire length of 138.5 Km of RBC are
completed. The lining works of Harangi Left Bank Canal for a length of 12.26 Km from
14.740 to 27.00 Km is taken up. Out of this, the lining works for a length of 11.36 Km are
completed and the works of balance 0.90 Km are in progress.
The works of improvements to 20 distributaries from 1 to 18 of Harangi Left Bank
Canal for a Length of 41.145km are taken up in 6 packages. Out of this, the improvement
works for a length of 31.256km are completed. The balance improvement works for a length
of 9.889km are in progress.
The works of improvements Harangi Right Bank Canal for a length of 19.73Km from
0.00 to 25.00 Km is taken up. Out of this, improvement works for a length of 14.46km are
completed. The balance improvement works for a length of 5.27km are in progress. These
balance works are proposed to be completed during 2014-15.
LIFT IRRIGATION SCHEMES: Somawarpete LIS and Piriyapatna LIS arecoming under
this project.
1. Somawarpete LIS:
2. Piriyapatna LIS:
200
The total irrigation potential created including flow and lift under this project since
inception to the end of Mar 2010 is 132248 acres (53520 ha.) as against the contemplated
potential of 134895 acres (54591 ha.). The balance potential of 2647 Acres (1079 Ha.) could
not be created due to high mounds and village limits. The project is physically completed.
During 2013-14 a grant of Rs.25.05 Crores has been allocated. Upto end of March-
2014 an expenditure of Rs.45.58 Crores is incurred. The cumulative expenditure incurred
since inception upto end of March-2014 is Rs.676.33 Crores.
The project envisages the construction of a composite dam across Taraka River near
Penjahally village in H.D. Kote Taluk of Mysore District. Administrative approval has been
accorded to the Original estimate amounting to Rs.1.70 Crores. vide G.O.
No.PWD/23/GIP/67 dtd: 12.04.1970. The work was started during 1970. Administrative
approval has been accorded to the Revised estimate amounting to Rs.51.00 Crores. vide G.O.
No.PWD/36/MMF dtd: 15.04.1996.
The planned utilization from this project is 3.20 TMC to create an ultimate potential
of 17396 acres (7040 ha.). H.D. Kote taluk of Mysore District is benefited by this project.
The Dam and allied works are completed. The earth work excavation and CD works
for 50 Km of LBC and 38.50 Km of RBC are completed. The CC lining works of LBC from
201
0.00 to 10.00 Km are completed. The Action has been taken up to implement the lining work
from 10.00 to 30.00 km of Left Bank Canal and proposed for completion during 2014-15.
To augment the short supplies to the reservoir and to the complete atchkat of the
project,lifting of 2.07 TMC water from foreshore of Kabini, through Taraka Lift irrigation
Scheme is completed and trail run has been conducted.
The total irrigation potential created under this project since inception to the end of
March 2009 is 17396 acres (7040 ha.). The project is physically completed.
During 2013-14, a grant of Rs.5.13 Crores has been allocated. Upto end of March-2014
an expenditure of Rs.1.37 Crores is incurred. The cumulative expenditure incurred since
inception upto end of March-2014 is Rs.77.66 Crores.
The project envisages the construction of a composite dam across Arkavathy River a
tributary to River Cauvery near Arobele village in Kanakapura Taluk of Ramanagara
District. Administrative approval has been accorded to the Original estimate amounting to
Rs.22.25 Crores vide G.O. No.PWD/126/MMK/83 dtd: 27.06.1984. The work was started
during 1983-84.
The project comprises of both flow and lift irrigation schemes. The total planned
utilization from flow and lift is 3.10 TMC.The planned potential to be created is 15400 acres
(6232 Ha) which includes 7500 acres (3035 Ha) by Flow and 7900 acres (3197 Ha) by Lift.
Kanakapura taluk of Ramanagara District is benefited by this project.
202
FLOW: The Dam and allied works are completed. The Length of LBC is 23 Km. and of
RBC is 22 Km. and the potential to be created is 4500 acres (1821 ha) and 3000 acres (1214
Ha) respectively totalling to 7500 acres (3035 Ha). The works for entire length of 23 Km of
LBC and 22 Km of RBCare completed. Potential created is 7490 acres (3031 Ha). It was not
possible to create a potential of balance for 10 acres (4 Ha.).
LIFT IRRIGATION SCHEMES: Arkavathy LBLC LIS and Arkavathy RBLC LIS are
coming under this project.
LBLC: It is proposed to lift 32.98 Cusecs of water on the foreshore of the Arkavathy
reservoir to create a potential of 3600acres (1457Ha). The total length of LBLC is 21 Km
(18.00 Km + 3.00 Km Reverse canal). The Left Bank lift scheme is completed and
commissioned.
RBLC: It is proposed to lift 39.98 Cusecs of water on the foreshore of the Arkavathy
reservoir to provide irrigation facilities to 4300 acres (1740 Ha). But, the atchkat coming
under the outlets of the canal from 0.00 to 23.00 Km is 3892 Acres (1575 Ha.). The Right
Bank lift scheme is completed and commissioned.
The total irrigation potential created under this project since inception to the end of
March 2013 is 15384 acres (6226 Ha) as against the total contemplated potential of 15400
acres (6232 Ha).
During 2013-14, a grant of Rs.3.60 Crores has been allocated. Upto end of March-
2014 an expenditure of Rs.1.46 Crores is incurred. The cumulative expenditure incurred
since inception upto end of March-2014 is Rs.202.81 Crores.
203
The project envisages the construction of a composite dam across Chiklihole River, a
tributary of River Cauvery near Rangasamudra village in Somawarpet Taluk of Kodagu
District. administrative approval has been accorded to the original estimate amounting to
Rs.3.40 Crores. vide G.O. No.PWD/25/GIP/71 dtd26.08.1977. The work was started during
1978. Administrative approval has been accorded to the revised estimate amounting to
Rs.19.20 Crores. The planned utilization from this project is 0.45 TMC to create an ultimate
potential of (2137 acres) 865 ha. Somawarapet taluk of Kodagu District is benefited by this
project.
The Dam and allied works are completed. The works of new LBC for a length of 29
Km are completed. The project is physically completed.
The total irrigation potential created under this project since inception to the end of
March 2007 is 2138 acres (865 ha.). The cumulative expenditure incurred since inception
upto end of 3/2007 is Rs. 19.20 Crores.
The total irrigation potential created under this project since inception is 2138 acres
(865 ha.). The cumulative expenditure incurred since inception is Rs. 19.20 Crores.
204
The planned utilization from this project is 1.23 TMC to create an ultimate potential
of 16314 acres (6602 ha.). Kollegala taluk of Chamarajanagara District is benefited by this
project.
The Dam and allied works are completed. The Length of LBC is 10.20 Km. and of
RBC is 9.10 Km. and the potential to be created is 6200 acres (2509 ha.) and 10114 acres
(4093 ha.) respectively, totalling to 16314 acres (6602 ha.) The works of entire length of
LBC and RBC are completed. This project is physically completed.
The total irrigation potential created under this project since inception to the end of
Mar 2009 is 15352 acres (6213 ha.) as against the contemplated potential of 16314 acres
(6602 ha.). A balance potential of 962 acres (389 ha.) has not been created due to hillocks
and villages.
During 2013-14, a grant of Rs.1.11 Crores has been allocated. Upto end of March-
2014 an expenditure of Rs.1.14 Crores is incurred. The cumulative expenditure incurred
since inception upto end of March-2014 is Rs.231.61 Crores.
The project envisages the construction of a Barrage across Shimsha River near Iggalur
village in Channapatna Taluk of Ramanagara District. Administrative approval has been
accorded to the Original estimate amounting to Rs.3.42Crores. vide G.O.No.PWD/17/GIP/71
dtd: 06.12.1977. The work was started during 1977. Administrative approval has been
accorded to the revised estimate amounting to Rs.10.75Crores vide
G.O.No.PWD/33/MMH/86/ dtd: 23.12.1986.
The project comprises of both flow and lift irrigation schemes. The planned
utilization is 1.80 TMC. The ultimate potential to be created is 10532 acres (4263 ha.) which
comprises of 3650 acres (1477 ha.) in flow and 6882 acres (2786 ha.) in Lift. The taluks
benefited by this project are Channapatna of Ramanagara District: Maddur, Malavally of
Mandya District.
205
FLOW: The Barrage and flow canal works are completed. The Length of LBC is 35 Km.
and the works is completed. The potential created is 3650 acres (1477 ha.)
LIFT IRRIGATION SCHEMES: 8 No. of LIS schemes are coming under this project. Out
of this 5 LIS Viz., Point A, Point C, Point C-2, Hulikere LIS water is lifted from the
foreshore and Point D LIS water is lifted from canal to irrigate 6882 acres (2786 ha.). The
balance 3 LIS Viz., Point B, Nittur LIS and Garkahalli LIS are tank feeding project.
The details of 5 LIS used for irrigation pupose are as under:
Sl. Ultimate Potential to be Potential created
Name of LIS
No. created in acres. (ha) in acres. (ha)
1 Point A 2243 (908) 2204 (892)
2 Point C 1255 (508) 1255 (508)
3 Point C-2 1000 (405) 1000 (405)
4 Point D 1890 (765) 1890 (765)
5 Hulikere 494 (200) 371 (150)
Total 6882 (2786) 6719 (2719)
LIS Projects: Point A, C, C-2, D and Hullikere LIS are completed. Potential Created is 6719
acres (2719 ha.). The total irrigation potential created including flow and lift from this
project since inception to the end of Mar-09 is 10368 acres (4196 ha.). The balance potential
of 163 acres (67 ha.) could not be created due to high mounds and village limits. This project
is physically completed.
During 2013-14, a grant of Rs.1.89 Crores has been allocated. Up to end of March -
2014 an expenditure of Rs.1.33 Crores is incurred. The cumulative expenditure incurred
since inception up to end of March-2014 is Rs.89.04 Crores.
The project envisages the construction of a composite dam across Arkavathy River
near Manchanabele village in Magadi Taluk of Ramanagara District. Administrative
approval has been accorded to the Original estimate amounting to Rs.2.37 Crores vide
G.O.No. PWD/12/GIP/64 dated: 30.09.1969. The work was started during 1969.
Administrative approval has been accorded to the re-revised estimate amounting to Rs.18.50
Crores vide G.O.No. PWD/14/MMK, dated: 25.08.86.
206
The planned utilization from this project is 0.80 TMC to create an ultimate potential of
6012 acres (2433 ha.). The taluks benefited by this project are Magadi and Ramanagara of
Ramanagara District.
The Dam and allied works are completed. The Length of LBC is 35.00 Km. and of
RBC is 36.00 Km. and the potential to be created from these canals are 2768 acres (1120 ha.)
and 3244 acres (1313 ha.) respectively. The project is physically completed.
The works for the entire length of LBC and RBC are completed. The project is
physically completed. The total irrigation potential created under this project since inception
to the end of March 2009 is 6009 acres (2432 ha.).
During 2013-14, a grant of Rs.1.74 Crores has been allocated. Upto end of March-2014
an expenditure of Rs.1.95 Crores is incurred. The cumulative expenditure incurred since
inception upto end of March-2014 is Rs.94.48 Crores.
207
13.1.10 KRS MODERNISATION
Modernization works are completed. The total additional irrigation potential created
under this project since inception to the end of Mar 2009 is 5250acres (2125 Ha.). The
project is physically completed.
During 2013-14, a grant of Rs.9.49 Crores has been allocated. Upto end of March-2014
an expenditure of Rs.10.52 Crores is incurred. The cumulative expenditure incurred since
inception upto end of March -2014 is Rs.467.98 Crores.
208
13.1.11 NANJAPURA LIFT IRRIGATION SCHEME
This project envisages to lift 119 Cusecs of water from Cauvery River near Nanjapura
village in T.Narasipura taluk (Bannur Town) of Mysore District to feed Turuganur Branch of
Vishveshwaraia Canal. Administrative approval has been accorded to the Original estimate
amounting to Rs.28.40 Crores vide G.O. No.PWD/197/MMK/1996 dtd: 27.05.1997.
Technical sanction accorded to the estimate amounting to Rs.31.60 Crores vide CER No.
CER No:119/1998-99.The work was started during 1999-2000.
The scheme is proposed to supply water to an extent10000 acres (4049 ha.) which
comprises of creation of additional atchkat of 8000 acres (3239 ha.) and Suffering atchkat of
2000 acres (810 ha.) under Turuganur Branch Canal. The taluks benefited by this project are
T.Narsipura of Mysore District and Mallavali of Mandya District.
The scheme is commissioned 01.03.2009 and physically completed. The total
irrigation potential created under this project since inception to the end of Mar 2009 is 10000
acres (4049 ha.) as against the contemplated potential of 10000 acres (4049 ha.).
During 2013-14, a grant of Rs.2.09 Crores has been allocated. Upto end of March-2014
an expenditure of Rs.2.16 Crores is incurred. The cumulative expenditure incurred since
inception upto end of March -2014 is Rs73.34 Crores.
209
The project envisages to lift 50 Cusecs of water from Right Bank of Kabini River
near Tayur Village in Nanjangudu Taluk of Mysore District. Administrative approval has
been accorded to the Original estimate amounting to Rs.16.25 Crores. vide G.O. No.ID
272/MMK/97 dtd: 2.02.2001. The work was started during July 2006.
The ultimate potential to be created is 4384 acres (1774 ha.). The taluks benefited by
this project are T.Narasipura of Mysore District and Chamarajanagara of Chamarajanagara
District.
The scheme is physically completed. The total irrigation potential created under this
project since inception to the end of Mar 2009 is 4384 acres (1774 ha.) as against the
contemplated potential of 4384 acres (1774 ha.).
During 2013-14, a grant of Rs.1.53 Crores has been allocated. Upto end of March-2014
an expenditure of Rs.1.86 Crores is incurred. The cumulative expenditure incurred since
inception upto end of March-2014 is Rs.22.00 Crores.
FLOW: Y- alignment The total length of Y alignment is 5.50 Km. Earth work and CD
works completed. 2.80 Km lining works are completed.Balance lining is to be done.
Tumkur Branch Canal (0-240 Km): The total Length of Tumkur Branch Canal is 240 Km
and the potential to be created is 236990 acres (95909 Ha). Out of this, the canal alignment
has been approved upto 228 Km The earth work excavation, CD works & lining work are
almost completed upto 214.00 km The works of the canal from 215.00 to 228.00 Km are in
various stages of progress. The water has been allowed in the canal up to 187 Km. The
balance length from 229 to 240.00 Km is treated as tail end distributory No.31. The tender is
in process.
44 Distributaries are coming under TBC. Out of this, the earth work excavation and CD
works for 42 distributaries are almost completed. The lining works are in different stages of
progress. Action has been taken up to implement the works of remaining tail end 2
distributaries (dy no 30 & 31).It is proposed to complete the works during 2014-15.
NAGAMANGALA BRANCH CANAL (0 TO 78.325 Km): The total Length of
Nagamangala Branch Canal is 78.325 Km and the potential to be created is 146994 acres
(59488 ha). The earth work excavation and CD works of the main canal are almost
completed. The lining works of main canal upto75 Km is completed. The lining works in
remaining Kms from 76 to 78 are in various stages of progress. The water has been allowed
in the canal upto 72 Km.
22 Distributaries are coming under NBC. Out of this, the works of distributary from 1
to 20 are completed except lining work. The works of remaining 2 distributaries are in
various stages of progress.
LIFT IRRIGATION SCHEME AT EXIT OF BAGUR – NAVILE TUNNEL:
It is proposed to lift 0.29/0.345 TMC of water to create a potential of 5828 acres
(2358 ha.) from Y- alignment canal at exit of Bagur- Navile tunnel near Navile village in
C.R. Patna Taluk of Hassan District. The Taluks benefited are Tiptur of Tumkur district and
C.R. Patna of Hassan District. The work of raising main, distribution chamber and jack well
cum pump house are completed and this scheme has been commissioned during February –
2004.
The total length of LBC is 13.97 Km and the works for the entire length is completed.
The total length of RBC is 16.25 Km. Out of this, the works of the canal up to 9.00 Km are
completed and the works of the canal from Km.10.00 to 16.25 are in progress.
The irrigation potential created during 2013-14 is 2,723 Ha. The total irrigation
potential created including flow and lift under this project since inception to the end of
March 2014 is 3,01,114 acres (1,21,859 ha.) as against the contemplated potential of
3,89,812 acres (1,57,755 ha.). The project is proposed for completion during 2014-15.
During 2013-14, a grant of Rs.86.00 Crores has been allocated. Upto end of March-
2014 an expenditure of Rs.74.19 Crores is incurred. The cumulative expenditure incurred
since inception upto end of March-2014 is Rs.1551.17 Crores.
211
13.3 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER,
HEMAVATHY CANAL ZONE, TUMKUR.
The project envisages the construction of a composite dam across Hemavathy River
near Gorur village in Hassan taluk of Hassan District. Administrative approval has been
accorded to the original estimate of Hemavathy project amounting to Rs.16.30 Crores vide
G.O. No.PWD/1/GKH/63 Dated: 18.09.1967. The work was started during 1967.
Administrative approval has been accorded to the revised estimate amounting to Rs.3877.00
Crores vide G.O. No.WRD/46/NHP/2007 Dated: 30.07.2007. This amount comprises of
Rs.1751.00 Crores towards Hemavathy Project Zone, Gorur and Rs. 2126.00 Crores towards
Hemavathy Canal Zone, Tumkur.
The planned utilization from this project is 56.67 TMC The ultimate potential to be
created under this project are 310943 acres (125837 ha.) which comprises of 271000 acres
(109672 ha.) under flow and 39743 acres (16165 ha.) under lift. The taluks benefited by this
project are Hassan, Alur, Arkalagud, Holenarsipura, Channarayapatna of Hassan District:
Mandya, K.R.Pet, Pandavapura, Nagamangala of Mandya District: K.R.Nagara of Mysore
District and Somwarapete of Kodagu District.
The Dam and allied works are completed.
The Details of Canals coming under this project are as below.
Atchkat in Acres
Sl. No. Name of the Canal Length
(Hectares)
1 Hemavathy Left Bank Canal 214 Km. 195000 (78,915)
2 Hemavathy Right Bank Canal 91 Km (Full length) 20000 (8,094)
3 Hemavathy Right Bank High Level Canal 106 Km (Full length) 56000 (22,663)
Sub-Total 2,71,000 (1,09,672)
4 LIS Schemes - 39,943 (16,179)
Total - 3,10,943 (1,25,837)
212
PRESENT STAGE:-
Out of 214 Km of Left Bank Canal, Earthwork excavation & C.D. works upto 212 Km
are completed. Works of all 72 distributaries are completed. Balance lining works are in
progress.
Out of 91 Km of Right Bank Canal, Earthwork excavation & C.D. works upto 91 km
are completed. Works of all 57 distributaries are completed Balance lining works are in
progress.
Out of 96.70 Km of Right Bank High level Canal, the earthwork excavation, C.D.
works and distributaries to a length 96.00 km are completed. Lining works for bed and sides
upto a length of 80 km are completed. Works of all 41 distributaries are completed Balance
lining works are in progress.
Out of the 14 LIS, 8 Lift Irrigation Schemes are completed. They are Ganjigere,
Ramenahalli, Mudigere, Marve, Adikebommanahalli, Kattepura, Hallimysore and Bagur
Navile approach. LIS at the exit of Bagur-Navile tunnel has been taken up under Hemavathy
Canal Zone-Tumkur and commissioned. Except Kendinne, Maniganahalli and
Janardhanahalli LIS, the works of Kyatanahalli and Hosapatna LIS are in different stages of
progress.
The total irrigation potential created to the end of March 2014 is 3,11,714 acres
(1,26,149 ha.) from flow and lift as against the contemplated potential of 3,10,943 acres
(1,25,837 ha.). The project is proposed for completion during 2014-15.
During 2013-14, a grant of Rs.49.56 has been allocated. for taking up the works of
Hemavathy Project under Hemavathy Canal Zone. Upto end of March-2014 an expenditure
of Rs.72.66 )is incurred. The cumulative expenditure incurred since inception upto end of
March-2014 is Rs1814.97.
Aqueduct
Aqueduct
Agile tunnel
The project envisages the construction of a composite dam across Yagachi River a
tributary of Hemavathy near Chikkabyadagere village in Belur Taluk of Hassan District.
Administrative approval has been accorded to the Original estimate amounting to Rs.35.38
Crores vide G.O.No.PWD/91/NHP/83, Dated: 27.06.1984. The work was started during
1984-85. Administrative approval has been accorded to the revised estimate amounting to
Rs.440.00 Crores vide G.O. No.WRD/40/NHP/2007 Dated: 30.07.2007.
213
The planned utilisation from this project is 5.74 TMC to create an ultimate potential
of 37000 acres (14973 ha.).
Kyatanahalli LIS it is proposed to lift 0.464 TMC of water from Yagachi Left Bank Canal
at Ch 33.133 Km in two stages to provide irrigation facilities to 5685 acres (2301 ha.) in
Hassan taluk. This total atchkat comprises of 1920 acres (777 Ha.) from 1st stage and 3765
acres (1524 Ha.) from 2nd stage.
1st Stage: Head works, jackwell and pump house works completed. Electro mechanical,
rising main and allied works are also completed. The work of providing power
supply line is completed. The works of the main canal of length 2.20 Km is
completed and distributary network is in progress.
2nd Stage: Administrative approval has been accorded for an estimate comprising of
sumpwell, pump house, rising main, cistern, machineries, electrification and
earth work excavation, CD works for the canal from 0.00 to 6.235 Km
amounting to Rs.8.30 Crores.
The irrigation potential created during 2013-14 is 750 Ha. The irrigation potential
created under this project since inception to the end of March-2014 is 31,251 acres (12,647
Ha) as against the total contemplated potential of 42,685 acres (17,274 Ha).The project is
proposed for completion during 2014-15
During 2013-14 a grant of Rs.39.39 Crores has been allocated. Upto end of March-
2014 and expenditure of Rs.15.98 Crores is incurred. The cumulative expenditure incurred
since inception up to end of March-2014 is Rs.448.85 Crores.
214
13.3.3. HUCHANAKOPPALU LIS
The project envisages to lift 0.936 TMC of water in II stages from Hemavathy River
near Huchanakoppalu Village in Holenarasipura taluk of Hassan District. Administrative
approval has been accorded to the Original estimate amounting to Rs.6.90 Crores vide G.O.
No.LIS/86 dtd: 14.07.1986. The work was started during 1985-86. Administrative approval
has been accorded to the revised estimate amounting to Rs.50.00 Crores vide G.O.
No.WRD/38/NHP/2007 dtd: 30.07.2007.
The ultimate potential to be created is 8305 acres (3361 ha.) which comprises of 3785
acres (1532 ha.) from 1st stage and 4520 acres (1829 ha.) from IInd stage. The taluks
benefited by this project are Holenarasipura and Arkalgudu taluk of Hassan District.
The works of Stage I are completed and commissioned.
Stage-II - The Canal works and head works are completed. The balance canal works
are nearing completion
The total irrigation potential created to the end March 2014 since inception is
8305acres (3361 ha.) as against the contemplated potential of 8305 acres (3361 ha.)
During 2013-14 a grant of Rs.2.50 Crores has been allocated. Upto end of March-
2014 and expenditure of Rs.1.89 Crores is incurred. The cumulative expenditure incurred
since inception up to end of March-2014 is Rs.56.44Crores.
The project envisages to lift 0.73 TMC of water in III stages from Hemavathy River
near Kachenahalli Village in Channarayapatna taluk of Hassan District. Administrative
approval has been accorded to the Original estimate amounting to Rs.8.90 Crores vide G.O.
No.PWD/1/NHP/92 dtd:27.12.1991. The work was started during 1991. Administrative
approval has been accorded to the revised estimate amounting to Rs.68.30 Crores vide
G.O.No.WRD /35/NHP/99, dated 19.10.2002. Further, Administrative approval has been
accorded to the Re-revised estimate amounting to Rs.165.00 Crores vide G.O.
No.WRD/37/NHP/2007 dtd: 30.07.2007. Approval accorded with a condition to complete I
& II stage LI Schemes on priority and to take up III stage LIS depending on the availability
of water.
The ultimate potential to be created is 12600 acres (5100 ha.) which comprises of
1390 acres (563 ha.) from I stage, 6610 acres (2675 ha.) from IInd stage and 4600 acres
(1862 ha.) from III stage respectively. The taluks benefited by this project are
Holenarasipura, Hassan, Arasikere and Channarayapatna of Hassan District. The details of
the Canal system are as under.
Sl. Length of Atchkat in acres
Stage Name of the Canal
No Canal in Km. (ha.)
1 1st Stage Samudravalli Main Canal 1.875 1390 (563)
2 2nd Stage Dandiganahalli Branch Canal 22.50 5385 (2179)
Bijamaranahalli Branch Canal 8.00 1225 (496)
rd
3 3 Stage Gandsi Branch Canal 32.00 4600 (1862)
Total 12600 (5100)
In stage I the head works and Earth Work Excavation of Samudravalli Main Canal is
partially completed. Head works, Intake canal, pump & jack well cum pump house works are
completed. Rising main and Electro-mechanical works are in progress. The works of
distributaries are also in progress.
In stage II, Rising main and Electro-mechanical works are in progress. Earth work
excavation for Dandiganahalli and Bijamaranahalli branch canals are completed.
The irrigation potential created during 2013-14 is 750 Ha. The total irrigation potential
created to the end of March 2014 since inception is 2654 acres (1074 ha.) from 1st stage and
2nd stage as against the total contemplated potential of 12,600 Acres (5100 Ha.). The project
is proposed for completion during 2014-15.
During 2013-14, a grant of Rs.15.60 Crores has been allocated. Up to end of
March-2014 an expenditure of Rs.4.90 Crores is incurred. The cumulative expenditure
incurred since inception up to end of March -2014 is Rs.64.43 Crores.
216
administrative approval has been accorded to the Re-revised estimate amounting to Rs.59.75
Crores vide G.O. No.WRD/47/NHP/2007 dtd: 30.07.2007.
The planned utilization from this project is 2.40 TMC to create an ultimate potential of
18500 acres (7487 ha.). The details of Canals coming under this project are as below.
Atchkat
Sl. Length in
Name of the Canal in Acres
No. Km
(Hectares)
1 Left Bank Canal 10 500 (202)
2 Right Branch Canal 45 10582 (4283)
3 Nakalgud Branch Canal 15 7418 (3002)
Total 18500 (7487)
The taluks benefited by this project are Belur and Alur of Hassan District. The Dam
and allied works are completed. The Canal works are also completed.
The total irrigation potential created under this project since inception to the end of
March 2009 is 18500 acres (7487 ha.). This project is physically completed.
During 2013-14, a grant of Rs.0.97 Crores has been allocated. Upto end of March-2014
an expenditure of Rs.0.92 Crores is incurred. The cumulative expenditure incurred since
inception up to end of March-2014 is Rs.64.57 Crores.
217
DRINKING WATER SCHEMES
Drinking water scheme to Honnavalli and other Hoblies envisages lifting of 27.03 cusecs
of water for Tiptur branch and 31.25 cusecs of water for Arasikere Branch independently
from Tumkur Branch Canal of Hemavathy project at Ch: 9.9 km. From Tiptur Branch it is
proposed to feed water to 18 no of tanks which are coming in series and 48 villages of Tiptur
taluk are benefited. Whereas from Arasikere branch it is proposed to feed water to 5 tanks
which are coming in series i.e., 3 tanks of Arasikere taluk, one tank of Kadur taluk and one
tank of Hosadurga taluk and 38 villages i.e., 20 villages of Arasikere taluk, 8 villages of
Kadur Taluk and 10 villages of Hosadurga Taluk are benefited. The Government vide order
No. WRD 26 NHP 2008, Bangalore, Dtd: 11.02.2009 has accorded administrative approval
to the scheme amounting to Rs.87.20 Crores. . The water is allowed to 24 tanks through
Tiptur and Arasikere Branches on trial run. The project is completed.
During 2013-14, a grant of Rs. 5.00 Crores has been allocated. Upto end of March-
2014 an expenditure of Rs.0.89Crores is incurred. The cumulative expenditure incurred since
inception upto end of March-2014 is Rs.76.43 Crores.
The scheme envisages lifting of 0.6 TMC of water in 3 stages from Kabini River near
Alambur village to fill 20 tanks of Harve, Haradanahalli and Kasabahoblis of
Chamarajanagar Taluk, Kavalandehobli of Nanjangud Taluk and adjacent Hoblies of
Gundlupet taluk to provide drinking water supply to drought affected areas and to improve
ground water table. The Government vide order No. WRD 10 MMK 2009, Bangalore, Dtd:
15.04.2011 has accorded administrative approval to the scheme amounting to Rs.212.00
Crores. The works of 3 stages of this scheme are in progress.The scheme is proposed for
completion during 2014-15
During 2013-14, a grant of Rs.70.00 Crores has been allocated. Up to end of March-
2014 an expenditure of Rs.93.23 Crores is incurred. The cumulative expenditure incurred
since inception upto end of March-2014 is Rs.213.88 Crores.
1
FILLING UP OF KANVA AND OTHER 17 TANKS - DRINKING WATER
SCHEME:
The villages of Channapatna Taluk of Ramanagar District are drought prone areas
and under ground water level had gone down sufficiently and created problem for even
drinking water to villagers. In order to overcome this it is proposed to lift 0.903 TMC of
water from Iggalur barrage to fill Kanva Reservoir and other 17 tanks so as to provide
drinking water supply and to raise the underground water level. The Government vide order
No. WRD 38MMK 2012, Bangalore, Dtd: 10.05.2012 has accorded administrative approval
to the scheme amounting to Rs.198.00 Crores. The works are in progress. The project is
proposed for completion during 2014-15
During 2013-14, a grant of Rs. 47.00 Crores has been allocated. Upto end of March-
2014 an expenditure of Rs.115.38 Crores is incurred. The cumulative expenditure incurred
since inception upto end of March-2014 is Rs. 115.55 Crores.
The scheme envisages inter linking of Vajranakatte, C.Kattigenahalli &Koppa tanks and
feeding 21 Mcft of water to these tanks from Ch: 14600 m. of D-23 of Tumkur Branch
Canal. The Government vide order No. WRD 71 NHP 2009, Bangalore, Dtd: 13.06.2011 has
accorded administrative approval to the scheme amounting to Rs.2.20 Crores.The works of
the scheme are in progress. The scheme is proposed for completion during 2014-15
During 2013-14, a grant of Rs. 1.00 Crore has been allocated No expenditure is incurred
upto end of March-2014. The cumulative expenditure incurred since inception upto end of
March-2014 is Rs. 0.22 Crores.
The scheme envisages lifting of 7.50 Mcft of water from Ch: 106.80 Km of Tumkur
Branch Canal to feed Bellavi and other 5 tanks to provide drinking water supply to Bellavi
and other 5 surrounding villages of Gubbi Taluk ofTumkur District. The Government vide
order No. WRD 79 NHP 2010, Bangalore, Dtd: 19.03.2012 has accorded administrative
approval to the scheme amounting to Rs.5.70 Crores. The works of the scheme are in
progress. The scheme is proposed for completion during 2014-15
During 2013-14, a grant of Rs. 4.00 Crores has been allocated. Upto end of March-
2014 an expenditure of Rs.1.89 Crores is incurred. The cumulative expenditure incurred
since inception upto end of March-2014 is Rs. 1.95 Crores.
The scheme envisages lifting of 0.80 TMC of water from Tumkur Branch Canal of
Hemavathy project to fill 26 tanks comprising filling of 22 tanks through gravity and 4 tanks
through lift to provide drinking water supply to drought affected villages of
Chikkanayakanhalli taluk. The Government vide order No. WRD 74 NHP 2009, Bangalore,
Dtd: 20.07.2011 has accorded administrative approval to the line estimate of the scheme
amounting to Rs.102.60 Crores. The works of the scheme are in progress. The scheme
proposed for completion during 2014-15.
2
During 2013-14, a grant of Rs.35.00 Crores has been allocated. Up to end of March-
2014 an expenditure of Rs.18.93Crores is incurred. The cumulative expenditure incurred
since inception up to end of March-2014 is Rs.19.47Crores.
The scheme envisages lifting of 18.20 Mcft of water from Ch: 64.625 Km of Tumkur
Branch Canal of Hemavathy project to fill Doddaguni tank in order to provide drinking water
supply to Doddaguni and other 14 villages in Gubbi Taluk of Tumkur District. The
Government vide order No. WRD 53 NHP 2008, Bangalore, Dtd: 13.06.2011 has accorded
administrative approval to the scheme amounting to Rs.3.25 Crores. The works of the
scheme are in progress. The scheme proposed for completion during 2013-14.
During 2013-14, a grant of Rs.0.80 Crores has been allocated. Up to end of March-
2014 an expenditure of Rs.0.98 Crores is incurred. The cumulative expenditure incurred
since inception up to end of March-2014 is Rs.3.88 Crores.
The scheme envisages lifting of 0.22 TMC of water from Yagachi Left Bank Canal to
fill 24 tanks of Halebeedu Hobli and 15 tanks of Madihallihobli under Belur Taluk to provide
drinking water supply. The Government vide order No. WRD 43 NHP 2010, Bangalore, Dtd:
05.07.2011 has accorded administrative approval to the scheme amounting to Rs.9.00 Crores.
The works of the scheme are in progress. The scheme is proposed for completion during
2014-15
During 2013-14, a grant of Rs.8.00 Crores has been allocated. Up to end of March-
2014 an expenditure of Rs.5.05 Crores is incurred. The cumulative expenditure incurred
since inception up to end of March-2014 is Rs.6.44 Crores.
The scheme envisages lifting of 171.00 Mcft of water from Bagur Navile approach
tunnel of Hemavathy Project to fill 11 tanks and to provide drinking water supply to 15
surrounding villages of Nuggehallihobli of Channarayapatna Taluk. The Government vide
order No. WRD 54 NHP 2011, Bangalore, Dtd: 19.03.2012 has accorded administrative
approval to the scheme amounting to Rs.17.60 Crores. The works of the scheme are in
progress. The scheme is proposed for completion during 2014-15.
During 2013-14, a grant of Rs. 8.00 Crores has been allocated. Up to end of March-
2014 an expenditure of Rs.1.28 Crores is incurred. The cumulative expenditure incurred
since inception up to end of March-2014 is Rs. 1.29 Crores.
3
Bangalore, Dtd: 28.02.2014 has accorded administrative approval to the scheme amounting
to Rs.12.50Crores. The scheme is proposed for completion during 2014-15.
The scheme envisages lifting of 106.04 Mcft of water from Ch: 69.55 Km of Tumkur
Branch Canal of Hemavathy project to fill19 tanks to meet the Drinking water needs of 30
villages surrounding Bikkegudda of Kadaba&Kasabahoblies in Gubbi Taluk of Tumkur
District. The Government vide order No.WRD 37 NHP 2013, Bangalore, Dated: 28.02.2014
has accorded administrative approval to the scheme amounting to Rs.28.16Crores. The
scheme is proposed for completion during 2014-15.
The scheme envisages lifting of 37.154 Mcft of water from Ch: 83.34 Km of Tumkur
Branch Canal of Hemavathy project to fill Hagalawadi tank to meet the Drinking water
needs of Hagalavadi and surrounding 35 villages in Gubbi Taluk of Tumkur District. The
Government vide order No. WRD 193 NHP 2013, Bangalore, Dated: 28.02.2014 has
accorded administrative approval to the scheme amounting to Rs.11.75Crores. The scheme is
proposed for completion during 2014-15.
The scheme envisages lifting of 26.48 Mcft of water from Ch: 101.380 Km of
Tumkur Branch Canal of Hemavathy project to fill Chelur tank to meet the Drinking water
needs of 21 villages in Gubbi Taluk of Tumkur District. The Government vide order
No.WRD 190 NHP 2013, Bangalore, Dated: 28.02.2014 has accorded administrative
approval to the scheme amounting to Rs.3.35 Crores. The scheme is proposed for completion
during 2014-15.
The scheme envisages lifting of 7.00 Mcft of water from Ch: 98.95 Km of Tumkur
Branch Canal of Hemavathy project to fill Kodiyala tank to meet the drinking water needs of
Kodiyala and Mugununse villages in Gubbi Taluk of Tumkur District. The Government vide
order No.WRD 191 NHP 2013, Bangalore, Dated: 28.02.2014 has accorded administrative
approval to the scheme amounting to Rs.2.90 Crores. The scheme is proposed for completion
during 2014-15.
The scheme envisages lifting of 9.457 Mcft of water from Ch: 93.850 Km of Tumkur
Branch Canal of Hemavathy project to fill Mathikere, Hosahalli and Shivanehalli tanks to
meet the drinking water needs of 6 villages in Gubbi Taluk of Tumkur District. The
Government vide order No.WRD 192 NHP 2013, Bangalore, Dated: 28.02.2014 has
4
accorded administrative approval to the scheme amounting to Rs.5.31 Crores. The scheme is
proposed for completion during 2014-15.
The scheme envisages lifting of 38.68 Mcft of water from Ch: 88.35 Km of Tumkur
Branch Canal of Hemavathy project to fill Hosakere, Alilugatta and Alilugatta Amanikere
tanks to meet the drinking water needs of 16 villages in Gubbi Taluk of Tumkur District.
The Government vide order No.WRD189 NHP 2013, Bangalore, Dated: 28.02.2014 has
accorded administrative approval to the scheme amounting to Rs.8.20 Crores. The scheme is
proposed for completion during 2014-15.
5
FILLING UP OF 12 TANKS OF NANJANAGUD AND GUNDLUPET TALUKS-
DRINKING WATER SCHEME:
The scheme envisages lifting of 95.00Mcft of water from kabini river near
Gandhigrama to fill 12 tanks to meet the drinking water needs of 30 villages of Nanjanagud
Taluk of Mysore District and Gundlupet Taluk of Chamarajanagara District. The
Government vide order No.WRD 171 MMK 2013, Bangalore, Dated: 29.01.2014 has
accorded administrative approval to the scheme amounting to Rs.67.50 Crores. The scheme
is proposed for completion during 2014-15.
The scheme envisages lifting of 87.10 Mcft of water from Hemavathy river near
Ganganalu to fill 88 tanks to meet the drinking water needs of Hebbale, Ganganalu
Ganjalagudu and surrounding 42 villages of Arakalagud Taluk of Hasana District. The
Government vide order No.WRD 40 NHP 2013, Bangalore, Dated: 04.03.2014 has accorded
administrative approval to the scheme amounting to Rs.28.00 Crores. The scheme is
proposed for completion during 2014-15.
6
MODERNIZATION OF KRISHNARAJA (KATTEPURA) ANECUT AND ITS
CANALS:
Krishnaraja anecut is the first anecut constructed across river Cauvery during 1732
near Kattepura village of Arakalgud taluk of Mysore district. This area lies in upper Cauvery
basin. This anecut has 2 canals namely Kattepura Left Bank Canal for a length of 40.20 Km
with an atchkat of 949 Ha. in Arakalgud taluk of Hassan district and Right Bank Canal for a
length of 83.60 Km with an atchkat of 2600 Ha in Arakalgud taluk of Hassan district and
K.R. Nagar taluk of Mysore district. There is a suffering atchkat of 944 Ha. The Government
vide order No. WRD 63 NHP 2009 Bangalore Dtd: 08.02.2010 has accorded administrative
approval to the DPR for the modernization of Krishnaraja (Kattepura) anecut and its canals
amounting to Rs.90.00 crores. The works of modernisation of Kattepura Anecut & its Canals
are in progress and proposed for completion during 2014-15
During 2013-14, a grant of Rs.25.00 Crores has been allocated. Up to end of March-
2014 an expenditure of Rs.27.23 Crores is incurred. The cumulative expenditure incurred
since inception up to end of March-2014 is Rs.108.80 Crores.
Mirle Anecut is constructed across river Cauvery during 1850 near Chunchanakatte
village in K.R Nagar Taluk of Mysore District. This area lies in upper Cauvery basin. This
anecut is having a Left Bank Canal for an length of 10.60 Km. which is named as Attikatte
Canal. With an atchkat of 1942 Ha. in K.R Nagar Taluk of Mysore District. This canal has a
branch canal of length 3.5 Km. which is named as KakanaKaluve and 4 seepage canals for a
length of 55 Km. There is a suffering atchkat of 40 Ha.
Ramasamudra Anecut is constructed across river Cauvery during 1850 near
Chunchanakatte village in K.R Nagar Taluk of Mysore District. This area lies in upper
Cauvery basin. This anecut is having a Right Bank Canal for a length of 59.20 Km with an
atchkat of 2761 Ha. in K.R Nagar Taluk, Mysore District. There is a suffering atchkat of 70
Ha. The Government vide order No. WRD 77, MMK 2009, Bangalore, Dtd: 05-11-2011 has
accorded administrative approval to to the DPR for the modernization of Mirle and
Ramasamudra Anecut and Anecut Canals amounting to Rs.64.00 Crores. The modernisation
works are in progress and proposed for completion during 3014-15
During 2013-14, a grant of Rs.30.00 Crores has been allocated. Up to end of March-
2014 an expenditure of Rs.38.95 Crores is incurred. The cumulative expenditure incurred
since inception up to end of March-2014 is Rs.49.08 Crores.
7
Chamaraja anecut and its canals amounting to Rs.132.00 Crores. The modernisation works
are in progress and proposed for completion during 2014-15.
During 2013-14, a grant of Rs.70.00 Crores has been allocated. Up to end of March-
2014 an expenditure of Rs.90.06 Crores is incurred. The cumulative expenditure incurred
since inception up to end of March-2014 is Rs.132.43 Crores.
MODERNISATION OF MADHAVAMANTRI ANECUT AND ANECUT CANALS:
Madhavamantri anecut is constructed across river Cauvery during 1140 near
Talakadu village in T.Narasipura Taluk of Mysore District. This area lies in lower Cauvery
basin. This anecut is having a Left Bank Canal for a length of 29.10 Km with an atchkat of
766 Ha comprising of 1590 Ha in T.Narasipura Taluk of Mysore District and 766 Ha. in
Malavalli Taluk of Mandya District. There is a suffering atchkat of 550 Ha. The Government
vide order No. WRD 53 MMK 2011, Bangalore, Dtd: 18.10.2011 has accorded
administrative approval to the DPR for the modernization of Madhavamantri Anecut and
Anecut Canals amounting to Rs.19.00 Crores. The modernisation works are in progress and
proposed for completion during 2014-15.
During 2013-14, a grant of Rs.12.00 Crores has been allocated. Up to end of March-
2014 an expenditure of Rs.20.43 Crores is incurred. The cumulative expenditure incurred
since inception up to end of March-2014 is Rs.21.86 Crores.
Devaraya Anecut is constructed across River Cauvery during 17th Century near
Majjigere village in Srirangapatna Taluk of Mandya District. This area lies in lower Cauvery
basin. This anecut is having a Right Bank Canal for a length of 36.30 Km with an atchkat of
1427 Ha in Srirangapatna Taluk of Mandya District and Mysore Taluk of Mysore District.
There is a suffering atchkat of 290 Ha. The Government vide order No. WRD 51 MMK
2011, Bangalore, Dtd: 18.10.2011 has accorded administrative approval to the DPR for the
modernization of Devaray Anecut and Anecut Canals amounting to Rs.21.00 Crores. The
modernisation works are in progress and proposed for completion during 2014-15.
During 2013-14, a grant of Rs. 9.16 Crores has been allocated. Up to end of March-
2014 an expenditure of Rs.4.50 Crores is incurred. The cumulative expenditure incurred
since inception up to end of March-2014 is Rs.4.52 Crores.
8
MODERNISATION OF VIRIJA ANECUT AND ANECUT CANALS:
Virija anecut is constructed during 17th century across right side branch near balamuri
kshetra of belagola village river Cauvery near Belagola village in Srirangapattana Taluk of
Mandya District. This area lies in Middle Cauvery basin. This anecut has only right bank
canal for a length of 93.60 Km with an atchkat of 5360 Ha coming under T.Narsipura and
Mysore Taluks of Mysore District. There is a suffering atchkat of 356.50 Ha. The
Government vide order No. WRD 35 MMK 2013, Bangalore, Dtd: 19.02.2014 has accorded
administrative approval to the DPR for the modernization of Madhavamantri Anecut and
Anecut Canals amounting to Rs.83.00 Crores. The Action has been taken up to implement
the modernisation works and proposed for completion during 2014-15.
During 2013-14, a grant of Rs.30.00 Crores has been allocated. No expenditure
incurred up to end of March-2014.
MODERNISATION OF RAJAPARMAESHWARI ANECUT AND ANECUT
CANALS:
Rajaparmaeshwari anecut is constructed across river Cauvery during the year 1888
near Mahadevapura village in Srirangapattana Taluk of Mandya District. This area lies in
Middle Cauvery basin. This anecut has only right bank canal for a length of 37.60 Km with
an atchkat of 2219.00Ha comprising of Srirangapattana Taluk of Mandya District and
T.Narsipura , Mysore Taluks of Mysore District. The Government vide order No. WRD 41
MMK 2013, Bangalore, Dtd: 20.09.2013 has accorded administrative approval to the DPR
for the modernization of Rajaparmaeshwari Anecut and Anecut Canals amounting to
Rs.26.50 Crores. The Action has been taken up to implement the modernisation works and
proposed for completion during 2014-15.
During 2013-14, a grant of Rs.9.78 Crores has been allocated. Up to end of March-
2014 an expenditure of Rs.0.03 Crores incurred.
9
19.02.2014 has accorded administrative approval to the DPR for the improvements to
Ramapura canal from Ch:0.00 to 53.410 km coming under left bank of hullahalli anecut.
Hullalli anecut amounting to Rs.43.50 Crores. The Action has been taken up to implement
the modernisation works and proposed for completion during 2014-15.
The length of the main canal, branch canals, sub branch canals and distributary canals
of Vishweshwaraiah canal network is 1523.30 Km. excluding the works taken up under
modernisation earlier in the main canal and selected branch canals and lining works taken up
in vulnerable reaches totalling to 522.50 Km. It is proposed to take up the improvements to
Vishweshwaraiah canal networks for an approximate length of 1000.80 Km. Out of this, a
length of 452.00 Km is identified on priority to take up the improvement works. As such the
Government vide order No. WRD 68 MMK 2012, Bangalore, Dtd: 24.08.2012 has accorded
administrative approval to the DPR for the Improvements to Vishweshwaraiah canal network
amounting to Rs.330.00 Crores. These improvement works are taken up in 5 packages
comprising of 11 estimates. All the works of these 5 packages are in progress and proposed
for completion during 2014-15.
During 2013-14, a grant of Rs.125.00 Crores has been allocated. Up to end of March-
2014 an expenditure of Rs.111.20 Crores is incurred. The cumulative expenditure incurred
since inception up to end of March-2014 is Rs.111.70 Crores.
Arkavathy River is a part of Cauvery river. This river originatesin Nandi Hills and
after traversing a distance of around 190 Km join river Cauvery at confluence point in
Kanakapura Taluk. Hesaraghatta reservoir and after joining of Kumudwati river,
Tippagondanahalli reservoir have been constructed the provide drinking water supply to
Bangalore city. Since, the inflow to these reservoirs is meagre, water is being lifted from
Cauvery river for provide drinking water supply to Bangalore. In view of much pressure for
supplying of water to Bangalore,it is proposed to take up rejuvenation worksin Hesaraghatta,
Kumudwathi and Arkavathi catchment areas from the originating point of Arkavathy river to
Tippagondanahalli reservoir. The Government vide order No. WRD 23 MMK 2009,
Bangalore Dated: 19.10.2011 has accorded administrative approval to the estimate for
Rejuvenation of the Arkavathy River amounting to Rs.22.43 Crores. The works of this
project are in progress and proposed for completion during 2014-15.
During 2013-14, a grant of Rs.8.00 Crores has been allocated. Up to end of March-
2014 an expenditure of Rs.11.92 Crores is incurred. The cumulative expenditure incurred
since inception up to end of March-2014 is Rs.18.86 Crores.
10
COMMAND AREA DEVELOPMENT
PROGRAMME
11
COMMAND AREA DEVELOPMENT PROGRAMME
THE OBJECTIVES
Irrigation Management is a multi-disciplinary activity involving major
department like Irrigation, Agriculture, Cooperation and other organization
engaged in training and research activities. Against this perspective, CADA
was constituted in the year 1970 to work as a catalyst between the various
organizations to reduce the gap between irrigation potential created and
utilized, to increase production per unit of water and land, to reduce the
loss of irrigation water in the conveyance system, to improve its efficiency at
the farm level and to ensure equitable distribution of water. The objectives
of the CADA, as envisaged under section 10 of the Karnataka Command
Areas Development (K.C.A.D.) Act 1980, are listed below:
12
To ensure the efficient maintenance of Field channels and Field
Drains by the Farmers within the Command Area;
To borrow and lend money necessary for the due discharge of its
functions;
13
Irrigation Project Zone, Gulbarga
14
BRIEF DETAILS OF CADA
15
CADA DIRECTORATE WAS FORMED IN THE STATE TO HAVE BETTER
CO-ORDINATION AMONG EACH CADA’s AND STEPS TO INCREASE
EFFICIENCY IN WATER USERs CO-OPERATIVE SOCIETIES (WUCs) IN
THE COMMAND AREA OF MAJOR AND MEDIUM IRRIGATION ON
17.11.2012.
ANNEXURE-B
CADA
Dir
Headed
(IAS or En
16
CADA CADA CADA CADA C
M&GP Sub M&GP Sub M&GP M&GP Sub UK
Division -1 Division-1 Sub Division-2 Div
Division-2
(Engineerin (Agriculture (Agrucultur (En
TUNGABHADRA PROJECT, MUNIRABAD
CADA, Tungabhadra Project came into existence in the year 1974.
Eleven irrigation projects with a total planned potential of 464054Ha are
coming under the jurisdiction of this CADA.
17
Programme for the year 2014-15 is Rs.3793.00 lakhs.
18
The details of the Physical programme & Progress and Financial
Programme & progress for the year 2013-14 up to the end of 3/2013.
19
Approved Projects Fin 1074.00 1074.00 69.39 6
Phy:Ha 17900 17900 1156 6
7 Training
Approved Projects Fin 362.00 362.00 321.06 89
Phy:No 17268 17268 22495 130
Other than approved projects Fin 30.00 30.00 28.07 94
Phy:No 105.00 105.00 84.00 80
8 Farmers Participation
Approved Projects Fin 760.00 760.00 317.24 42
Phy:Ha 75414 75404 30723 41
Other than approved projects Fin 50.00 50.00 50.06 100
Phy:Ha 5000.00 5000.00 5006.00 100
9 Land Reclamation
Approved Projects Fin 9545.00 9545.00 953.66 10
Phy:Ha 52327.07 52327.07 3799.06 7
Other than approved projects Fin 39.00 39.00 85.71 220
Phy:Ha 97.50 97.50 214.00 219
20
BRIEF DETAILS OF CADA
During 2011-12, the budget allocation is `.21762.50 lakhs (under head 2705 ) &
400.00 lakhs (under head 4705 ) out of which total expenditure of `.2898.87 lakhs has been
incurred.
Programme for the year 2012-13 is `.191.12 crores.
21
During 2011-12, the budget allocation is `.14301.25 lakhs (under head 2705 ) &
800.00 lakhs (under head 4705 ) out of which total expenditure of `.877.84 lakhs has been
incurred. Programme for the year 2012-13 is `.126.94 crores.
CAUVERY BASIN PROJECTS, MYSORE
Command Area Development Authority, Cauvery basin projects,
Mysore, came into existence during 1974-75.
During 2011-12, the budget allocation is Rs.5464.81 lakhs (under
head 2705 ) & 2100.00 lakhs (under head 4705 ) out of which total
expenditure of Rs.2986.29 lakhs has been incurred.
Programme for the year 2012-13 is Rs.62.03 crores.
22
Financial and Physical Programme and Progress under CADA and
WALMI for the Year 2011-12
(Physical In Ha) (`.In Lakhs)
Revised
Sl. Annual Annual Cumulative
No CADA Unit Target Target Progress %
A) Central Sector Schemes
1 Direction & Administration
Approved projects
23
5 Adoptive Trials/ Demonstration
Fin 328.00 328 306.26 93
Approved projects Phy:No 7734.00 7734 7687 99
Fin 5.00 5 4.93 99
Other than approved
projects Phy:No 100.00 100 150 150
6 Correction of System deficiencies
7 Training
24
Special Development
Programme (4705) Fin 5001.00 5001 2524.86 50
KNNL Fin 4981.00 4981 534.19 11
KBJNL Fin 6000.00 6000 1991.51 33
CNNL Fin 2500.00 2500 1857.37 74
Grand Total
(2705+4705) Fin 76070.00 76070 21238.94 28
25